W9123620R0001 Amendment 5.pdf

PDF 1 MB Posted

Attached to
Battalion Complex (Amendment 8)
Solicitation number
W9123620R0001
Issued by

View the file

Other files

File Type Posted
W9123620R0001P0008 - Amendment 8.pdf PDF
18245_ - AREA T - POWER.pdf PDF
A.07.24 - W9123620R0001(Amendment 7).pdf PDF
W9123620R0001 Amendment 6.pdf PDF
719_BC-PH2_SF423.pdf PDF
719_BC-PH2_MP121.pdf PDF
719_BC -PH2-A-601.pdf PDF
719_BC-PH2_SF600(Amend5).pdf PDF
720_BC-PH3-S504.pdf PDF
719_BC-PH2_26 20 00.pdf PDF
719_BC-PH2_MP111.pdf PDF
719_BC_PH2_Sheet A-200.pdf PDF
719_BC_Sheet - I-003.pdf PDF
719_BC-PH2_SF505.pdf PDF
719_BC-PH2_MP122.pdf PDF
720_BC-PH3-CS103.pdf PDF
719_BC-PH2_MP116.pdf PDF
719_BC-PH2_SF422.pdf PDF
719_BC_Sheet - I-223.pdf PDF
05 12 00.pdf PDF
22 00 00.pdf PDF
720_BC-PH3-CU102.pdf PDF
719_BC_PH2_Sheet A-412.pdf PDF
720_BC-PH3-S215 (1).pdf PDF
719_BC_FFE_PH2_Amendment 5 sheets(Amend5).pdf PDF
719_BC-PH2_SF420.pdf PDF
719_BC-PH2 Sheet EP404.pdf PDF
26 51 00.pdf PDF
719_BC-PH2_SF425.pdf PDF
10 28 13.pdf PDF
23 65 00.pdf PDF
28 31 76.pdf PDF
719_BC_Sheet - I-008.pdf PDF
AMEND005-719_BC-PH2_FA001-FA126.pdf PDF
719_BC-PH2_03 30 00.00 10.pdf PDF
719_BC-PH2_10 21 13.pdf PDF
PH1 TWS TWR piping routing.pdf PDF
720_BC-PH3-SF600.pdf PDF
720_BC_PH3_EL119-EL123_EL502.pdf PDF
719_BC-PH2_FA001_FA111-FA114.pdf PDF
719_BC_Sheet - I-124.pdf PDF
719_BC -PH2-A- 603.pdf PDF
719_BC_PH2_Sheet A-411.pdf PDF
720_BC_PH3_FP001_FP140-FP143.pdf PDF
719_BC-PH2_SF421.pdf PDF
719_BC-PH2_SB106.pdf PDF
720_BC_PH3_A-605.pdf PDF
719_BC-PH2_MP113.pdf PDF
719_BC-PH2_11 46 01.06.pdf PDF
719_BC-PH2_S-001(Amend5).pdf PDF
Show 40 more

Latest 50 of 136 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W9123620R0001

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to complete the follow ing:

1. Revise the narrative in CLIN 0028 to match Attachment 7 BID Schedule (Rev. 1.0);

2. Incorporate the ProNet inquiries and answ ers into the solicitation;

3. Incorporate the remaining specifications/draw ings into the solicitation; and

4. Change Clause 52.217-7 to reflect no CLIN 0035.

All other terms and conditions remain unchanged.

(See Continuation page)

All other terms and conditions remain unchanged.

(see the Continuation page)

1. CONTRACT ID CODE PAGE OF PAGES

J 1 139

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 24-Apr-2020

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W9123620R0001

X 9B. DATED (SEE ITEM 11)

05-Mar-2020

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

24-Apr-2020

CODE

USA ENGINEER DISTRICT, NORFOLK

803 FRONT STREET

NORFOLK VA 23510

W91236 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)

The following have been added by full text:

AMENDMENT 0005

The purpose of this amendment is to complete the following:

1. Revise the narrative in CLIN 0028 to match Attachment 7 BID Schedule (Rev. 1.0);

2. Incorporate the ProNet inquiries and answers into the solicitation;

3. Incorporate the remaining specifications/drawings into the solicitation; and

4. Change Clause 52.217-7 to reflect no CLIN 0035.

All other terms and conditions remain unchanged.

PROJNET QUESTIONS AND ANSWERS

UNCLASSIFIED\\FOR OFFICIAL USE ONLY | AGENCY: USACE-ProjNet Bid Inquiry Technical Evaluators Report All

Inquiries Project: Battalion Complex - PHhase 3 Hangar Facility Review: Battalion Complex PH2- 3 Bidder Inquiries

Displaying 319 inquiries.

Id Discipline Sheet Detail Spec

8441144 General Section 00 21 00-

Instructions

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Please clarify that we are to only submit Volume I Factors I and II for the initial response. The remaining Volume I Factor 3 and Volume II Factor 4 will be submitted if selected to compete after the amendment is issued. Volume II information is not required in the initial submittal.

On: Mar 10 2020. .

1-1 Government Response. In the Solicitation, Instructions to Offerors, Section B. Overview of this Source Selection, there is language directing the submission of proposals in a bifurcated manner.

This language is included in error. The Offeror's proposal which consist of two volumes, (i.e., Volume I – Factors 1, 2, and 3, and Volume II – Factor 4), shall be submitted simultaneously.

There is no bifurcation of the Volumes or their factors for submission purposes. The misleading information within the solicitation will be removed in the next amendment. On: Mar 25 2020

Current Request Status: Request Closed

Information for this report is procurement sensitive.

