W56MES60280297
FY16 Boardman River Dam Removal and River Restoration
This project is solicited as an unrestricted procurement.
The North American Industrial Classif ication System (NAICS) code is 237990, w hich has a small business size standard of $36.5 Million in average annual receipts.
The estimated range of construction is betw een $5 Million and $10 Million.
A Preproposal Conference w ill be held via w eb and teleconference on 17 October 2016 at 11:00 am Eastern.
An orgnaized site visit w ill be held. Reference FAR clause 52.236-27 Alt I for details pertaining to the site visit.
CARLETTE WILLIAMS 313.226.2683
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS
NEGOTIATED
06-Oct-2016
(RFP)
(IFB)
X
CALL:
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
See Item 7
2. TYPE OF SOLICITATION
SEALED BID
3. DATE ISSUED
9. FOR INFORMATION A. NAME
SOLICITATION
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Prescribed by GSA
FAR (48 CFR) 53.236-1(e)
11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________720 calendar days after receiving aw ard, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________52.211-10
12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
X YES NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and __________3 copies to perform the w ork required are due at the place specified in Item 8 by ___________ local time ______________17 Nov 2016 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.
shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
B. An offer guarantee X is, is not required.
C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than _______90 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
7. ISSUED BY CODE
CONTRACTING BRANCH
USACE DETROIT DISTRICT
477 MICHIGAN AVENUE, 7TH FLOOR
DETROIT MI 48226-4523
W911XK
PAGE OF PAGES
1 OF
CODE
(Title, identifying no., date):
12B. CALENDAR DAYS
02:00 PM (hour)
Sealed envelopes containing offers
5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
8. ADDRESS OFFER TO (If Other Than Item 7)
FAX:TEL: (313) 226-6819 TEL: FAX:
W911XK-16-R-0006 60
20B. SIGNATURE
(REV. 4-85)STANDARD FORM 1442 BACK
TO SIGN
NSN 7540-01-155-3212
SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)
CODE FACILITY CODE
17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.
the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS SEE SCHEDULE OF PRICES
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN
OFFER (Type or print)
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
(4 copies unless otherwise specified)
CODE
(Insert any number equal to or greater than
20C. OFFER DATE
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY
(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)
See Item 14
(Include only if different than Item 14)16. REMITTANCE ADDRESS
30B. SIGNATURE
29. AWARD (Contractor is not required to sign this document.)
document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .
gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)
30C. DATE
(Type or print)
TEL: EMAIL:
31B. UNITED STATES OF AMERICA 31C. AWARD DATE
BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this28. NEGOTIATED AGREEMENT
(M ust be fully completed by offeror)OFFER
W911XK-16-R-0006
Section 00010 - Solicitation Contract Form
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Job
IGF::OT::IGF
FFP
BOARDMAN RIVER [457123] --- PROJECT NO.:457123
FOB: Destination
MILSTRIP: W56MES60280297
PURCHASE REQUEST NUMBER: W56MES60280297
NET AMT
PRICE SCHEDULE
BOARDMAN DAM REMOVAL AND RIVER RESTORATION
DIVISION 1 – DAM BREACHING
Item Item Description Unit Quantity Unit Price Total Price
EARTHWORK AND SITE PREPARATION
1 Site Clearing JA 1 $ $
2 Excavation - Dam Top Cut JA 1 $ $
TEMPORARY AUXILIARY SPILLWAY
3 Excavation - Spillway Channel JA 1 $ $
4 Articulated Concrete Block System JA 1 $ $
AUXILIARY SPILLWAY STILLING BASIN
Excavation – Stilling Basin, Bottom of Chute
JA 1 $ $
Engineered Earth Fill – Stilling Basin and Tailwater Berms
CY 450 $ $
7 Filter Fabric / Geotextile – Stilling Basin SY 716 $ $
Granular Fill / Clean River Stone for Stilling Basin
TN 400 $ $
9 R-1500 Rip-Rap for Energy Dissipation TN 334 $ $
10 R-700 Rip-Rap TN 962 $ $
11 R-300 Rip-Rap TN 548 $ $
12 Grout for Rip-Rap CY 200 $ $
13 Jersey Barriers EA 5 $ $
14 36” HDPE Culverts LF 200 $ $
SIPHON STILLING BASIN
15 Earthwork JA 1 $ $
16 R-300 Rip-Rap TN 1500 $ $
17 Filter Fabric / Geotextile – Stilling Basin SY 355 $ $
Granular Fill / Clean River Stone for Stilling Basin
TN 156 $ $
COREWALL DEMOLITION
19 Corewall and Sheetpile Removal JA 1 $ $
SIPHON BYPASS
20 Siphon, Installation and Removal JA 1 $ $
Siphon, Drawdown Operation, down to
EL 627
JA 1 $ $
RESTORATION CHANNEL THROUGH DAM
22 Excavation - Restoration Channel JA 1 $ $
