BATTALION COMPLEX PH 2 719ACPH2
RTA SUBMITTAL
SECTION 03 30 00.00 10
CAST-IN-PLACE CONCRETE
05/14
PART 1 GENERAL
1.1 LUMP SUM CONTRACT
Under this type of contract, concrete items will be paid for by lump sum and will not be measured. The work covered by these items consists of furnishing all concrete materials, reinforcement, miscellaneous embedded materials, and equipment, and performing all labor for the forming, manufacture, transporting, placing, finishing, curing, and protection of concrete in these structures.
1.2 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AMERICAN CONCRETE INSTITUTE (ACI)
ACI 117 (2010; Errata 2011) Specifications for Tolerances for Concrete Construction and Materials and Commentary
ACI 121R (2008) Guide for Concrete Construction Quality Systems in Conformance with ISO
ACI 207.2R (2007) Report on Thermal and Volume Change Effectson Cracking of Mass Concrete
ACI 211.1 (1991; R 2009) Standard Practice for Selecting Proportions for Normal, Heavyweight and Mass Concrete
ACI 214R (2011) Evaluation of Strength Test Results of Concrete
ACI 301 (2016) Specifications for Structural Concrete
ACI 304.2R (1996; R 2008) Placing Concrete by Pumping Methods
ACI 304R (2000; R 2009) Guide for Measuring, Mixing, Transporting, and Placing Concrete
ACI 305.1 (2014) Specification for Hot Weather Concreting
ACI 306.1 (1990; R 2002) Standard Specification for Cold Weather Concreting
SECTION 03 30 00.00 10 Page 1
Charles Sanders Polygon
ACI 309R (2005) Guide for Consolidation of Concrete
ACI 318 (2014; Errata 1-2 2014; Errata 3-5 2015;
Errata 6 2016; Errata 7-9 2017) Building Code Requirements for Structural Concrete (ACI 318-14) and Commentary (ACI 318R-14)
ACI SP-15 (2011) Field Reference Manual: Standard Specifications for Structural Concrete ACI 301-05 with Selected ACI References
ASTM INTERNATIONAL (ASTM)
ASTM C1017/C1017M (2013; E 2015) Standard Specification for Chemical Admixtures for Use in Producing Flowing Concrete
ASTM C1064/C1064M (2011) Standard Test Method for Temperature of Freshly Mixed Hydraulic-Cement Concrete
ASTM C1077 (2016) Standard Practice for Laboratories Testing Concrete and Concrete Aggregates for Use in Construction and Criteria for Laboratory Evaluation
ASTM C1107/C1107M (2017) Standard Specification for Packaged Dry, Hydraulic-Cement Grout (Nonshrink)
ASTM C1157/C1157M (2011) Standard Specification for Hydraulic Cement
ASTM C1260 (2014) Standard Test Method for Potential Alkali Reactivity of Aggregates (Mortar-Bar Method)
ASTM C136/C136M (2014) Standard Test Method for Sieve Analysis of Fine and Coarse Aggregates
ASTM C143/C143M (2015a) Standard Test Method for Slump of Hydraulic-Cement Concrete
ASTM C150/C150M (2018) Standard Specification for Portland Cement
ASTM C1567 (2013) Standard Test Method for Potential Alkali-Silica Reactivity of Combinations of Cementitious Materials and Aggregate (Accelerated Mortar-Bar Method)
ASTM C1602/C1602M (2018) Standard Specification for Mixing Water Used in Production of Hydraulic Cement Concrete
ASTM C172/C172M (2017) Standard Practice for Sampling Freshly Mixed Concrete
ASTM C173/C173M (2016) Standard Test Method for Air Content of Freshly Mixed Concrete by the
SECTION 03 30 00.00 10 Page 2
Volumetric Method
ASTM C192/C192M (2016a) Standard Practice for Making and Curing Concrete Test Specimens in the Laboratory
ASTM C231/C231M (2017a) Standard Test Method for Air Content of Freshly Mixed Concrete by the Pressure Method
ASTM C260/C260M (2010a; R 2016) Standard Specification for Air-Entraining Admixtures for Concrete
ASTM C309 (2011) Standard Specification for Liquid Membrane-Forming Compounds for Curing Concrete
ASTM C31/C31M (2019) Standard Practice for Making and Curing Concrete Test Specimens in the Field
ASTM C311/C311M (2018) Standard Test Methods for Sampling and Testing Fly Ash or Natural Pozzolans for Use in Portland-Cement Concrete
ASTM C33/C33M (2018) Standard Specification for Concrete Aggregates
ASTM C39/C39M (2018) Standard Test Method for Compressive Strength of Cylindrical Concrete Specimens
ASTM C42/C42M (2018a) Standard Test Method for Obtaining and Testing Drilled Cores and Sawed Beams of Concrete
ASTM C494/C494M (2017) Standard Specification for Chemical Admixtures for Concrete
ASTM C552 (2017; E 2018) Standard Specification for Cellular Glass Thermal Insulation
ASTM C578 (2018) Standard Specification for Rigid, Cellular Polystyrene Thermal Insulation
ASTM C591 (2019) Standard Specification for Unfaced Preformed Rigid Cellular Polyisocyanurate Thermal Insulation
ASTM C595/C595M (2016) Standard Specification for Blended Hydraulic Cements
ASTM C618 (2019) Standard Specification for Coal Fly Ash and Raw or Calcined Natural Pozzolan for Use in Concrete
ASTM C78/C78M (2018) Standard Test Method for Flexural Strength of Concrete (Using Simple Beam with Third-Point Loading)
SECTION 03 30 00.00 10 Page 3
ASTM C937 (2016) Grout Fluidifier for Preplaced-Aggregate Concrete
ASTM C94/C94M (2018) Standard Specification for Ready-Mixed Concrete
ASTM C989/C989M (2017) Standard Specification for Slag Cement for Use in Concrete and Mortars
ASTM D5759 (2012) Characterization of Coal Fly Ash and Clean Coal Combustion Fly Ash for Potential Uses
ASTM D75/D75M (2014) Standard Practice for Sampling Aggregates
ASTM E1643 (2011) Standard Practice for Selection, Design, Installation, and Inspection of Water Vapor Retarders Used in Contact with Earth or Granular Fill Under Concrete Slabs
