719_BC-PH2_12 21 00.pdf

PDF 43 KB Posted

Attached to
Battalion Complex (Amendment 8)
Solicitation number
W9123620R0001
Issued by

View the file

Other files

File Type Posted
W9123620R0001P0008 - Amendment 8.pdf PDF
18245_ - AREA T - POWER.pdf PDF
A.07.24 - W9123620R0001(Amendment 7).pdf PDF
W9123620R0001 Amendment 6.pdf PDF
719_BC-PH2_SF423.pdf PDF
719_BC-PH2_MP121.pdf PDF
719_BC -PH2-A-601.pdf PDF
719_BC-PH2_SF600(Amend5).pdf PDF
720_BC-PH3-S504.pdf PDF
719_BC-PH2_26 20 00.pdf PDF
719_BC-PH2_MP111.pdf PDF
719_BC_PH2_Sheet A-200.pdf PDF
719_BC_Sheet - I-003.pdf PDF
719_BC-PH2_SF505.pdf PDF
719_BC-PH2_MP122.pdf PDF
720_BC-PH3-CS103.pdf PDF
719_BC-PH2_MP116.pdf PDF
719_BC-PH2_SF422.pdf PDF
719_BC_Sheet - I-223.pdf PDF
05 12 00.pdf PDF
22 00 00.pdf PDF
720_BC-PH3-CU102.pdf PDF
719_BC_PH2_Sheet A-412.pdf PDF
720_BC-PH3-S215 (1).pdf PDF
719_BC_FFE_PH2_Amendment 5 sheets(Amend5).pdf PDF
719_BC-PH2_SF420.pdf PDF
719_BC-PH2 Sheet EP404.pdf PDF
26 51 00.pdf PDF
719_BC-PH2_SF425.pdf PDF
10 28 13.pdf PDF
23 65 00.pdf PDF
28 31 76.pdf PDF
719_BC_Sheet - I-008.pdf PDF
AMEND005-719_BC-PH2_FA001-FA126.pdf PDF
719_BC-PH2_03 30 00.00 10.pdf PDF
719_BC-PH2_10 21 13.pdf PDF
PH1 TWS TWR piping routing.pdf PDF
720_BC-PH3-SF600.pdf PDF
720_BC_PH3_EL119-EL123_EL502.pdf PDF
719_BC-PH2_FA001_FA111-FA114.pdf PDF
719_BC_Sheet - I-124.pdf PDF
719_BC -PH2-A- 603.pdf PDF
719_BC_PH2_Sheet A-411.pdf PDF
720_BC_PH3_FP001_FP140-FP143.pdf PDF
719_BC-PH2_SF421.pdf PDF
719_BC-PH2_SB106.pdf PDF
720_BC_PH3_A-605.pdf PDF
719_BC-PH2_MP113.pdf PDF
719_BC-PH2_11 46 01.06.pdf PDF
719_BC-PH2_S-001(Amend5).pdf PDF
Show 40 more

Latest 50 of 136 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BATTALION COMPLEX PH 2-3 719BCPH2

720BCPH3

SECTION 12 21 00

WINDOW BLINDS

08/10

PART 1 GENERAL

1.1 SUMMARY

Provide window treatment, conforming to NFPA 701 , complete with necessary brackets, fittings, and hardware. Provide each window treatment type as a complete unit in accordance with paragraph WINDOW TREATMENT PLACEMENT SCHEDULE. Mount and operate equipment in accordance with manufacturer's instructions. Completely cover windows to receive a treatment.

1.2 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by basic designation only.

NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)

NFPA 701 (2015) Standard Methods of Fire Tests for Flame Propagation of Textiles and Films

SCIENTIFIC CERTIFICATION SYSTEMS (SCS)

SCS SCS Global Services (SCS)Indoor Advantage

UL ENVIRONMENT (ULE)

ULE Greenguard UL Greenguard Certification Program

1.3 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submittals with an "S" are for inclusion in the Sustainability eNotebook, in conformance to Section 01 33 29 SUSTAINABILITY REPORTING. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES

SD-02 Shop Drawings

Installation

SD-03 Product Data

Window Blinds; G Installation Certification

SD-04 Samples

Window Blinds; G

SECTION 12 21 00 Page 1 e4ecedgg Polygon

BATTALION COMPLEX PH 2 719ACPH2

SD-06 Test Reports

Window Blinds

SD-08 Manufacturer's Instructions

Window Blinds; G

SD-10 Operation and Maintenance Data

Window Blinds; G

1.4 SUSTAINABLE DESIGN CERTIFICATION

Product shall be third party certified in accordance with ULE Greenguard , SCS Scientific Certification Systems Indoor Advantageor equal.

Certification shall be performed annually and shall be current.

1.5 DELIVERY, STORAGE, AND HANDLING

Deliver components to the jobsite in the manufacturer's original packaging with the brand or company name, item identification, and project reference clearly marked. Store components in a dry location that is adequately ventilated and free from dust, water, or other contaminants and has easy access for inspection and handling. Store materials flat in a clean dry area with temperature maintained above 50 degrees F. Do not open containers until needed for installation unless verification inspection is required.

1.6 WARRANTY

Provide manufacturer's standard performance guarantees or warranties that extend beyond a 1 year period.

PART 2 PRODUCTS

2.1 WINDOW BLINDS

Provide each blind, including hardware, accessory items, mounting brackets and fastenings, as a complete unit produced by one manufacturer. All parts shall be one color, unless otherwise indicated, to match the color of the blind slat. Treat steel features for corrosion resistance. Submit samples of each type and color of window treatment. Provide horizontal louver blind slats 6 inch in length for each color. Provide 6 inch sample of horizontal blind slats in each color specified. Also submit results of Fire resistance, Flame Spread, and Smoke contribution tests.