INCIDENTAL CONSTRUCTION AND REVEGETATION
23 Erosion Control JA 1 $ $
24 Temporary Seeding AC 2 $ $
25 Permanent Seeding AC 7 $ $
26 Top Soil AC 5 $ $
27 Parking Lot and Access Repair JA 1 $ $
Total Amount--DIVISION 1 – DAM BREACHING BASE ITEMS: $
DIVISION 2 – BOARDMAN DAM DEMOLITION
POWER HOUSE
1 Powerhouse Superstructure Demolition JA 1 $ $
Dam Demolition
Existing Dam and Appurtenances Demolition (Walls, Spillway, Substation)
JA 1 $ $
BRIDGE AND STRUCTURE BELOW
Existing Bridge and Structure Below Demolition
JA 1 $ $
Total Amount-DIVISION 2 – BOARDMAN DAM DEMOLITION ITEMS: $
DIVISION 3 – CASS ROAD CONSTRUCTION
HMA
1 HMA, 5E3 TN 142 $ $
2 HMA, 4E3 TN 379 $ $
SHOULDER
3 Shoulder, CL II, 6 inch SY 284 $ $
BASE
4 Aggregate Base, 8 inch SY 1734 $ $
EMBANKMENT
5 Embankment, CIP CY 23406 $ $
MISCELLANEOUS
6 Turf Establishment, Performance SY 7775 $ $
7 Erosion Control, Silt Fence LF 800 $ $
8 Erosion Control, Sediment Trap EA 2 $ $
9 Erosion Control, Check Dam, Stone LF 16 $ $
REMOVALS
10 Excavation, Earth CY 1874 $ $
11 HMA Surface, Rem SY 864 $ $
12 Guardrail, Rem LF 55 $ $
13 Barrier, Rem LF 132 $ $
14 Traffic Signal Removal JA 1 $ $
Maintenance of Traffic, Permanent Signs and Permanent Pavement Markings
JA 1 $ $
Total Amount-DIVISION 3 – CASS ROAD CONSTRUCTION ITEMS: $
DIVISION 4 – RIVER RESTORATION
BOARDMAN – SEDIMENT MANAGEMENT AND RESTORATION
River channel and floodplain excavation
JA 1 $ $
2 Install and Maintain Sediment Traps EA 3 $ $
3 Cass Road Bridge Heavy Rip Rap TN 800 $ $
Seed (floodplain mix) Floodplain Corridor
AC 10 $ $
5 Seed Spoils Areas AC 24 $ $
In‐Channel Dig and Pitch (Operator and Excavator)
DA 15 $ $
7 Channel Bed Construction SY 5170 $ $
8 FES Bank Construction LF 3100 $ $
| Large | Wood | Crib | (Station | 254+50 | to |
| Station | 256+00) |
EA 55 $ $
| Large | Wood | Logs | with | Rootwads |
| (Station | 254+50 | to | Station | 256+00) |
EA 45 $ $
Total Amount--DIVISION 4 – RIVER RESTORATION ITEMS: $
DIVISION 5 – BOARDMAN OPTIONS
BOARDMAN – OPTION ITEMS
Large Wood Logs and Piles (restored channel)
EA 48 $ $
Large Wood Logs with Rootwads (restored channel)
EA 18 $ $
3 Tributary Stabilization Boulders TN 200 $ $
Tributary Stabilization Channel Substrate
TN 200 $ $
5 Slope Restoration SY 9680 $ $
6 Topsoil and Seed Impacted Uplands AC 76 $ $
7 Topsoil Spoils Area AC 24 $ $
FES Bank Construction (restored channel)
LF 400 $ $
Fabric Slope Protection (restored channel)
SY 400 $ $
Total Amount--DIVISION 5 – BOARDMAN OPTIONS ITEMS: $
DIVISION 6 – INCIDENTALS
BOARDMAN – INCIDENTALS
1 Mobilization JA 1 $ $
2 Haul Road LF 5500 $ $
3 Signage JA 1 $ $
Total Amount--DIVISION 6 – INCIDENTALS ITEMS: $
DIVISION ITEM TOTALS
DIVISION 1 – DAM BREACHING $
DIVISION 2 – BOARDMAN DAM DEMOLITION $
DIVISION 3 – CASS ROAD CONSTRUCTION $
DIVISION 4 – RIVER RESTORATION $
DIVISION 5 – BOARDMAN OPTION ITEMS $
DIVISION 6 – INCIDENTALS $
TOTAL PRICE – (SUM OF ALL 6 DIVISIONS) $
EA = Each; DA = Day; CY = Cubic Yard; JA = Job; LF = Linear Foot; AC = Acre; SY = Square Yard; TN = Net Ton
SCOPE OF WORK
The work to be completed consists of four major components, and includes installation and maintenance of erosion and sedimentation control measures for each:
1. The breaching and removal of the Boardman Dam earthen embankment.
2. Restoration of the Boardman River for approximately 10,000 linear feet from Sabin Pond through the extents of the former Boardman impoundment.
3. Demolition and removal of the Boardman Dam powerhouse, intake works and existing Cass Road
Bridge.
4. Construction of 400 linear feet of Cass Road roadway.
BREACHING AND DAM REMOVAL SUMMARY:
1. Breaching and Dam Removal generally consists of:
a. Site clearing and installation of construction access drives.
b. Excavation of temporary channel from proposed energy dissipation structures to Sabin impoundment.
c. Construction of energy dissipation structures for siphon outlet and auxiliary spillway.
d. Excavation of earthen dam and demolition of concrete core wall to elevation 646.00.
Temporarily stockpile roughly 12,000 cubic yards of material adjacent to existing intake channel, to be graded into intake channel later.
e. Installation and operation of siphon dewatering system capable of passing 400 cubic feet per second (cfs). Dewatering will occur at a maximum rate of 1 foot per day.
f. Excavation of auxiliary spillway downstream of core wall and installation of articulated block channel armoring with crest elevation of 638.00.
g. Excavation of auxiliary spillway upstream of core wall and demolition of core wall to elevation 638, always maintaining a minimum 3 feet freeboard on the core wall.
h. Removal of articulated block as necessary to excavate auxiliary channel crest to elevation 630.