ASTM E1745 (2011) Standard Specification for Water Vapor Retarders Used in Contact with Soil or Granular Fill under Concrete Slabs
ASTM E96/E96M (2016) Standard Test Methods for Water Vapor Transmission of Materials
CONCRETE REINFORCING STEEL INSTITUTE (CRSI)
CRSI 10MSP (2009; 28th Ed) Manual of Standard Practice
NATIONAL INSTITUTE OF STANDARDS AND TECHNOLOGY (NIST)
NIST HB 44 (2013) Specifications, Tolerances, and Other Technical Requirements for Weighing and Measuring Devices
NATIONAL READY MIXED CONCRETE ASSOCIATION (NRMCA)
NRMCA CPMB 100 (2000; R 2006) Concrete Plant Standards
NRMCA QC 3 (2011) Quality Control Manual: Section 3, Plant Certifications Checklist:
Certification of Ready Mixed Concrete Production Facilities
NRMCA TMMB 100 (2001; R 2007) Truck Mixer, Agitator and Front Discharge Concrete Carrier Standards
U.S. ARMY CORPS OF ENGINEERS (USACE)
COE CRD-C 104 (1980) Method of Calculation of the Fineness Modulus of Aggregate
SECTION 03 30 00.00 10 Page 4
1.3 Definitions
1.3.1 Cementitious Material
As used herein, includes all portland cement, pozzolan, fly ash, and ground granulated blast-furnace slag.
1.3.2 Chemical Admixtures
Materials in the form of powder or fluids that are added to the concrete to give it certain characteristics not obtainable with plain concrete mixes.
1.3.3 Complementary Cementing Materials (CCM)
Coal fly ash, granulated blast-furnace slag, natural or calcined pozzolans, and ultra-fine coal ash when used in such proportions to replace the portland cement that result in considerable improvement to sustainability, durability.
1.3.4 Design Strength (f'c)
The specified compressive strength of concrete at time(s) specified in this section to meet structural design criteria.
1.3.5 Mass Concrete
Any concrete system that approaches a maximum temperature of 158 degrees F within the first 72 hours of placement. In addition, it includes all concrete elements with a least section thickness of 3 feet or more regardless of temperature.
1.3.6 Mixture Proportioning
The process of designing concrete mixture proportions to enable it to meet the strength, service life and constructability requirements of the project.
1.3.7 Mixture Proportions
The masses or volumes of individual ingredients used to make a unit measure (cubic yard) of concrete.
1.3.8 Pozzolan
Siliceous or siliceous and aluminous material, which in itself possesses little or no cementitious value but will, in finely divided form and in the presence of moisture, chemically react with calcium hydroxide at ordinary temperatures to form compounds possessing cementitious properties.
1.3.9 Workability or Consistency
The ability of a fresh (plastic) concrete mix to fill the form/mould properly with the desired work (vibration) and without reducing the concrete's quality. Workability depends on water content, chemical admixtures, aggregate (shape and size distribution), cementitious content and age (level of hydration).
SECTION 03 30 00.00 10 Page 5
1.4 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submittals with an "S" are for inclusion in the Sustainability Notebook, in conformance to Section 01 33 29 SUSTAINABILITY REPORTING. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
Quality Control Plan; G Laboratory Accreditation Sampling Plan; G
SD-03 Product Data
Recycled Content Products; (LEED) Cementitious Materials Vapor Retarder Floor Finish Chemical Admixtures
SD-05 Design Data
Mixture Proportions; G, DO Thermal Control Plan for mass concrete; G, DO
SD-06 Test Reports
Mixture Proportions; G, DO Testing and Inspection for CQC; G Fly Ash Ground Granulated Blast-Furnace (GGBF) Slag Aggregates Air Content Slump Compressive Strength Water Temperature Monitoring For Mass Concrete
SD-07 Certificates
Contractor Quality Control personnel Ready-Mix Plant
1.5 QUALITY ASSURANCE
Submit qualifications for Contractor Quality Control personnel assigned to concrete construction as American Concrete Institute (ACI) Certified Workmen in one of the following grades or show written evidence of having completed similar qualification programs:
Concrete Field Testing Technician Grade I
Concrete Laboratory Testing Technician Grade I or II
SECTION 03 30 00.00 10 Page 6
Concrete Construction Inspector Level II
Concrete Transportation Construction Inspector or Reinforced Concrete Special Inspector
Jointly certified by American Concrete Institute (ACI), Building Official and Code Administrators International (BOCA), International Code Council (ICC), and Southern Building Code Congress International (SBCCI)
Foreman or Lead Journeyman of the flatwork finishing crew
Similar qualification for ACI Concrete Flatwork Technician/Finisher or equal, with written documentation
1.5.1 Laboratory Accreditation
Provide laboratory and testing facilities. The laboratories performing the tests must be accredited in accordance with ASTM C1077, including ASTM C78/C78M and ASTM C1260. The accreditation must be current and must include the required test methods, as specified. Furthermore, the testing must comply with the following requirements:
1.5.1.1 Aggregate Testing and Mix Proportioning
Perform aggregate testing and mixture proportioning studies in an accredited laboratory, under the direction of a registered professional engineer in a U.S. state or territory who is competent in concrete materials. This person is required to sign all reports and designs.
