23 65 00.pdf

PDF 82 KB Posted

Attached to
Battalion Complex (Amendment 8)
Solicitation number
W9123620R0001
Issued by

View the file

Other files

File Type Posted
W9123620R0001P0008 - Amendment 8.pdf PDF
18245_ - AREA T - POWER.pdf PDF
A.07.24 - W9123620R0001(Amendment 7).pdf PDF
W9123620R0001 Amendment 6.pdf PDF
719_BC-PH2_SF423.pdf PDF
719_BC-PH2_MP121.pdf PDF
719_BC -PH2-A-601.pdf PDF
719_BC-PH2_SF600(Amend5).pdf PDF
720_BC-PH3-S504.pdf PDF
719_BC-PH2_26 20 00.pdf PDF
719_BC-PH2_MP111.pdf PDF
719_BC_PH2_Sheet A-200.pdf PDF
719_BC_Sheet - I-003.pdf PDF
719_BC-PH2_SF505.pdf PDF
719_BC-PH2_MP122.pdf PDF
720_BC-PH3-CS103.pdf PDF
719_BC-PH2_MP116.pdf PDF
719_BC-PH2_SF422.pdf PDF
719_BC_Sheet - I-223.pdf PDF
05 12 00.pdf PDF
22 00 00.pdf PDF
720_BC-PH3-CU102.pdf PDF
719_BC_PH2_Sheet A-412.pdf PDF
720_BC-PH3-S215 (1).pdf PDF
719_BC_FFE_PH2_Amendment 5 sheets(Amend5).pdf PDF
719_BC-PH2_SF420.pdf PDF
719_BC-PH2 Sheet EP404.pdf PDF
26 51 00.pdf PDF
719_BC-PH2_SF425.pdf PDF
10 28 13.pdf PDF
28 31 76.pdf PDF
719_BC_Sheet - I-008.pdf PDF
AMEND005-719_BC-PH2_FA001-FA126.pdf PDF
719_BC-PH2_03 30 00.00 10.pdf PDF
719_BC-PH2_10 21 13.pdf PDF
PH1 TWS TWR piping routing.pdf PDF
720_BC-PH3-SF600.pdf PDF
720_BC_PH3_EL119-EL123_EL502.pdf PDF
719_BC-PH2_FA001_FA111-FA114.pdf PDF
719_BC_Sheet - I-124.pdf PDF
719_BC -PH2-A- 603.pdf PDF
719_BC_PH2_Sheet A-411.pdf PDF
720_BC_PH3_FP001_FP140-FP143.pdf PDF
719_BC-PH2_SF421.pdf PDF
719_BC-PH2_SB106.pdf PDF
720_BC_PH3_A-605.pdf PDF
719_BC-PH2_MP113.pdf PDF
719_BC-PH2_11 46 01.06.pdf PDF
719_BC-PH2_S-001(Amend5).pdf PDF
719_BC-PH2_M-401.pdf PDF
Show 40 more

Latest 50 of 136 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BATTALION COMPLEX PH 2 719ACPH2

RTA SUBMITTAL

SECTION 23 65 00

COOLING TOWERS AND REMOTE EVAPORATIVELY-COOLED CONDENSERS

11/16

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

ACOUSTICAL SOCIETY OF AMERICA (ASA)

ASA S1.13 (2005; R 2010) Methods for the Measurement of Sound Pressure Levels in Air (ASA 118)

AMERICAN WELDING SOCIETY (AWS)

AWS Z49.1 (2012) Safety in Welding and Cutting and Allied Processes

ASTM INTERNATIONAL (ASTM)

ASTM D2996 (2015) Filament-Wound "Fiberglass" (Glass-Fiber-Reinforced Thermosetting-Resin) Pipe

ASTM E84 (2018a) Standard Test Method for Surface Burning Characteristics of Building Materials

COOLING TECHNOLOGY INSTITUTE (CTI)

CTI ATC-105 (2000) Acceptance Test Code

CTI Std-201 (2011) Standard for the Certification of Water Cooling Tower Thermal Performance

NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION (NEMA)

NEMA MG 1 (2018) Motors and Generators

NEMA MG 11 (1977; R 2012) Energy Management Guide for Selection and Use of Single Phase Motors

NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)

NFPA 70 (2017; ERTA 1-2 2017; TIA 17-1; TIA 17-2;

TIA 17-3; TIA 17-4; TIA 17-5; TIA 17-6;

TIA 17-7; TIA 17-8; TIA 17-9; TIA 17-10;

TIA 17-11; TIA 17-12; TIA 17-13; TIA

17-14; TIA 17-15; TIA 17-16; TIA 17-17 )

National Electrical Code

SECTION 23 65 00 Page 1

SOCIETY OF AUTOMOTIVE ENGINEERS INTERNATIONAL (SAE)

SAE J534 (2015) Lubrication Fittings

1.2 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for Contractor Quality Control approval. Submittals with an "S" are for inclusion in the Sustainability eNotebook, in conformance with Section 01 33 29 SUSTAINABILITY REPORTING.