2.1.1 Horizontal Blinds

Provide horizontal blinds with 2 inch slats. Blind units shall be capable of nominally 180 degree partial tilting operation and full-height raising. Blinds shall be inside mount. Provide tapes for 2 inch slats with longitudinal reinforced vinyl plastic in 1-piece turn ladder construction. Tapes for 1 inch slats shall be braided polyester or nylon.

SECTION 12 21 00 Page 2

2.1.1.1 Head Channel and Slats

Provide head channel made of steel or aluminum with corrosion-resistant finish nominal 0.018 inch for 2 inch slats. Provide slats of aluminum, not less than 0.008 inch thick, and of sufficient strength to prevent sag or bow in the finished blind. Provide a sufficient amount of slats to assure proper control, uniform spacing, and adequate overlap. Enclose all hardware in the headrail.

2.1.1.2 Controls

The slats shall be tilted by a transparent tilting wand, hung vertically by its own weight, and shall swivel for easy operation. Provide a tilter control of enclosed construction. Provide moving parts and mechanical drive made of compatible materials which do not require lubrication during normal expected life. The tilter shall tilt the slats to any desired angle and hold them at that angle so that any vibration or movement of ladders and slats will not drive the tilter and change the angle of slats. Include a mechanism to prevent over tightening. Provide a wand of sufficient length to reach to within 5 feet of the floor.

2.1.1.3 Intermediate Brackets

Provide intermediate brackets for installation, as recommended by the manufacturer, of blinds over 48 inch wide.

2.1.1.4 Bottom Rail

Provide bottom rail made of corrosion-resistant steel with factory applied finish. Provide closed oval shaped bottom rail with double-lock seam for maximum strength. Bottom rail and end caps to match slats in color.

2.1.1.5 Braided Ladders

Provide braided ladders of 100 percent polyester yarn, color to match the slat color. Space ladders 15.2 slats per foot of drop in order to provide a uniform overlap of the slats in a closed position.

2.1.1.6 Hold-Down Brackets

Provide universal type hold-down brackets for sill or jamb mount where indicated on placement list.

2.1.1.7 Audio Visual Blinds

In addition to requirements for blinds, each unit shall include light traps at sides, and sill. Provide privacy blinds which provide light enhancing capabilities by means of hidden slat holes. Construct light traps from aluminum or sheet steel, not less than 0.02 inch thick, U-shaped, with legs not less than 1.75 inch long for 2 inch blinds. Round or bead edges in contact with blinds. Finish inside surfaces of light traps in a dull gray or black color.

2.2 COLOR

Provide color, pattern and texture selected from manufacturer's standard colors

SECTION 12 21 00 Page 3

PART 3 EXECUTION

3.1 EXAMINATION

After becoming familiar with details of the work, verify all dimensions in the field, and advise the Contracting Officer of any discrepancy before performing the work.

3.2 WINDOW TREATMENT PLACEMENT SCHEDULE

All interior and exeterior windows for both phases of construction.

3.3 INSTALLATION

Submit drawings showing fabrication and installation details. Show layout and locations of track, direction of draw, mounting heights, and details.

3.3.1 Horizontal and Audio Visual Blinds

Perform installation of Horizontal and Audio Visual Blinds in accordance with the approved detail drawings and manufacturer's installation instructions. Install units level, plumb, secure, and at proper height and location relative to window units. Provide and install supplementary or miscellaneous items in total, including clips, brackets, or anchorages incidental to or necessary for a sound, secure, and complete installation. Do not start installation until completion of room painting and finishing operations.

3.4 CLEAN-UP

Upon completion of the installation, free window treatments from soiling, damage or blemishes; and adjust them for form and appearance and proper operating condition. Repair or replace damaged units as directed by the Contracting Officer. Isolate metal parts from direct contact with concrete, mortar, or dissimilar metals. Ensure blinds installed in recessed pockets can be removable without disturbing the pocket. The entire blind, when retracted, shall be contained behind the pocket. For blinds installed outside the jambs and mullions, overlap each jamb and mullion 0.75 inch or more when the jamb and mullion sizes permit. Include all hardware, brackets, anchors, fasteners, and accessories necessary for a complete, finished installation.

-- End of Section --

SECTION 12 21 00 Page 4

DIVISION 12 - FURNISHINGS
12 21 00 - WINDOW BLINDS
PART 1 GENERAL
1.1 SUMMARY
1.2 REFERENCES
1.3 SUBMITTALS
1.4 SUSTAINABLE DESIGN CERTIFICATION
1.5 DELIVERY, STORAGE, AND HANDLING
1.6 WARRANTY
PART 2 PRODUCTS
2.1 WINDOW BLINDS
2.1.1 Horizontal Blinds
2.1.1.1 Head Channel and Slats
2.1.1.2 Controls
2.1.1.3 Intermediate Brackets
2.1.1.4 Bottom Rail
2.1.1.5 Braided Ladders
2.1.1.6 Hold-Down Brackets
2.1.1.7 Audio Visual Blinds

2.2 COLOR

PART 3 EXECUTION
3.1 EXAMINATION
3.2 WINDOW TREATMENT PLACEMENT SCHEDULE
3.3 INSTALLATION
3.3.1 Horizontal and Audio Visual Blinds

3.4 CLEAN-UP

File details come from the government source that posted it. Updated .