1.5.1.2 Acceptance Testing
Furnish all materials, labor, and facilities required for molding, curing, testing, and protecting test specimens at the site and in the laboratory.
Furnish and maintain boxes or other facilities suitable for storing and curing the specimens at the site while in the mold within the temperature range stipulated by ASTM C31/C31M.
1.5.1.3 Contractor Quality Control
All sampling and testing must be performed by an approved, onsite, independent, accredited laboratory.
1.5.2 Quality Control Plan
Submit a concrete quality control program in accordance with the guidelines of ACI 121R and as specified herein. Identify the approved laboratories. Provide direct oversight for the concrete qualification program inclusive of associated sampling and testing. Provide all quality control reports to the Quality Manager, Concrete Supplier and the Contracting Officer. Maintain a copy of ACI SP-15 and CRSI 10MSP at the project site.
1.5.3 Special Properties and Products
Concrete may contain admixtures other than air entraining agents, such as water reducers, superplasticizers, or set retarding agents to provide
SECTION 03 30 00.00 10 Page 7 special properties to the concrete, if specified or approved. Include any of these materials to be used on the project in the mix design studies.
1.5.4 Technical Service for Mass Concrete
Obtain the services of a Professional Engineer registered in the State of Virginia to oversee proportioning, batching, mixing, placing, consolidating, and finishing of mass concrete. The engineer must be on the job full time from the beginning of mass concrete placement until the Contracting Officer is satisfied that field controls indicate concrete of specified quality is furnished and that the crews are capable of continued satisfactory work. Make the professional engineer available for consultation with and advising Government forces.
All mix and placement design of the mass concrete is delegated to the Professional Engineer required by this section, subject to the approval of designs by the Engineer of Record. The delegated professional engineer shall be responsible for the preparation of the Thermal Control Plan in accordance with ACI 301 Section 8.
1.5.5 Government Assurance Inspection and Testing
Day-to day inspection and testing is the responsibility of the Contractor Quality Control (CQC) staff. However, representatives of the Contracting Officer can and will inspect construction as considered appropriate and will monitor operations of the CQC staff. Government inspection or testing will not relieve any CQC responsibilities.
1.5.5.1 Materials
The Government will sample and test aggregates, cementitious materials, other materials, and concrete to determine compliance with the specifications as considered appropriate. Provide facilities and labor as may be necessary for procurement of representative test samples. Samples of aggregates will be obtained at the point of batching in accordance with ASTM D75/D75M. Other materials will be sampled from storage at the jobsite or from other locations as considered appropriate. Samples may be placed in storage for later testing when appropriate.
1.5.5.2 Fresh Concrete
Fresh concrete will be sampled as delivered in accordance with ASTM C172/C172M and tested in accordance with these specifications, as considered necessary.
1.5.5.3 Hardened Concrete
Tests on hardened concrete will be performed by the Government when such tests are considered necessary.
1.5.5.4 Inspection
Concrete operations may be tested and inspected by the Government as the project progresses. Failure to detect defective work or material will not prevent rejection later when a defect is discovered nor will it obligate the Government for final acceptance.
SECTION 03 30 00.00 10 Page 8
1.6 DELIVERY, STORAGE, AND HANDLING
Follow ACI 301 and ACI 304R requirements and recommendations. Store cement and other cementitious materials in weathertight buildings, bins, or silos that exclude moisture and contaminants and keep each material completely separated. Arrange and use aggregate stockpiles in a manner to avoid excessive segregation and to prevent contamination with other materials or with other sizes of aggregates. Do not store aggregate directly on ground unless a sacrificial layer is left undisturbed. Store reinforcing bars and accessories above the ground on platforms, skids or other supports. Store other materials in a manner to avoid contamination and deterioration. Admixtures which have been in storage at the project site for longer than 6 months or which have been subjected to freezing cannot be used unless retested and proven to meet the specified requirements. Materials must be capable of being accurately identified after bundles or containers are opened.
PART 2 PRODUCTS
In accordance with Section 01 33 29 SUSTAINABILITY REPORTING submit documentation indicating: distance between manufacturing facility and the project site, distance of raw material origin from the project site, percentage of post-industrial and post-consumer recycled content per unit of product and relative dollar value of recycled content products to total dollar value of products included in project. Provide Submittals as specified in the subject Section.
2.1 SYSTEM DESCRIPTION
Provide concrete composed of portland cement, other cementitious and pozzolanic materials as specified, aggregates, water and admixtures as specified.
2.1.1 Mass Concrete
All foundation pile caps and certain grade beams in this project, which meet the minimum dimensions of paragraph "Definitions", are considered to be mass concrete. Specification for mass concrete herein includes multiple broad provisions and permissions, permitting the cost to the contractor and the Government.
Unless otherwise specified, all mass concrete shall be in compliance with the requirements of ACI 301 Section 8, "Mass Concrete."
a. Contractor may choose from a broad range of permitted cementitious materials in this specification in order to produce an economical mix with lower heat of hydration.
b. Contractor may elect to use a concrete mix which meets the specified compressive strength f'c at 56 days in lieu of the usual 28 days.
This allows use of a mix with reduced cementitious material content, which may lower heat of hydration in an economical fashion. This may also extend the waiting period before loads may be applied to the cast member, in accordance with drawing restrictions on minimum member strength.
c. Contractor may reduce the number of identical elements requiring temperature monitoring and reporting required by ACI 301 paragraph 8.3.1.2(a)under the following conditions. The first three examples of any identical item (e.g. pile cap of a given size) must have
SECTION 03 30 00.00 10 Page 9 temperature monitoring and reporting in accordance with ACI 301 .