Submit the following in accordance with Section 01 33 00 SUBMITTAL

PROCEDURES:

SD-03 Product Data

Cooling Towers; G

Posted Instructions; G

Demonstrations; G

Verification of Dimensions; G

SD-06 Test Reports

Packaged Cooling Tower - Installation Instructions; G

Packaged Cooling Tower - Field Acceptance Test Plan; G

Packaged Cooling Tower - Field Acceptance Test Report; G

SD-07 Certificates

Service Organization

Cooling Tower

SD-08 Manufacturer's Instructions

Packaged Cooling Tower - Installation Instructions

SD-10 Operation and Maintenance Data

Operation and Maintenance Manuals

SD-11 Closeout Submittals

Energy Efficient Equipment for Cooling Towers; S

1.3 SAFETY REQUIREMENTS

Exposed moving parts, parts that produce high operating temperature, parts which may be electrically energized, and parts that may be a hazard to operating personnel must be insulated, fully enclosed, guarded, or fitted with other types of safety devices. Safety devices must be installed so that proper operation of equipment is not impaired. Welding and cutting safety requirements must be in accordance with AWS Z49.1 . Catwalk, ladder, and guardrail must be provided where indicated and in accordance with Section 05 50 13 MISCELLANEOUS METAL FABRICATIONS and Section 05 51 33

SECTION 23 65 00 Page 2

E4TEEZAG

Polygon

METAL LADDERS.

1.4 DELIVERY, STORAGE, AND HANDLING

Stored items must be protected from the weather, humidity and temperature variations, dirt and dust, or other contaminants. Proper protection and care of all material both before and during installation shall be the Contractor's responsibility. Any materials found to be damaged shall be replaced at the Contractor's expense. During installation, piping and similar openings must be capped to keep out dirt and other foreign matter.

1.5 PROJECT/SITE CONDITIONS

1.5.1 Verification of Dimensions

The Contractor shall become familiar with all details of the work, verify all dimensions in the field, and advise the Contracting Officer of any discrepancy before performing any work.

1.5.2 Drawings

Because of the small scale of the drawings, it is not possible to indicate all offsets, fittings, and accessories that may be required. The Contractor must carefully investigate the plumbing, fire protection, electrical, structural and finish conditions that would affect the work to be performed and must arrange such work accordingly, furnishing required offsets, fittings, and accessories to meet such conditions.

PART 2 PRODUCTS

2.1 PRODUCT SUSTAINABILITY CRITERIA

For products in this section, where applicable and to extent allowed by performance criteria, provide and document the following:

2.1.1 Energy Efficient Equipment for Cooling Towers

Provide cooling towers with a CTI certified thermal performance in accordance with CTI Std-201 , otherwise verify thermal performance by field testing according to the requirements of CTI ATC-105 .

2.2 STANDARD COMMERCIAL PRODUCTS

Materials and equipment must be standard commercial catalogued products of a manufacturer regularly engaged in the manufacturing of such products, which are of a similar material, design and workmanship. The standard products must have been in satisfactory commercial or industrial use in field service for two years prior to bid opening. The two year use must include applications of equipment and materials under similar circumstances and of similar size. Products having less than a two year field service record will be acceptable if a certified record of satisfactory field operation, for not less than 6000 hours exclusive of the manufacturer's factory tests, can be shown. This 6000 hour record must not include any manufacturer's prototype or factory testing. Records of satisfactory field use must be completed by a product that had been, and presently is, sold, or offered for sale on a commercial market through the following copyrighted means: advertisements, manufacturer's catalogs, or brochures. Products must be supported by a service organization.

System components must be environmentally suitable for the indicated

SECTION 23 65 00 Page 3 locations.

2.3 MANUFACTURER'S STANDARD NAMEPLATES

Major equipment including cooling towers, cooling tower gear drive assemblies, fans, and motors must have the manufacturer's name, address, type or style, model or serial number, and catalog number on a plate secured to the item of equipment. Plates must be durable and legible throughout equipment life. Plates must be fixed in prominent locations.