Reinstall articulated block armoring.
i. Excavation of auxiliary spillway upstream of core wall and demolition of core wall to elevation 630, always maintaining a minimum 3 feet freeboard on the core wall.
j. Removal of articulated block as necessary to excavate auxiliary channel crest to elevation 623.
Reinstall articulated block armoring.
k. Excavation of auxiliary spillway upstream of core wall to elevation 623. Demolition of core wall to elevation 627 in the dry. Demolition of core wall to elevation 623 in the wet with a maximum drawdown rate of 1 foot per day.
l. Dismantle and remove siphon dewatering system.
m. Construct access drive into impoundment upstream of earthen dam.
n. Once impoundment is dewatered to 625, excavate proposed river channel and concrete core wall.
o. Excavation material to be spoiled in intake channel and used as Cass Road embankment material if passing MDOT Class II criteria.
p. Finish grading and seeding and restoration of dam breaching area.
SEDIMENT MANAGEMENT AND RIVER RESTORATION SUMMARY:
1. Sediment Management and River Restoration generally consists of:
1. A large deposit of sediment has accumulated in the upstream portion of the Boardman Pond (Impoundment), as noted on the Drawings. The intent is to excavate a corridor through this sediment, wasting material in adjacent disposal areas as noted, to expose the pre-dam Boardman River channel. The average channel dimensions used for grading are a 60-62 foot wide channel top width, 3.3-3.5 foot (average) bankfull depth, and a total of 40 feet of floodplain in alternating widths between the left and right banks. Dimensions will be both deeper and shallower than average to account for pool and riffle development. Dimensions increase slightly in the downstream direction. All cut slopes are 3H:1V (horizontal to vertical) unless steeper native slopes are encountered.
2. The sediment accumulation in the delta above +/- Station 210+00 is primarily sand. The nature and extent of material between approximately Station 210+00 to 177+00 (the dam embankment) is expected to consist of primarily fine material and will be revealed during drawdown of the pond.
3. As finished grades are reached indicators such as the gravel bed of the pre-dam channel and stumps of trees along the pre-dam banks will help guide detailed grading as the old river channel is exposed. Additional restoration including the enhancement of pool and riffle features and the addition of large wood habitat may occur if budgets allow, but are considered additive items for pricing.
4. Sediment removal may occur under the most efficient means possible, including mechanical, hydraulic, or otherwise. The contractor will provide a detailed submittal of the means and methods for excavation and sequencing using the lowest cost and most effective method. The approach utilized must minimize the transport of sediment downstream of the dam to the extent feasible. Sediment traps will be used to collect material that will mobilize through the work area as an additional control to minimize sediment transport. Controlled drawdown of the headpond will also be used to minimize sediment transport. Some sediment is expected to mobilize and be transported within the work area and downstream of the dam as part of the project.
DEMOLITION OF POWERHOUSE, INTAKE WORKS AND EXISTING CASS ROAD BRIDGE:
1. Demolition of Powerhouse, Intake works and existing Cass Road Bridge generally includes:
a. Coordination with Owner for removal of powerhouse equipment and intake gate equipment.
b. Demolition and removal of powerhouse, substructure, spillway, substation, bridge and retaining walls.
c. Nonhazardous materials may be disposed of onsite, in former intake channel, according to local, state and federal regulations. Disposal site shall be capped with 3 feet of fill, topsoil and seed.
d. Sampling of wiring and roofing materials for asbestos, lead based paint survey and an inventory of building components that may contain PCBs, mercury, chlorofluorocarbons, refrigerants, and other potentially hazardous materials.
e. All hazardous material shall be disposed of according to local, state and federal regulations.
f. Coordination with utility companies for removal power service and work around utilities.
CONSTRUCTION OF CASS ROAD
1. Construction of Cass Road generally consists of:
a. Removal of guardrail, barrier, traffic signals, HMA, and excavation of earthen material to subgrade.
b. Earthworks for preparation of roadway embankment.
c. Installation of aggregate base, HMA and pavement striping.
d. Seeding and restoration of site.
e. Coordination with utility companies for work around utilities.
SECURITY REQUIREMENTS:
1. All personnel employed by this contract and in the performance of the services specified in the contract or any representative of the contractor entering the Boardman Dam Removal Project Site, Traverse County, MI area shall conform and comply with all applicable Federal/State of Michigan/County of Grand Traverse/and City of Traverse City Laws, Rules, Regulations or Policies.
It is the contractor’s responsibility to be aware of the prevailing Laws, Rules, Regulations or Policies of the area.
2. Pre-screening of contractor candidates via E-verify Program: The Contractor must pre‐screen candidates using the E‐verify Program (http://www.uscis.gov/e-verify) website to meet the established employment eligibility requirements. The Vendor must ensure that all contractors working on the site have two valid forms of Government issued identification prior to entering the information in E-Verify. The vendor must ensure the correct information is entered into the E‐verify system. A verification sheet for each verified/eligible contractor candidate must be provided to the COR no later than 3 business days after the initial contract award. (The purpose of using E-Verify is to ensure all contractors are U.S. citizens or documented foreign citizens with authority to work in the United States of America). The COR will forward the verification sheets to the USACE, Detroit District Security Office for validation.
3. Security Checks – All contract employees must carry pictured identification at all times. They must show I.D. upon request by City/State/Government personnel. The Contractor must have a copy of the contract requirements, with them at the Boardman Dam site during the implementation of this contract.