Subsequent examples of the same item do not reqire continuous monitoring and reporting of internal temperature, provided they are cast under substantially equivalent conditions. Only logging of the date of pour, and the usual reporting of temperature at time of placement required for all other non mass concrete, is required for excepted items.
For the purposes of this exception, substantially identical conditions means the seven day moving average maximum and minimum daily air temperatures at the site have not deviated more than 20 degrees Farenheit, and the seven day moving average noontime soil temperature at a depth of 24" at the site has not deviated more than 10 degrees Farenheit, compared to the seven day average temperatures taken on the day of pouring for the successfully completed example item with existing monitoring data. In order to take advantage of this exception, the contractor must esablish, maintain, and log a soil temperature measurement point on site at the required depth, in a location which will not be distrubed for a period of time from 7 days before the first mass concrete pour, to seven days after the completion of cure of the last mass concrete pour. Air temperature data may be based on the daily NOAA data from the site at Newport News International Airport, in lieu of maintaining a monitor on site.
d. Contractor may exceed the temperature differential limit of 35 degrees Farenheit in ACI 301 paragraph 8.1.3(b) by developing an engineered, variable limit based on concrete time since pouring and time-based increases in concrete tensile strength as the concrete cures.
Calculations for an engineered limit should be based on the design data and guidance in ACI 207.2R , and should be calculated to limit thermal cracking from pour until completion of cure period to 0.012 inches or less. These calculations should be included in the Thermal Control Plan for review and approval. Performance of initial poured specimens of each type in the field shall be used to validate the performance of the engineered limit; cracking exceeding the limit given here will require revision of the engineered limit for further pours.
e. Contractor may use the mass concrete mix design for other concrete elements of the same required strength, if it is more economical than providing an additional mix. This mix may only be used for concrete below grade and not exposed to weather or view. If this mix is a 56 day mix, the same extended limits on application of load vs. cure time apply. However, thermal monitoring and reporting would not apply for items which are not otherwise required to be treated as mass concrete.
2.1.2 Proportioning Studies-Normal Weight Concrete and Mass Concrete
Trial design batches, mixture proportions studies, and testing requirements for various types of concrete specified are the responsibility of the Contractor. Base mixture proportions on compressive strength as determined by test specimens fabricated in accordance with ASTM C192/C192M and tested in accordance with ASTM C39/C39M. Obtain mix design approval from the Contracting Officer prior to concrete placement.
a. Samples of all materials used in mixture proportioning studies must be representative of those proposed for use in the project and be accompanied by the manufacturer's or producer's test reports indicating compliance with these specifications.
SECTION 03 30 00.00 10 Page 10
b. Make trial mixtures having proportions, consistencies, and air content suitable for the work based on methodology described in ACI 211.1 , using at least three different water-cementitious material ratios for each type of mixture, which produce a range of strength encompassing those required for each type of concrete required on the project.
c. The maximum water-cementitious material ratios allowed in subparagraph WATER-CEMENTITIOUS MATERIAL RATIO below will be the equivalent water-cementitious material ratio as determined by conversion from the weight ratio of water to cement plus pozzolan by the weight equivalency method as described in ACI 211.1 . In the case where GGBF slag is used, include the weight of the GGBF slag in the equations in ACI 211.1 for the term P, which is used to denote the weight of pozzolan. If pozzolan is used in the concrete mixture, the minimum pozzolan content is 15 percent by weight of the total cementitious material.
d. Design laboratory trial mixtures for maximum permitted slump and air content. Make separate sets of trial mixture studies for each combination of cementitious materials and each combination of admixtures proposed for use. No combination of either may be used until proven by such studies, except that, if approved in writing and otherwise permitted by these specifications, an accelerator or a retarder may be used without separate trial mixture study. Separate trial mixture studies must also be made for concrete for any conveying or placing method proposed which requires special properties and for concrete to be placed in unusually difficult placing locations. For previously approved concrete mix designs used within the past twelve months, the previous mix design may be re-submitted without further trial batch testing if accompanied by material test data conducted within the last six months.
e. Report the temperature of concrete in each trial batch. For each water-cementitious material ratio, make at least three test cylinders for each test age, cure in accordance with ASTM C192/C192M and test at 7 and 28 days in accordance with ASTM C39/C39M for 28 day mixes, and additionally at 56 days for 56 day mixes. From these test results, plot a curve showing the relationship between water-cementitious material ratio and strength for each set of trial mix studies. In addition, plot a curve showing the relationship between 7 day and 28 day strengths, as well as 56 day strengths for 56 day mixes. Use this curve as the basis for minimum time before loading newly constructed elements as required by drawing notes. Design each mixture to promote easy and suitable concrete placement, consolidation and finishing, and to prevent segregation and excessive bleeding.
f. Submit the results of trial mixture design studies along with a statement giving the maximum nominal coarse aggregate size and the proportions of ingredients that will be used in the manufacture of each strength of concrete, at least 60 days prior to commencing concrete placing operations. Base aggregate weights on the saturated surface dry condition. Accompany the statement with test results from an approved independent commercial testing laboratory, showing that mixture design studies have been made with materials proposed for the project and that the proportions selected will produce concrete of the qualities indicated. No substitutions may be made in the materials used in the mixture design studies without additional tests to show that the quality of the concrete is satisfactory.