2.4 ELECTRICAL WORK

a. Provide motors, controllers, integral disconnects, contactors, and controls with their respective pieces of equipment, except controllers indicated as part of motor control centers. Provide electrical equipment, including motors and wiring, as specified in Section 26 20 00 INTERIOR DISTRIBUTION SYSTEM. Manual or automatic control and protective or signal devices required for the operation specified and control wiring required for controls and devices specified, but not shown, must be provided. For packaged equipment, the manufacturer must provide controllers including the required monitors and timed restart.

b. For single-phase motors, provide high-efficiency type, fractional-horsepower alternating-current motors, including motors that are part of a system, in accordance with NEMA MG 11.

c. For polyphase motors, provide squirrel-cage medium induction motors, including motors that are part of a system, and that meet the efficiency ratings for premium efficiency motors in accordance with

NEMA MG 1.

d. Provide motors in accordance with NEMA MG 1 and of sufficient size to drive the load at the specified capacity without exceeding the nameplate rating of the motor. Motors must be rated for continuous duty with the enclosure specified. Motor duty requirements must allow for maximum frequency start-stop operation and minimum encountered interval between start and stop. Motor torque must be capable of accelerating the connected load within 20 seconds with 80 percent of the rated voltage maintained at motor terminals during one starting period. Provide motor starters complete with thermal overload protection and other necessary appurtenances. Motor bearings must be fitted with grease supply fittings and grease relief to outside of the enclosure. Motor enclosure type may be either TEAO or TEFC.

e. Use adjustable frequency drives for all variable-speed motor applications. Provide variable frequency drives for motors as specified in Section 26 29 23 VARIABLE FREQUENCY DRIVE SYSTEMS UNDER

600 VOLTS.

f. Provide inverter duty premium efficiency motors for use with variable frequency drives.

2.5 COOLING TOWER MATERIALS

2.5.1 Stainless Steel Sheets

Type 304.

SECTION 23 65 00 Page 4

2.5.2 Hardware

Bolts must be Type 304 stainless steel.

2.6 COOLING TOWERS

2.6.1 Factory Assembled Towers

2.6.1.1 Description

The cooling tower must be of the induced mechanical draft type. The cooling tower must include frames and casings, louvers, drift eliminators, partitions, windbreak baffles, drift-check walls, cold water basin equipment, fans and fan walls, blowers, drives, electric motors, access doors and working platforms on each side wall, inspection plates, and panels.

2.6.1.2 Construction

Tower must be constructed to withstand a wind pressure of not less than 30 psf on any external surface. Fan deck must be constructed to withstand a live load of not less than 60 psf in addition to the concentrated or distributed loads of equipment mounted on the fan deck. A 15 percent increased loading must be included for ice or snow load.

The hot water distribution system must be of the open basin gravity feed type or the pressurized spray header type design.

2.6.1.3 Tower Frame and Louvers

Provide frame constructed from 304 stainless steel. Intermediate structural members must be provided for rigidity and support of casings, louvers, fill, distribution systems, fan decks, and other equipment.

Inlet air louvers must permit free air passage but no splashout, and must be designed to prevent debris and sunlight from entering the cold water basin.

2.6.1.4 Fill

The fill must support expected loads without sag or failure and arranged to effectively break up the water. The fill must be manufactured and performance tested by the cooling tower manufacturer. The fill must be of the materials as specified. Polyvinyl chloride (PVC) fill is suitable for inlet temperatures to 125 degrees F on cross flow type units and temperatures to 130 degrees F on counterflow type units. Chlorinated polyvinyl chloride(CPVC) fill must be used for applications where inlet temperatures are greater than 130 degrees F. Fill must be in accordance with ASTM E84, Class A.

2.6.1.5 Drift Eliminators

Provide drift eliminator sections designed and arranged to effectively trap water droplets entrained in the discharge airstream. Sections must be assembled in easily removable sections for counterflow induced mechanical draft tower. Drift eliminators must be constructed of Polyvinyl chloride (PVC) in accordance with ASTM E84, Class A.

SECTION 23 65 00 Page 5

2.6.1.6 Cold Water Basin Equipment.

Include Type 304 stainless steel sump with stainless steel removable screen and vortex breaker, float valves, and necessary pipe connections and fittings within the tower. Electronic water level control must be provided.

Provide cold water basins and casings suitably sealed and flashed at joints and connections to ensure watertight construction.

2.6.1.7 Fans, Blowers, and Drives.

The towers must have axial propeller-type fans having not less than four aluminum alloy or glass-reinforced polypropylene blades or squirrel-cage, centrifugal-type blowers, as applicable. Fans and blowers must be designed and constructed to withstand 50 percent overspeed above normal maximum operating speeds.