8458126 General Specification Section

002100 Instructions

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Section 2.0 General Instructions, 2.5.2 requires submission of a hard copy of Volumes I and II with digital copies. In light of the current COVID-19 Pandemic, has the Army Corps considered receiving proposals for the above referenced project electronically in lieu of hard copies?

On: Mar 18 2020. .

1-2 Government Response. Proposal due date remains unchanged at this time. On: Mar 25 2020

Current Request Status: Request Closed

Information for this report is procurement sensitive.

8468052 Contracting Solicitation Pg. 30

5.2.2 Evaluation

Criteria

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

The recency criteria states for a project to be turned over "no longer" than ten years preceding the date of this Solicitation. Can a completed project where the CPARS reflects a completion date after the solicitation date but before the submission date be submitted and considered "recent"?

On: Mar 24 2020. .

1-1 Government Response. In accordance with the solicitation requirements, only those projects that meet the recency definition will be considered. Per the solicitation, recency will be assessed based on whether the performance record documentation clearly demonstrates that the project was completed and turned over no longer than ten (10) years preceding the date of this Solicitation.

On: Mar 25 2020

Current Request Status: Request Closed

Information for this report is procurement sensitive.

8470404 Contracting 011000 011000

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

In light of disruptions (materials and labor) that are occurring in the marketplace as a result of the novel Coronavirus (COVID-19) we respectfully request the government consider a 90-day postponement of the bid.

On: Mar 25 2020. .

1-1 Government Response. Proposal due date remains unchanged at this time. On: Mar 25 2020

Current Request Status: Request Closed

Information for this report is procurement sensitive.

8470405 Contracting 01100 01100

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

If the government will not consider a bid postponement will the government accept a contractor clarification to the bid as follows: "Due to the recent outbreak of COVID-19 and the unpredictable nature of pricing and performing in the current state of this pandemic, the Contractor's proposal does not include schedule or cost impacts caused by events outside of its control, including without limitation delays and cost escalation arising from pandemics, financial shocks, supply chain and/or travel disruptions caused by the COVID-19 outbreak. The Contract Time and Contract Sum will be adjusted for the impacts caused by events outside our control including those currently occurring and known due to the COVID-19 outbreak."

On: Mar 25 2020. .

1-1 Government Response. The Norfolk District understands the risks of operating in an uncertain future but also understands that all potential offerors are on common ground in that each is facing these challenges. The District remains optimistic it will receive robust competition for this important project, and that offerors will make appropriate business decisions to reflect these risks while providing competitive proposals. Offerors are encouraged to remain practical in the preparation of their proposals because in all likelihood many of the contingencies that might be under consideration, including potential impacts arising from our collective response to the COVID-19 pandemic, will not come to pass during the construction of this facility. Furthermore, the resulting contract will contain the standard FAR contract terms and conditions which will enable the successful offeror to seek a reasonable adjustment to the contract where appropriate under the circumstances. On: Mar 25 2020

Current Request Status: Request Closed

Information for this report is procurement sensitive.

8474934 General Section 00 21 00-

Instructions

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Page 22 of 88 in the RFP in addition to Page 2 of 20 in both Adendum 0001 and 0002 state the following: "In the bifurcated process, the initial solicitation will include plans and specifications that are substantially complete but undergoing final reviews by the government. Offerors responding to the initial solicitation will be required to submit proposals responsive to Factor 1 (Specialized Experience) and Factor 2 (Past Performance). At a future date, the Government will issue an amendment to only those Offerors that submitted timely proposals to the initial solicitation."

Bidder Inquiry ID # 8441144 response states "In the Solicitation, Instructions to Offerors, Section B. Overview of this Source Selection, there is language directing the submission of proposals in a bifurcated manner. This language is included in error. The Offeror's proposal which consist of two volumes, (i.e., Volume I – Factors 1, 2, and 3, and Volume II – Factor 4), shall be submitted simultaneously. There is no bifurcation of the Volumes or their factors for submission purposes. The misleading information within the solicitation will be removed in the next amendment."

Based on the information provided in the RFP, Adm 0001 and Adm 0002, it was anticipated no pricing would be required at this time.

We request a 90 day extension to allow appropriate amount of time to solicit pricing from the trade partner community as none has occurred at this time.

On: Mar 26 2020. .

1-1 Government Response. Amendment 0003 was (will be) issued to clarify proposal submission requirements and extend the proposal due date. On: Apr 02 2020

Current Request Status: Request Closed

Information for this report is procurement sensitive.

8478957 Electrical E731 262816

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

What is the withstand requirements for the automatic transfer and bypass isolation switches? Is it 100kA as on Phase 1?

On: Mar 29 2020. .

1-1 Government Response. Automatic Transfer Switches with BP/IS that are installed in the Generator Switchboard as indicated on Sheet E-731 are rated 100KAIC. On: Apr 08 2020

Current Request Status: Request Closed

Information for this report is procurement sensitive.

8479069 Electrical E-731 Phase2 262816

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Was ATS #3 supplied in phase 1 for the CEP-East? On: Mar 29 2020. .

1-1 Government Response. ATS-3 shall be provided under Phase 3 as per Power Note #5 on Sheet E-731. ATS-3 shall serve Panelboard HV41 located in the Fire Pump Building to be provided under Phase 3 as per Power Note 10 on Sheet E- 731. On: Apr 02 2020

Current Request Status: Request Closed

Information for this report is procurement sensitive.

8480192 Fire Protection/Life Safety

Section 33 16 15

Would the government accept a corrugated galvanized bolted steel tank for the fire tanks? Would the government accept a factory-coated bolted steel tank from foreign country?