SECTION 03 30 00.00 10 Page 11
2.1.3 Average Compressive Strength
The mixture proportions selected during mixture design studies must produce a required average compressive strength (f'cr) exceeding the specified compressive strength (f'c) by the amount indicated below, but may not exceed the specified strength at the same age by more than 20 percent. This required average compressive strength, f'cr, will not be a required acceptance criteria during concrete production. However, whenever the daily average compressive strength at 28 days drops below f'cr during concrete production, or daily average 7-day strength drops below a strength correlated with the 28-day f'cr, adjust the mixture, as approved, to bring the daily average back up to f'cr. During production, the required f'cr must be adjusted, as appropriate, based on the standard deviation being attained on the job.
2.1.4 Computations from Test Records
Where a concrete production facility has test records, establish a standard deviation in accordance with the applicable provisions of ACI 214R .
Test records from which a standard deviation is calculated must represent materials, quality control procedures, and conditions similar to those expected; must represent concrete produced to meet a specified strength or strengths (f'c) within 1000 psi of that specified for proposed work; and must consist of at least 30 consecutive tests. A strength test must be the average of the strengths of two cylinders made from the same sample of concrete and tested at 28 days. Required average compressive strength f'cr used as the basis for selection of concrete proportions must be in accordance with ACI 318 Chapter 5.
2.1.5 Tolerances
Except as otherwise specified herein, tolerances for concrete batching, mixture properties, and construction as well as definition of terms and application practices must be in accordance with ACI 117 . Take level and grade tolerance measurements of slabs as soon as possible after finishing;
when forms or shoring are used, the measurements must be made prior to removal.
2.1.6 Floor Finish
For floor finishes, see Section 03 35 00.00 10 CONCRETE FINISHING.
2.1.7 Strength Requirements
Specified compressive strength (f'c) must be as follows:
COMPRESSIVE STRENGTH STRUCTURE OR PORTION OF STRUCTURE
7500 psi at 28 days 8" thick slab on grade, see plans for location
5000 psi at 28 days All ground floor slabs on grade, exterior concrete, and paving unless otherwise noted
4000 psi at 28 or 56 days Mass concrete
SECTION 03 30 00.00 10 Page 12
COMPRESSIVE STRENGTH STRUCTURE OR PORTION OF STRUCTURE
4000 psi at 28 days All other concrete unless otherwise noted
Concrete made with high-early strength cement must have a 7-day strength equal to the specified 28-day strength for concrete made with Type I or II portland cement. Compressive strength must be determined in accordance with ASTM C39/C39M.
2.1.7.1 Evaluation of Concrete Compressive Strength
Fabricate six compressive strength specimens, 6 inch by 12 inch cylinders, laboratory cure them in accordance with ASTM C31/C31M and test them in accordance with ASTM C39/C39M. Test two cylinders at 7 days, two cylinders at 28 days, two cylinders at 56 days for 56 day mixes, and hold two cylinder in reserve. The strength of the concrete is considered satisfactory so long as the average of all sets of three consecutive test results do not exceed the specified compressive strength f'c by 20 percent and no individual test result falls below the specified strength f'c by more than 500 psi), unless approved by the Contracting Officer. A "test" is defined as the average of two companion cylinders, or if only one cylinder is tested, the results of the single cylinder test. Additional analysis or testing, including taking cores and/or load tests may be required when the strength of the concrete in the structure is considered potentially deficient.
2.1.7.2 Investigation of Low-Strength Compressive Test Results
When any strength test of standard-cured test cylinders falls below the specified strength requirement by more than 500 psi or if tests of field-cured cylinders indicate deficiencies in protection and curing, take steps to assure that the load-carrying capacity of the structure is not jeopardized. When the strength of concrete in place is considered potentially deficient, obtain cores and test in accordance with ASTM C42/C42M. Take at least three representative cores from each member or area of concrete in place that is considered potentially deficient.
The location of cores will be determined by the Contracting Officer to least impair the strength of the structure. Concrete in the area represented by the core testing will be considered adequate if the average strength of the cores is equal to at least 85 percent of the specified strength requirement and if no single core is less than 75 percent of the specified strength requirement. Non-destructive tests (tests other than test cylinders or cores) may not be used as a basis for acceptance or rejection. Perform the coring and repair the holes; cores will be tested by the Government.
2.1.7.3 Load Tests
If the core tests are inconclusive or impractical to obtain or if structural analysis does not confirm the safety of the structure, load tests may be directed by the Contracting Officer in accordance with the requirements of ACI 318 . Correct concrete work evaluated by structural analysis or by results of a load test as being understrength in a manner satisfactory to the Contracting Officer. Perform all investigations, testing, load tests, and correction of deficiencies approved by the Contracting Officer, except that if all concrete is found to be in compliance with the drawings and specifications, the cost of
SECTION 03 30 00.00 10 Page 13 investigations, testing, and load tests will be at the expense of the Government.
2.1.8 Water-Cementitious Material Ratio
Maximum water-cementitious material ratio (w/c) for normal weight concrete is as follows:
WATER-CEMENTITIOUS MATERIAL RATIO, BY
WEIGHT
STRUCTURE OR PORTION OF STRUCTURE
0.50 All concrete unless otherwise noted
0.40 Exterior concrete and paving
2.1.9 Air Entrainment
Air entrain normal weight concrete based on the following table.
MINIMUM AIR CONTENT Percent STRUCTURE OR PORTION OF STRUCTURE
6.0 Exterior concrete and paving
None All other concrete unless otherwise noted
Attain specified air content at point of placement into the forms within plus or minus 1.5 percent. Determine air content for normal weight concrete in accordance with ASTM C231/C231M.
2.1.10 Slump
Slump of the concrete, as delivered to the point of placement into the forms, must be within the following limits. Determine slump in accordance with ASTM C143/C143M.
