W56MES60280297
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
FY Boardman River Dam Removal and Ecosystem Restoration
This amendment is issued to make changes to the plans, specificaitons and procedures. Reference changes on the follow ing pages. All other terms and conditions remain unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 16-Nov-2016
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W911XK-16-R-0006
X 9B. DATED (SEE ITEM 11)
06-Oct-2016
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
16-Nov-2016
CODE
CONTRACTING BRANCH
USACE DETROIT DISTRICT
477 MICHIGAN AVENUE, 7TH FLOOR
DETROIT MI 48226-4523
W911XK 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W911XK-16-R-0006
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
AMENDEMNT 0003
CHANGES TO THE SPECIFICATIONS
1. Delete 31 20 40 SITE RESTORATION Add revised 31 20 40 SITE RESTORATION, see attached file titled ’31 20 40 Amendment 0003.pdf’.
2. Delete 31 36 00 STREAM CONSTRUCTION Add revised 31 36 00 STREAM CONSTRUCTION, see attached file titled ’31 36 00 Amendment 0003.pdf’.
3. Delete 31 40 00 SLOPE PROTECTION AND EROSION CONTROL Add revised 31 40 00 SLOPE PROTECTION AND EROSION CONTROL, see attached file titled ’31 40 00 Amendment 0003.pdf’.
4. Delete 32 90 00 PLANTING Add revised 32 90 00 PLANTING, see attached file titled ’32 90 00 Amendment 0003.pdf’.
5. Delete 01 29 01 MEASUREMENT AND PAYMENT Add revised 01 29 01 MEASUREMENT AND PAYMENT, see attached file titled ’01 29 01 Amendment 0003.pdf’.
6. Delete 32 60 00 RIVER SIGNAGE Add revised 32 60 00 RIVER SIGNAGE, see attached file titled’ 32 60 00 Amendment 0003.pdf’.
CHANGES TO THE PLANS
1. Delete Sheet B-7.1, Add Revised Sheet B-7.1.
CHANGES TO PROCEDURES PARAGRAPH 2.2
1. Delete the following paragraph:
Proposals must set forth full, accurate, and complete information as required by this RFP. Absence of information demonstrates the lack of support for an evaluation factor. Proposals shall contain only data essential for evaluation of proposals to expedite both the RFP proposal preparation and evaluation. Data submitted must reflect the Offeror’s interpretation of criteria contained in the RFP. Proposals are to be on 8-1/2 x 11-inch paper, to the maximum extent practicable, and submitted in standard letter (8-1/2 x 11-inch) hardback loose-leaf binders. Contents of binders shall be appropriately tabbed and labeled corresponding to the proposal table of contents, affording ease of identification. The proposal shall not exceed 125 pages, with a font size no smaller than 10 point. Should the proposal exceed the limit, there will be an evaluation of the contents of ONLY the first 125 pages. In addition to the hard copies of the proposal, Offerors must submit an electronic version on a CD-ROM or DVD-ROM disc. Electronic copies shall have the same volume and file structure as the hard copies, and shall be in PDF file format. ONLY CD-ROM or DVD-ROM media will be accepted. Floppy discs, W911XK-16-R-0006
USB drives, etc. are not permitted. The Gantt Chart as required in Factor 3 shall be folded and inserted into the pocket of the loose-leaf binder. Note: Each side of the paper is considered one page. Example: If there is information on both sides of the paper it will be considered as two (2) pages. If there is information on one side of the paper it will be considered as one (1) page.
Add the following revised paragraph:
Proposals must set forth full, accurate, and complete information as required by this RFP. Absence of information demonstrates the lack of support for an evaluation factor. Proposals shall contain only data essential for evaluation of proposals to expedite both the RFP proposal preparation and evaluation. Data submitted must reflect the Offeror’s interpretation of criteria contained in the RFP. Proposals are to be on 8-1/2 x 11-inch paper, to the maximum extent practicable, and submitted in standard letter (8-1/2 x 11-inch) hardback loose-leaf binders. Contents of binders shall be appropriately tabbed and labeled corresponding to the proposal table of contents, affording ease of identification. The proposal shall not exceed 125 pages for Volume 1 – Technical and Past Performance and 25 pages for Volume 3- Small Business Participation, with a font size no smaller than 10 point. Should the proposal exceed the limit, there will be an evaluation of the contents of ONLY the first 125 pages for Volume 1 – Technical and Past Performance and the first 25 pages for Volume 3- Small Business Participation.
Volume 2- Price has no page limit. In addition to the hard copies of the proposal, Offerors must submit an electronic version on a CD-ROM or DVD-ROM disc. Electronic copies shall have the same volume and file structure as the hard copies, and shall be in PDF file format. ONLY CD-ROM or DVD-ROM media will be accepted. Floppy discs, USB drives, etc. are not permitted. The Gantt Chart as required in Factor 3 shall be folded and inserted into the pocket of the loose-leaf binder. Note: Each side of the paper is considered one page. Example: If there is information on both sides of the paper it will be considered as two (2) pages. If there is information on one side of the paper it will be considered as one (1) page.