On: Mar 30 2020. .

1-1 Government Response. Per the solicitation, all components must be in compliance with the drawings and specifications in the solicitation. If foreign products are utilized, they must meet the standards of FAR Clause 52.225-12 in the solicitation On: Apr 02 2020

Current Request Status: Request Closed

Information for this report is procurement sensitive.

8480555 Electrical

PHASE 2 EP701,

EP401, EP301

26 32 33.00 10

These drawings indicate Parallel 500KVA UPS systems, but if paralleled the total system can have only one Maintenance By-Pass Switch. If the intent is to parallel these UPS systems, the output would then feed to SBU- 1135 for supported loads. A parallel Tie board not shown on the plans would be required to get the paralleled operation to work. This would also incorporate a system MBP. Please clarify.

1-1 Government Response. The 500 KVA UPS units "UPS1-1135" and "UPS2- 1135" are in an N+1 configuration as per Power Note 4 on Sheet EP701. "UPS1- 1135" and "UPS2-1135" are not in a parallel configuration. On: Apr 08 2020

Current Request Status: Request Closed

Information for this report is procurement sensitive.

8480601 Electrical Phase 2 EP703 26 32 33.00 10

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

No Spec available for the Phase 2 EP703 external 225KVA PDU in Room 2223. The project's other PDUs are integral distribution section per UPS Spec 263233.0010. But we need PDU Spec for Phase 2.

1-1 Government Response. Specification Section 26 32 35 Power Distribution Units (PDU) will be issued in an Amendment. On: Apr 03 2020

Current Request Status: Request Closed

Information for this report is procurement sensitive.

8480672 Electrical

PHASE 2 EP721,

EP731

262300

Please clarify that Existing CEP-WEST & EAST Main Switchboards are actually UL-1558 Drawout Switchgear rather than UL-891 Switchboards, and new vertical sections are required.

And confirm that both Feeder breakers and Busway must be rated 100kaic to match the existing.

1-1 Government Response. 1. CEP-West Main Switchboard shall utilize Contract Specification Section 26 23 00 (Low Voltage Switchgear) as per Power Note 26 on Sheet E-122.

2. CEP-East Main Switchboard shall utilize Contract Specification Section 26 23 00 (Low Voltage Switchgear) as per Power Note 31 on Sheet E-132.

3. CEP-West Main Switchboard is rated UL 1558 as per paragraph 2.2 of Specification 26 23 00.

4. CEP-East Main Switchboard is rated UL 1558 as per paragraph 2.2 of Specification 26 23 00.

5. CEP-West Main Switchboard Circuit Breakers and Busway are rated 100KAIC as per E-721.

6. CEP-East Main Switchboard Circuit Breakers and Busway are rated 100KAIC as per E-731.

7. CEP-West Main Switchboard will require new vertical sections as per Contract Drawings.

8. CEP-East Main Switchboard will require new vertical sections as per Contract Drawings. On:

Apr 08 2020

Current Request Status: Request Closed

Information for this report is procurement sensitive.

8481035 Structural 00000 00000

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Please provide the structural .ifc file or Revit model file for this project if available. On: Mar 30 2020. .

1-1 Government Response. BIM files will be provided to the successful awardee upon request.

On: Apr 02 2020

Current Request Status: Request Closed

Information for this report is procurement sensitive.

8482899 General 01100 01100

We would like to request a 21-day extension to the bid due to the confusion of the RFP. Since the questions around the pricing submission have not been clarified officially, we would request the extension to ensure pricing is competitive for the Corps. If possible to expedite this response to ensure subcontractors have adequate time to bid.

On: Mar 31 2020. .

1-1 Government Response. Amendment 0003 will be posted (was posted) to extend the proposal submission date. On: Apr 02 2020

Current Request Status: Request Closed

Information for this report is procurement sensitive.

8483383 Electrical EP602

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

There are two apparent discrepancies related to UFGS 26 35 43 400 Hertz Frequency Converter and UFGS 26 35 44 270 VOLT DC Power Supply.

UFGS 26 35 43 400 Hertz Frequency Converter states the kva rating of the unit is to be as indicated in the drawings. Sheet EP602 shows this unit is to be rated at 90 KiloWatts (KW) but is being fed off the line by a 125 amp breaker. The 125 amp breaker is sufficient for a 90 KVA converter but not a 90 KW (112.5 KVA) converter.

Please confirm the intended KVA rating of the 400 Hertz Frequency Converter.

UFGS 26 35 44 is titled "270 VOLT DC SOLID STATE GROUND POWER UNIT" with a steady state rating of 267 amps. Drawing EP602 indicates the power supply is 28.5 Volts DC rather than 270 volts DC and indicates the 28.5 volt DC power supply is rated for 600 amps rather than 267 amps. Please confirm the required full load amps and the required output voltage of this power supply.

UFGS 26 35 44 270 VOLT DC SOLID STATE GROUND POWER UNIT specification is specifically developed for F-22 Raptor and F-35 Lightning Aircraft as a ground power unit. Most of the parameter included in this spec do not apply to other aircraft. Please provide a correct specification for 28 volt dc power supplies.

On: Mar 31 2020. .

1-1 Government Response. Amendment 4 will be (was posted) regarding specification 26 35 44 modification. Amendment 0004 will be (was posted) regarding clarification of 90kVA converter rating on riser diagram. On: Apr 20 2020

Information for this report is procurement sensitive.

8484613 General 01100 01100

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Please confirm the GCs will be given a Letter of Authorization to purchase FF&E items through the GSA schedule

On: Apr 01 2020. .