Structural Element Slump inches
Minimum Maximum
Walls, columns and beams 2 4
Foundation walls, substructure walls, footings, slabs
1 3
Any structural concrete approved for placement by pumping:
At pump 2 8
At discharge of line 1 4
When use of a plasticizing admixture conforming to ASTM C1017/C1017M or when a Type F or G high range water reducing admixture conforming to
SECTION 03 30 00.00 10 Page 14
ASTM C494/C494M is permitted to increase the slump of concrete, concrete must have a slump of 2 to 4 inches before the admixture is added and a maximum slump of 8 inches at the point of delivery after the admixture is added.
2.1.11 Concrete Temperature
The temperature of the concrete as delivered must not exceed 90 degrees F.
When the ambient temperature during placing is 40 degrees F or less, or is expected to be at any time within 6 hours after placing, the temperature of the concrete as delivered must be between 55 and 75 degrees F.
Temperature of concrete delivered for mass concrete pours must be in accordance with the requirements and limits of the submitted and approved Thermal Control Plan.
2.1.12 Size of Coarse Aggregate
Use the largest feasible nominal maximum size aggregate (NMSA), specified in PART 2 paragraph AGGREGATES, in each placement. However, do not exceed nominal maximum size of aggregate for any of the following: three-fourths of the minimum cover for reinforcing bars, three-fourths of the minimum clear spacing between reinforcing bars, one-fifth of the narrowest dimension between sides of forms, or one-third of the thickness of slabs or toppings.
2.2 CEMENTITIOUS MATERIALS
Cementitious Materials must be portland cement, portland-pozzolan cement, portland blast-furnace slag cement, or portland cement in combination with pozzolan or ground granulated blast furnace slag conforming to appropriate specifications listed below. Restrict usage of cementitious materials in concrete that will have surfaces exposed in the completed structure so there is no change in color, source, or type of cementitious material.
2.2.1 Portland Cement
ASTM C150/C150M, Type II or Type II(MH) with a maximum 10 percent amount of tricalcium aluminate, and a maximum cement-alkali content of 0.80 percent Na2Oe (sodium oxide) equivalent. White portland cement must meet the above requirements except that it may be Type I, Type II.
2.2.2 Blended Cements
Conform blended cement to ASTM C595/C595M and ASTM C1157/C1157M , Type IP or IS, including the optional requirement for mortar expansion and consist of a mixture of ASTM C150/C150M Type I, or Type II, or Type II(MH) cement and a complementary cementing material. The slag added to the Type IS blend must be ASTM C989/C989M ground granulated blast-furnace slag. The pozzolan added to the Type IP blend must be ASTM C618 and must be interground with the cement clinker. Provide a manufacturer's statement that the amount of pozzolan in the finished cement will not vary more than plus or minus 5 mass percent of the finished cement from lot-to-lot or within a lot. Do not change the percentage and type of mineral admixture used in the blend from that submitted for the aggregate evaluation and mixture proportioning.
2.2.3 Fly Ash
Conform fly ash to ASTM C618. If pozzolan is used, it must never be less
SECTION 03 30 00.00 10 Page 15 than 15 percent by weight of the total cementitious material. Report the chemical analysis of the fly ash in accordance with ASTM C311/C311M.
Evaluate and classify fly ash in accordance with ASTM D5759. Comply with EPA requirements in accordance with Section 01 33 29 SUSTAINABILITY
REPORTING.
2.2.4 Raw or Calcined Natural Pozzolan
Natural pozzolan must be raw or calcined and conform to ASTM C618, Class N, including the optional requirements for uniformity and effectiveness in controlling Alkali-Silica reaction. Class N pozzolan for use in mitigating Alkali-Silica Reactivity must have a Calcium Oxide (CaO) content of less than 13 percent and total equivalent alkali content less than 3 percent.
2.2.5 Ultra Fine Fly Ash and Ultra Fine Pozzolan
Conform Ultra Fine Fly Ash (UFFA) and Ultra Fine Pozzolan (UFP) ASTM C618, and the following additional requirements:
a. The strength activity index at 28 days of age is at least 95 percent of the control specimens.
b. The average particle size does not exceed 6 microns.
c. The sum of SiO2 + Al2O3 + Fe2O3 is greater than 77 percent.
2.2.6 Ground Granulated Blast-Furnace (GGBF) Slag
ASTM C989/C989M. Slag content must be a minimum of 25 percent by weight of cementitious material. Submit test results in accordance with ASTM C989/C989M for GGBF slag. Submit test results performed within 6 months of submittal date.
2.3 AGGREGATES
Test and evaluate fine and coarse aggregates for alkali-aggregate reactivity in accordance with ASTM C1260. Evaluate the fine and coarse aggregates separately and in combination, which matches the proposed mix design proportioning. All results of the separate and combination testing must have a measured expansion less than 0.10 (0.08) percent at 16 days after casting. Should the test data indicate an expansion of 0.10 (0.08) percent or greater, reject the aggregate(s) or perform additional testing using ASTM C1260 and ASTM C1567. Perform the additional testing using ASTM C1260 and ASTM C1567 using the low alkali portland cement in combination with ground granulated blast furnace (GGBF) slag, or fly ash or natural pozzolan. Provide fine and coarse aggregates conforming to the following.
2.3.1 Fine Aggregate
Conform to the quality and gradation requirements of ASTM C33/C33M.
2.3.2 Coarse Aggregate
Conform to ASTM C33/C33M, Class 5S, size designation 3, 357, 4, 467,v5, 56, or 57.
SECTION 03 30 00.00 10 Page 16
2.4 CHEMICAL ADMIXTURES
When required or permitted, conform to the appropriate specification listed. Furnish admixtures in liquid form and of suitable concentration for easy, accurate control of dispensing.