If belt drives are utilized, multi-grooved solid back single belt design must be used to avoid uneven belt stretch. Adjustment must be provided for belt tension and drive centers. Belt drives must be designed and constructed for 150 percent overload. Sheaves located in the airstream must be corrosion-resistant material. Shafting for gear drives must have flexible-type couplings requiring no lubrication. The gear assemblies must be enclosed in an oil filled housing provided with fill and drain plugs.

2.6.1.8 Tower Piping

Piping must be schedule 40 PVC and conform to ASTM D2996. Fittings for other piping materials must be of the same material or equal and of the same class and grade as the pipe.

2.6.1.9 Electric Motors

Requirements are specified in paragraph ELECTRICAL WORK.

2.6.1.10 Vibration Cutout Switch.

Provide electronic vibration cutout switch with auxiliary contacts in a protected position and most effective location, interlocked with the fan wiring to electrically open the motor circuit under excessive fan vibration.

2.6.1.11 Performance

The factory assembled tower must have Cooling Tower Institute certification that, in accordance with CTI Std-201 , the cooling tower will perform thermally at the rating published by the tower manufacturer in his copyrighted literature.

2.6.1.12 Sound Power Level

Sound power levels, in decibels (dB)with a reference pressure of 0.0002 microbars, of the cooling tower must be not greater than the maximum permitted dB levels for the designated octave band as set forth in Table I or Table II. The sound power level data for the cooling tower must have been verified in tests conducted in accordance with ASA S1.13 .

SECTION 23 65 00 Page 6

Table I. Sound Power Level For Induced Mechanical Draft Type

Octave Band (Hz) 63 125 250 500 1000 2000 4000 8000

Sound Power Level (dB)

112 112 110 108 102 98 93 90

2.6.1.13 Drift Loss

Drift loss must be not greater than 0.005 percent of the water circulated.

2.6.2 Lubrication

The lubricating points must be extended to the outside of the unit for easy accessibility. Hydraulic lubrication fittings must be in accordance with SAE J534 . Where use of high pressure lubricating equipment, 1000 psi or higher, will damage grease seals or other parts, a suitable warning must be affixed to the equipment in a conspicuous location.

2.7 SUPPLEMENTAL COMPONENTS/SERVICES

2.7.1 Tower Water Piping and Accessories

Tower water piping and accessories must be provided and installed in accordance with Section 23 64 26 CHILLED, CHILLED-HOT, AND CONDENSER WATER

PIPING SYSTEMS.

2.7.2 Cooling Tower Water Treatment Systems

Cooling tower water treatment systems must be provided and installed in accordance with Section 23 25 00 CHEMICAL TRESTMENT OF WATER FOR MECHANICAL.

2.7.3 Temperature Controls

Cooling towers must be fully coordinated with and integrated into the temperature control system specified in Section 23 09 00 INSTRUMENTATION AND CONTROL FOR HVACSection 23 09 23.02 BACNET DIRECT DIGITAL CONTROL FOR

HVAC AND OTHER BUILDING CONTROL SYSTEMS .

PART 3 EXECUTION

3.1 DEMONSTRATIONS

Contractor must conduct a training course for the operating staff as designated by the Contracting Officer. The training period must consist of a total 8 hours of normal working time and start after the system is functionally completed but prior to final acceptance tests. The training course must cover all of the items contained in the approved Operation and Maintenance Manuals as well as demonstrations of routine maintenance operations.

Provide a schedule, at least 2 weeks prior to the date of the proposed training course, which identifies the date, time, and location for the training.

SECTION 23 65 00 Page 7

3.2 INSTALLATION

Installation of cooling tower systems including materials, installation, workmanship, fabrication, assembly, erection, examination, inspection, and testing must be in accordance with NFPA 70 , and in compliance with the manufacturer's written installation instructions, including the following:

(1) Packaged cooling tower - installation instructions

3.2.1 Installation Instructions

Provide manufacturer's standard catalog data, at least 5 weeks prior to the purchase or installation of a particular component, highlighted to show features such as materials of construction, dimensions, options, performance and efficiency. Data must include manufacturer's recommended installation instructions and procedures. Data must be adequate to demonstrate compliance with contract requirements.

3.2.2 Posted Instructions

Provide posted instructions, including equipment layout, wiring and control diagrams, piping, valves and control sequences, and typed condensed operation instructions. The condensed operation instructions must include preventative maintenance procedures, methods of checking the system for normal and safe operation, and procedures for safely starting and stopping the system. The posted instructions must be framed under glass or laminated plastic and be posted where indicated by the Contracting Officer.

3.2.3 Verification of Dimensions

Provide a letter including the date the site was visited, conformation of existing conditions, and any discrepancies found.

3.2.4 Demonstrations

Provide a schedule, at least 2 weeks prior to the date of the proposed training course, which identifies the date, time, and location for the training.