1-1 Government Response. No authorization letters will be issued at this time. On: Apr 09 2020

Information for this report is procurement sensitive.

8484803 General Specification Section

002100 Instructions

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Based on the Instruction to Offerers, this was to be a bifurcated process, with only Factor 1 and Factor 2 being submitted on April 16. Now, according to the responses to questions in ProjNet, this was an error and Factor 3 and Factor 4 are also to be provided on April 16. Given that an Amendment has not been issued as noted in the response and the subcontractors and vendors are only now be notified that bids are due April 16, it is an unreasonably short period of time for bidders and small businesses to prepare a competent response for this complex project. We request a 30 day extension.

1-1 Government Response. Amendment 0003 will be (was) issued to clarify the submission requirements and to extend the proposal submission date. On: Apr 02 2020

Current Request Status: Request Closed

Information for this report is procurement sensitive.

8485821 Structural sb501

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Please clear up inconsistencies in precast piles details between Phase 2 Op's drawings and Phase 3 Hangar.

* Phase 2 drawing SB501 indicates #7 rebar hooked dowel epoxied into pipe sleeve insert at driven pile head.

Phase 3 drawings S-001 Foundation note 7 & S-501 Note A2 indicate hooked dowels to be grouted in place with non-shrink grout. We would request authorization to utilize non-shrink grout for pile head dowel installation in pre-installed sleeves or drilled holes for both OP's and Hangar piles.

* Phase 3 Hangar drawing S-001, Foundation note 8. Please describe the applicability of this note for installed Hangar piles as all piles will have hooked bars protruding from the pile head for anchorage. Additionally a similar note on drawing S-501 has been X'd out. Can foundation note 8 on drawing S-001 be removed?

* Sitework & Ancillary Buildings drawings S-141 & S-523. Please provide the required pile length for the 14" piles at the water tanks foundations.

1-1 Government Response. The pile design will be completed by contractor's specialty engineer who can select either method of embedding the anchoring steel on pile top.

Note 8 of S-001 is superseded by the notation on S-501. Strands need not be embedded to pile cap because rebar dowels are in place.

Piles for ancillary structures are the same as Phase 2 piles. On: Apr 14 2020

Current Request Status: Request Closed

Information for this report is procurement sensitive.

8485898 General Bid Item 0034 RTA Submittal for

FF&E

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO) confirm bid item 0034 (aquatic training center & covered outdoor turf area) only consists of 1ea TV7. Please note that TV7 is not listed in the furniture schedule or FF&E submittal.

On: Apr 01 2020. .

1-4 Government Response. TV7 was not added to the FF&E as no additional FF&E was created for bid options. Only note has been provided on sheet IF115; however, TV7 - 65" outdoor TV shall be provided for this area. Furniture Illustration Sheet will be revised in forthcoming Amendment 4.

On: Apr 20 2020

Current Request Status: Request Closed

Information for this report is procurement sensitive.

8485904 General Bid Item 0033 RTA Submittal for

FF&E

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

There is also no FF&E depicted in the Phase 2 furniture plans or Phase 2 RTA submittal for FF&E for bid item 0033 (firing range).

1-1 Government Response. Radka Lindquist - 757-201-7703

Please provide (2) WT4 Trash cans with Flat lid. Please see attached Furniture Illustration Sheet. On: Apr 09 2020

Current Request Status: Request Closed

Information for this report is procurement sensitive.

8488209 Architectural 08 14 16 and 08 34

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Wood door spec calls for Grade A, plain sliced maple, book & running but Sound Door spec calls for plain sliced walnut, slip & running. Please confirm

On: Apr 02 2020. .

1-1 Government Response. Rake Lindquist - 757.201-7703

Plain sliced Walnut, slip and running is correct On: Apr 03 2020

Current Request Status: Request Closed

Information for this report is procurement sensitive.

8488255 Architectural A-601 Phase 3

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Door 033 has Set 2 per the door schedule but is not listed in any spec sets. Is Set 2 correct? On: Apr 02 2020.

1-1 Government Response. Set 2.0 is correct. On: Apr 09 2020

Information for this report is procurement sensitive.

8488336 Architectural A-601 - A-603 Phase 2

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Door 003 is single but has Set 5 per both spec sets and door schedule. Set 5 is for pairs. Please provide correct set.

1-1 Government Response. Set 8.0 is correct. On: Apr 09 2020

8488338 Architectural A-601 - A-603 Phase 2

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Door 004 has set 5 on door schedule but is listed in spec set 7. Door is pair. Is set 5 correct? On: Apr 02 2020.

1-1 Government Response. Set 5.0 is correct. On: Apr 09 2020

Information for this report is procurement sensitive.

8488343 Architectural A-601 - A-603 Phase 2

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Doors 007 & 008 are Blast doors but have set 7. Is this correct? On: Apr 02

1-1 Government Response. The blast doors are now no longer subject to a hardware requirement. The doors must meet the required Standard 12. The standard has been reduced to require doors that open outwards and that have Standard 10 compliant glazing. Provide hardware set 7 for these doors. On:

Apr 14 2020

Current Request Status: Request Closed

Information for this report is procurement sensitive.

8488348 Architectural A-601 - A-603 Phase 2

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Door 0023 has set 8 on the door schedule but is listed in spec set 4. Is set 8 correct? On: Apr 02

1-1 Government Response. Set 8.0 is correct. On: Apr 09 2020

Information for this report is procurement sensitive.

8488351 Architectural A-601 - A-603 Phase 2

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Door 0024 has set 4 on the door schedule but is not listed in any spec sets. Is set 4 correct? On: Apr 02 2020.