2.4.1 Air-Entraining Admixture
ASTM C260/C260M and must consistently entrain the air content in the specified ranges under field conditions.
2.4.2 Accelerating Admixture
ASTM C494/C494M, Type C or E, except that calcium chloride or admixtures containing calcium chloride cannot be used.
2.4.3 Water-Reducing or Retarding Admixture
ASTM C494/C494M, Type A, B, or D, except that the 6-month and 1-year compressive strength tests are waived.
2.4.4 High-Range Water Reducer
ASTM C494/C494M, Type F or G, except that the 6-month and 1-year strength requirements are waived. Use the admixture only when approved in writing, such approval being contingent upon particular mixture control as described in the Contractor's Quality Control Plan and upon performance of separate mixture design studies.
2.4.5 Expanding Admixture
Aluminum powder type expanding admixture conforming to ASTM C937.
2.4.6 Other Chemical Admixtures
Provide chemical admixtures for use in producing flowing concrete in compliance with ASTM C1017/C1017M , Type I or II. Use these admixtures only when approved in writing, such approval being contingent upon particular mixture control as described in the Contractor's Quality Control Plan and upon performance of separate mixture design studies.
2.5 WATER
Provide water complying with the requirements of ASTM C1602/C1602M .
Provide potable water for mixing, free of injurious amounts of oil, acid, salt, or alkali. Submit test report showing water complies with
ASTM C1602/C1602M .
2.6 NONSHRINK GROUT
Provide nonshrink grout conforming to ASTM C1107/C1107M , and a commercial formulation suitable for the proposed application.
2.7 NONSLIP SURFACING MATERIAL
Provide nonslip surfacing material consisting of 55 percent, minimum, aluminum oxide or silicon-dioxide abrasive ceramically bonded together to form a homogeneous material sufficiently porous to provide a good bond with portland cement paste; or factory-graded emery aggregate consisting
SECTION 03 30 00.00 10 Page 17 of not less than 45 percent aluminum oxide and 25 percent ferric oxide.
Use well graded aggregate from particles retained on the No. 30 sieve to particles passing the No. 8 sieve.
2.8 EMBEDDED ITEMS
Provide the size and type indicated or as needed for the application.
2.9 PERIMETER INSULATION
Polystyrene conforming to ASTM C578, Type II; polyurethane conforming to ASTM C591, Type II; or cellular glass conforming to ASTM C552, Type I or IV. Comply with EPA requirements in accordance with Section 01 33 29
SUSTAINABILITY REPORTING.
2.10 VAPOR RETARDER
Polyethylene sheeting, ASTM E1745 Class C, with a minimum thickness of 10 mils or other equivalent material having a vapor permeance rating not exceeding 0.04 perms as determined in accordance with ASTM E96/E96M.
2.11 JOINT MATERIALS
2.11.1 Joint Fillers, Sealers, and Waterstops
Provide materials for expansion joint fillers and waterstops in accordance with Section 03 15 00.00 10 CONCRETE ACCESSORIES. Provide materials for and sealing of joints conforming to the requirements of Section 07 92 00
JOINT SEALANTS.
2.11.2 Contraction Joints in Slabs
Provide materials for contraction joint inserts in accordance with Section
03 15 00.00 10 CONCRETE ACCESSORIES.
PART 3 EXECUTION
3.1 PREPARATION FOR PLACING
Before commencing concrete placement, perform the following: Clean surfaces to receive concrete, free from frost, ice, mud, and water.
Place, clean, coat, and support forms in accordance with Section 03 11 13.00 10 STRUCTURAL CONCRETE FORMWORK. Place, clean, tie, and support reinforcing steel in accordance with Section 03 20 00.00 10 CONCRETE REINFORCEMENT. Transporting and conveying equipment is in-place, ready for use, clean, and free of hardened concrete and foreign material.
Equipment for consolidating concrete is at the placing site and in proper working order. Equipment and material for curing and for protecting concrete from weather or mechanical damage is at the placing site, in proper working condition and in sufficient amount for the entire placement. When hot, windy conditions during concreting appear probable, equipment and material is at the placing site to provide windbreaks, shading, fogging, or other action to prevent plastic shrinkage cracking or other damaging drying of the concrete as required in Section 03 39 00.00 10
CONCRETE CURING.
SECTION 03 30 00.00 10 Page 18
3.1.1 Foundations
3.1.1.1 Concrete on Earth Foundations
Earth (subgrade, base, or subbase courses) surfaces upon which concrete is to be placed is clean, damp, and free from debris, frost, ice, and standing or running water. Prior to placement of concrete, the foundation must be well drained, satisfactorily graded and uniformly compacted.
3.1.1.2 Excavated Surfaces in Lieu of Forms
Concrete for footings may be placed directly against the soil provided the earth or rock has been carefully trimmed, is uniform and stable, and meets the compaction requirements of Section 31 00 00 EARTHWORK. Place the concrete without becoming contaminated by loose material, and outlined within the specified tolerances.
3.1.2 Previously Placed Concrete
Prepare concrete surfaces to which additional concrete is to be bonded for receiving the next horizontal lift by cleaning the construction joint surface with either air-water cutting, sandblasting, high-pressure water jet, or other approved method. Prepare concrete at the side of vertical construction joints as approved by the Contracting Officer. Do not use air-water cutting on formed surfaces or surfaces congested with reinforcing steel. Regardless of the method used, the resulting surfaces must be free from all laitance and inferior concrete so that clean surfaces of well bonded coarse aggregate are exposed and make up at least 10-percent of the surface area, distributed uniformly throughout the surface. Do not undercut the edges of the coarse aggregate. Keep the surface of horizontal construction joints continuously wet for the first 12 hours during the 24-hour period prior to placing fresh concrete. Wash the surface completely clean as the last operation prior to placing the next lift. For heavy duty floors and two-course floors, thoroughly scrub a thin coat of neat cement grout of about the consistency of thick cream into the existing surface immediately ahead of the topping placing. The grout must be a 1:1 mixture of portland cement and sand passing the No. 8 sieve. Deposit the topping concrete before the grout coat has had time to stiffen.