NOTES TO OFFERORS
1 NOTE
1.1 EVALUATION: The Government intends to award a firm-fixed price contract as a result of this Request for Proposal (RFP). The acquisition and source selection are being conducted in accordance with the Federal Acquisition Regulation (FAR) Part 15. Award will be made to the proposal determined to be the best value to the Government based on the evaluation criteria outlined in this solicitation.
1.2 The Army will procure this project through a technical and price competition in accordance with the provisions set forth in this RFP. When a contract is awarded, it will be a "Firm Fixed Price” contract.
1.3 POST-AWARD CONFERENCE: The contractor agrees to attend any post-award conference(s) convened by the contracting activity or contract administration office in accordance with Federal Acquisition Regulation Subpart 42.5.
1.4 Prices must be submitted on all individual line items of the Price Schedule. Otherwise, the Offer may be considered non-compliant and may be rejected.
1.5 The “JOB” line items in the Price Schedule are not “Estimated Quantity” line items and are not subject to FAR 52.211-18 Variation in Estimated Quantity.
1.6 Contract Clause 52.232-27, “Prompt Payment for Construction Contracts” requires that the name and address of the contractor official, to whom payment is to be sent, be the same as that in the contract or in a proper Notice of Assignment.
1.7 The Contracting Officer who signs the contract will be the Principal Contracting Officer for the contract.
However, any Contracting Officer assigned to the Detroit District, contracting within their authority, may take formal action on the contract when the Principal Contracting Officer is unavailable and the action needs to be taken.
1.8 Amounts and prices shall be indicated in either words or figures, NOT BOTH.
1.9 Payment of Electronic Funds Transfer (EFT) is the mandatory method of payment. The Contractor’s attention is directed to Contract Clause 52.232-33 “Mandatory Information for Electronic Funds Transfer.”
1.10 The Government will review all submitted Price Schedules for any unbalancing of the items. Any submitted Price Schedule determined to be unbalanced may be considered unacceptable and may cause the Offeror to be ineligible for award.
1.11 The Offeror shall furnish all plant, labor, material (excluding any Government furnished material that is detailed within this RFP) equipment, etc., necessary to perform all work in strict accordance with the terms and conditions set forth in this solicitation, to include all attachments thereto.
1.12 PLEASE NOTE: Submit solicitation inquiries in accordance with the instructions. Inquires MUST be received no later than five (5) business days prior to proposal due date.
1.13 The contractor shall submit as-builts.
1.14 EVALUATION OF OFFERORS: OFFERORS MUST SUBMIT A PROPOSAL ON ALL LINE ITEMS
IN THE PRICE SCHEDULE. THE GOVERNMENT WILL MAKE ONE (1) AWARD TO THE OFFEROR WITH
THE BEST VALUE TO THE GOVERNMENT USING THE “TRADE OFF PROCESS” IN ACCORDANCE
WITH FAR SECTION 15.101-1 ENTITLED “TRADE OFF PROCESS”.
INSTRUCTIONS TO OFFERORS
1 INQUIRIES
Bidders shall not include identifying information in any submitted inquiry.
***Please Note: Offerors shall only submit one question per inquiry. Inquiries containing multiple questions may be rejected.
1.1 Prospective Offerors should submit questions concerning this Request for Proposal via Bidder Inquiry in ProjNet at www.projnet.org/projnet.
1.1.1 To submit and review bid inquiry items, bidders will need to be a current registered user or self-register into the system. To self-register, go to the aforementioned web page and click on the BID tab.
Select Bidder Inquiry, select agency USACE, and enter the Bidder Inquiry Key for this solicitation listed below, your email address, and then click login. Fill in all required information and click create user.
Verify that information on next screen is correct and click continue.
1.1.2 From this page, you may view all bidder inquiries or add inquiry.
1.1.3 Offerors will receive an acknowledgement of their question via email, followed by an answer to their question after it has been processed by our technical team.
The Solicitation Number is: W911XK-16-R-0006 The Bidder Inquiry Key is: KWCEKU-59JXSD
1.2 The Bidder Inquiry System will be unavailable for new inquires 5 business days prior to proposal submission in order to ensure adequate time is allotted to form an appropriate response and amend the solicitation if necessary.
1.3 Offerors are requested to review the solicitation in its entirety, review the Bidder Inquiry System for answers to questions prior to submission of a new inquiry.
1.4 The call center operates weekdays from 8AM to 5PM U.S. Central Time Zone (Chicago). The telephone number for the Call Center is 800-428-HELP.
1.5 Offers will NOT be publicly opened. Information concerning the status of the evaluation and/or award will NOT be available after receipt of proposals.
2 TELEGRAPHIC BIDS/OFFERS
2.1 TELEGRAPHIC OFFERS ARE NOT ACCEPTABLE
2.1.1 Any telegram to modify or withdraw a offer sent to this office must be physically delivered to the office designated for receipt of offer by the date and time set for receipt of proposals. No one from this office will be dispatched to the local telegraph office to pick up any telegram for any reason.
3 FACSIMILE BIDS/OFFERS
3.1 Facsimile offers, modifications thereto, or cancellations of offers will not be accepted.
4 SAFETY REQUIREMENTS
4.1 The successful contractor to this Request for Proposals will be required to comply with all pertinent provisions of the latest version of the U.S. Army Corps of Engineers Safety and Health Requirements Manual, EM 385-1-1, in effect on the date of the solicitation. EM 385-1-1 and its changes are available at http://www.usace.army.mil by selecting “Safety and Occupational Health” followed by “EM 385-1-1”. The Contractor must also comply with Occupational Safety and Health Act (OSHA) standards. OSHA standards are subject to change. It is the Contractor's responsibility to maintain familiarity with current OSHA standards.