1-1 Government Response. Set 4.0 is correct. On: Apr 09 2020

Information for this report is procurement sensitive.

8488354 Architectural A-601 - A-603 Phase 2

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Door 022 has set 6 on the door schedule but is listed in spec set 8. Is set 6 correct? Door is pair. On: Apr 02 2020.

1-1 Government Response. Set 6.0 is correct. On: Apr 09 2020

Information for this report is procurement sensitive.

8488355 Architectural A-601 - A-603 Phase 2

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Door 021 has no set listed on the door schedule but is listed in spec set 6. Is this correct? On: Apr 02

1-1 Government Response. Set 6.0 is correct. On: Apr 09 2020

Information for this report is procurement sensitive.

8488359 Architectural A-601 - A-603 Phase 2

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Door 021 missing door finish, frame level, frame type frame material and frame finish. Please provide.

1-2 Government Response. The text below appends or clarifies ALL previous replies.

Door 0021 to have a DOOR FINISH that is painted (PNT) with a DOOR LEVEL at 4. The FRAME TYPE for this door to be 4. The FRAME MAERIAL is Hollow metal (HM) and painted (PNT). The HARDWARE SET is 6.0. The COMMENTS associated with this door are listed as 1 and 10. On:

Apr 16 2020

8488363 Architectural A-601 - A-603 Phase 2

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Spec set 9 lists door 0015. There is no door 015 on the door schedule nor the floor plans. On: Apr 02

1-1 Government Response. There is no door at this location, just a case opening. Door tag on plan and hardware set in spec, to be removed/deleted. Refer to Door 0023 in Phase 3 drawings (A-119)for additional information. Will provide detail of cased opening and phase 3 door in Amendment 4.

On: Apr 20 2020

Current Request Status: Request Closed

Information for this report is procurement sensitive.

8488364 Architectural A-601 - A-603 Phase 2

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Spec set 10 lists door 0016. There is no door 015 on the door schedule nor the floor plans. On: Apr 02 2020.

1-1 Government Response. There is no door at this location, just a case opening. Door tag on plan and hardware set in spec, to be removed/deleted. Refer to Door 0024 in Phase 3 drawings (A- 119)for additional information. Details will be (were) published in amendment 4. On: Apr 14

Current Request Status: Request Closed

Information for this report is procurement sensitive.

8488366 Architectural A-601 - A-603 Phase 2

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Door 019 has STL for door 7 frame material. What is it? Is it HM? Alum? Stainless? Etc. On: Apr 02

1-1 Government Response. Door 0019 door and frame material to be Hollow Metal Painted. On:

Apr 15 2020

Current Request Status: Request Closed

Information for this report is procurement sensitive.

8488368 Architectural A-601 - A-603 Phase 2

Doors 1303A & 1303B have sets 75 & 76 on the door schedule but are listed in spec set 16. There are no sets 75 & 76. Also, doors are fire rated. Set 16 is not for rated doors. Please provide correct set.

On: Apr 02 2020.

1-1 Government Response. See attachment for sets 75.0 and 76.0. On: Apr 09 2020

Information for this report is procurement sensitive.

8488371 Architectural A-601 - A-603 Phase 2

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Doors 1006, 1318, 1324B, 1325, 1326, 1327 and 1336C have FRP for door material but frames are HM. Is this correct? Shouldn't frames be FRP or Alum?

1-1 Government Response. Provide FRP frames for FRP doors. On: Apr 20 2020

Information for this report is procurement sensitive.

8488372 Architectural A-601 - A-603 Phase 2

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Door 2204 has set 28 on the door schedule but is listed in spec set 22. Which one? On: Apr 02

1-1 Government Response. Base on sheet EY123, a card reader is shown at this door location. Use hardware set 22.0. On: Apr 15 2020

Current Request Status: Request Closed

Information for this report is procurement sensitive.

8488374 Architectural A-601 - A-603 Phase 2

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Door 2009 has set 22 on the door schedule but is listed in spec set 23. Which one? On: Apr 02 2020.

1-1 Government Response. Set 22.0 is correct. On: Apr 09 2020

Current Request Status: Request Closed

Information for this report is procurement sensitive.

8488376 Architectural A-601 - A-603 Phase 2

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Door 1100 has HM for door material but ST for finish. Should finish be PNT? On: Apr 02

1-1 Government Response. Door 1100 to be painted (PNT). On: Apr 09 2020

Information for this report is procurement sensitive.

8488377 Architectural A-601 - A-603 Phase 2

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Door 1338 has HM for door material but BAKED for finish, note 7 and set 72. Should material be STL like 1339?

1-1 Government Response. Door 1338 to be is Hollow Metal with a Painted finish. On: Apr 09 2020

Information for this report is procurement sensitive.

8488379 Architectural A-601 - A-603 Phase 2

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Doors 2002A, 2129, 2130 and 2132 missing door level, frame type, frame material and frame finish. Please provide.

1-1 Government Response. Provide doors with: door level at 2; frame type HM; frame material is HM; frame finish is PNT.

Door 2002A to have frame type 2, while doors 2129, 2130, 2132 to have frame type 1. On:

Apr 20 2020

Information for this report is procurement sensitive.

8488381 Architectural A-601 - A-603 Phase 2

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Doors 2127, 2205C, 2312, SB1, SB2A, SC1, SC2, SD1 and SD2 missing door level. On: Apr 02

1-1 Government Response. Provide doors with level 2 door. On: Apr 15 2020

Information for this report is procurement sensitive.

