719_BC-PH2_SF420.pdf
PDF 99 KB Posted
- Attached to
- Battalion Complex (Amendment 8)
- Solicitation number
- W9123620R0001
View the file
Other files
Show 40 more
Latest 50 of 136 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
0"
FIRST FLOOR
16' - 8"
SECOND FLOOR
1113141617 1215 12.814.314.916.3
C O
N
ST
J T
CONST JT
CONST JT
C O
N T
JT
C O
N T
JT
C O
N T
JT
C O
N T
JT
C O
N T
JT
C O
N T
JT
C O
N
ST
J T
C O
N
ST
J T
C O
N
ST
J T
C O
N
ST
J T
C O
N T
JT
C O
N T
JT
4'-0" DOWEL AT 1'-0" OC AT VERT CONST JT ONLY.
CAST END INTO ONE SIDE; GREASE AND SLEEVE OPPOSITE END
CONST JT CONST JTCONST JT
CONST JTCONST JT
CONST JT
ALTERNATE CONT REINF EVERY
OTHER ROW AT CONT JT ONLY
(2) #5 T&B OF OPNGS TYP (2)#5 JAMB BARS TYP
C O
N T
JT
8' - 7" 8' - 7" 8' - 2"
BASE BIDBID OPTION POOL
BASE BIDBID OPTION POOL
6'
0" 8'
0"
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
RS
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
'D
D
AT
E
TI
M
E
ST
AM
P:
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
PR
O
JE
C
T N
O
FI
LE
N U
M
BE
R
1 2 3 4 5
D
C
B
A
PROPERTY OF UNITED STATES GOVERNMENT, FOR OFFICIAL USE ONLY (FOUO). COPYING, DISSEMINATION, AND DISTRIBUTION TO UNAUTHORIZED INDIVIDUALS PROHIBITED.
4/
/2
3:
:1
PM
SF420
PHASE 2
C O
N C
R
ET
E W
AL
L
EL
VA
TI
O
N S
G R
ID
C
B
AT
TA
LI
O N
C O
M
PL
EX
N
O R
FO
LK
D
IS
TR
IC
T N
O R
FO
LK
, V A
J.
J
O N
ES
C . S
AN
D
ER
S
C . S
AN
D
ER
S
W . M
IL
LE
R
JA
N
U
AR
Y
R
TA
S U
BM
IT
TA
L
3/16" = 1'-0"SF420
1 CONCRETE WALL ELEVATION C
0'
SCALE: 3/16" = 1' - 0"
4' 8' 12' 16'
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
AM
E N D
M
EN
T
-0 4-
1 6
CONCRETE WALL ELEVATION NOTES
1. THE MINIMUM REINFORCEMENT IS INDICATED IN 1/SF505, AND IS NOT ALL SHOWN ON THESE
ELEVATIONS. WHERE REINFORCEMENT IS NOT OTHERWISE SHOWN ON THESE
ELEVATIONS, PROVIDE THE MINIMUM REINFORCEMENT FROM 1/SF505.
2. VERTICAL CONSTRUCTION JOINT AND CONTROL JOINT LOCATIONS ARE SHOWN
ON THE PLANS. FOR CONSTRUCTION AND CONTROL JOINT DETAILS, SEE SF505.
DO NOT SUBSTITUTE VERTICAL CONSTRUCTION JOINTS FOR CONTROL JOINTS OR
VISE VERSA WITHOUT APPROVAL OF THE ENGINEER OF RECORD FOR THE LOCATION
REQUESTED.
3. VERTICAL CONTROL JOINTS HAVE BEEN LAID OUT SUCH THAT IF THE WALL IS
POURED FULL HEIGHT IN ONE POUR (MULTIPLE LIFTS), VOLUMES OF POUR WILL
USUALLY FALL BETWEEN 30-40 CUBIC YARDS (CY). SOME POURS IF PERFORMED
FULL HEIGHT WILL APPROACH 50 CY. DO NOT PERFORM SINGLE POURS GREATER
THAN 50 CY WITHOUT APPROVAL OF THE ENGINEER OF RECORD AND THE
CONTRACT OFFICER.
4. ALL HORIZONTAL JOINTS SHOWN AS CONSTRUCTION JOINTS MAY BE CONSTRUCTED
AS CONTROL JOINTS, PROVIDED THE SINGLE POUR VOLUME LIMITS OF NOTE 3
AND THE INDIVIDUAL LIFT LIMITS OF ACI ARE OBSERVED. INTERCHANGEABILITY BETWEEN
HORIZONTAL CONTROL AND CONSTRUCTION JOINTS IS INTENDED TO ALLOW THE
CONTRACTOR FLEXIBILITY TO PLAN INDIVIDUAL POURS OF A SIZE THAT IS CONSITENT
WITH THEIR QUALITY CONTROL PLAN AND CREW ABILITY TO MAINTAIN QUALITY FOR
LARGER POURS.
5. VAULT WALLS HAVE A REINFORCING SIZE AND SPACING THAT DIFFERS FROM THE
DEFAULT REINFORING ON 1/SF505. FOR VAULT WALL LOCATIONS, SEE PLAN ON
SB106.
| Sheets |
| SF420 - CONCRETE WALL ELVATIONS GRID C |
File details come from the government source that posted it. Updated .