5 DIRECTIONS FOR SUBMITTING OFFERS
5.1 Envelopes/packages containing offers must be sealed, marked and addressed as follows:
5.1.1 MARK ENVELOPES/PACKAGES:
Solicitation No. W911XK-16-R-0006 Closing Date: [Insert date from SF1442 Box 13] Closing Time: 2:00 PM Eastern
5.1.2 ADDRESS ENVELOPES/PACKAGES TO:
Department of the Army U. S. Army Corps of Engineers, Detroit District ATTN: Contracting Branch C/O: Carlette Williams 477 Michigan Avenue, Floor 7 Detroit, Michigan 48226
5.1.3 Hand carried offers must be delivered to: Detroit District. Due to Security precautions, all Corps of Engineers visitors are now required to be screened upon entry of the McNamara Federal Building. Therefore, please allow sufficient time for turning in your proposal.
-- End of Section -
PROCEDURES
1 INSTRUCTIONS, CONDITIONS AND NOTICES TO OFFEROR
1.1 Introduction:
Your firm is invited to submit a proposal in response to this Request for Proposal (RFP) for the “Boardman River Dam Removal and Ecosystem Restoration. Prepare the proposal for evaluation in accordance with the solicitation.
The Government will evaluate the performance capability proposals in accordance with the criteria described herein.
1.2 Project Description:
The work consists of a controlled breaching and demolition of a 50 feet high earthen dam, management and removal of roughly 280,000 cubic yards of impounded sediments, restoration of roughly 10,000 feet of river channel and floodplain, demolition of the existing powerhouse, and intake works and existing Cass Road Bridge and construction of proposed Cass Road roadway. The work involves selective demolition, earthwork, bypass pumping, and in-stream rehabilitation work.
2 PROPOSAL COMPOSITION AND SUBMISSION
2.1 General Requirements: Submit your proposal in three (3) parts: Volume I - Technical (Factor 1 Technical Capability, and Factor 2 Past Performance), Volume II - Price (Factor 3 Price, and Pro Forma Information) and
Volume III – Small Business Participation (Factor 4 Small Business Participation and Factor 5 Small Business Utilization). Submit each in a separate envelope or package with the type of proposal (i.e., technical or price) clearly printed on the outside of the envelope or package.
2.2 Proposals must set forth full, accurate, and complete information as required by this RFP. Absence of information demonstrates the lack of support for an evaluation factor. Proposals shall contain only data essential for evaluation of proposals to expedite both the RFP proposal preparation and evaluation. Data submitted must reflect the Offeror’s interpretation of criteria contained in the RFP. Proposals are to be on 8-1/2 x 11-inch paper, to the maximum extent practicable, and submitted in standard letter (8-1/2 x 11-inch) hardback loose-leaf binders. Contents of binders shall be appropriately tabbed and labeled corresponding to the proposal table of contents, affording ease of identification. The proposal shall not exceed 125 pages, with a font size no smaller than 10 point. Should the proposal exceed the limit, there will be an evaluation of the contents of ONLY the first 125 pages. In addition to the hard copies of the proposal, Offerors must submit an electronic version on a CD-ROM or DVD-ROM disc. Electronic copies shall have the same volume and file structure as the hard copies, and shall be in PDF file format. ONLY CD-ROM or DVD-ROM media will be accepted. Floppy discs, USB drives, etc. are not permitted. The Gantt Chart as required in Factor 3 shall be folded and inserted into the pocket of the loose-leaf binder. Note: Each side of the paper is considered one page. Example: If there is information on both sides of the paper it will be considered as two (2) pages. If there is information on one side of the paper it will be considered as one (1) page.
Volume Title Printed Copies Digital Copies
Maximum Pages
1- Technical & Past Performance
Original + 3 copies
2 125
2- Price Original + 3 copies
2 N/A
3- Small Business Participation
Original +3 copies
2 25
2.3 Number pages consecutively. There shall be no consideration of information incorporated by reference or reiteration of the RFP. Proposal presentation shall be in a manner which allows it to “STAND ALONE” without need for evaluators to reference other documents. It is allowable to combine arrangements, layout plans, and notes on single sheets in order to simplify presentation, so long as there is maintenance of clarity.
Elaborate brochures or other presentation materials beyond those sufficient to present complete and effective responses are unnecessary and may give the appearance of an Offeror’s lack of cost-consciousness. Elaborate artwork, expensive paper and bindings, and expensive/extensive visual and other presentation aids are neither necessary nor wanted.
2.4 Penalty for making false statements in proposals is prescribed in 18 U.S.C. 1001.
2.5 Marking Proposals - Identifying Proprietary Technical Data & Privileged or Confidential Commercial or Financial Data: To protect trade secrets, privileged or confidential commercial or financial information incorporated in the proposal, each page, including each line or paragraph thereof, containing such information must be specifically marked to identify such data and the cover sheet must be marked with the following notice:
NOTICE:
The data contained in Page(s) ____ of ____ in the proposal have been submitted in confidence and contain trade secrets and/or privileged or confidential commercial or financial information. Such data shall be used or disclosed for evaluation purposes, provided, if a contract is awarded to the Offeror as a result, or in connection with the submission of this proposal, the Government shall have the right to use or disclose the data herein to the extent provided in the contract.