3.2.5 Certificates

Where the system, components, or equipment are specified to comply with requirements of AGA, NFPA, ARI, ASHRAE, ASME, or UL, proof of such compliance must be provided. The label or listing of the specified agency must be acceptable evidence. In lieu of the label or listing, a written certificate from an approved, nationally recognized testing organization equipped to perform such services, stating that the items have been tested and conform to the requirements and testing methods of the specified agency may be submitted. When performance requirements of this project's drawings and specifications vary from standard ARI rating conditions, computer printouts, catalog, or other application data certified by ARI or a nationally recognized laboratory as described above must be included.

If ARI does not have a current certification program that encompasses such application data, the manufacturer may self certify that his application data complies with project performance requirements in accordance with the specified test standards.

SECTION 23 65 00 Page 8

3.2.6 Operation and Maintenance Manuals

Provide Six complete copies of an operation manual in bound 8 1/2 by 11 inch booklets listing step-by-step procedures required for system startup, operation, abnormal shutdown, emergency shutdown, and normal shutdown at least 4 weeks prior to the first training course. The booklets must include the manufacturer's name, model number, and parts list. The manuals must include the manufacturer's name, model number, service manual, and a brief description of all equipment and their basic operating features. Six complete copies of maintenance manual in bound 8 1/2 by 11 inch booklets listing routine maintenance procedures, possible breakdowns and repairs, and a trouble shooting guide. The manuals must include piping and equipment layouts and simplified wiring and control diagrams of the system as installed.

3.2.7 Connections to Existing Systems

Notify the Contracting Officer in writing at least 15 calendar days prior to the date the connections are required. Obtain approval before interrupting service. Furnish materials required to make connections into existing systems and perform excavating, backfilling, compacting, and other incidental labor as required. Furnish labor and tools for making actual connections to existing systems.

3.3 RELATED FIELD TESTING

3.3.1 Test Plans

a. Manufacturer's Test Plans: Within 120 calendar days after contract award, submit the following plans:

(1) Packaged cooling tower - field acceptance test plan

3.4 TESTING

a. Each cooling tower system must be field acceptance tested in compliance with its approved field acceptance test plan and the resulting following field acceptance test report submitted for approval:

(1) Packaged cooling tower - field acceptance test report

-- End of Section --

SECTION 23 65 00 Page 9

DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
23 65 00 - COOLING TOWERS AND REMOTE EVAPORATIVELY-COOLED CONDENSERS
PART 1 GENERAL
1.1 REFERENCES
1.2 SUBMITTALS
1.3 SAFETY REQUIREMENTS
1.4 DELIVERY, STORAGE, AND HANDLING
1.5 PROJECT/SITE CONDITIONS
1.5.1 Verification of Dimensions
1.5.2 Drawings
PART 2 PRODUCTS
2.1 PRODUCT SUSTAINABILITY CRITERIA
2.1.1 Energy Efficient Equipment for Cooling Towers
2.2 STANDARD COMMERCIAL PRODUCTS
2.3 MANUFACTURER'S STANDARD NAMEPLATES
2.4 ELECTRICAL WORK
2.5 COOLING TOWER MATERIALS
2.5.1 Stainless Steel Sheets
2.5.2 Hardware
2.6 COOLING TOWERS
2.6.1 Factory Assembled Towers
2.6.1.1 Description
2.6.1.2 Construction
2.6.1.3 Tower Frame and Louvers
2.6.1.4 Fill
2.6.1.5 Drift Eliminators
2.6.1.6 Cold Water Basin Equipment.
2.6.1.7 Fans, Blowers, and Drives.
2.6.1.8 Tower Piping
2.6.1.9 Electric Motors
2.6.1.10 Vibration Cutout Switch.
2.6.1.11 Performance
2.6.1.12 Sound Power Level
2.6.1.13 Drift Loss

2.6.2 Lubrication

2.7 SUPPLEMENTAL COMPONENTS/SERVICES
2.7.1 Tower Water Piping and Accessories
2.7.2 Cooling Tower Water Treatment Systems
2.7.3 Temperature Controls
PART 3 EXECUTION
3.1 DEMONSTRATIONS
3.2 INSTALLATION
3.2.1 Installation Instructions
3.2.2 Posted Instructions
3.2.3 Verification of Dimensions
3.2.4 Demonstrations
3.2.5 Certificates
3.2.6 Operation and Maintenance Manuals
3.2.7 Connections to Existing Systems
3.3 RELATED FIELD TESTING
3.3.1 Test Plans

3.4 TESTING

File details come from the government source that posted it. Updated .