8488382 Architectural A-601 - A-603 Phase 2

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Door 2008C has set 23 on the door schedule but is listed in spec set 28. Which one? On: Apr 02

1-1 Government Response. Set 23.0 is correct. On: Apr 09 2020

Information for this report is procurement sensitive.

8488384 Architectural A-601 - A-603 Phase 2

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Door 2005B has set 34 on the door schedule but is listed in spec set 25. Which one? Since door is not a sound door set 25 is not correct. Is set 34 correct?

1-1 Government Response. There is no door 2005B in Project. If referring to door 2003B, then use hardware set 34.0. On: Apr 15 2020

Current Request Status: Request Closed

Information for this report is procurement sensitive.

8488385 Architectural

Door 1002 has set 78 on the door schedule but is listed in spec set 30. First there is no set 78. Second set 30 is not correct for a sound door. Please provide correct set.

1-1 Government Response. See attachment fro set 78.0. On: Apr 09 2020

Information for this report is procurement sensitive.

8488386 Architectural A-601 - A-603 Phase 2

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Door 2003A has set 33 on the door schedule but is listed in spec set 31. Which one? On: Apr 02

1-1 Government Response. Set 33.0 is correct. On: Apr 09 2020

Information for this report is procurement sensitive.

8488387 Architectural A-601 - A-603 Phase 2

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Door 2003B has set 34 on the door schedule but is listed in spec set 32. Which one? On: Apr 02

1-1 Government Response. Set 34.0 is correct. On: Apr 09 2020

Information for this report is procurement sensitive.

8488388 Architectural A-601 - A-603 Phase 2

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Door 2107A is not rated but has set 33. Panic in set 33 is for rated doors. On: Apr 02

1-1 Government Response. Remove fire exit hardware and replace with panic hardware at 2107A only. On: Apr 09 2020

Current Request Status: Request Closed

Information for this report is procurement sensitive.

8488391 Architectural A-601 - A-603 Phase 2

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Door 2107B is not rated but has set 34. Panic in set 34 is for rated doors. On: Apr 02

1-1 Government Response. Remove fire exit hardware and replace with panic hardware at 2107B only. On: Apr 09 2020

Current Request Status: Request Closed

Information for this report is procurement sensitive.

8488412 Architectural A-601 - A-603 Phase 2

Doors 2121 and 2122 have set 39 on the door schedule but are listed in spec set 56. Which one? On: Apr 02 2020.

1-1 Government Response. Based on sheet EY122, card readers are not provided. Use hardware set

56.0. On: Apr 15 2020

Current Request Status: Request Closed

Information for this report is procurement sensitive.

8488414 Architectural A-601 - A-603 Phase 2

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Set 40 lists door 1126B. This door is not on the door schedule nor the floor plans. On: Apr 02

1-1 Government Response. Remove Door 1126B from Spec. Not in drawing/project. On: Apr 20

8488415 Architectural A-601 - A-603 Phase 2

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Door 1330B has set 50 on the door schedule but is listed in spec set 40. Which one? On: Apr 02

1-1 Government Response. Set 50.0 is correct. On: Apr 09 2020

Information for this report is procurement sensitive.

8488416 Architectural A-601 - A-603 Phase 2

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Door 2226 has set 58 on the door schedule but is listed in spec set 40. Which one? On: Apr 02

1-1 Government Response. Based on sheet EY124, this door has a card reader. Use hardware set 40.

On: Apr 15 2020

Current Request Status: Request Closed

Information for this report is procurement sensitive.

8488418 Architectural A-601 - A-603 Phase 2

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Door 1100 has set 62 on the door schedule but is listed in spec set 42. Which one? On: Apr 02

1-1 Government Response. Based on sheet EY111, this door has a card reader. Use hardware set 48.

Current Request Status: Request Closed

Information for this report is procurement sensitive.

8488420 Architectural A-601 - A-603 Phase 2

Doors 1228, 1229 and 1332 have set 42 on the door schedule but are listed in spec set 48. Which one?

1-1 Government Response. Set 42.0 is correct. On: Apr 09 2020

Information for this report is procurement sensitive.

8488421 Architectural A-601 - A-603 Phase 2

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Set 42 lists door 1337. This door is not on the door schedule nor the floor plans. On: Apr 02 2020. .

1-3 Government Response. Door number 1337 will be removed from hardware set 42 in the Specifications. A revised door hardware specification will be included in the final Amendment.

On: Apr 20 2020

Current Request Status: Request Closed

Information for this report is procurement sensitive.

8488423 Architectural A-601 - A-603 Phase 2

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Door 2110 has set 42 on the door schedule but is listed in spec set 44. Which one? On: Apr 02

1-1 Government Response. Set 42.0 is correct for non STC opening. On: Apr 09 2020

Information for this report is procurement sensitive.

8488425 Architectural A-601 - A-603 Phase 2

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Door 2111 has set 59 on the door schedule but is listed in spec set 42. Which one? On: Apr 02

1-1 Government Response. Based on sheet EY121, this door has a card reader. Use hardware set 42.

Current Request Status: Request Closed

Information for this report is procurement sensitive.

8488426 Architectural A-601 - A-603 Phase 2

Doors 2112 and 2120 have set 43 on the door schedule but are listed in spec set 42. Which one? On: Apr 02 2020.

1-1 Government Response. Set 42.0 is correct for non STC access control. On: Apr 09 2020

Information for this report is procurement sensitive.

8488427 Architectural A-601 - A-603 Phase 2

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Doors 2113, 2116, 2135 and 2216 have set 48 on the door schedule but are listed in spec set 42. Which one?

1-1 Government Response. Set 48.0 is correct. On: Apr 09 2020

Information for this report is procurement sensitive.