2.6 The restriction does not limit the Government’s right to use or disclose data obtained without restriction from any source, including the Offeror, and references to the aforementioned notice should be placed on each page to which the notice applies. The Government assumes no liability for disclosure or use of unmarked data and may use or disclose such data for any purpose.
2.7 Release of Information: After receipt of proposals, no source selection information will be available to any Offeror until contract award. This includes, but is not limited to, the relative standing of the Offeror’s proposal or the number or identity of the participating Offerors.
2.8 Proposal Expenses and Pre-Contract Costs: The Government is in no way responsible for costs incurred in the preparation and submission of a proposal or for any other costs incurred prior to the execution of a formal contract.
2.9 Technical Proposal Format: At a minimum, each copy of the technical proposal should follow the general format specified below. Number pages from beginning to end. Do not repeat numbering for new sections. The technical proposal should include 1) a cover letter, 2) a table of contents, and 3) required technical data. A description of each is as follows:
2.9.1 Cover Letter: The technical proposal cover letter, printed on the prime Offeror’s letterhead, shall be the first page of the technical proposal. It shall be signed by an officer of the company and must contain the following:
Solicitation number;
Name, address, telephone, facsimile numbers and e-mail address of the Offeror;
Names, titles, telephone and facsimile numbers and e-mail addresses of persons authorized to negotiate on the Offeror’s behalf with the Government in connection with this solicitation;
Names, title, and signature of the person authorized to sign the proposal;
A statement that the offer is acceptable for a period of 90 calendar days from the date of submission;
If necessary, a section entitled “Deviations.” This section is to include all deviations from the minimum RFP requirements, and, in the event of the submittal of a Final Proposal Revision, all changes made to their original proposal. Such deviations must include specific explanations concerning their nature, as well as why the Offeror thinks that they are necessary or appropriate.
Deviations are not necessarily substitutions and must not result in an Offeror’s proposal that does not meet minimum RFP criteria;
If necessary, a section entitled “Identification of Items Exceeding RFP Requirements.” This section must include a list including all items in excess of the minimum RFP requirements, and, if required to submit a Final Proposal Revision, all changes made to their original proposal that exceed RFP minimum requirements. Such items exceeding RFP requirements must include specific explanations concerning their nature, as well as why the Offeror thinks that they are necessary or appropriate;
Acknowledgement of all amendments by number and date of issue (likewise, acknowledge all amendments on any proposal revisions.)
2.9.2 Table of Contents: The Table of Contents shall list all sections contained in the technical proposal. Provide a separate section for each evaluation criterion. Any additions or revisions to the proposal shall include an updated Table of Contents for each set.
2.9.3 Technical Data: The Technical Data section shall consist of all information furnished in accordance with the RFP requirements, including technical specifications and referenced regulations. This section shall be specific and complete, demonstrating a thorough understanding of the requirements. It shall include, where applicable, diagrams and/or charts. It shall include complete explanations of procedures and proposed programs, as well as the demonstration of the merit of the offered technical approach. It shall demonstrate all criteria requirements. It shall be an orderly, specific, and complete document in every detail.
2.9.4 Format and Contents of the Proposal/List of Tabs: The original and all copies of Volume I - Technical Proposal will be appropriately labeled as such. Each set shall be organized using the tabs specified in the chart below.
TAB CONTENTS OF VOLUME I - TECHNICAL PROPOSAL
TAB #1
FACTOR 1: Technical Capability (Experience and Organization) SUBFACTOR 1: Relevant Experience in Key Construction Areas SUBFACTOR 2: Technical Approach Summary SUBFACTOR 3: Qualifications of Key Team Members SUBFACTOR 4: Proposed Contract Duration and Preliminary Schedule
TAB #2
FACTOR 2: Past Performance
3 SELECTION PROCEDURES
3.1 Technical Evaluation: There will be an evaluation of technical proposals for conformance with the minimum RFP criteria to determine if the proposal is technically acceptable. While there is intent to keep the Offeror’s pre-award proposal effort to a minimum, proposals must provide adequate detail for evaluators to determine if the proposal is technically acceptable.
3.2 There will be an evaluation of all technical proposals by a Source Selection Evaluation Board (SSEB).
The SSEB’s duty is the assignment of a fair, unbiased technical rating for each proposal based solely on the merits of the proposal. Proposals that do not conform to the terms and conditions contained in the RFP or those that include stipulations or qualifying conditions unacceptable to the Government are not eligible for award.
There will be no consideration of pricing data during the technical evaluation.
3.3 Selection without Discussions: It is the intent of the Government to make selections based upon initial offers, without further discussions or additional information. Therefore, submit your proposal on the most favorable terms from a price and technical standpoint. Do not assume you will have an opportunity to clarify, discuss or revise your proposal. If selections are not possible from initial offers, discussions will be conducted as follows:
3.4 Competitive Range: The Contracting Officer may establish a competitive range comprised of all of the highest rated technical proposals. The range may be further reduced for purposes of efficiency, i.e., the Contracting Officer determines that the number of most highly rated proposals that might otherwise be included in the competitive range exceeds the number at which an efficient competition can be conducted.
3.5 Discussions: The Government intends to make a selection without discussions. However, there may be written or oral (i.e., telephonic) discussions with all Offerors in the competitive range. As a result, Offerors may be asked to revise their initial offers. If an Offeror's proposal is eliminated or otherwise removed from the competitive range during discussions, further revisions to that Offeror's proposal will neither be accepted nor considered. Discussions will culminate in a request for Final Proposal Revisions, the date and time of which will be common to all Offerors.