3.1.2.1 Air-Water Cutting
Perform air-water cutting of a fresh concrete surface at the proper time and only on horizontal construction joints. The air pressure used in the jet mustl be 100 psi, plus or minus 10 psi, and the water pressure must be just sufficient to bring the water into effective influence of the air pressure. When approved by the Contracting Officer, a surface retarder complying with the requirements of ASTM C309 may be applied to the surface of the lift in order to prolong the period of time during which air-water cutting is effective. After cutting, wash and rinse the surface as long as there is any trace of cloudiness of the wash water. Where necessary to remove accumulated laitance, coatings, stains, debris, and other foreign material, use high-pressure waterjet or sandblasting as the last operation before placing the next lift.
3.1.2.2 High-Pressure Water Jet
Use a stream of water under a pressure of not less than 3,000 psi for cutting and cleaning. Delay its use until the concrete is sufficiently
SECTION 03 30 00.00 10 Page 19 hard so that only the surface skin or mortar is removed and there is no undercutting of coarse-aggregate particles. If the waterjet is incapable of a satisfactory cleaning, clean the surface by sandblasting.
3.1.2.3 Wet Sandblasting
Use wet sandblasting after the concrete has reached sufficient strength to prevent undercutting of the coarse aggregate particles. After wet sandblasting, thoroughly wash the surface of the concrete to remove all loose materials.
3.1.2.4 Waste Disposal
Dispose of waste water employed in cutting, washing, and rinsing of concrete surfaces in a manner that the waste water does not stain, discolor, or affect exposed surfaces of the structures, or damage the environment of the project area. The method of disposal is subject to approval.
3.1.2.5 Preparation of Previously Placed Concrete
Abrade concrete surfaces to which other concrete is to be bonded in an approved manner that exposes sound aggregate uniformly without damaging the concrete. Remove laitance and loose particles. Thoroughly wash surfaces, leaving them moist but without free water when concrete is placed.
3.1.3 Vapor Retarder
Provide vapor retarder beneath the interior on-grade concrete floor slabs installed in accordance with ASTM E1643. Use the greatest widths and lengths practicable to eliminate joints wherever possible. Lap joints a minimum of 12 inches. Remove torn, punctured, or damaged vapor barrier material and provide new vapor barrier prior to placing concrete. For minor repairs, patches may be made using laps of at least 12 inches. Seal lapped joints and patch edges with pressure-sensitive adhesive or tape not less than 2 inches wide and compatible with the membrane. Place vapor barrier directly on underlying subgrade, base course, or capillary water barrier, unless it consists of crushed material or large granular material which could puncture the vapor barrier. In this case, a thin layer of approximately 1/2 inch of fine graded material should be rolled or compacted over the fill before installation of the vapor barrier to reduce the possibility of puncture. Control concrete placement so as to prevent damage to the vapor barrier.
3.1.4 Perimeter Insulation
Install perimeter insulation at locations indicated. Use adhesive where insulation is applied to the interior surface of foundation walls and may be used for exterior application.
3.1.5 Embedded Items
Before placement of concrete, determine that all embedded items are firmly and securely fastened in place as indicated on the drawings, or required.
Conduit and other embedded items must be clean and free of oil and other foreign matter such as loose coatings or rust, paint, and scale. The embedding of wood in concrete is permitted only when specifically authorized or directed. Temporarily fill voids in sleeves, inserts, and
SECTION 03 30 00.00 10 Page 20 anchor slots with readily removable materials to prevent the entry of concrete into voids. Do not Weld on embedded metals within 12 inches of the surface of the concrete. Do not tack weld on or to embedded items.
3.2 CONCRETE PRODUCTION
3.2.1 General Requirements
Batch and mix concrete onsite or furnish from a ready-mixed concrete plant. Batch, mix, and transport ready-mixed concrete in accordance with ASTM C94/C94M, except as otherwise specified. Truck mixers, agitators, and nonagitating transporting units must comply with NRMCA TMMB 100.
Ready-mix plant equipment and facilities must be certified in accordance with NRMCA QC 3. Furnish approved batch tickets for each load of ready-mixed concrete. Conform site-mixed concrete to the following subparagraphs.
3.2.2 Batching Plant
Locate the batching plant onsite in the general area indicated or offsite close to the project. Conform the batching plant to the requirements of NRMCA CPMB 100 and as specified; however, rating plates attached to batch plant equipment are not required.
3.2.3 Batching Equipment
Use semiautomatic or automatic batching controls as defined in NRMCA CPMB 100. Provide a semiautomatic batching system with interlocks such that the discharge device cannot be actuated until the indicated material is within the applicable tolerance. Equip the batching system with accurate recorder or recorders that meet the requirements of NRMCA CPMB 100. Record the weight of water and admixtures if batched by weight. Provide separate bins or compartments for each size group of aggregate and type of cementitious material, to prevent intermingling at any time. Weigh aggregates either in separate weigh batchers with individual scales or, provided the smallest size is batched first, cumulatively in one weigh batcher on one scale. Do not weigh aggregate in the same batcher with cementitious material. If both portland cement and other cementitious material are used, they may be batched cumulatively, provided that the portland cement is batched first. Water may be measured by weight or volume. Do not weigh or measure water cumulatively with another ingredient.