8488428 Architectural A-601 - A-603 Phase 2

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Door 2117 has set 55 on the door schedule but is listed in spec set 42. Which one? On: Apr 02

1-1 Government Response. Use Set 50.0. On: Apr 09 2020

Information for this report is procurement sensitive.

8488430 Architectural A-601 - A-603 Phase 2

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Door 2206 has set 50 on the door schedule but is listed in spec set 42. Which one? On: Apr 02

Information for this report is procurement sensitive.

8488431 Architectural A-601 - A-603 Phase 2

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Doors 2219B has set 23 on the door schedule but is listed in spec set 44. Which one? On: Apr 02

1-1 Government Response. Set 44.0 is correct. On: Apr 09 2020

Information for this report is procurement sensitive.

8488434 Architectural A-601 - A-603 Phase 2

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Door 2211 has set 43 on the door schedule but is listed in spec set 49. Which one? FYI both sets are incorrect.

They are for sound doors. Door 2211 is not a sound door. Please provide correct set.

1- Government Response. T Use hardware 43 for doors 2211 and door 2208. Both doors to have a STC rating of 47. On: Apr 17 2020

8488435 Architectural A-601 - A-603 Phase 2

Doors 2227 and 2309 have set 43 on the door schedule but are listed in spec set 50. Which one? On: Apr 02 2020.

1-1 Government Response. Set 43.0 is correct On: Apr 09 2020

Information for this report is procurement sensitive.

8488436 Architectural A-601 - A-603 Phase 2

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Door 2308A has set 43 on the door schedule but is listed in spec set 44. Which one? On: Apr 02

1-1 Government Response. Set 43.0 is correct. On: Apr 09 2020

Information for this report is procurement sensitive.

8488438 Architectural A-601 - A-603 Phase 2

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Door 1118, 1127 and 2218 have set 60 on the door schedule but are listed in spec set 44. Which one?

1-1 Government Response. Door 1118 has no card reader, use hardware set 60. Door 1127 has card reader, use hardware set 44.0 Door 2218 has card reader , use hardware set 44.0. On: Apr 15 2020

8488439 Architectural A-601 - A-603 Phase 2

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Door 1123 has set 74 on the door schedule but is listed in spec set 44. Please note there is no set

74. Is set 44 correct?

1-1 Government Response. See attachment for set 74.0. On: Apr 09 2020

Information for this report is procurement sensitive.

8488441 Architectural A-601 - A-603 Phase 2

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Door 1126A has set 44 on the door schedule but is listed in spec set 64. Which one? On: Apr 02

1-1 Government Response. Based on sheet EY111, this door has a card reader. Use hardware set 44.

Current Request Status: Request Closed

Information for this report is procurement sensitive.

8488442 Architectural A-601 - A-603 Phase 2

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Door 1219 has set 44 per both door schedule and spec set but door is not a sound door and set 44 is for sound doors. Please provide correct set.

1-1 Government Response. Door 1219 is not a STC rated door. Use hardware used 42. On: Apr 15

Current Request Status: Request Closed

Information for this report is procurement sensitive.

8488443 Architectural A-601 - A-603 Phase 2

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Doors 2124 and 2125 have set 67 on the door schedule but are listed in spec set 44. Which one? On: Apr 02 2020.

1-1 Government Response. Based on sheet EY122, card readers are not provided. Use hardware set

67.0. On: Apr 15 2020

Current Request Status: Request Closed

Information for this report is procurement sensitive.

8488444 Architectural A-601 - A-603 Phase 2

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Door 2205C has set 53 on the door schedule but is listed in spec set 44. Which one? On: Apr 02

1-1 Government Response. Based on sheet EY123, this door has a card reader. Use hardware set

42.0. On: Apr 15 2020

Current Request Status: Request Closed

Information for this report is procurement sensitive.

8488448 Architectural A-601 - A-603 Phase 2

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Spec set 47 lists door 1312A. This door is not on the door schedule nor the floor plans. On: Apr 02

1-3 Government Response. Specifications will be revised to delete door 1312A from hardware set

47. Revised specifications will be provided in the next amendment 4. On: Apr 20 2020

Current Request Status: Request Closed

Information for this report is procurement sensitive.

8488449 Architectural A-601 - A-603 Phase 2

Door 1312 has set 47 per the door schedule but is not listed in any spec set. Is this correct? On: Apr 02 2020.

1-1 Government Response. Set 47.0 is correct. On: Apr 09 2020

Information for this report is procurement sensitive.

8488451 Architectural A-601 - A-603 Phase 2

Door 2102 and 2123 have set 48 on the door schedule but are listed in spec set 50. Which one? On: Apr 02 2020.

Information for this report is procurement sensitive.

8488453 Architectural A-601 - A-603 Phase 2

Doors 2103 and 2108 have set 50 on the door schedule but are listed in spec set 48. Which one? On: Apr 02 2020.

Information for this report is procurement sensitive.

8488454 Architectural A-601 - A-603 Phase 2

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Door 1200 has set 50 on the door schedule but is listed in spec set 66. Which one? On: Apr 02

1-1 Government Response. Based on sheet EY113, this door has a card reader. Use hardware set

50.0. On: Apr 15 2020

Current Request Status: Request Closed

Information for this report is procurement sensitive.

8488456 Architectural

Set 51 lists 2 electric mortise locks. Which one? On: Apr 02 2020.

1-1 Government Response. For Set 51, use PN220 Lock. On: Apr 09 2020

Information for this report is procurement sensitive.