3.6 After discussions and the subsequent receipt of final proposal revisions, the SSEB will evaluate supplemental information provided by offers, adjust previously assigned technical ratings, and provide a recommendation to the Contracting Officer. The Contracting Officer will consider the SSEB’s findings and perform a best- value analysis.
4 DEBRIEFINGS
Post-award: In accordance with FAR 15.506, Unsuccessful Offerors may request a post-award debriefing within three (3) days after the date on which the Offeror received notification of contract award. There will be no point-by-point comparisons with other Offerors’ proposals and debriefings will not reveal any information that is not releasable under the Freedom of Information Act (FOIA).
5 EVALUATION CRITERIA
5.1 Factor 1 will be evaluated using a Combined Technical/Risk Rating. The combined technical risk/rating includes consideration of risk in conjunction with the strengths, weaknesses, and deficiencies in determining technical ratings. Combined technical/risk evaluations shall utilize the combined technical/risk rating shown below:
Combined Technical/Risk Ratings
Color Rating Description
Blue Outstanding Proposal indicates an exceptional approach and understanding of the requirements and contains multiple strengths, and risk of unsuccessful performance is low.
Purple Good Proposal indicates a thorough approach and understanding of the requirements and contains at least one strength, and risk of unsuccessful performance is low to moderate.
Green Acceptable Proposal meets requirements and indicates an adequate approach and understanding of the requirements, and risk of unsuccessful performance is no worse than moderate.
Yellow Marginal Proposal has not demonstrated an adequate approach and understanding of the requirements, and/or risk of unsuccessful performance is high.
Red Unacceptable Proposal does not meet requirements of the solicitation, and thus, contains one or more deficiencies, and/or risk of unsuccessful performance is unacceptable. Proposal is unawardable.
5.2 Factor 2, will be evaluated using the Past Performance Relevancy Ratings and the Performance
Confidence Assessments shown below:
Past Performance Relevancy Ratings Ratings Definition Very Relevant Present/past performance effort involved essentially the same scope and magnitude of effort and complexities this solicitation requires.
Relevant Present/past performance effort involved similar scope and magnitude of effort and complexities this solicitation requires.
Somewhat Relevant Present/past performance effort involved some of the scope and magnitude of effort and complexities this solicitation requires.
Not Relevant Present/past performance effort involved little or none of the scope and magnitude of effort and complexities this solicitation requires.
Performance Confidence Assessments
Rating Description
Substantial Confidence Based on the offeror’s recent/relevant performance record, the Government has a high expectation that the offeror will successfully perform the required effort.
Satisfactory Confidence Based on the offeror’s recent/relevant performance record, the Government has a reasonable expectation that the offeror will successfully perform the required effort.
Neutral Confidence No recent/relevant performance record is available or the offeror’s performance record is so sparse that no meaningful confidence assessment rating can be reasonably assigned. The offeror may not be evaluated favorably or unfavorably on the factor of past performance.
Limited Confidence Based on the offeror’s recent/relevant performance record, the Government has a low expectation that the offeror will successfully perform the required effort.
No Confidence Based on the offeror’s recent/relevant performance record, the Government has no expectation that the offeror will be able to successfully perform the required effort.
5.2.1 Factor 4 will be evaluated using Small Business Rating Method shown below:
Small Business Rating Method
Color Rating
Adjectival Rating Description
Blue Outstanding Proposal indicates an exceptional approach and understanding of the small business objectives.
Purple Good Proposal indicates a thorough approach and understanding of the small business objectives.
Green Acceptable Proposal meets requirements and indicates an adequate approach and understanding of the small business objectives.
Yellow Marginal Proposal has not demonstrated an adequate approach and understanding of the small business objectives.
Red Unacceptable Proposal does not meet the small business objectives.
5.2.2 Factor 5 will be evaluated using Small Business Rating Method shown below:
Small Business Rating Method Small Business Acceptable/Unacceptable Ratings Adjectival Rating Description Acceptable Proposal indicates an adequate approach and understanding of small business objectives.
Unacceptable Proposal does not meet small business objectives.
5.3 The Offeror’s conformance with the specified format and submission requirements will be considered during the technical evaluation. Material omission(s) may cause the technical proposal to be rejected as unacceptable.
5.4 The Offeror’s adherence to prescribed page and formatting limitations prescribed will be strictly adhered to and enforced. Information submitted which exceeds the specified limit will NOT be evaluated. For example, the Government will not evaluate excess information. If four pages are submitted in response to an item with a three page limitation, the information of the fourth page will not be evaluated.
5.5 Proposals will be reviewed for compliance with the technical specifications. Non-compliance with the technical specifications will be considered a deficiency and an Unacceptable rating will be assigned.
5.6 Order of Importance
This is a Best Value solicitation. During evaluation, Factor 1 Technical Capability and Factor 2- Past Performance, Factor 4- Small Business Participation and Factor 5 Small Business Utilization when combined are approximately equal to price. Factor 1-Technical Capability will be considered of higher importance than Factor 2- Past Performance. Factor 2 will be considered of higher importance than Factor 4- Small Business Participation and Factor 5- Small Business Utilization, which are approximately equal. To receive consideration for award, a rating of no less than “Acceptable” must be achieved for the Technical factor (to include all subfactors).
