18245_ - AREA T - POWER.pdf
PDF 222 KB Posted
- Attached to
- Battalion Complex (Amendment 8)
- Solicitation number
- W9123620R0001
View the file
Other files
Show 40 more
Latest 50 of 136 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MECHANICAL EQUIPMENT CONNECTION SCHEDULE
TAG MCA LOAD MOCP VOLTS Ø CIRCUIT # CONNECTION CONDUIT AND WIRE NOTES
OAVAV-1501 120 1 SEE PLAN INTEGRAL SWITCH 2 #12, 1#12 GND - 1/2"C 1
OAVAV-1502 120 1 SEE PLAN INTEGRAL SWITCH 2 #12, 1#12 GND - 1/2"C 1
WAHP-1501 3.7 15 277 1 HM2-1444-22 MOTOR RATED SWITCH 2 #12, 1 #12 GND - 1/2"C 1
WAHP-1502 11.2 15 277 1 HM2-1444-24 MOTOR RATED SWITCH 2 #12, 1 #12 GND - 1/2"C 1
WAHP-1504 10.5 15 277 1 HM2-1444-26 MOTOR RATED SWITCH 2 #12, 1 #12 GND - 1/2"C 1
RP 1/6 HP 20 120 1 SEE PLAN MOTOR RATED SWITCH 2 #12, 1 #12 GND - 1/2"C 1
CP-10 75W 20 120 1 SEE PLAN MOTOR RATED SWITCH 2 #12, 1 #12 GND - 1/2"C 1
FCP-1 15 HP 480 3 SERVICE LATERAL CONTROL PANEL 3 #8, 1 #10 GND - 1/2"C 2
FCP-2 15 HP 480 3 SERVICE LATERAL CONTROL PANEL 3 #8, 1 #10 GND - 1/2"C 2
HD3 17.7 (3) 5HP 70 480 3 HG2-1454-37 60A-3P NFSS 3#4, 1#8GND - 1"C
TH1 57.0 38kW 60 480 3 HM1-1493-32 100A-3P NFSS 3 #2, 1 #4 GND - 1 1/2"C
NOTES:
1. COORDINATE ALL CONNECTIONS TO EQUIPMENT WITH MECHANICAL SUB-CONTRACTOR AND APPROVED SHOP DRAWINGS.
2. CONNECT TO AND EXTEND FIRE PUMP UNDERGROUND RACEWAY PROVIDED IN PHASE 1 OF PROJECT.
PHASE 1 RACEWAY IS IN PLACE FROM CEP EAST TO WITHIN 5' OF THE SOUTHWEST CORNER
OF THIS BUILDING'S LIMIT (+/- 300 FT). PROVIDE FEEDER CONDUCTORS FROM PUMP CONTROLLER
TO SWITCHBOARD IN CEP EAST.
E
D E F F.05 F.1 F.2 F.3
1.3
1.2
1.1
2.0
D.1
0.1
1.0
E
WAHP-1502
OAVAV-1502
WAHP-1501
G
G
G
G
G
G
EE
RP
CP-10
RP
FCP-2
FCP-1
SNOW MELTING
CONTROL PANEL
FOAM CONTROL PANEL
M A
T C
H
LI
N E
A
R E
A S
E E
S H
E E
T E
L1
M A
T C
H
LI
N E
A
R E
U
E
S H
E E
T E
L1
M A
T C
H
LI
N E
A
R E
E
S H
E E
T E
L1
LG2-1444-1
SERVICE RACK 'F.05'
A - HG1-1454-1
B - HG1-1454-7
C - HG1-1454-2
D - HG1-1454-8
E - LG1-1454-9
F - LG1-1454-11
G - LG1-1454-18
H - LG1-1454-20
J - LG1-1454-22
K - LG1-1454-24
LG2-1444-2
LM1-1461-7
BALANCE
TOOL ROOM
MECH/FIRE
LG2-1444-4
LG2-1444-6
OVERHEAD DOOR
480V, 3Ø
HM2-1444-1
30A-3P, NF
MATCHLINE - AREA K
SEE SHEET EP114
MATCHLINE - AREA L
SEE SHEET EP115 MATCHLINE - AREA M
SEE SHEET EP116
HD3
HANGAR DOOR
CONTROLLER
TH1
WAHP-1504
LG2-1444-3 1 AIRCRAFT SERVICE POINT RACK. SEE DETAILS ON SHEET EP501 FOR
MORE INFORMATION.
CONNECTION TO EMERGENCY SHOWER & EYE WASH STATION ALARM;
120V, 1Ø.
HANGAR AREA IS A CLASS 1 DIVISION 1
HAZARDOUS AREA FROM FLOOR TO
18" AFF
A I
N I
G
RI
VFOHTLAE
W
N O
M M
O C
P R
O F
ESS I ONAL ENG
I N
E E
R
N
8' 16' 24'
SCALE: 1/8" = 1' - 0"
0'
SCALE: NTS
KEY PLAN
Q R S TPHASE 2
G H J K L M N P
VU
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S D
R A
W N
B Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I 'D
D
A T
E
T
IM
E S
T A
M P
IS
S
U E
D A
T E
C O
N T
R A
C T
N
O
P R
O J E
C T
N O
F
IL
E N
U M
B E
R
1 2 3 4 5
D
C
B
A
PROPERTY OF UNITED STATES GOVERNMENT, FOR OFFICIAL USE ONLY (FOUO). COPYING, DISSEMINATION, AND DISTRIBUTION TO UNAUTHORIZED INDIVIDUALS PROHIBITED.
JAMES E. BARKLEY, JR.
Lic. No. 043854
01/10/20
/6
/2
:4
:2
A M
EP122
PHASE 3
F
IR
S T
F L O
O R
P L A
N
A R
E A
T
P O
W E
R
B A
T T
A L
IO
N
C O
M P
L E
X N
O R
F O
L K
D
IS
T R
IC
T
N O
R F
O L
K
V A
M L
IN
D A
L E
A R
A M
O S
B W
O O
D
J B
A R
K L E
Y
J A
N U
A R
Y
R T
A S
U B
M
IT
T A
L
SCALE: 1/8" = 1'-0"
FIRST FLOOR PLAN - AREA T - POWER
NOTES THIS SHEET
M A
R K
D E
S C
R
IP
T
IO
N D
A T
E
A m e n d m e n t
/2
/2
A m e n d m e n t
/2
/2
| Sheets |
| EP122 - FIRST FLOOR PLAN - AREA T - POWER |
File details come from the government source that posted it. Updated .