Amendment 0001

View the file

Other files

File Type Posted
Revised_Exhibit_B-_Key_Personnel_Information_&_Consent_Form_.pdf PDF
Q&A.pdf PDF
01_29_01_Amendment_0006.pdf PDF
Dam_Safety_Inspection_Report--Boardman_Dam_2015.pdf PDF
W911XK-16-R-0006-0006_FY16_Boardman_River_Dam_Removal_and_Restoration.pdf PDF
Certification_Regarding_Responsibility_Matters.pdf PDF
W911XK-16-R-0006-0005_FY16_Boardman_River_Dam_Removal_and_Restoration.pdf PDF
31_70_00_Amendment_0004.pdf PDF
31_23_00_Amendment_0004.pdf PDF
01_29_01_Amendment_0004.pdf PDF
W911XK-16-R-0006-0004_FY16_Boardman_River_Dam_Removal_and_Restoration.pdf PDF
32_90_00_Amendment_0003.pdf PDF
B-7.1_-_Amendment_0003.pdf PDF
31_36_00_Amendment_0003.pdf PDF
31_20_40_Amendment_0003.pdf PDF
31_40_00_Amendment_0003.pdf PDF
32_60_00_Amendment_0003.pdf PDF
01_29_01_Amendment_0003.pdf PDF
W911XK-16-R-0006-0003_FY16_Boardman_River_Dam_Removal_and_Restoration.pdf PDF
W911XK-16-R-0006-0002_FY16_Boardman_River_Dam_Removal_and_Restoration.pdf PDF
Boardman_Site_Vist_1_November_2016.pdf PDF
Site_Visit_Sign_in_Sheet_Boardman_Dam.pdf PDF
FY16_Boardman_River_Dam_Removal_ _Restoration_Pre-Proposal_Meeting_Presentation.pptx PPTX presentation
BOARDMAN_FINAL_CERTIFIED_RTA_-PLANS_10.13.2016_24X36_.pdf PDF
BOARDMAN_FINAL_CERTIFIED_RTA_-_PLANS_09.27.2016.pdf PDF
W911XK-16-R-0006_FY16_Boardman_River_Dam_Removal.pdf PDF
Exhibit_B-_Key_Personnel_Information_ _Consent_Form_.pdf PDF
EXHIBIT_E-_Small_Business_Participation_Plan_(Form).pdf PDF
Final_Grading_Surface.zip ZIP file
Exhibit_C_-_Past_Performance_Reference_Questionnaire_revised_17_March_2016.pdf PDF
Boardman_Final_RTA_Specs_9_28_2016_.pdf PDF
Existing_Topo_Surface.zip ZIP file
Exhibit_A--Performance_Relevancy.pdf PDF
EXHIBIT_D_-_Requirements_of_the_Small_Business_Subcontracting_Plan.pdf PDF
Show all 34

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W56MES60280297

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

FY16 Boardman River Dam Removal and Restoration

This modification is issued to update FAR clause 52.219-9 Small Business Subcontracting Plan Alternate II; and to add another site visit. The site visit is scheduled for 1 November 2016. Reference changes on the follow ing page.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 24-Oct-2016

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W911XK-16-R-0006

X 9B. DATED (SEE ITEM 11)

06-Oct-2016

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

24-Oct-2016

CODE

CONTRACTING BRANCH

USACE DETROIT DISTRICT

477 MICHIGAN AVENUE, 7TH FLOOR

DETROIT MI 48226-4523

W911XK 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W911XK-16-R-0006

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

AMENDMENT 0001

52.236-27 Site Visit Alternate I

ADD:

An additional organized site visit has been scheduled for 01 November 2016 at 10:00 am to 12:00 noon Eastern.

Participants will meet at the Beaver Dam parking Lot which is located on Cass Road just west of Keystone road adjacent to the Boardman Dam Power House.

Point of Contact:

Christopher C. Schropp

(616) 842-5510 x25526

SECTION 00700 - CONTRACT CLAUSES

The following have been added by reference:

52.219-9 ALT II

(Dev)

Small Business Subcontracting Plan (Deviation 2016-O0009)

- Alternate II

AUG 2016

The following have been deleted:

52.219-9 Alt II Small Business Subcontracting Plan (OCT 2015) Alternate II OCT 2001

(End of Summary of Changes)