5.6.1 Factors and Subfactors to be evaluated.
FACTOR 1: Technical Capability (Experience and Organization)
SUBFACTOR 1: Relevant Experience in Key Construction Areas SUBFACTOR 2: Technical Approach Summary SUBFACTOR 3: Qualification of Key Team Members SUBFACTOR 3: Proposed Contract Duration and Proposed Schedule
All subfactors are equal.
FACTOR 2: Past Performance: Each Offeror’s past performance will be reviewed to determine relevancy and confidence assessment.
FACTOR 3: Price and Pro Forma Information: The resulting award will be a Firm Fixed Price type contract. A Bid Bond required.
Factor 4: Small Business Participation: The extent of Small Business Participation will be evaluated for unrestricted acquisitions. This solicitation is solicited as unrestricted.
Factor 5: Small Business Utilization: Past Performance of Utilization of small Business Concerns.
Subcontracting Plan is required for large businesses only.
6 LIST OF EVALUATION FACTORS, SUB-FACTORS AND SPECIFIC TECHNICAL
EVALUATION CRITERIA
6.1 FACTOR 1: TECHNICAL CAPABILITY (EXPERIENCE AND ORGANIZATION)
The Experience and Organization evaluation will consider such things as an Offeror’s previous relevant experience with similar projects, the qualifications and organization of key team members, and other considerations as described in the sub-factors and elements. If the Offeror does not assume all roles in this contract, then the Offeror must clearly demonstrate that its major subcontractors have the relevant technical experience for the role they are assuming of the scope and complexity required in the Specifications. The sub-factors are described below:
6.1.1 FACTOR 1, SUBFACTOR 1: RELEVANT EXPERIENCE IN KEY
CONSTRUCTION AREAS
-.1 Submittal for Evaluation:
If the prime contractor proposes self-performing the onsite construction, ensure the proposal is clear which work the Offeror will be performing. If the prime contractor proposes to subcontract some or all of the onsite construction the Offeror must submit a Letter of Commitment from the subcontractor with the proposal. If the prime contractor proposes to use a subcontractor for the steel fabrication, the
Offeror must submit relevant past experience working with the subcontractor that demonstrates successful completion of a similar project in size and complexity.
The Offeror shall demonstrate relevant experience by providing project examples of relevant work performed in the key construction areas. Submit projects that are at least 50% construction progress completed or completed and turned over no longer than ten (10) years preceding the date of this Solicitation. Submitted projects must have been performed by the Offeror as either the prime contractor or major subcontractor to be considered relevant. Any project that was less than $1,000,000 will not be considered relevant. If any firm has multiple functions or divisions, limit the project examples to those performed by the division or unit submitting the offer or by the team member. Limit each project description to 1 page.
An Offeror shall provide evidence of experience on at least three but no more than five construction projects performed in the United States. The submitted projects must demonstrate relevant work experience in the following key areas:
1. The Offeror’s ability to develop and adhere to a detailed construction sequencing schedule.
2. The Offeror’s and subcontractor’s previous work experience with river flow management and/or pond/ lake dewatering. Examples including bypass channels, pumps and siphons preferred. Include with project descriptions discharge values in cubic feet per second for typical project conditions (river flow, flow management, dewatering rate).
3. The Offeror’s previous work on high hazard dam removal and new dam construction projects. Please include dam height and length in project description.
4. The Offeror’s previous work experience with river restoration projects. Please include linear feet of restoration in project description.
5. The Offeror’s previous work experience with sediment management projects. Please include quantity of sediment managed in cubic yards or tons.
In addition to the project examples, the Offeror may provide a supplemental narrative (not project lists), not to exceed two pages, explaining how any corporate experience that is not directly related to the specific projects above is applicable to this project and how the Government will benefit.
The above information is limited to projects that are well underway or that have been completed and turned over no longer than the past ten years preceding the date of this solicitation.
The Government reserves the right to verify the experience record of cited projects or other recent projects by reviewing the Government Contractor Performance Assessment Reporting System (CPARS), or other Government appraisal systems or to interview owners or references. The Government may check any or all cited references to verify supplied information.
-.2 Evaluation Criteria
The Government will evaluate whether the proposal demonstrates relevant experience performed in all of the key construction areas, as evidenced in at least three projects but no more than five projects completed by the prime contractor, within the last ten years or currently underway and at least 50 percent complete. Projects submitted by the Offeror must clearly identify which of the key construction areas are represented in the work; a minimum of two out of the five construction areas described above must be demonstrated in each of the submitted projects. Additionally, areas 1 through 5 must be demonstrated in the combined submitted projects. The projects must be of similar scope to this project and be valued at least $1,000,000.
Proposals where a contractor has two or more projects where each project demonstrates experience in ALL 5 key construction areas will also be considered a strength in the proposal.
6.1.2 FACTOR 1, SUBFACTOR 2: TECHNICAL APPROACH SUMMARY
-.1 Submittal for Evaluation The Offeror shall submit a narrative (not to exceed two pages) describing the overall technical approach to the contract work. The narrative should demonstrate the offeror’s understanding of the project and shall include the following:
1) Dam Removal procedure for high hazard dam. Procedure shall include sequence of work and all flow management, dewatering systems necessary during construction.
2) Work processes description and how work will prevent flooding based on weather and other uncontrollable situations.
3) River restoration and sediment management in coordination with dam removal and flow management.
4) Approaches and scheduling that minimizes closure of Cass Road.
5) Any innovative approaches or techniques that offeror may propose that benefit the owner in terms of costs schedule, safety and risk management.
-.2 Evaluation Criteria A narrative that is realistic and…