8488457 Architectural A-601 - A-603 Phase 2

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Door 1336A has set 42 on the door schedule but is listed in spec set 59. Which one? On: Apr 02

1-1 Government Response. Based on sheet EY116, this door has a card reader. Use hardware set

42.0. On: Apr 15 2020

Current Request Status: Request Closed

Information for this report is procurement sensitive.

8488458 Architectural A-601 - A-603 Phase 2

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Door 1119 has set 60 on the door schedule but is listed in spec set 57. Which one? On: Apr 02

1-1 Government Response. Set 60.0 is correct. On: Apr 09 2020

Information for this report is procurement sensitive.

8488459 Architectural A-601 - A-603 Phase 2

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Door 1102B has set 73 on the door schedule but is listed in spec set 58. FYI set 73 is a list of misc items not hardware for a door. Is set 58 correct?

1-1 Government Response. See attachment for updated set 73.0. On: Apr 09 2020

Current Request Status: Request Closed

Information for this report is procurement sensitive.

8488460 Architectural A-601 - A-603 Phase 2

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Door 1227 has set 60 on the door schedule but is listed in spec set 59. Which one? On: Apr 02

1-1 Government Response. Set 60.0 is correct. On: Apr 09 2020

Information for this report is procurement sensitive.

8488461 Architectural A-601 - A-603 Phase 2

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Door 2132 has set 77 on the door schedule but is listed in spec set 61. Please note there is no set

77. Is set 61 correct? On:

Apr 02 2020. .

2-0 Government Response:Set 61.0 is not correct. Set 77.0 per the door schedule is correct. See attachment for required HW set 77.0 specification information. (Attachment: BC_P2-3_Bidder_Inquiries_Hardware_Sets4.pdf)

Current Request Status: Request Closed

Information for this report is procurement sensitive.

8488463 Architectural A-601 - A-603 Phase 2

Doors 2202 and 2203 have set 52 on the door schedule but are listed in spec set 46. Which one? On: Apr 02 2020.

1-1 Government Response. Set 52.0 is correct. On: Apr 09 2020

8488615 Architectural A-505 Phase 2 10 22 13

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

The wire cage details on A-505 Phase 2 and A-504 Phase 3 call out both welded wire mesh and woven wire mesh while the specification appears to only call out a woven diamond mesh.

Please clarify the mesh type required at the cages. On: Apr

02 2020. .

1-2 Government Response. Provide 6 gauge welded wire mesh; refer to revised sheet A-505 to be included in Amendment #4. This applies to both phases. On: Apr 20 2020

Current Request Status: Request Closed

Information for this report is procurement sensitive.

8488636 Architectural A-505 Phase 2

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

The Floor Plan Keynotes refer to 8' tall wire cages in numerous locations throughout the OPS and Hangar buildings. The cage details and notes on A-505 Phase 2 and A-504 Phase 3 call out 10'-2" tall cages with cage tops to fully enclose. Please clarify the cage dimensions and whether tops are required.

1-1 Government Response. Cages with fully enclosed tops to follow drawings. Second floor cages also needs to be fully enclosed top at 8'-0" tall, but only if room ceiling height limits it.

On: Apr 09 2020

Current Request Status: Request Closed

Information for this report is procurement sensitive.

8488660 Architectural A-116 Phase 2

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Door Tag 1338 into the Weapons Cleaning Room is depicted as a standard door but is noted on the Door Schedule by Comment 7 to be a Class 5A Vault Door Assembly w/ Standard Day Gate, similar to Door Tag 1339 into the Arms Vault. Please clarify the construction of Door Tag 1338.

1-1 Government Response. Door 1338 is a standard HM door. Door 1339 is the vaulted door with day gate. On: Apr 09 2020

Current Request Status: Request Closed

Information for this report is procurement sensitive.

8488678 Architectural A-505 Phase 2 10 22 13

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

The wire cage details on A-505 Phase 2 and A-504 Phase 3 indicate that the wire mesh panels are to be framed with steel angle frames. The Wire Mesh specification indicates the frames are steel C-channels. Please clarify which is correct.

1-1 Government Response. Either angle frames or C-channels are acceptable. On: Apr 09 2020

Information for this report is procurement sensitive.

8488684 Architectural A603

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

In Phase 2, sheet A-603 under the Pool option door schedule, there are two aluminum frames listed, but the details show FRP frames (tags 1310a and 1312b). Please advise.

1-3 Government Response. Provide FRP frames for FRP doors. Revised door schedule will be provided in Amendment 4. On: Apr 20 2020

Current Request Status: Request Closed

Information for this report is procurement sensitive.

8488686 Specifications 096853

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Spec Section 09 68 53, Paragraph 2.1.1.f- States "As Alternate #1, the entire turf system shall be protected with a factory-applied antimicrobial treatment." Please clarify where this alternate is to be listed on the bid form as this is not currently a bid option.

1-1 Government Response. "As alternate #1," should be omitted to clarify the statement. On: Apr 06

Current Request Status: Request Closed

Information for this report is procurement sensitive.

8488689 Specifications 096853

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Spec Section 09 68 53, Paragraph 1.5.1.b- States "Minimum of 50 full sized tall fiber infilled type field installations. Field size to be a minimum of 65,000 square feet to qualify. This list is to be provided with the bid."

Please clarify this list does not need to be provided at bid time.

1-1 Government Response. Specification will be (was) revised in Amendment 4, "b. 10 full sized tall fiber infilled type field installations. Field size to be a minimum of 20,000 square feet to qualify."

On: Apr 22 2020

Current Request Status: Request Closed

Information for this report is procurement sensitive.

8488695 Contracting 01100

Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Will we be allowed to physically enter Fort Norfolk to complete (including…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .