BOARDMAN_FINAL_CERTIFIED_RTA_-_PLANS_09.27.2016.pdf
PDF 43 MB Posted
- Attached to
- FY16 Boardman Dam Removal and Restoration
- Solicitation number
- W911XK-16-R-0006
About this file
Plans
View the file
Other files
Show all 34
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
P:
\R es ou rc es
\W
AT
ER
_R
ES
O
U
RC
ES
\P ro je ct s\
B oa rd m an \B
O
AR
DM
AN
_C
AD
D ra w in gs \C
AD
D\
PD
S\
Ri ve r R es to ra tio n\
D
ES
IG
N
S
HE
ET
S\
1_ T-
X.
X
T- 1.
GE
N
ER
AL
N
O
TE
S_ re v_
.0
5.
_m lc
.d w g M ay
5,
- 3 :2
4p m
Ja ne en _S ta ld er
CIVIL ABBREVIATIONS
EX./EXIST.
WM
C.P.
Y.D.
STM
SN
C & G
F.F.E.
I.E./INV.
T.P.
CB
MH
LB
EXISTING
WATER MAIN
CONTROL POINT WITH NUMBER
STORM YARD DRAIN
STORM SYSTEM
SANITARY SYSTEM
CURB & GUTTER
FINISH FLOOR ELEVATION
INVERT ELEVATION
TOP OF PIPE
STORM CATCH BASIN
STORM LEACH BASIN
PR./PROP. PROPOSED
DIA. DIAMETER
PVMT. PAVEMENT
TYP. TYPICAL
FRP FIBER REINFORCED PIPE
LF LINER FOOT
C.Y. CUBIC YARDS
S.Y. SQUARE YARDS
GAL. GALLON
CL CENTER LINE
MECH. MECHANICAL
RCP REINFORCED CONCRETE PIPE
INV INVERT
ELEV./EL. ELEVATION
N NORTHING
E EASTING
BTM. BOTTOM
C.O. CLEAN OUT
S.B. SOIL BORING
FT. FOOT
PP POWER POLE
ELEC. ELECTRICAL
PVC POLYVINYL CHLORIDE
W/L WATER LINE
HYD. HYDRANT
CONC. CONCRETE
P.O.B POINT OF BEGINNING
S.S. STAINLESS STEEL
1. THE CONTRACTOR SHALL HAVE SOLE AND COMPLETE RESPONSIBILITY FOR JOB SITE
CONDITIONS DURING THE COURSE OF CONSTRUCTION OF THIS PROJECT, INCLUDING SAFETY OF
ALL PERSONS AND PROPERTY.
2. THE CONTRACTOR SHALL DESIGN, CONSTRUCT, AND MAINTAIN ALL SAFETY DEVICES,
INCLUDING SHORING, AND SHALL BE SOLELY RESPONSIBLE FOR CONFORMING TO ALL LOCAL,
STATE, AND FEDERAL HEALTH AND SAFETY STANDARDS, LAWS, AND REGULATIONS TO INCLUDE
USACE EM 385-1-1.
3. THE CONTRACTOR IS REQUIRED TO TAKE DUE PRECAUTIONARY MEASURES TO PROTECT AND
MAINTAIN ANY EXISTING UTILITY SERVICES SHOWN ON THESE PLANS AND ANY OTHERS NOT OF
RECORD OR NOT SHOWN ON THESE PLANS. THE UTILITIES SHOWN ON THE PLANS ARE
APPROXIMATE LOCATIONS AND SHOULD BE INTERPRETED AS SUCH. THE CONTRACTOR IS
REQUIRED TO PROVIDE A MARK-OUT OF ALL UTILITIES WITHIN THE AREA OF WORK PRIOR TO
COMMENCING CONSTRUCTION. CONTRACTOR TO CALL MISS DIG (1-800-482-7171) TO OBTAIN
A MARK-OUT OF PUBLIC UNDERGROUND UTILITIES. THE CONTRACTOR SHALL CONTACT THE
PRIVATE UTILITIES (REFER TO SHEET C-0.1) TO ARRANGE FOR MARK-OUT OF PRIVATE UTILITIES
NOT LOCATED BY THE MISS DIG SYSTEM. CONTRACTOR SHALL BE AWARE OF HIGH-VOLTAGE
OVERHEAD ELECTRIC LINES. THE CONTRACTOR IS RESPONSIBLE FOR ALL DAMAGE TO EXISTING
UTILITIES AND ALL COSTS TO REPAIR DAMAGE TO ANY UTILITY (SEWERS, WATER, GAS,
ELECTRICAL, UNDERDRAIN SYSTEMS, & SPRINKLER SYSTEMS, ETC.) KNOWN, OR OTHERWISE,
SHALL BE BORNE SOLELY BY THE CONTRACTOR. ACCEPTANCE & APPROVAL OF SAID REPAIRS
SHALL BE PER THE OWNER OF THE DAMAGED UTILITY.
4. THE CONTRACTOR SHALL TAKE PRECAUTIONARY MEASURES TO ENSURE ALL UTILITY SERVICES
WILL REMAIN FUNCTIONAL DURING THE CONSTRUCTION PERIOD.
5. THE CONTRACTOR SHALL HAVE THE MOST RECENTLY APPROVED SET OF FINAL PLANS MARKED
“FOR CONSTRUCTION” ON THE JOB SITE AT ALL TIMES.
6. UPON COMPLETION OF EACH DAY'S WORK, THE CONTRACTOR SHALL BE RESPONSIBLE FOR
LEAVING THE WORK AREA FREE OF HAZARDS AND SHALL PROVIDE ALL NECESSARY TEMPORARY
SIGNS, WARNING DEVICES, AND BARRICADES.
7. THE CONTRACTOR SHALL KEEP ACCURATE AND LEGIBLE RECORDS OF ALL CHANGES OF WORK
THAT OCCUR DURING CONSTRUCTION AND INFORMATION ON “AS-BUILT” CONDITIONS.
DOCUMENTATION OF CHANGES AND AS-BUILT INFORMATION SHALL BE RECORDED ON AN
APPROVED SET OF FINAL PROJECT PLANS AND DELIVERED TO THE COR WITHIN 90 DAYS AFTER
COMPLETION OF WORK.
8. THE CONTRACTOR SHALL TAKE THE NECESSARY STEPS TO PROTECT THE PROJECT AND
ADJACENT PROPERTY, STRUCTURES, UTILITIES AND LANDSCAPING FROM ANY DAMAGE,
EROSION AND SILTATION THAT RESULTS FROM THE CONSTRUCTION BY APPROPRIATE MEANS
(SAND BAGS, HAY BALES, SILT FENCE, DIKES, ETC.) UNTIL SUCH TIME THE PROJECT IS
COMPLETED AND ACCEPTED BY THE GOVERNMENT.
9. THE CONTRACTOR SHALL REFER TO SPECIFICATION SECTION 01 11 00 SUMMARY OF WORK FOR
ALL PERMIT REQUIREMENTS AND GUIDANCE IN OBTAINING THE APPLICABLE PERMITS. THE
CONTRACTOR SHALL BE RESPONSIBLE FOR CONFORMANCE WITH ALL APPLICABLE PERMIT
REQUIREMENTS DURING THE EXECUTION OF THE WORK AND PRIOR TO FINAL ACCEPTANCE BY
THE GOVERNMENT. ADDITIONAL DETAILS ON CONTRACTOR RESPONSIBILITIES ARE PROVIDED
IN THE SPECIFICATIONS.
10. ALL NON-PAVED DISTURBED AREAS SHALL BE RESTORED AS SHOWN ON THE PLANS.
11. THE CONTRACTOR SHALL ACCESS THE WORK AREAS USING THE PUBLIC RIGHT-OF-WAY AND
EXISTING EASEMENTS ONLY. CROSSING PRIVATE PROPERTY TO ACCESS THESE AREAS WITHOUT
WRITTEN PERMISSION FROM THE PROPERTY OWNER IS PROHIBITED.
12. OTHER THAN PLANS THAT ARE ALREADY PART OF THE CONTRACT DOCUMENTS, HISTORIC
CONSTRUCTION DOCUMENTS ARE ALSO AVAILABLE FOR THE EARTHEN DAM EMBANKMENT,
CONCRETE CORE WALL, DAM INTAKE STRUCTURE, AND APPURTENANCES. IF ADDITIONAL
INFORMATION IS DESIRED, CONTRACTOR SHOULD SUBMIT REQUEST TO THE COR.
13. TOPOGRAPHY SHOWN HERE REPRESENTS CONDITIONS EXISTING AT THE TIME THE FIELD
SURVEY WAS MADE (MAY 2014).
14. WATER LEVEL IS SUBJECT TO CHANGE. THE CONTRACTOR IS RESPONSIBLE FOR MAKING A
DETERMINATION OF WATER LEVELS THAT MAY EXIST DURING CONSTRUCTION.
15. MEASURES SHALL BE TAKEN TO PREVENT DEBRIS FROM FALLING FROM THE EXISTING
STRUCTURES AND BEING TRANSPORTED DOWNSTREAM.
16. THE EXISTING CASS ROAD BRIDGE, DAM INTAKE STRUCTURES, AND POWERHOUSE SHALL NOT
BE REMOVED UNTIL THE AUXILIARY SPILLWAY AT THE EARTHEN DAM EMBANKMENT IS
CONSTRUCTED AND OPERATIONAL.
17. ALL WORK FOR THE CONDITIONS SHOWN AS "PROPOSED" IS REQUIRED UNDER THIS
CONTRACT.
GENERAL NOTES
THE PURPOSE OF THE WORK SHOWN ON THESE PLANS IS THE DEWATERING OF THE BOARDMAN
IMPOUNDMENT, DESIGN AND CONSTRUCTION OF AN AUXILIARY SPILLWAY THROUGH THE
EARTHEN DAM EMBANKMENT, EXCAVATION AND RELOCATION OR DISPOSAL OF SOILS AND
MATERIALS WITHIN THE LIMITS OF EXCAVATION, REMOVAL OF THE EXISTING DAM STRUCTURE
AND APPURTENANCES, RECONSTRUCTION OF CASS ROAD, AND RESTORATION OF THE BOARDMAN
RIVER. THE WORK GENERALLY INCLUDES, BUT IS NOT LIMITED TO, CONCRETE REMOVAL,
REMOVAL AND DISPOSAL OF FILL/SEDIMENT MATERIALS, CONSTRUCTION OF THE RIVER CHANNEL
THROUGH THE EARTHEN EMBANKMENT, CONSTRUCTION OF INSTREAM HABITAT IN THE
RESTORED RIVER, AND RESTORATION OF THE RIVER BANK AND FLOODPLAIN AREAS. THIS WORK
WILL BE CONDUCTED WHILE CONTRACTOR ACTIVELY MANAGES WATER LEVELS IN BOARDMAN
POND AND FLOW OVER BOARDMAN DAM WITHIN THE CONSTRAINTS SPECIFIED IN THESE PLANS.
THE MDEQ HYDROLOGIC STUDIES UNIT PROVIDED THE FOLLOWING HYDROLOGY INFORMATION
FOR THE BOARDMAN RIVER AT THE LOCATION OF BOARDMAN DAM:
TOTAL DRAINAGE AREA OF 266.9 SQUARE MILES AND CONTRIBUTING DRAINAGE AREA OF 205
SQUARE MILES
MDEQ 50 % FREQUENCY DISCHARGE VALUES (HALF OF FLOWS ARE GREATER AND HALF ARE LESS)
FOR THE SUMMER MONTHS DURING WHICH CONSTRUCTION WILL TAKE PLACE:
MAY 310 CFS
JUNE 270 CFS
JULY 240 CFS
AUG 230 CFS
SEPT 230 CFS
OCT 250 CFS
NOV 270 CFS
DEC 270 CFS
MDEQ PROVIDED FLOOD DISCHARGE VALUES:
50% (2 YEAR) 800 CFS
10% (10 YEAR) 1200 CFS
2% (50 YEAR) 1500 CFS
1% (100 YEAR) 1700 CFS
0.5% (200 YEAR) 1900 CFS
0.2% (500 YEAR) 2200 CFS
THE DESIGN DISCHARGE FOR THE DAM REMOVAL IS THE 10% (10 YEAR) FLOOD (1200 CFS).
A STAFF GAGE WILL BE INSTALLED UPSTREAM OF THE PROJECT SITE TO MONITOR FLOWS EVERY 12
HOURS EXCEPT DURING AND AFTER STORM EVENTS WHEN INFLOW SHOULD BE MONITORED
HOURLY UNTIL 12 HOURS FOLLOWING THE PEAK FLOW. THE GOVERNMENT REPRESENTATIVE
WILL PROVIDE THE STAGE DISCHARGE CURVE FOR THE STAFF GAGE.
TO COMPLY WITH THE MICHIGAN DEPARTMENT OF ENVIRONMENTAL QUALITY REGULATION OF A
MAXIMUM DEWATERING RATE OF 1 FT/DAY, CONTRACTOR SHALL SURVEY WATER SURFACE
ELEVATION AT THE DAM EVERY 12 HOURS.
THE SIPHON SYSTEM SPECIFIED FOR THIS PROJECT HAS THE CAPACITY TO DISCHARGE UP TO 400 CFS. THE AUXILIARY SPILLWAY SPECIFIED IN THESE PLANS HAS THE CAPACITY TO CARRY UP TO
1200 CFS. THE COMBINED DESIGN CAN ACCOMMODATE UP 1600 CFS.
MORE DETAILS ABOUT THE OPERATION, HISTORY AND CONDITION OF THE DAM ARE AVAILABLE IN
THE FOLLOWING DOCUMENTS, WHICH ARE ON FILE AND AVAILABLE FOR REVIEW BY
APPOINTMENT WITH WILLIAM MERTE USACE - DETROIT DISTRICT (313) 226-2433:
1. BOARDMAN DAM DESIGN PLANS DATED 1930 PREPARED BY HARZA ENGINEERING COMPANY
FOR THE CITY OF TRAVERSE CITY.
2. BOARDMAN RIVER FEASIBILITY STUDY DATED JANUARY 2009 PREPARED BY ENVIRONMENTAL
CONSULTING AND TECHNOLOGY, INC.
3. PROBABLE MAXIMUM FLOOD STUDY, BOARDMAN AND SABIN HYDROELECTRIC DAMS, FERC
PROJECT. DATED SEPTEMBER 1995. PREPARED BY MEAD AND HUNT, INC.
4. PROBABLE MAXIMUM FLOOD STUDY, BROWN BRIDGE AND BOARDMAN DAMS, FERC PROJECT.
DATED SEPTEMBER 1995. PREPARED BY MEAD AND HUNT, INC.
5. SPILLWAY DESIGN FLOOD STUDIES, BROWN BRIDGE, BOARDMAN, AND SABIN PROJECTS
DATED JULY 17, 1991 PREPARED BY MEAD AND HUNT, INC.
6. UNITED STATES ARMY CORP OF ENGINEERS (USACE) FEASIBILITY STUDY, PHASE I REPORT
DATED AUGUST 2013. PREPARED BY THE USACE.
ENGINEER'S STATEMENT
1. PROTECTION OF WORK
DURING THE EXECUTION OF THE WORK SHOWN ON THESE PLANS, THE CONTRACTOR SHALL
BE RESPONSIBLE FOR PROTECTION OF THE WORK AREA AND EQUIPMENT FROM FLOODS AND
DAMAGE OR DELAYS DUE TO FLOODS. NO EQUIPMENT SHALL BE LEFT IN CHANNEL AFTER
WORK HOURS.
2. BREACHING SAFETY
IN THE CASE OF AN UNEXPECTED BREACH THROUGH THE DAM EMBANKMENT THE
CONTRACTOR SHALL HAVE A STOCKPILE OF DEMOLISHED CONCRETE MATERIALS NEARBY FOR
EMERGENCY PLACEMENT. THIS MATERIAL WILL COME FROM THE DEMOLITION OF THE TOP
OF THE CONCRETE CORE WALL. ALSO RECOMMEND THE CONTRACTOR TO HAVE EXTRA SAND
BAGS AVAILABLE. CONTRACTOR SHALL PREPARE SITE SPECIFIC HEALTH & SAFETY PLAN,
INCLUDING EMERGENCY ACTION PLAN. THIS EMERGENCY ACTION PLAN SHALL BE REVIEWED
AND COORDINATED WITH THE GRAND TRAVERSE COUNTY EMERGENCY MANAGER.
SPECIAL NOTES
THE GRAND TRAVERSE COUNTY, THE GRAND TRAVERSE COUNTY ROAD COMMISSION,
CONTRACTOR, AND COR SHALL COORDINATE AND ARRANGE FOR A PRECONSTRUCTION
MEETING AT THE SITE PRIOR TO THE START OF CONSTRUCTION. PRIOR TO THE TIME OF THE
PRECONSTRUCTION MEETING, THE CONTRACTOR SHALL HAVE THE LIMITS OF THE WORK
(GRADING, SHEET PILE, AND TEMPORARY ACCESS ROAD) STAKED AND THE LOCATIONS OF
EXISTING UTILITIES MARKED OUT. THE PURPOSE OF THIS IS TO CONFIRM THE PROPOSED
WORK WILL NOT CONFLICT WITH THE ADJACENT SITES. IF A CONFLICT IS IDENTIFIED AT THAT
TIME, THE CONTRACTOR SHALL REQUEST DIRECTION FROM THE GOVERNMENT PER THE
CONTRACT.
PRECONSTRUCTION MEETING
SPW TEMPORARY SHEET PILE WALL
Know what's
R
T - 1.2
GE
NE
RA
L N
OT
ES
JS TR
N
BW DD
D.
D
EV
AU
N 3/3
/15
D
ES
IG
N
RE
VI
EW
MANHOLE (ANY UTILITY)
6/3 /15
D
ES
IG
N
RE
VI
EW
AFTER BIDS HAVE BEEN SUBMITTED AND A SELECTION IS MADE, ELECTRONIC FILES WILL BE
PROVIDED TO THE CONTRACTOR FOR LOCATING KEY DESIGN ITEMS.
ELECTRONIC FILES
8/2 1/1
0%
D
ES
IG
N
RE
VI
EW
COORDINATE SYSTEM: STATE PLANE
ZONE: MICHIGAN CENTRAL 2112
ELLIPSOID: GRS 80
HORIZONTAL DATUM: NAD 83 (CORS 2011)
VERTICAL DATUM: NAVD 88
GEOID: GEOID 12A
UNITS: INTERNATIONAL FEET
SURVEY GENERAL NOTES
PLAN ELEVATION
ELEVATIONS SHOWN ON THESE PLANS ARE NAVD88 FROM GPS OBSERVATIONS.
GENERAL NOTES
PROJECT PERFORMED TO LOCAL AGENCY STANDARDS.
CP1 N 506321.70 E 19358566.81 Z 650.88
"POINT 1"
SET 1/2" DIAMETER REBAR 18" LONG WITH CONTROL POINT CAP
FLUSH WITH GRADE 21' NORTH OF CASS ROAD CENTERLINE 360'
WEST OF EXISTING BRIDGE.
CP2 N 505985.00 E 19358822.06 Z 655.63
CP4 N 505869.33 E 19357931.16 Z 659.29
CP5 N 505898.29 E 19358217.32 Z 659.18
CP6 N 506007.30 E 19359524.45 Z 660.75
"POINT 6"
SET 1/2" DIAMETER REBAR 18" LONG WITH CONTROL POINT CAP
FLUSH WITH GRADE IN THE SOUTHWEST QUADRANT OF CASS
ROAD AND KEYSTONE ROAD, 69' WEST OF KEYSTONE ROAD
CENTERLINE AND 55' SOUTH OF CASS ROAD CENTERLINE.
CP7 N 506106.51 E 19359181.62 Z 660.62
"POINT 7"
SET 1/2" DIAMETER REBAR 18" LONG WITH CONTROL POINT CAP
FLUSH WITH GRADE 40' SOUTH OF CASS ROAD CENTERLINE 175'
EAST OF EXISTING BRIDGE.
CP8 N 506455.18 E 19357972.57 Z642.89
"POINT 8"
SET 1/2" DIAMETER REBAR 18' LONG WITH CONTROL POINT CAP
FLUSH WITH GRADE 18' SOUTH OF CASS ROAD CENTERLINE IN
CURVE 40' WEST OF OLD CULVERT CROSSING.
CP9 N 506730.15 E 19357742.67 Z 650.51
CP10 N 507187.84 E 19357678.71 Z 672.34
CP11 N 506237.43 E 19358006.60 Z 622.83
CP12 N 506327.12 E 19357857.34 Z 635.80
CP13 N 505954.16 E 19358519.75 Z 659.02
CP14 N 506367.22 E 19358235.34 Z 639.30
CP15 N 506246.08 E 19358382.97 Z 637.69
CP16 N 506143.22 E 19358575.92 Z 652.26
CP17 N 507160.43 E 19357653.36 Z 672.81
CP19 N 506607.49 E 19357810.02 Z 646.17
CP20 N 506902.61 E 19358235.26 Z 619.77
CP21 N 506934.07 E 19358087.86 Z 623.98
PROJECT CONTROL
CONTROL POINTS SET
BENCHMARKS FOUND
BM1 N 506283.36 E 19358832.64 Z 661.54
"BM#1"
FOUND "X" IN CONCRETE SLAB 93' WEST OF WEST WALL OF DAM
SPILLWAY 47' NORTH OF CENTERLINE OF CASS ROAD.
BENCHMARKS SET
BM2 N 506831.99 E 19357703.89 Z 655.15
"BM#2"
SET SPIKE IN POWER POLE 36' WEST OF CASS ROAD
CENTERLINE 61' SOUTH OF PC OF CURVE.
BENCHMARKS
THERE ARE NO GOVERNMENT CORNERS WITHIN THE PROJECT LIMITS.
GOVERNMENT CORNERS
NO ALIGNMENT POINTS WERE SET AS PART OF THIS PROJECT.
ALIGNMENT(S) POINTS
THE CONSTRUCTION SEQUENCE FOR THE BOARDMAN DAM REMOVAL AND RIVER RESTORATION PROJECT WAS DRAFTED TO PROVIDE FOR THE SAFEST DEWATERING POSSIBLE WHILE ACCOMMODATING FLEXIBILITY IN WATER LEVEL CONTROL FOR SEDIMENT MANAGEMENT PURPOSES. THE SIPHON SYSTEM PROPOSED IS DESIGNED TO ACCOMMODATE NORMAL SUMMER FLOWS UP TO 97% OF THE DAILY MEASURED FLOWS. THE AUXILIARY SPILLWAY WAS DESIGNED FOR EMERGENCY FLOWS WHICH WOULD INCLUDE LARGE STORM EVENTS OUTSIDE OF THE CAPACITY OF THE SIPHON BYPASS SYSTEM. THE SEQUENCE OF CONSTRUCTION FOR THE AUXILIARY SPILLWAY WAS DETERMINED BY A STABILITY ANALYSIS OF THE CONCRETE CORE WALL, WHICH STATES THAT THE CORE WALL IS CAPABLE OF HANDLING A MAXIMUM OF 8 FEET OF UNBALANCED LOADS.
1. THE PROPOSED CASS ROAD BRIDGE WILL BE COMPLETED BY OTHERS PRIOR TO THE START OF THE
DAM BREACHING.
2. INSTALL TEMPORARY SOIL EROSION MEASURES PRIOR TO EARTH MOVING ACTIVITIES.
3. INSTALL THE CONSTRUCTION ACCESS ROAD AT THE SOUTH END OF THE PROJECT AREA FOR ACCESS INTO THE UPPER IMPOUNDMENT AND BEGIN RIVER CHANNEL AND FLOODPLAIN WORK WITHIN THE
UPPER IMPOUNDMENT BETWEEN STATIONS 256+00 - 243+50, WHERE THE PROPOSED RESTORED
RIVER AREAS ARE ALREADY EXPOSED AND DEWATERED (SHEET R-0.2).
4. INSTALL CONSTRUCTION ACCESS ROADS TO THE EAST AND WEST SIDE OF THE DAM, AS WELL AS A STAGING AREA FOR EQUIPMENT PARKING AND WASHING. INSTALL THE CONSTRUCTION ACCESS ROAD
NORTH OF CASS ROAD INTO THE BEAVER POND AREA (STAGE 1, SHEET B-1.1).
5. EXCAVATE TEMPORARY CHANNEL FROM PROPOSED STILLING BASIN & SIPHON OUTLET TO SABIN
POND. TEMPORARY CHANNEL TO BE ROUGHLY GRADED TO CHANNEL INVERT OF PROPOSED
RESTORED RIVER CHANNEL. BY WORKING FROM SABIN IMPOUNDMENT TO BOARDMAN DAM, THE
PROPOSED CHANNEL WILL FACILITATE THE DRAINING OF THE BEAVER POND. INSTALL CONSTRUCTED RIVER CHANNEL AND BANKS UNDER CASS ROAD BRIDGE, AS INDICATED IN THE RESTORATION PLANS.
INSTALL CASS ROAD BRIDGE RIPRAP ALONG ABUTMENTS. (STAGE 1, SHEETS B-2.1 - B-2.3; SHEETS
R-1.4, R-3.3, SHEET B-6.4).
6. CONSTRUCT SIPHON OUTLET ENERGY DISSIPATION FOR SIPHONING OPERATION DISCHARGE AND TAILWATER BERMS FOR SIPHON OUTLET AND AUXILIARY SPILLWAY OUTLET. (STAGE 1, SHEETS B-2.1, B-3.5, B-8.1 AND B-8.3).
7. EXCAVATE TOP CUT OF DAM TO AN ELEVATION OF 646, LEAVING 2 FEET OF EXPOSED CONCRETE CORE WALL. NOTCH OUT THE CORE WALL AS NECESSARY FOR THE INSTALLATION OF SIPHON PUMPING PAD AND PIPING. INSTALLATION OF THE SIPHON BYPASS SYSTEM WILL TAKE APPROXIMATELY 24 DAYS TO COMPLETE. THEREFORE, THIS STEP MUST BE COMPLETE NO MORE THAN 24 DAYS PRIOR TO THE
ANTICIPATED START OF THE DEWATERING OPERATION (STAGE 1, SHEET B-2.1).
8. PLACE SPOILS FROM DAM EXCAVATION IN AREA DESIGNATED WEST OF CURRENT DAM INTAKE
CHANNEL (STAGE 1, SHEET B-1.1)
9. INSTALL SIPHONS AND APPURTENANCES AND BEGIN DEWATERING OPERATION (STAGE 2, SHEET B-3.1
- B-3.4).
10. EXCAVATE FOR AUXILIARY SPILLWAY AS NECESSARY TO INSTALL LOWER 70' OF ARTICULATED BLOCK CHANNEL AS WELL AS THE AUXILIARY SPILLWAY STILLING BASIN. MAINTAIN TOP WIDTH AT 646' AS NECESSARY FOR CONSTRUCTION TRAFFIC. THIS PRELIMINARY INSTALLATION WILL REDUCE THE TIME NECESSARY TO EXCAVATE AND INSTALL THE REMAINING AUXILIARY SPILLWAY TO ELEVATION 623'
(STAGE 2, SHEET B-3.1).
11. BEGIN RIVER CHANNEL EXCAVATION IN THE UPPER IMPOUNDMENT BETWEEN STATIONS 244+50 - 224+00, PLACING SPOILS IN THE CLOSEST DESIGNATED AREAS AS APPROPRIATE (SHEET R-0.3).
12. BUILD SEDIMENT TRAPS AT THE LOCATIONS SHOWN ON THE PLANS TO MITIGATE MIGRATION OF
SEDIMENT DOWNSTREAM. ACTUAL SEDIMENT TRAP LOCATION MAY BE ADJUSTED BY COR IN THE
FIELD.
13. PROGRESS RIVER EXCAVATION AND RESTORATION FURTHER INTO THE IMPOUNDMENT, WORKING
BETWEEN STATIONS 224+00 - 210+00 WHEN THE IMPOUNDED WATER SURFACE ELEVATION HAS
REACHED 633 FEET. DISPOSE OF SPOILS IN THE CLOSEST DESIGNATED AREAS AS APPROPRIATE (SHEET R-0.3).
14. DEWATER IMPOUNDMENT TO ELEVATION 627 WITH SIPHONS. MANAGE SEDIMENT MIGRATION
THROUGHOUT THE IMPOUNDMENT WITH INTERMITTENT SEDIMENT TRAPS. SIPHONS WILL BE USED
TO MAINTAIN IMPOUNDMENT WATER SURFACE ELEVATION OF 627. (STAGE 3, SHEET B-4.1).
15. PROGRESS RIVER EXCAVATION AND RESTORATION TO STATIONS 210+00 - 176+00 WHEN IMPOUNDED
WATER SURFACE ELEVATIONS ARE BETWEEN 633 FEET AND 623 FEET (SHEET R-0.3).
16. PRIOR TO FINAL EXCAVATION AND INSTALLATION OF AUXILIARY SPILLWAY, RIVER SHALL BE OBSERVED AT BASE FLOW CONDITIONS (~250 CFS) FOR THREE DAYS AND TEN DAY WEATHER FORECAST SHALL HAVE A TOTAL PREDICTED PRECIPITATION OF LESS THAN 0.25 INCHES. ADDITIONALLY, GROUT
CYLINDERS FROM STILLING BASIN SHALL PASS 14 DAY STRENGTH TEST.
17. INSTALL ADDITIONAL CONSTRUCTION ACCESS ROAD INTO THE IMPOUNDMENT, AS WATER LEVEL ALLOWS. THIS ACCESS ROAD WILL BE USED FOR THE EXCAVATION OF THE AUXILIARY SPILLWAY AND
DREDGED CHANNEL UPSTREAM OF THE CONCRETE COREWALL (STAGE 3, SHEET B-4.1).
18. EXCAVATE UPSTREAM AND DOWNSTREAM AUXILIARY SPILLWAY CHANNEL AND INSTALL ARTICULATED
CONCRETE BLOCK ARMORING TO ELEVATION 623. REMOVE THE CONCRETE COREWALL DOWN TO
ELEVATION 627. WHILE DEMOLISHING CONCRETE COREWALL, NO MORE THAN 10 FEET OF VERTICAL WALL SHALL BE EXPOSED AT ONE TIME AND UNBALANCED LOADING (GRADE DIFFERENTIAL UPSTREAM AND DOWNSTREAM) OF WALL SHALL BE LIMITED TO NO MORE THAN 8 FEET (STAGE 3, SHEET B-4.1).
THIS ACTIVITY SHALL BE COMPLETED UTILIZING 24HR OPERATIONS TO REDUCE DURATION OF
INSTALLATION AND THEREFORE REDUCE RISK OF EXCEEDANCE OF SIPHON CAPACITY.
19. SIPHON FUNCTION WILL DIMINISH AS WATER IS LOWERED WITHIN THE IMPOUNDMENT AND WILL BE SHUT OFF AND REMOVED AS FLOW IS DIVERTED THROUGH THE AUXILIARY SPILLWAY (STAGE 3, SHEET B-4.1).
20. BEGIN REMOVAL OF EXISTING POWERHOUSE, INTAKES, SPILLWAY, CONCRETE WING WALLS, AND THE
OLD CASS ROAD BRIDGE. COORDINATE WITH THE COR AND THE GRAND TRAVERSE DEPUTY
ADMINISTRATOR JENNIFER DEHAAN AT (231) 922-4756 ON REMOVAL OF TRASH RACK SYSTEM AND
REMAINING HYDROELECTRIC POWER EQUIPMENT. BEGIN CONSTRUCTION OF CASS ROAD (SHEETS
S-1.1 - S-6.4).
21. WITHIN THE AUXILIARY SPILLWAY, NOTCH THE CONCRETE CORE WALL DOWN AT 1 FOOT INCREMENTS FROM ELEVATION 627 TO 623, IN ACCORDANCE WITH PERMIT REQUIREMENTS, UNTIL CORE WALL
CREST REACHES SHEET PILING (ELEVATION OF 623) (STAGE 4, SHEET B-5.1 AND B-5.2).
22. ONCE AN IMPOUNDMENT WSE OF 625 IS REACHED, INSTALL BULK BAG COFFERDAM AND EXCAVATE
PROPOSED RIVER CHANNEL DOWNSTREAM OF COREWALL. EXPOSE UPSTREAM FACE OF CORE WALL
WHILE MAINTAINING MINIMUM 50 FEET WIDE DIRT PLUG. REMOVE COREWALL TO 4 FEET BELOW
FINAL CHANNEL ELEVATION (STAGE 5, SHEET B-6.1 AND B-6.2).
23. DIRT PLUG WILL BE REMOVED AND FLOW DIVERTED TO RESTORED CHANNEL THROUGH DAM (STAGE
5, SHEET B-6.2) THROUGH SEQUENTIAL REMOVAL OF BULK BAGS OVER 24 HOUR PERIOD.
24. REMOVE AUXILIARY SPILLWAY STILLING BASIN AND ARTICULATED BLOCK. COMPLETE FINAL GRADING
AND RESTORATION (STAGE 6, SHEET B-7.1).
25. COMPLETE RESTORATION OF RIVER CHANNEL FROM DAM EMBANKMENT TO SABIN POND, INCLUDING
FINISHED GRADING OF RIVER CHANNEL AND FLOODPLAIN .
SUGGESTED CONSTRUCTION SEQUENCINGCP22 N 506752.77 E 19358085.76 Z 618.42
CP23 N 506602.7693 E 19358510.53 Z 637.11
CP24 N 506603.73 E 19357992.23 Z 636.69
CP25 N 506471.26 E 19358469.87 Z 645.17
CP26 N 506373.90 E 19358377.53 Z 638.57
CP500N 506945.21 E 19358230.36 Z 660.54
NORTH TOPOGRAPHIC LIMITS
CP501N 506945.21 E 19357730.36 Z 660.53
NORTH TOPOGRAPHIC LIMITS
/21
/15
0% D
ES
IG
N
RE
VI
EW
THE FOLLOWING ARE CRITICAL PATH ITEMS WHERE THESE ITEMS MUST BE DONE BEFORE CERTAIN ASPECTS
OF THE CONSTRUCTION CAN PROGRESS.
1. COMPLETE EXCAVATION OF TEMPORARY CHANNEL FROM SABIN POND TO PROPOSED STILLING BASIN
AND SIPHON OUTLET, INSTALL CONSTRUCTED RIVER CHANNEL AND BANKS UNDER CASS ROAD
BRIDGE, INCLUDING BRIDGE RIPRAP ALONG ABUTMENTS, AND CONSTRUCT STILLING BASIN AND
SIPHON OUTLET PRIOR TO STARTING SIPHON AND BREACHING OPERATION.
2. DETERMINE ANTICIPATED START OF THE DEWATERING OPERATION PRIOR TO EXCAVATION OF THE TOP CUT OF THE DAM, AS EXCAVATION OF THE TOP CUT OF THE DAM SHALL NOT OCCUR MORE THAN
24 DAYS PRIOR TO THE ANTICIPATED START OF DEWATERING.
3. OBSERVE BASE FLOW CONDITIONS IN THE RIVER FOR A MINIMUM OF THREE DAYS WITH A TEN DAY WEATHER FORECAST WITH TOTAL PREDICTED PRECIPITATION OF LESS THAN 0.25 INCHES PRIOR TO
FINAL EXCAVATION AND INSTALLATION OF AUXILIARY SPILLWAY STRUCTURE.
4. FULLY CONSTRUCT THE AUXILIARY SPILLWAY PRIOR TO REMOVING POWERHOUSE AND INTAKE
STRUCTURE AND FILLING THE INTAKE CHANNEL WITH SPOILS.
5. DEWATER IMPOUNDMENT TO A WSE OF 625 PRIOR TO EXCAVATION OF PROPOSED RIVER CHANNEL
DOWNSTREAM OF COREWALL.
CRITICAL PATH ITEMS
ς͗
ͰΨ
ĞƐ
ŽƵ
ƌĐ
ĞƐ
Ͱσ
�χ �Ψ
ͺΨ ϑ γ Ψ�
Ͱς ƌŽ ũĞ Đƚ
ƐͰ
ϭϯ ϲϱ ϯϭ ϲϬ
ŽĂ
ƌĚ ŵ
ĂŶ
Ͱ� ϑ �Ψ
�Χ
ͺ� ƌĂ ǁ ŝŶ
ŐƐ
Ͱ�
Ͱς
ͰΨ
ŝǀ Ğƌ �Ψ
ĞƐ
ƚŽ ƌĂ ƚŝŽ
ŶͰ
ϯϬ й
�χ ]Ͱ ϭͺ χͲ ξ͘ ξ� χͲ Ϯ͘ ϭ�
�Ψ �ς �ϑ χ�
ͺƌ Ğǀ
ͺϮ Ϭϭ ϲ͘ Ϭϰ
͘Ϯ Ϭ͘ Ěǁ
Ő� ��Χ
ĂLJ
�ϭ ϯ͕ �Ϯ Ϭϭ ϲ� Ͳ�ϰ
͗ϭ
ϴƉ
ŵ �9Ă
ŶĞ
ĞŶ
ͺ] ƚĂ ůĚ Ğƌ
SEE BREACHING
PLAN SHEETS
SEE CASS ROAD
PLAN SHEETS
Ψ�%�Ψ�χϑ�Ψ.ρ�Ψ�Ψ�]χϑΨ�χ.ϑ∆�ς=�∆�]+��χ]�%ϑΨ�σϑΨ;�ς�Ψχ�.∆.∆&�χϑ�Ψ.ρ�Ψ��+�∆∆�=��∆� %=ϑϑ�ς=�.∆�Ψ�]χϑΨ�χ.ϑ∆͕��ξ��ρ�χ.ϑ∆͕��∆���∆&.∆��Ψ���Ψ.%%=���∆��ςϑϑ=���].&∆]͘
&�∆�Ψ�=�∆ϑχ�͗
T - 2.1
GE
NE
RA
LP
LA
N
OF
SI
TE
JS TR
N
BW DD
D.
DE
VA
UN
3/ 3/1
DE
SI
GN
RE
VI
EW
WETLAND AREA
WETLAND AREA
WETLAND AREA
WETLAND AREA
WETLAND AREA
WETLAND AREA
WETLAND AREA
WETLAND AREA
WETLAND AREA
WETLAND AREA
WETLAND AREA
WETLAND AREA
WETLAND AREA
WETLAND AREA
WETLAND AREA
WETLAND AREA
WETLAND AREA
WETLAND AREA
WETLAND AREA
CASS
ROAD
CASS ROAD
PARCEL #
05-034-010-00
(PRIVATE)
PARCEL #
05-034-007-00
(PRIVATE)
PARCEL #
05-034-006-00
(PRIVATE)
PARCEL #
05-
-00 4-0
(PRIVATE
PARCEL #
05-
-00 4-0
(PRIVATE
PARCEL #
05-
-00 4-0
(PRIVATE
PARCEL #
05-034-001-30
(PRIVATE)
PARCEL #
05-034-001-10
(PRIVATE)
PARCEL #
05-034-003-00
(PRIVATE)
PARCEL #
05-034-00 1-2
(PRIVATE)
PARCEL #
05- 034-
001-4
(PRIVATE)
PARCEL #
05- 034-0
01-6
(PRIVATE)
PARCEL #
05- 034-
001-
(PRIVATE)
PARCEL #
05-034-005-00
(PRIVATE)
PARCEL #
05-034-008-00
(PRIVATE)
PARCEL #
05-
-02 5-0
(PRIVATE)
PARCEL #
05-
-02 4-0
(PRIVATE
PARCEL #
05-
-02 3-0
(PRIVATE)
PARCEL #
05-205-022-00
(PRIVATE)
PARCEL #
05-200-001-00
(PRIVATE)
PARCEL #05-200-002-00(PRIVATE)
PARCEL #
05-200-003-00
(PRIVATE)
PARCEL #
05-200-004-00
(PRIVATE)
PARCEL #
05- 200-
005-
(PRIVATE)
PARCEL #
05-20 0-0
06-
(PRIVATE)
PA
RC
EL
-20
0-0
-00 (P
RI
VA
TE
PA
RC
EL
-20
0-0
-00 (P
RI
VA
TE
)PA
RC
EL
-20 0-0
-0
(P
RI
VA
TE
PARCEL #
05-200-011-00
(PRIVATE)
PARCEL #
05-200-012-00
(PRIVATE)
PA
RC
EL
-2
0 0 -0
-0
(P
RI
VA
TE
PA
RC
EL
-20
0-0
-00 (P
RIV
AT
E)
PA
RC
EL
-20
5-
6-
(P
RI
VA
TE
)PAR
CEL
05-
5-0
17-
(PRIVATE
)PA
RCEL #
05-
5-0
18-
(PR
IVAT
E)
PA
RCEL #
05-
-01 9-0
(PR
IVAT
E)
PARCEL #05-034-008-00(PRIVATE)
PARCEL #
05-
-02
5-0
(PRIVA
TE
PARCEL #
05-205-021-00
(PRIVATE)
PARCEL #
05- 205-020-00
(PRIVATE)
PARCEL #
05-034-017-20
(PRIVATE )
PARCEL #
05-034- 017-10
(PRIVATE )
PARCEL #05-034-023-00(PRIVATE)
PARCEL #05-034-009-00(COUNTY)
PARCEL #05-034-009-00(COUNTY)
PARCEL #05-034-022-00(PRIVATE)
PARCEL #05-034-019-00(PRIVATE)
PA
RC
EL
-0
-01
9-0
(P
RI
VA
TE
PARCEL #
05-034-020-00
(PRIVATE)
PARCEL #
02-003-006-00
(COUNTY)
PARCEL #
02-003-013-00
(COUNTY)
PARCEL #
02-003-015-00
(PRIVATE)
PARCEL #
02-003-006-00
(COUNTY)
PARCEL #
05-034-009-00
(COUNTY)
PARCEL #
05-034-015-00
(PRIVATE)
PARCEL #
05-015-001-00
(PRIVATE)
PARCEL #
05-034-009-00
(COUNTY)
PARCEL #
05-034-014-00
(PRIVATE)
PARCEL #
05-034-013-00
(PRIVATE)
PARCEL #
05-034-012-00
(PRIVATE)
PARCEL #
05-034-012-60
(PRIVATE)
PARCEL #
05-034-011-01
(PRIVATE)
PARCEL #
05-034-008-00
(PRIVATE)
SURVEY BYBENCHMARKS (DATUM NAVD 88)
BM# 1 FOUND "X" IN CONCRETE SLAB 93' WEST OF WEST WALL OF DAM SPILLWAY 47'
NORTH OF CENTERLINE OF CASS ROAD. ELEV. = 661.54
BM# 2 SET SPIKE IN POWER POLE 36' WEST OF CASS ROAD CENTERLINE 61' SOUTH OF
PC OF CURVE. ELEV. = 655.15
CASS ROAD TOPOGRAPHY
SURVEY BYDESCRIPTION
BATHYMETRY DATA WITHIN BOARDMAN IMPOUNDMENT WAS COLLECTED BY INTERFLUVE, INC.
BETWEEN JULY 29 AND 31, 2014. DATA WAS COLLECTED USING A SONAR DEVICE ATTACHED TO
A BOAT.
BOARDMAN IMPOUNDMENT
BATHYMETRY
SURVEY BY
A 600' SWATH OF LIDAR DATA WAS COLLECTED ALONG THE BOARDMAN RIVER IN 2002 BY
GRAND TRAVERSE COUNTY. 2' CONTOUR INTERVALS ARE SHOWN ON THIS DRAWING.
BOARDMAN RIVER LIDAR
GRAND TRAVERSE COUNTY
DESCRIPTION
LIMITS OF CONSTRUCTION
SUGGESTED TEMPORARY
ACCESS ROUTES
KEYSTONE RD.
KEYSTONE RD.
STATE OF MICHIGAN RAILROAD LINE
STATE OF MICHIGAN RAILROAD LINE
ϑΨ�]+Ψγ��=.∆� ��&��ϑ%�χΨ����∆�ͬ ςΨϑ9��χ��ϑγ∆��Ψψ
]γ&&�]χ���χ�ΧςϑΨ�Ψψ
�ξ.]χ.∆&��ϑ∆χϑγΨ�=.∆�
&γ�Ψ�Ψ�.= ϑρ�Ψ+�����=��χΨ.� σ�χ=�∆���ϑγ∆��Ψψ σ�χ=�∆���Ψ��
KEYSTONE RD.
KEYSTONE RD.
BOARDMAN VIEW DR.
�ϑ∆χΨϑ=�ςϑ.∆χ]
6/ 3/1
DE
SI
GN
RE
VI
EW
8/2
1/
DE
SI
GN
RE
VI
EW
=.Χ.χ]�ϑ%��.]χγΨ��∆��
����]]�Ψϑγχ�
/21
/15
0%
DE
SI
GN
RE
VI
EW
LIMITS OF COUNTY
PROPERTY
CP1
CP3
CP7
CP2
CP13
CP16
CP5
CP4
CP11
CP15
CP12
CP19
CP9
CP18
]γΨρ�ψ�ςϑ.∆χ]�∆ϑΨχ+.∆&]��∆����]χ.∆&]͗
�ςϭ͗�ϱϬϲϯϮϭ͘ϳϬϬϲ͕�ϭϵϯϱϴϱϲϲ͘ϴϭϯϰ �ςϮ͗�ϱϬϱϵϴϰ͘ϵϵϲϵ͕�ϭϵϯϱϴϴϮϮ͘Ϭϱϴϱ �ςϯ͗�ϱϬϲϮϴϯ͘ϯϲϬϰ͕�ϭϵϯϱϴϴϯϮ͘ϲϰϭϯ �ςϰ͗�ϱϬϱϴϲϵ͘ϯϯϯϯ͕�ϭϵϯϱϳϵϯϭ͘ϭϱϴϰ �ςϱ͗�ϱϬϱϴϵϴ͘Ϯϴϵϰ͕�ϭϵϯϱϴϮϭϳ͘ϯϮϬϰ �ςϲ͗�ϱϬϲϬϬϳ͘ϯϬϭϲ͕�ϭϵϯϱϵϱϮϰ͘ϰϱϯϰ �ςϳ͗�ϱϬϲϭϬϲ͘ϱϭϰϯ͕�ϭϵϯϱϵϭϴϭ͘ϲϭϳϭ �ςϴ͗�ϱϬϲϰϱϱ͘ϭϴϰϭ͕�ϭϵϯϱϳϵϳϮ͘ϱϳϮϮ �ςϵ͗�ϱϬϲϳϯϬ͘ϭϱϮϲ͕�ϭϵϯϱϳϳϰϮ͘ϲϲϴϳ �ςϭϬ͗�ϱϬϳϭϴϳ͘ϴϰϮϳ͕�ϭϵϯϱϳϲϳϴ͘ϳϬϳϵ �ςϭϭ͗�ϱϬϲϮϯϳ͘ϰϮϵϭ͕�ϭϵϯϱϴϬϬϲ͘ϲϬϮϵ �ςϭϮ͗�ϱϬϲϯϮϳ͘ϭϭϳϭ͕�ϭϵϯϱϳϴϱϳ͘ϯϯϳϴ �ςϭϯ͗�ϱϬϱϵϱϰ͘ϭϲϭϰ͕�ϭϵϯϱϴϱϭϵ͘ϳϰϵϳ �ςϭϰ͗�ϱϬϲϯϲϳ͘Ϯϭϵϵ͕�ϭϵϯϱϴϮϯϱ͘ϯϰϰϯ �ςϭϱ͗�ϱϬϲϮϰϲ͘Ϭϴϰϴ͕�ϭϵϯϱϴϯϴϮ͘ϵϲϵϬ �ςϭϲ͗�ϱϬϲϭϰϯ͘Ϯϭϱϭ͕�ϭϵϯϱϴϱϳϱ͘ϵϭϳϱ �ςϭϳ͗�ϱϬϳϭϲϬ͘ϰϮϱϳ͕�ϭϵϯϱϳϲϱϯ͘ϯϲϭϮ �ςϭϴ͗�ϱϬϲϴϯϭ͘ϵϴϵϲ͕�ϭϵϯϱϳϳϬϯ͘ϴϵϬϴ �ςϭϵ͗�ϱϬϲϲϬϳ͘ϰϴϲϴ͕�ϭϵϯϱϳϴϭϬ͘Ϭϭϲϳ �ςϮϬ͗�ϱϬϲϵϬϮ͘ϲϬϱϱ͕�ϭϵϯϱϴϮϯϱ͘Ϯϲϭϴ �ςϮϭ͗�ϱϬϲϵϯϰ͘Ϭϲϴϳ͕�ϭϵϯϱϴϬϴϳ͘ϴϲϯϬ �ςϮϮ͗�ϱϬϲϳϱϮ͘ϳϳϯϲ͕�ϭϵϯϱϴϬϴϱ͘ϳϱϳϮ �ςϮϯ͗�ϱϬϲϲϬϮ͘ϳϲϵϯ͕�ϭϵϯϱϴϱϭϬ͘ϱϯϯϱ �ςϮϰ͗�ϱϬϲϲϬϯ͘ϳϮϲϰ͕�ϭϵϯϱϳϵϵϮ͘ϮϯϮϬ �ςϮϱ͗�ϱϬϲϰϳϭ͘Ϯϲϯϰ͕�ϭϵϯϱϴϰϲϵ͘ϴϲϱϱ �ςϮϲ͗�ϱϬϲϯϳϯ͘ϴϵϲϬ͕�ϭϵϯϱϴϯϳϳ͘ϱϮϲϳ
CP26
CP14
CP25
CP23
CP8 CP24
CP22
CP21
CP20
SUGGESTED TEMPORARY
ACCESS ROUTE
HAUL ROAD TO REMAIN
+�γ=�Ψϑ���χϑ�Ψ�Χ�.∆ ςΨϑς�Ψχψ�=.∆�
Ψ͗ Ͱς ƌŽ ũĞ Đƚ
ƐͰ
ϭϯ ϲϱ ϯϭ ϲϬ Ͱ�
�Ͱ ς�
]Ͱ Ψŝ ǀĞ ƌ�Ψ
ĞƐ
ƚŽ ƌĂ ƚŝŽ
ŶͰ
ϯϬ й �χ ]Ͱ ϭͺ χͲ ξ͘ ξ� Ͳ�χ .χ χ]
Ͱχ Ͳϯ ͘ϭ ͘Ě ǁ Ő� ��Χ
ĂLJ
�ϭ Ϭ͕ �Ϯ Ϭϭ ϲ� Ͳ�ϵ
͗Ϭ ϵĂ ŵ �Đ Žƚ Ğŵ ϯ
.+/+65�1(�%105647%6+10
−∋;5610∋�4&�
56#6∋�1(�/+%∗+)#0�4#+.41#&�.+0∋ ςΨϑς�Ψχψ�=.∆�
�ϑ∆]χΨγ�χ.ϑ∆�����]]� χ�ΧςϑΨ�Ψψ�����]]͕ σϑΨ;�Θ�]χϑΨ�&� ��]�Χ�∆χ�;ϭ͘ϵϬ�ĂĐƌĞͿ
=.Χ.χ]�ϑ%��.]χγΨ��∆��
Ψϑ��
.+/+65�1(�%1706;
2412∋46;
6∋/214#4;�#%%∋55� 914−� �5614#)∋�∋#5∋/∋06 (41/�#..7.
9+..+#/5�4&�
.10∋�2+0∋ 64#+.�∗∋#&
∃1#4&/#0 +/2170&/∋06
∃1#4&/#0 +/2170&/∋06
#2241:��)#6∋�.1%#6+10
�+�∆∆�=�Θ %=ϑϑ�ς=�.∆ .ΧςΨϑρ�Χ�∆χ ��]�Χ�∆χ�;ϭϱ͘ϲϴ�ĂĐƌĞͿ
=.Χ.χ]�ϑ% �ϑ∆]χΨγ�χ.ϑ∆�;ϯϴ͘Ϯϵ ĂĐƌĞͿ
56#6∋�.1%#6+10�/#2
)4#0&�64#8∋45∋ %1706;
Ψ͗ Ͱς ƌŽ ũĞ Đƚ
ƐͰ
ϭϯ ϲϱ ϯϭ ϲϬ Ͱ�
�Ͱ ς�
]Ͱ Ψŝ ǀĞ ƌ�Ψ
ĞƐ
ƚŽ ƌĂ ƚŝŽ
ŶͰ
ϯϬ й �χ ]Ͱ ϭͺ χͲ ξ͘ ξ� Ͳ�χ .χ χ]
Ͱχ Ͳϯ ͘ϭ ͘Ě ǁ Ő� ��Χ
ĂLJ
�ϭ Ϭ͕ �Ϯ Ϭϭ ϲ� Ͳ�ϵ
͗Ϭ ϵĂ ŵ �Đ Žƚ Ğŵ ϯ
6������
6#
6∋ �2
�1
,5 64
∋8
�4 8+ ∋9
�4 8+ ∋9
�4 8+ ∋9
�4 8+ ∋9
Ψ͗ Ͱς ƌŽ ũĞ Đƚ
ƐͰ
ϭϯ ϲϱ ϯϭ ϲϬ Ͱ�
�Ͱ ς�
]Ͱ Ψŝ ǀĞ ƌ�Ψ
ĞƐ
ƚŽ ƌĂ ƚŝŽ
ŶͰ
ϯϬ й �χ ]Ͱ ϭͺ χͲ ξ͘ ξ� Ͳ�χ .χ χ]
Ͱχ Ͳϯ ͘ϭ ͘Ě ǁ Ő� ��Χ
ĂLJ
�ϭ Ϭ͕ �Ϯ Ϭϭ ϲ� Ͳ�ϵ
͗Ϭ ϵĂ ŵ �Đ Žƚ Ğŵ ϯ
#55�4
%#55�41#&
.+/+65�1(�%105647%6+10
%105647%6+10�#%%∋55� 914−� �5614#)∋�∋#5∋/∋06
(41/�)4#0&�64#8∋45∋�%1706;
−∋;5610∋�4&�
56#6∋�1(�/+%∗+)#0�4#+.41#&�.+0∋ ςΨϑς�Ψχψ�=.∆�
�ϑ∆]χΨγ�χ.ϑ∆�����]]�
=.Χ.χ]�ϑ%��.]χγΨ��∆��
Ψϑ��
.+/+65�1(�%1706;
2412∋46;
5#∃+0�210&
.+/+65�1(�%105647%6+10
.+/+65�1(�%1706;
2412∋46;
4+)∗6�1(�9#;��∋#5∋/∋06 4∋37+4∋&�(41/��)4#0&
64#8∋45∋�%1706;
41#&�%1//+55+10
#2241:��)#6∋�.1%#6+10
#2241:��)#6∋ .1%#6+105
∃1#4&/#0�&#/
∃1#4&/#0 +/2170&/∋06
∋#46∗∋0 ∋/∃#0−/∋06
∃1#4&/#0 +/2170&/∋06
∃1#4&/#0 +/2170&/∋06
∃1#4&/#0 +/2170&/∋06 χ�ΧςϑΨ�Ψψ�����]]͕ σϑΨ;�Θ�]χϑΨ�&� ��]�Χ�∆χ�;ϯ͘ϲϵ�ĂĐƌĞͿ
�+�∆∆�=�Θ %=ϑϑ�ς=�.∆ .ΧςΨϑρ�Χ�∆χ ��]�Χ�∆χ�;ϭϳ͘Ϭϵ�ĂĐƌĞͿ
=.Χ.χ]�ϑ% �ϑ∆]χΨγ�χ.ϑ∆�;ϰϵ͘ϵϱ ĂĐƌĞͿ
Ψ.&+χ�ϑ%�σ�ψ�����]] ;ϰ͘ϭϮ���Ψ�Ϳ
.+/+65�1(�%1706;
2412∋46;
4+)∗6�1(�9#;
∋#5∋/∋06
%105647%6+10�#%%∋55� 914−� �5614#)∋�∋#5∋/∋06 (41/�)4#0&�64#8∋45∋�%1706;
Ψ͗ Ͱς ƌŽ ũĞ Đƚ
ƐͰ
ϭϯ ϲϱ ϯϭ ϲϬ Ͱ�
�Ͱ ς�
]Ͱ Ψŝ ǀĞ ƌ�Ψ
ĞƐ
ƚŽ ƌĂ ƚŝŽ
ŶͰ
ϯϬ й �χ ]Ͱ ϭͺ χͲ ξ͘ ξ� Ͳ�χ .χ χ]
Ͱχ Ͳϯ ͘ϭ ͘Ě ǁ Ő� ��Χ
ĂLJ
�ϭ Ϭ͕ �Ϯ Ϭϭ ϲ� Ͳ�ϵ
͗Ϭ ϰĂ ŵ �Đ Žƚ Ğŵ ϯ Ψ͗ Ͱς ƌŽ ũĞ Đƚ
ƐͰ
ϭϯ ϲϱ ϯϭ ϲϬ Ͱ�
�Ͱ ς�
]Ͱ Ψŝ ǀĞ ƌ�Ψ
ĞƐ
ƚŽ ƌĂ ƚŝŽ
ŶͰ
ϯϬ й �χ ]Ͱ ϭͺ χͲ ξ͘ ξ� Ͳ�χ .χ χ]
Ͱχ Ͳϯ ͘ϭ ͘Ě ǁ Ő� ��Χ
ĂLJ
�ϭ Ϭ͕ �Ϯ Ϭϭ ϲ� Ͳ�ϵ
͗Ϭ ϰĂ ŵ �Đ Žƚ Ğŵ ϯ
6������
6∋
�2
,5 64
∃9 &
∋8
�4 8+ ∋9
�4 8+ ∋9
�4 8+ ∋9
�4 8+ ∋9
Ψ͗ Ͱς ƌŽ ũĞ Đƚ
ƐͰ
ϭϯ ϲϱ ϯϭ ϲϬ Ͱ�
�Ͱ ς�
]Ͱ Ψŝ ǀĞ ƌ�Ψ
ĞƐ
ƚŽ ƌĂ ƚŝŽ
ŶͰ
ϯϬ й �χ ]Ͱ ϭͺ χͲ ξ͘ ξ� Ͳ�χ .χ χ]
Ͱχ Ͳϯ ͘ϭ ͘Ě ǁ Ő� ��Χ
ĂLJ
�ϭ Ϭ͕ �Ϯ Ϭϭ ϲ� Ͳ�ϵ
͗Ϭ ϰĂ ŵ �Đ Žƚ Ğŵ ϯ
BIRMLEY RD
C
ASS
R D
D R
AC
KA
RD
U S
N R
U
SC
H R
D
BOARDMAN
IMPOUNDMENT
SABIN
POND
BROAD
RD
DIPLEY RD
BLAIR TWP.
GARFIELD TWP.
BEITNER
RDW
IL
LI
AM
S R
D
BIRMLEY RD
C
ASS
R D
D R
AC
KA
RD
U S
N R
U
SC
H R
D
BOARDMAN
IMPOUNDMENT
SABIN
POND
BROAD
RD
DIPLEY RD
BLAIR TWP.
GARFIELD TWP.
BEITNER
RDW
IL
LI
AM
S R
D
5∗∋∋6 #4∋# ς͗
ͰΨ
ĞƐ
ŽƵ
ƌĐ
ĞƐ
Ͱσ
�χ �Ψ
ͺΨ ϑ γ Ψ�
Ͱς ƌŽ ũĞ Đƚ
ƐͰ
ϭϯ ϲϱ ϯϭ ϲϬ
ŽĂ
ƌĚ ŵ
ĂŶ
Ͱ� ϑ �Ψ
Χ
ͺ� ƌĂ ǁ ŝŶ
ŐƐ
Ͱ�
Ͱς
ͰΨ
ŝǀ Ğƌ �Ψ
ĞƐ
ƚŽ ƌĂ ƚŝŽ
ŶͰ
ϯϬ й
�χ ]Ͱ Ϯͺ �Ͳ ξ͘ ξ� Ͳ��
Ψ� χ]
Ͱ�
ͲϬ
͘ϭ �Ͳ� �dž ŝƐ ƚŝŶ
Ő� ]ŝ ƚĞ �χ
ŽƉ
ŽŐ
ƌĂ
ƉŚ
LJ� ςů
ĂŶ
ͺΧ
͘Ě ǁ Ő� ��Χ
ĂLJ
�ϭ ϯ͕ �Ϯ Ϭϭ ϲ� Ͳ�ϭ
͗ϯ ϱƉ ŵ �Đ Žƚ Ğŵ ϯ
%10%4∋6∋�%14∋�9#..
)4#8∋.
)4#8∋.
219∋4∗175∋
∋6∋�52+. .9
∋:�����%.#;�2+2∋ �61�∃∋�4∋/18∋&�
��∋:������%/2 �4∋/18∋&�∃;�∃4+&)∋�%1064#%614�
2#4%∋.��
2#4%∋.��
+0 +5 6+ �6
,5 64
∃9 &
#7
∋5
�4
95∋� �#2241:�����
�419
�419
%#55�41#&�∃4+&)∋ �%105647%6∋&�∃;�16∗∋45�
95∋� �#2241:�������
#7)756����� ∋:2∋%6∋&�#6�56#46 1(�%105647%6+10 ϑΨ�]+Ψγ��=.∆� ��&��ϑ%�χΨ����∆�ͬ ςΨϑς�Ψχψ�=.∆�
Ψϑσ ς�ρ�Χ�∆χ��ϑγ∆��Ψψ
�ξ.]χ.∆&�Χ�9ϑΨ
&γ�Ψ�Ψ�.= ϑρ�Ψ+�����=��χΨ.� σ�χ=�∆���Ψ�� σ�χ�Ψ�]γΨ%��� �=�ρ�χ.ϑ∆
�ϑ∆χϑγΨ�=.∆�
�ξ.]χ.∆&�Χ.∆ϑΨ �ϑ∆χϑγΨ�=.∆�
Ψ.ς�Ψ�ς�Χ�χ�Ψ.�=
∋5
�4
∋5
�4
4∋/18∋�#0&�5614∋�(∋0%+0) (14�4∋�+056#..#6+10�#(6∋4 %105647%6+10
18∋4∗∋#&�5+)0 �61�∃∋�4∋/18∋&�
5#(∋6;�∃71;�#0&�%#∃.∋ �61�∃∋�4∋/18∋&�
∋5
�4
5647%674#.�4∋/18#.
5%12∋�1(�914−�
5∋∋�5∗∋∋65�5�������5����
911&;�&∋∃4+5�561%−�2+.∋ (14�∗#∃+6#6��4∋5614#6+10�5647%674∋5 σϑϑ�ψ����Ψ.]
G B
G B
G B
G B
G B
G B
G B
G
B
20'
20'
20'
C A
S
R
D
D R
A C
K A
N
R
U S
H
BOARDMAN
IMPOUNDMENT
SABIN
POND
BROAD
RD
DIPLEY RD
BLAIR TWP.
GARFIELD TWP.
W I L L I A
M
SHEET
AREA
R:
\P ro je ct s\
\C
AD
D\
PD
S\ Ri ve r R es to ra tio n\
D
ES
IG
N S
HE
ET
S\ 2_
B- X.
X
- B
RE
AC
HI
N
G
SH
EE
TS
\B -1
.1
DA
M
B
RE
AC
HI
N G
SI
TE
P
LA
N _M
LC
.d w g
M ay
3,
- 1
0:
am c ot em
00 25' 50'
TEMPORARY SPOILS
STORAGE
OVERHEAD ELECTRIC
(REMOVED BY OTHERS)
B - 1.1
BR
EA
CH
IN
G
- G
EN
ER
AL
S
IT
E
PL
AN
JS TR
N
BW DD
D.
D
EV
AU
N 3/3
/15
D
ES
IG
N
RE
VI
EW
WETLAND AREA
WETLAND AREA
RECOMMENDED EQUIPMENT
STAGING AREA (ACTUAL
STAGING AREAS TO BE
COORDINATED BETWEEN
CONTRACTOR & COR
TEMPORARY
CONSTRUCTION
ENTRANCE
POWERHOUSE
CONCRETE SPILLW
AY
CONSTRUCTION
ACCESS ROAD
SEE SHEET B-1.4
FOR DETAIL
SIPHON
PUMPING PAD
SEE SHEET B-3.2
SIPHON OUTLET
ENERGY
DISSIPATION
SEE SHEET B-3.3
FOR DETAILS
STILLING BASIN OUTLET
SEE SHEETS B-7.1 - B-7.3
FOR DETAILS
TAILWATER BERM
SEE SHEETS B-7.1 - B-7.4
FOR DETAILS
(4) 36" HDPE
SEE SHEETS B-7.1 - B-7.4
FOR DETAILS
ARTICULATED
BLOCK LIMITS OF AUXILIARY
SPILLWAY CHANNEL
GRADING
LIMITS OF AUXILIARY
SPILLWAY CHANNEL
GRADING
CHANNEL
TOP OF BANK
CHANNEL
ALIGNMENT
LEGEND
RIVER CHANNEL TOP
RIVER CHANNEL FLOODPLAIN
EXISTING MAJOR
GUARDRAIL
OVERHEAD ELECTRIC
WETLAND BOUNDARY
RIP RAP
OF BANK
GBGRADE BREAK LINE
PAVEMENT BOUNDARY
CONSTRUCTION
ACCESS / SIPHON PAD
CONTOUR LINE
EXISTING MINOR
CONTOUR LINE
CONSTRUCTION
ACCESS ROAD
SEE SHEET B-1.4
FOR DETAIL
CONSTRUCTION ACCESS ROAD
SEE DETAIL SEE SHEET
B-1.4 FOR DETAIL
6/3 /15
D
ES
IG
N
RE
VI
EW
EXISTING TREE LINE
TREE CLEARING LIMITS
REQUIRED AS
NECESSARY
SIPHON PIPES
SEE SHEET B-3.2
PROPOSED TREE
CLEARING LIMITS
REQUIRED AS
NECESSARY
EXISTING TREE
LINE
SIPHON PIPES
EXISTING
CONCRETE
COREWALL
AUXILIARY
SPILLWAY
EXISTING
INTAKE
OLD CASS ROAD
BRIDGE
CULVERTS
8/2 1/1
0%
D
ES
IG
N
RE
VI
EW
SPILLWAY STILLING
BASIN. SEE SHEETS B-7.1 - B-7.3
FOR DETAILS
GRAVEL
GRAVEL
OBSERVATION AREA
TO BE QUARANTINED
FROM CONSTRUCTION
EQUIPMENT AND ACTIVITY
CONSTRUCTION FENCING
PUBLIC OBSERVATION
AREA
CONSTRUCTION
FENCING
PUBLIC PARKING AREA
PUBLIC PARKING
AREA
LIMITS OF DISTURBANCE
TEMPORARY
CONSTRUCTION
ENTRANCE
Know what's
R
SURVEY CONTROLPOINT
1. IMPOUNDMENT WATER SURFACE SHOULD BE MONITORED AT ALL TIMES.
2. MAINTAIN REQUIRED AMOUNT OF FREEBOARD (AS NOTED IN CONSTRUCTION SEQUENCING)
AT ALL TIMES.
3. INSTALLATION OF STAFF GAGE AT THE DAM SITE MUST BE DONE PRIOR TO BEGINNING
CONSTRUCTION
4. DRAWDOWN RATE OF IMPOUNDMENT WATER SURFACE LIMITED TO 1' PER DAY BY PERMIT
5. EXISTING PARK SIGNAGE AND FENCING TO BE PROTECTED TO EXTENT POSSIBLE. SIGNAGE AND
FENCING DAMAGED OR REMOVED TO BE REPLACED IN KIND.
DAM BREACHING NOTES
TEMPORARY
GATE
TEMPORARY
GATE
OVERHEAD SIGN
(TO BE REMOVED)
SAFETY BUOY AND CABLE
(TO BE REMOVED)
PROTECT
TREES
PROTECT
TREES
PROTECT EXISTING
PARK SIGN
AUXILIARY SPILLWAY
CHANNEL. SEE SHEETS
B-7.1 - B-7.3 FOR DETAILS
/23
/15
0% D
ES
IG
N
RE
VI
EW
CONSTRUCTION
ACCESS ROAD
SEE SHEET B-1.4
FOR DETAIL
CONTROL POINT 4
NORTHING: 505869.3333
EASTING: 19357931.1584
CONTROL POINT 12
NORTHING: 506327.1171
EASTING: 19357857.3378
CONTROL POINT 19
NORTHING: 506607.4868
EASTING: 19357810.0167
CONTROL POINT 8
NORTHING: 506455.1841
EASTING: 19357972.5722
CONTROL POINT 24
NORTHING: 506603.7264
EASTING: 19357992.2320
CONTROL POINT 11
NORTHING: 506237.4291
EASTING: 19358006.6029
CONTROL POINT 14
NORTHING: 506367.2199
EASTING: 19358235.3443
CONTROL POINT 26
NORTHING: 506373.8960
EASTING: 19358377.5267
CONTROL POINT 15
NORTHING: 506246.0848
EASTING: 19358382.9690
CONTROL POINT 1
NORTHING: 506321.7006
EASTING: 19358566.8134
CONTROL POINT 5
NORTHING: 505898.2894
EASTING: 19358217.3204
CONTROL POINT 16
NORTHING: 506143.2151
EASTING: 19358575.9175
CONTROL POINT 13
NORTHING: 505954.1614
EASTING: 19358519.7497
CONTROL POINT 2
NORTHING: 505984.9969
EASTING: 19358822.0585
CONTROL POINT 3
NORTHING: 506283.3604
EASTING: 19358832.6413
CONTROL POINT 7
NORTHING: 506106.5143
EASTING: 19359181.6171
NOTE: TREE CLEARING LIMITS CAN BE FOUND ON SHEET B-6.2
G B
G B
G B
G B
G B
G B
G B
G
B
BOARDMAN
IMPOUNDMENT
BROAD
RD
DIPLEY RD
BLAIR TWP.
GARFIELD TWP.
W I L
L I A
SHEET
AREA
R:
\P ro je ct s\
\C
AD
D\
PD
S\ Ri ve r R es to ra tio n\
D
ES
IG
N S
HE
ET
S\ 2_
B- X.
X
- B
RE
AC
HI
N
G
SH
EE
TS
\B -1
.2
SO
IL
E
RO
SI
O
N
S
ED
IM
EN
TA
TI
O N
C O
N
TR
O L
PL
AN
_2
6.
.0 5_
RE
V_
M
LC
.d w g M ay
3,
- 1 0:
am c ot em
00 50' 100'
TEMPORARY SPOILS
STORAGE
OVERHEAD SIGN
(TO BE REMOVED)
B - 1.2
SO
IL
ER
OS
IO
N
SE
DI
ME
NT
AT
IO
N
CO
NT
RO
L -
B
RE
AC
HI
NG
JS TR
N
BW DD
D.
D
EV
AU
N 3/3
/15
D
ES
IG
N
RE
VI
EW
WETLAND AREA
WETLAND AREA
WETLAND AREA
EQUIPMENT STAGING
AREA
TEMPORARY CONSTRUCTION
ENTRANCE (SEE DETAIL SE50)
POWERHOUSE
CONCRETE SPILLW
AY
CONSTRUCTION
ACCESS ROAD
SIPHON
PUMPING
PAD
SIPHON OUTLET
ENERGY
DISSIPATION
SPILLWAY
STILLING
BASIN
TAILWATER
BERM EL 623
(4) 36" HDPE
CULVERT EL 615
ARTICULATED
BLOCK
CHANNEL
TOP OF BANK
CHANNEL
ALIGNMENT
LEGEND
RIVER CHANNEL TOP
PAVEMENT BOUNDARY
EXISTING MAJOR
GUARDRAIL
OVERHEAD ELECTRIC
RIP RAP
OF BANK
GBGRADE BREAK LINE
PAVEMENT BOUNDARY
CONSTRUCTION
ACCESS / SIPHON PAD
CONTOUR LINE
EXISTING MINOR
CONTOUR LINE
CONSTRUCTION
ACCESS ROAD
CONSTRUCTION ACCESS ROAD
6/3 /15
D
ES
IG
N
RE
VI
EW
EXISTING TREE LINE
TREE CLEARING
LIMITS REQUIRED AS
NECESSARY
PROPOSED TREE
CLEARING LIMITS
REQUIRED AS
NECESSARY
EXISTING TREE
LINE
CONCRETE
COREWALL
AUXILIARY
SPILLWAY
EXISTING
INTAKE
OLD CASS ROAD
BRIDGE
CULVERTS
TEMPORARY CONSTRUCTION
ENTRANCE (SEE DETAIL SE50)
SILT FENCE
(SEE DETAIL SE26)
SILT FENCE
(SEE DETAIL SE26)
SILT FENCING
SILT FENCE
(SEE DETAIL SE26)
SILT FENCE
(SEE DETAIL SE26)
SILT FENCE
(SEE DETAIL SE26)
8/2 1/1
0%
D
ES
IG
N
RE
VI
EW
SIPHON HDPE PIPES
GRAVEL ACCESS PAD
PUBLIC OBSERVATION
AREA
PUBLIC PARKING AREA
OBSERVATION AREA
TO BE QUARANTINED
FROM CONSTRUCTION
EQUIPMENT AND ACTIVITY
CONSTRUCTION
FENCING
PUBLIC PARKING
AREA
1. THE CONTRACTOR SHALL COMPLY WITH GRAND TRAVERSE COUNTY RULES &
REGULATIONS FOR SOIL EROSION CONTROL & SUBMIT A SCHEDULE OF SOIL EROSION
ACTIVITIES TO THE LOCAL ENFORCING AGENCY PRIOR TO ANY EARTH CHANGE AND
AFTER RECEIVING A NOTICE OF COVERAGE AND COMPLIANCE.
2. EROSION AND SEDIMENTATION CONTROL MEASURES SHALL BE CATEGORIZED AS INITIAL,
INTERIM, AND FINAL MEASURES. INITIAL MEASURES SHALL BE IMPLEMENTED PRIOR TO
ANY MAJOR SOIL DISTURNACE ON THE SITE, AND SHALL BE LOCATED AT AND ADJACENT
TO AREAS THAT WILL BE DISTURBED AT THE START OF CONSTRUCTION (TEMPORARY
ACCESS ROADS, ACCESS ROAD ENTRANCE/EXIT POINTS FROM THE SITE, DOWNLOPE OF
THE EXCAVATIONS AT THE DAM, STILLING BASINS AND OUTLETS). INTERIM MEASURES
SHALL BE APPLIED TO AREAS THAT WILL BE DISTURVED AS CONSTRUCTION PTOGRESSES
(DOWNSLOPE OF SPOIL DISPOSAL AREAS, STOCKPILE PERIMETERS). FINAL MEASURES
SHALL BE APPLIED UPON COMPPLETION OF CONSTRUCTION, AND MAY CONSIST OF
MAINTENENACE AND UPGRADES OF PREVIOUSLY PLACED INITIAL OR INTERIM
MEASURES.
EROSION CONTROL NOTES
3. ALL INITIAL SOIL EROSION AND SEDIMENT CONTROL PRACTICES ARE TO BE INSTALLED
PRIOR TO ANY MAJOR SOIL DISTURBANCE, AND IN THEIR PROPOER SEQUENCE, AND
MAINTAINED UNTIL PERMANENT PROTECTION IS ESTABLISHED.
4. ANY DISTUBED AREAS THAT WILL BE LEFT EXPOSED MORE THAN 30 DAYS, AND NOT
SUBJECT TO CONSTRUCTION TRAFFIC, WILL IMMEDIATELY RECEIVE A TEMPORARY
SEEDING AS SPECIFIED IN SPECIFICATION SECTION 32 90 00. IF THE SEASON PREVENTS
THE ESTABLICHMENT OF TEMPORARY COVER, THE DISTURBED AREAS SHALL BE
MULCHED WITH STRAW, OR EQUIVALENT MATERIAL, AT A RATE OF 2 TO 2 ½ TONS PER
ACRE.
5. THE CONTRACTOR SHALL INSPECT ALL TEMPORARY & PERMANENT EROSION CONTROL
MEASURES WEEKLY & IMMEDIATELY (WITHIN 24 HOURS) AFTER A SIGNIFICANT
RAINFALL EVENT. ALL MEASURES REQUIRING MAINTENANCE REPAIR OR REPLACEMENT
SHALL BE CORRECTED IMMEDIATELY AT NO ADDITIONAL COST TO THE GOVERNMENT.
6. IF UNFORESEEN EROSION OR SEDIMENTATION PROBLEMS ARE IDENTIFIED; THE
CONTRACTOR SHALL TAKE IMMEDIATE MEASURES TO STABILISE THE AREA AND
CONTROL THE PROBLEM. THE CONTRACTOR SHALL ALSO NOTIFY THE COR. THE
CONTRACTOR SHALL IMPLEMENT ANY ADDITIONAL MEASURES REQUIRED BY THE COR.
LIMITS OF CASS
ROAD CONSTRUCITON
(SEE SHEETS C-0.1 - C-6.4)
/21
/15
0% D
ES
IG
N
RE
VI
EW
7. ALL SUBGRADE SLOPES SHALL BE TRACKED PERPENDICULAR TO THE SLOPE TO AID IN
EROSION CONTROL OF SLOPED AREAS.
8. CONTRACTOR SHALL FENCE OFF AND PROTECT TREES/AREAS DESIGNATED BY COR.
9. THE LOCATION OF ANY STOCKPILES SHALL BE DESIGNATED BY THE COR PRIOR TO
CONSTRUCTION. THIS AREA SHALL BE ENCLOSED BY SILT FENCE A REASONABLE
DISTANCE FROM THE TOE OF SLOPE UNTIL SUCH TIME IT IS USED.
10. A CRUSHED STONE, STABILIZED CONSTRUCTION ACCESS PAD WILL BE INSTALLED
WHEREVER A CONSTRUCTION ACCESS ROAD INTERSECTS A PAVED ROADWAY. SAID
PAD WILL MEET THE REQUIREMENTS OF THE TEMPORARY CONSTRUCTION ENTRANCE
DETAIL ON SHEET B-1.4.
11. STREET SWEEPING AND DUST CONTROL SHALL BE THE CONTRACTOR'S RESPONSIBILITY.
12. ALL DRAINAGE DITCHES ARE TO BE STABILIZED WITH EROSION CONTROL BLANKET;
DRAINAGE DITCHES STEEPER THAN 3% ARE TO BE SODDED.
13. SLOPES STEEPER THAN 1V:6H (16%) LOCATED WITHIN THE DAM BREACHING AREA ARE
TO BE STABILIZED WITH EROSION CONTROL BLANKETS.
14. ALL WETLANDS NOT LOCATED WITHIN LIMITS OF DISTURBANCE SHALL BE PROTECTED
WITH SILT FENCE AND SHALL NOT BE DISTURBED.
15. CONCRETE RUBBLE MAY BE SALVAGED AND USED FOR TEMPORARY EROSION CONTROL,
BUT ALL METAL SHALL BE CUT FLUSH AND DISPOSED OF OFF-SITE.
16. FINAL SOIL EROSION CONTROL MEASURES, PLANTINGS & SEEDMIX FOR ALL SLOPES,
WETLANDS, OR DISTURBED LAND AREA SHALL BE COMPLETED WITHIN FIFTEEN (15)
CALENDAR DAYS AFTER FINAL GRADING OR FINAL EARTH CHANGE HAD BEEN
COMPLETED. SEEDING, COMPOST, MULCHING, AND FERTILIZER REQUIREMENTS AND
SPECIFICATIONS ARE PROVIDED IN SPECIFICATION SECTIONS 32 90 00.
17. AT COMPLETION OF CONSTRUCTION ACTIVITIES OR UPON REQUEST FOR REVIEW,
SUBMIT INSPECTION LOG BOOK TO THE COUNTY AND THE COR.
CLEAN INFILTRATION
BASIN UPON COMPLETION
OF PROJECT
PROTECT
PROTECT
SAFETY BUOY AND CABLE
(TO BE REMOVED)
LIMITS OF DISTURBANCE
BOARDMAN
IMPOUNDMENT
BROAD
RD
DIPLEY RD
BLAIR TWP.
GARFIELD TWP.
W I L
L I A
SHEET
AREA
R:
\P ro je ct s\
\C
AD
D\
PD
S\ Ri ve r R es to ra tio n\
D
ES
IG
N S
HE
ET
S\ 2_
B- X.
X
- B
RE
AC
HI
N
G
SH
EE
TS
\B -1
.2
SO
IL
E
RO
SI
O
N
S
ED
IM
EN
TA
TI
O N
C O
N
TR
O L
PL
AN
_2
6.
.0 5_
RE
V_
M
LC
.d w g M ay
3,
- 1 0:
am c ot em
00 50' 100'
B - 1.3
SO
IL
ER
OS
IO
N
SE
DI
ME
NT
AT
IO
N
CO
NT
RO
L -
C
AS
S
TO
S
AB
IN
JS TR
N
BW DD
D.
D
EV
AU
N 3/3
/15
D
ES
IG
N
RE
VI
EW
WETLAND AREA
TEMPORARY CONSTRUCTION
ENTRANCE (SEE DETAIL SE50)
POWERHOUSE
CONCRETE SPILLW
AY
CHANNEL
TOP OF BANK
CHANNEL
ALIGNMENT
LEGEND
RIVER CHANNEL TOP
PAVEMENT BOUNDARY
EXISTING MAJOR
GUARDRAIL
OVERHEAD ELECTRIC
OF BANK
GBGRADE BREAK LINE
PAVEMENT BOUNDARY
CONSTRUCTION
ACCESS / SIPHON PAD
CONTOUR LINE
EXISTING MINOR
CONTOUR LINE
6/3 /15
D
ES
IG
N
RE
VI
EW
EXISTING TREE LINE
PROPOSED TREE
CLEARING LIMITS
PROPOSED TREE
CLEARING LIMITS EXISTING TREE
LINE
EXISTING
OLD CASS ROAD
BRIDGE
CULVERTS
SILT FENCE
(SEE DETAIL SE26)
SILT FENCE
(SEE DETAIL SE26)
SILT FENCING
SILT FENCE
(SEE DETAIL SE26)
8/2 1/1
0%
D
ES
IG
N
RE
VI
EW
SIPHON HDPE PIPES
GRAVEL ACCESS PAD
PUBLIC PARKING AREA
PUBLIC PARKING
AREA
LIMITS OF CASS
ROAD CONSTRUCITON
(SEE SHEETS C-0.1 - C-6.4)
/23
/15
0% D
ES
IG
N
RE
VI
EW
CLEAN INFILTRATION
BASIN UPON COMPLETION
OF PROJECT
LIMITS OF DISTURBANCE
5∋��
���/+0��������%.∋#0�9#5∗∋&�5610∋
���/+0��1(�������%.∋#0�9#5∗∋&�5610∋
�4#&+75
����/+0�
���/+0��1(�������%.∋#0�9#5∗∋&�5610∋ ∋:+56+0)
2#8∋/∋06
����1
(.#6 6∋4
/#6%∗�∋.∋8#6+10 1(�612�1(�∋:+56+0)
2#8∋/∋06
∋:%#8#6∋�61�%10(14/
61�2#8∋/∋06�14�%74∃�
5∋∋�,1+0�&∋6#+.
+56
+0) �2#
8∋ &�4
1# &9
6#2∋4�#6�#..�∋&)∋5
∃∋4/����� ∗∋+)∗6�∃;���� 9+&6∗
�/+0�
010�918∋0�)∋16∋:6+.∋ (#∃4+%
6#2∋4�∋&)∋5 #6������
14+)+0#.
)4170&
/+0
6;2 %4155�5.12∋ ���14�(.#66∋4
,1+0�&∋6#+.
2∋452∋%6+8∋
5∋%6+10�#�#
010�918∋0�)∋16∋:6+.∋�(#∃4+%
52#%+0)�2∋4�/#07(�
+0
5∋%6+10�#�#
)∋16∋:6+.∋�(+.6∋4�(#∃4+% (#56∋0∋&�10�72∗+..�5+&∋ 619#4&5�∋#46∗�&+54726+10
4+&)∋�1(�%1/2#%6∋&�∋#46∗ 10�72∗+..�5+&∋�1(�)∋16∋:6+.∋ (+.6∋4�(#∃4+%
��Ζ�� #0%∗14+0) 64∋0%∗
)∋16∋:6+.∋�(#∃4+%�5∗#..
∃∋�94#22∋&�#4170&�∋#%∗ (∋0%∋�2156
5+.6�(∋0%∋�#
5+.6�(∋0%∋�∃
8+∋9�∃�∃ 5+.6�(∋0%∋�,1+06
(4106�8+∋9
)∋16∋:6+.∋�(+.6∋4�(#∃4+%
4∋(∋4�61�/�&�1�6��51+.�∋415+10� 5∋&+/∋06#6+10�%10641.�/∋#574∋5 4����∃
70&+5674∃∋&�8∋)∋6#6+10)∋16∋:6+.∋ (+.6∋4 (#∃4+%
(∋0%∋
5+.6�(∋0%∋�,1+06� 4∋(∋4�61�8+∋9�∃�∃
���#0%∗14 64∋0%∗
70&+5674∃∋& 8∋)∋6#6+10
61∋�+0�∃.#0−∋6��� /+0��#6�612��6;2� ∃16∗�5+&∋5�
4∋(∋4�61�/�&�1�6��51+.�∋415+10� 5∋&+/∋06#6+10�%10641.�/∋#574∋5 4����∃
∋415+10�%10641.�∃.#0−∋65 56#2.+0)�2#66∋40�2∋4�/#07(� 4∋%1//∋0+105
4∋(∋4�61�2.#05 (14�5.12∋5� 9+&6∗5
5∋��
5∋��
���/+0��1(�/&16����##�#))4∋)#6∋ 010�918∋0�)∋16∋:6+.∋ (#∃4+%
6#2∋4�∋&)∋5 #6������
14+)+0#.
)4170&
/+0
%4155�5.12∋ ���14�(.#66∋4
5∋%6+10�#�#
5∋��
(+..�#5�0∋%∋55#4;
∃∋69∋∋0�#))4∋)#6∋ #0&�)∋16∋:6+.∋
5∋∋�4∋5614#6+10�5∗∋∋6�4�����(14 5+.6�(∋0%∋�&∋6#+.5�2∋46#+0+0)�52∋%+(+%#..;
61�4+8∋4�4∋5614#6+10
5.12∋�#9#;�(41/�41#&�(14��
14�5+/+.#4
016∋� %1064#%614�61�+056#..�6∋/214#4;
%7.8∋465�#5�0∋%∋55#4;�61�#%%1//1∋ 5∋#25�#0&�64+∃76#4+∋5�
Ψ͗ Ͱς ƌŽ ũĞ Đƚ
ƐͰ
ϭϯ ϲϱ ϯϭ ϲϬ Ͱ�
�Ͱ ς�
]Ͱ Ψŝ ǀĞ ƌ�Ψ
ĞƐ
ƚŽ ƌĂ ƚŝŽ
ŶͰ
ϯϬ й �χ ]Ͱ Ϯͺ �Ͳ ξ͘ ξ� Ͳ�� Ψ� χ]
Ͱ� Ͳϭ ͘Ϯ �Ͳ� ]ϑ
Ψϑ ϑ �Θ
.Χ χ� χ.
ϑ ϑ χΨ ϑ ς=
ͺϮ Ϭϭ ϲ͘ Ϭϱ
͘Ϭ ϱͺ Ψ� ρͺ Χ
͘Ě ǁ Ő� ��Χ
ĂLJ
�ϭ ϯ͕ �Ϯ Ϭϭ ϲ� Ͳ�ϭ
͗ϭ ϯƉ ŵ �Đ Žƚ Ğŵ ϯ
+1 �5 6#
6+
6#
,5 64
#7
∋5
�4
∋5
�4
�4 8+ ∋9
�4 8+ ∋9 ϭ͘�����].=χ�%�∆����∆���γ&Χ�∆χ���].=χ�%�∆���]+�==����.∆]ς��χ����∆��Ψ�ς�.Ψ���.ΧΧ��.�χ�=ψ %ϑ==ϑσ.∆&��∆ψ�].&∆.%.��∆χ�Ψ�.∆%�==�;�Ξγ�=�χϑ�ϑΨ�&Ψ��χ�Ψ�χ+�∆�Ϭ͘ϱ�.∆�+�]ͬϮϰ+ΨͿ��∆����.=ψ �γΨ.∆&�ςΨϑ=ϑ∆&���Ψ�.∆%�==͘��ϑχ+�Ψσ.]� �͕.∆]ς��χ.ϑ∆�]+�==����σ��;=ψ͕��χ���Χ.∆.ΧγΧ͘
Ϯ͘�����]��.Χ�∆χ�]+�==����Ψ�Χϑρ���%ΨϑΧ�χ+��γς]χΨ��Χ�%����ϑ%�χ+��]��.Χ�∆χ���ΨΨ.�Ψ�σ+�∆�.χ�+�] Ψ���+�����ϭͬϯ���ςχ+�ϑ%�χ+����ΨΨ.�Ψ�+�.&+χ͘ ϯ͘�����Ψ�ς�.Ψ�ϑΨ�Ψ�ς=������ΨΨ.�Ψ�;%��Ψ.�͕�ςϑ]χ] �͕��=�] �͕�χ�͘Ϳ�σ+�∆���Χ�&��͘
.∆]ς��χ.ϑ∆��∆��Χ�.∆χ�∆�∆��͗ ]��.Χ�∆χ���ΨΨ.�Ψ]͗ ϭ �͘����χ+���∆χΨ�∆���]+�==����Χ�.∆χ�.∆���.∆����ϑ∆�.χ.ϑ∆�σ+.�+�σ.==�ςΨ�ρ�∆χ�χΨ��;.∆&�ϑΨ�%=ϑσ.∆& ϑ%�]��.Χ�∆χ�ϑ∆χϑ�ς�ρ�Χ�∆χ͘��χ+.]�Χ�ψ�Ψ�Ξγ.Ψ��ς�Ψ.ϑ�.��χϑς��Ψ�]].∆&�σ.χ+����.χ.ϑ∆�=�]χϑ∆��ϑΨ ���.χ.ϑ∆�=�=�∆&χ+��]��ϑ∆�.χ.ϑ∆]���Χ�∆���∆��Ψ�ς�.Ψ��∆�ͬϑΨ��=��∆ϑγχ�ϑ%��∆ψ�Χ��]γΨ�]�γ]�� χϑ�χΨ�ς�]��.Χ�∆χ͘���==�]��.Χ�∆χ�]ς.==��͕��Ψϑςς��͕�σ�]+�� �͕ϑΨ�χΨ��;���ϑ∆χϑ�Ψϑ��σ�ψ]�;ςγ�=.� ϑΨ�ςΨ.ρ�χ�Ϳ�ϑΨ�ϑχ+�Ψ�.Χς�Ψρ.ϑγ]�]γΨ%���]�Χγ]χ����Ψ�Χϑρ���.ΧΧ��.�χ�=ψ͘
Ϯ͘�����σ+�Ψ�����γΧγ=�χ.ϑ∆�ϑ%��γ]χͬ]��.Χ�∆χ�.]�.∆���Ξγ�χ�=ψ��=��∆���ϑΨ�Ψ�Χϑρ����ψ �ϑ∆ρ�∆χ.ϑ∆�=�Χ�χ+ϑ�]͕���ςϑσ�Ψ��ΨϑϑΧ�ϑΨ�]χΨ��χ�]σ��ς�Ψ�σ.==����Ψ�Ξγ.Ψ���χϑ��=��∆�ς�ρ���ϑΨ .Χς�Ψρ.ϑγ]�]γΨ%���] �͘�����]]�ςϑ.∆χ]�χϑ�χ+��σϑΨ;��Ψ���]+�==�����ϑ∆χΨϑ==��͘
]χ��.=.∼����ϑ∆]χΨγ�χ.ϑ∆�����]]͗ ϭ �͘����.%�χ+��%�∆����Ψ.%χ]�%ΨϑΧ�.χ]�.∆]χ�==���=ϑ��χ.ϑ∆�ϑΨ����ϑΧ�]�ς�Ψχ.�==ψ�]γ�Χ�Ψ&�� �͕Ψ�ς�.Ψ ]+ϑγ=�����.ΧΧ��.�χ�=ψ�γ∆��Ψχ�;�∆͘
Ϯ͘�����Ψ�&γ=�Ψ=ψ�Ψ�Χϑρ���∆ψ��ϑ==��χ������Ψ.]�χ+�χ�.Χς���]�χ+��%γ∆�χ.ϑ∆�ϑ%�χ+��%�∆��͘
].=χ�%�∆��͗
NORTHING: 506105.3398
EASTING: 19358202.2887
NORTHING: 506107.8898
EASTING: 19358263.8656
C A
BOARDMAN
IMPOUNDMENT
BROAD
RD
DIPLEY RD
BLAIR TWP.
GARFIELD TWP.
SHEET
AREA
R:
\P ro je ct s\
\C
AD
D\
PD
S\ Ri ve r R es to ra tio n\
D
ES
IG
N S
HE
ET
S\ 2_
B- X.
X
- B
RE
AC
HI
N
G
SH
EE
TS
\B -2
.1
Ex ist in g
Si te
T op og ra ph y
Pl an
_r ev
.d w g M ay
3,
- 1 0:
am c ot em
00 30' 60'
B - 2.1
BR
EA
CH
IN
G
- S
TA
GE
PL
AN
(T
OP
C
UT
T
O
EL
6)
JS TR
N
BW DD
D.
D
EV
AU
N 3/3
/15
D
ES
IG
N
RE
VI
EW
REMOVE CONCRETE COREWALL
TO ELEVATION 648
SIPHON OUTLET
ENERGY DISSIPATION
REFER TO SHEET B-3.3
FOR DETAILS
WSE = APPROX. 639.5'
AUGUST 2014
EXPECTED AT START
OF DEWATERING
(4) 36" HDPE PIPES
REFER TO SHEETS
B-7.1 & B-7.4
DOWNSTREAM TAILWATER
BERM TO ELEVATION 623'
WITH OUTLET WEIR AT 620'
REFER TO SHEETS B-7.1 & B-7.4
LEGEND
RIP RAP
PROPOSED CONTOUR
GBGRADE BREAK LINE
TEMPORARY
RIVER CHANNEL
BOTTOM OF BANK
EXISTING MAJOR
CONTOUR LINE
EXISTING MINOR
CONTOUR LINE
6/3 /15
D
ES
IG
N
RE
VI
EW
RIVER CHANNEL
TOP OF BANK
CULVERTS
8/2 1/1
0%
D
ES
IG
N
RE
VI
EW
DAM TOP CUT
ELEVATION 646
CONSTRUCTION ACCESS
CONSTRUCTION ACCESS
CONSTRUCTION
ACCESS
NOTE:
REFER TO RESTORATION SHEETS R-1.4 & R-2.4 FOR DETAILS PERTAINING TO THE TEMPORARY RIVER
CHANNEL. PROPOSED PROFILE AND CROSS SECTIONS ARE DETAILED IN THOSE PLAN SHEETS.
LIMITS OF DISTURBANCE
LIMITS OF DISTURBANCE
WSE = WATER SURFACE ELEVATION
Know what's
R
EQUIPMENT STAGING
AREA
OBSERVATION AREA
TO BE QUARANTINED
FROM CONSTRUCTION
EQUIPMENT AND ACTIVITY
CONSTRUCTION
FENCING
PUBLIC OBSERVATION
AREA
/21
/15
0% D
ES
IG
N
RE
VI
EW
LIMITS OF TEMPORARY
CHANNEL EXCAVATION
CONSTRUCTION
ENTRANCE
GRAVEL ACCESS PAD
PUBLIC PARKING AREA
MATCHLINE B-2.2
48'
NORTHING: 506105.3398
EASTING: 19358202.2887
NORTHING: 506107.8898
EASTING: 19358263.8656
R D
BOARDMAN
IMPOUNDMENT
BROAD
RD
DIPLEY RD
BLAIR TWP.
GARFIELD TWP.
ς͗
ͰΨ
ĞƐ
ŽƵ
ƌĐ
ĞƐ
Ͱσ
�χ �Ψ
ͺΨ ϑ γ Ψ�
Ͱς ƌŽ ũĞ Đƚ
ƐͰ
ϭϯ ϲϱ ϯϭ ϲϬ
ŽĂ
ƌĚ ŵ
ĂŶ
Ͱ� ϑ �Ψ
�Χ
ͺ� ƌĂ ǁ ŝŶ
ŐƐ
Ͱ�
Ͱς
ͰΨ
ŝǀ Ğƌ �Ψ
ĞƐ
ƚŽ ƌĂ ƚŝŽ
ŶͰ
ϯϬ й
�χ ]Ͱ Ϯͺ �Ͳ ξ͘ ξ� �Ͳ Ϯ͘ ϭ� Ͳ�� džŝ Ɛƚ ŝŶ Ő� ]ŝ ƚĞ �χ
ŽƉ
ŽŐ
ƌĂ
ƉŚ
LJ� ςů
ĂŶ
ͺƌ Ğǀ
͘Ě ǁ Ő� ��Χ
ĂLJ
�ϭ ϯ͕ �Ϯ Ϭϭ ϲ� Ͳ�ϰ
͗Ϯ
ϮƉ
ŵ �9Ă
ŶĞ
ĞŶ
ͺ] ƚĂ ůĚ Ğƌ
00 30' 60'
B - 2.2
BR
EA
CH
IN
G -S
TA
GE
1P
LA
N (C
HA
NN
EL
AT
CA
SS
RD
JS TR
N
BW DD
D.
DE
VA
UN
3/3 /1
DE
SI
GN
RE
VI
EW
(4) 36" HDPE PIPES
REFER TO SHEETS
B-7.1 & B-7.4 FOR DETAILS
DOWNSTREAM TAILWATER
BERM TO ELEVATION 623'
WITH OUTLET WEIR AT 620'
REFER TO SHEET B-7.1 & B-7.4
FOR DETAILS
Ψ.ς�Ψ�ς ςΨϑςϑ]����ϑ∆χϑγΨ
Ψ.ρ�Ψ��+�∆∆�=
GB&Ψ�����Ψ��;�=.∆�
TEMPORARY
RIVER CHANNEL
TOP OF BANK
�ξ.]χ.∆&�Χ�9ϑΨ �ϑ∆χϑγΨ�=.∆�
�ξ.]χ.∆&�Χ.∆ϑΨ �ϑ∆χϑγΨ�=.∆�
6/3 /1
DE
SI
GN
RE
VI
EW
�ϑχχϑΧ�ϑ%���∆;
�γ=ρ�Ψχ]
8/2 1/
DE
SI
GN
RE
VI
EW
CONSTRUCTION ACCESS
�ξ.]χ.∆&�%�∆��
�ϑ∆]χΨγ�χ.ϑ∆
SIPHON OUTLET ENERGY
DISSIPATION REFER
TO SHEET B-3.3 FOR DETAILS
NOTE:
REFER TO RESTORATION SHEETS R-1.4 & R-2.4 FOR DETAILS PERTAINING TO THE TEMPORARY RIVER
CHANNEL. PROPOSED PROFILE AND CROSS SECTIONS ARE DETAILED IN THOSE PLAN SHEETS.
LIMITS OF DISTURBANCE
LIMITS OF DISTURBANCE
=.Χ.χ]�ϑ%��.]χγΨ��∆��
EQUIPMENT STAGING
AREA
CONSTRUCTION
FENCING
PUBLIC PARKING
AREA
LIMITS OF DISTURBANCE
LIMITS OF TEMPORARY
CHANNEL EXCAVATION
LIMITS OF TEMPORARY
CHANNEL EXCAVATION
/21
/1
DE
SI
GN
RE
VI
EW
SHEET
AREA
Know what's
R
CONSTRUCTION
ENTRANCE
CONSTRUCTION
ENTRANCE
&Ψ�ρ�=�����]]�ς�� ςγ�=.��ς�Ψ;.∆&��Ψ��
MATCHLINE B-2.1
MATCHLINE B-2.3
A
BOARDMAN
IMPOUNDMENT
BROAD
RD
DIPLEY RD
BLAIR TWP.
GARFIELD TWP.
R:
\P ro je ct s\
\C
AD
D\
PD
S\ Ri ve r R es to ra tio n\
D
ES
IG
N S
HE
ET
S\ 2_
B- X.
X
- B
RE
AC
HI
N
G
SH
EE
TS
\B -2
.1
Ex ist in g
Si te
T op og ra ph y
Pl an
_r ev
.d w g M ay
3,
- 1 0:
am c ot em
00 30' 60'
B - 2.3
BR
EA
CH
IN
G
- S
TA
GE
PL
AN
(C
HA
NN
EL
T
O
SA
BI
N
PO
ND
JS TR
N
BW DD
D.
D
EV
AU
N 3/3
/15
D
ES
IG
N
RE
VI
EW
LEGEND
PROPOSED CONTOUR
RIVER CHANNEL
TEMPORARY
RIVER CHANNEL
TOP OF BANK
EXISTING MAJOR
CONTOUR LINE
EXISTING MINOR
CONTOUR LINE
6/3 /15
D
ES
IG
N
RE
VI
EW
BOTTOM OF BANK
8/2 1/1
0%
D
ES
IG
N
RE
VI
EW
EXISTING FENCE
CONSTRUCTION
ACCESS
NOTE:
REFER TO RESTORATION SHEETS R-1.4 & R-2.4 FOR DETAILS PERTAINING TO THE TEMPORARY RIVER
CHANNEL. PROPOSED PROFILE AND CROSS SECTIONS ARE DETAILED IN THOSE PLAN SHEETS.
LIMITS OF DISTURBANCE
LIMITS OF DISTURBANCE
LIMITS OF DISTURBANCE
LIMITS OF DISTURBANCE
LIMITS OF TEMPORARY
CHANNEL EXCAVATION
LIMITS OF TEMPORARY
CHANNEL EXCAVATION
/21
/15
0% D
ES
IG
N
RE
VI
EW
SHEET
AREA
Know what's
R
CONSTRUCTION ACCESS
CONSTRUCTION
ENTRANCE
MATCHLINE B-2.2
MATCHLINE B-2.4
GRAVEL ACCESS PAD
SPOILS AREA
SPOILS AREA
S
R D
D
BOARDMAN
IMPOUNDMENT
BROAD
RD
DIPLEY RD
BLAIR TWP.
GARFIELD TWP.
ς͗
ͰΨ
ĞƐ
ŽƵ
ƌĐ
ĞƐ
Ͱσ
�χ �Ψ
ͺΨ ϑ γ Ψ�
Ͱς ƌŽ ũĞ Đƚ
ƐͰ
ϭϯ ϲϱ ϯϭ ϲϬ
ŽĂ
ƌĚ ŵ
ĂŶ
Ͱ� ϑ �Ψ
�Χ
ͺ� ƌĂ ǁ ŝŶ
ŐƐ
Ͱ�
Ͱς
ͰΨ
ŝǀ Ğƌ �Ψ
ĞƐ
ƚŽ ƌĂ ƚŝŽ
ŶͰ
ϯϬ й
�χ ]Ͱ Ϯͺ �Ͳ ξ͘ ξ� �Ͳ Ϯ͘ ϭ� Ͳ�� džŝ Ɛƚ ŝŶ Ő� ]ŝ ƚĞ �χ
ŽƉ
ŽŐ
ƌĂ
ƉŚ
LJ� ςů
ĂŶ
ͺƌ Ğǀ
͘Ě ǁ Ő� ��Χ
ĂLJ
�ϭ Ϭ͕ �Ϯ Ϭϭ ϲ� Ͳ�ϯ
͗Ϭ
ϴƉ
ŵ �9Ă
ŶĞ
ĞŶ
ͺ] ƚĂ ůĚ Ğƌ
00 30' 60'
B - 2.4
BR
EA
CH
IN
G -S
TA
GE
1P
LA
N (S
AB
IN
PO
ND
TI
E
IN
JS TR
N
BW DD
D.
DE
VA
UN
3/3 /1
DE
SI
GN
RE
VI
EW
ςΨϑςϑ]����ϑ∆χϑγΨ
Ψ.ρ�Ψ��+�∆∆�=
TEMPORARY
RIVER CHANNEL
BOTTOM OF BANK
�ξ.]χ.∆&�Χ�9ϑΨ �ϑ∆χϑγΨ�=.∆�
�ξ.]χ.∆&�Χ.∆ϑΨ �ϑ∆χϑγΨ�=.∆�
6/3 /1
DE
SI
GN
RE
VI
EW
TEMPORARY
RIVER CHANNEL TO
SABIN POND
�ϑχχϑΧ�ϑ%���∆;
8/
/1
0%
DE
SI
GN
RE
VI
EW
CONSTRUCTION
ACCESS ROAD
LIMITS OF
DISTURBANCE
LIMITS OF
DISTURBANCE
ϑρ�Ψ+�����=��χΨ.�
TIE IN POINT
WITH SABIN POND
REFER TO RESTORATION
SHEETS R-1.4 & R-2.4
NOTE:
REFER TO RESTORATION SHEETS R-1.4 & R-2.4 FOR DETAILS PERTAINING TO THE TEMPORARY RIVER
CHANNEL. PROPOSED PROFILE AND CROSS SECTIONS ARE DETAILED IN THOSE PLAN SHEETS.
�ξ.]χ.∆&�χΨ�.=
SPOILS AREA
=.Χ.χ]�ϑ%��.]χγΨ��∆��
REMOVE BOARDWALK
AS NEEDED
SHEET
AREA
/21
/15
0%
DE
SI
GN
RE
VI
EW
Know what's
RMATCHLINE B-2.3
%.��Ψ�ϑςχ.�����=�
APPROXIMATE LOCATION OF UNDERGROUND
FIBER OPTIC CABLE AT AN APPROXIMATE
ELEVATION OF 591 FT (NGVD 29)
NOTE: CONTRACTOR SHOULD EXERCISE
CAUTION WHEN EXCAVATING TO WITHIN 10
VERTICAL FT OF THE FIBER OPTIC CABLE LINE.
NORTHING: 506052.9671
EASTING: 19358107.6165
NORTHING: 506014.3463
EASTING: 19358110.5099
NORTHING: 506017.4576
EASTING: 19358150.5560
NORTHING: 506056.1078
EASTING: 19358147.4132
SS
R
D
D
BOARDMAN
IMPOUNDMENT
BROAD
RD
DIPLEY RD
BLAIR TWP.
GARFIELD TWP.
ς͗
ͰΨ
ĞƐ
ŽƵ
ƌĐ
ĞƐ
Ͱσ
�χ �Ψ
ͺΨ ϑ γ Ψ�
Ͱς ƌŽ ũĞ Đƚ
ƐͰ
ϭϯ ϲϱ ϯϭ ϲϬ
ŽĂ
ƌĚ ŵ
ĂŶ
Ͱ� ϑ �Ψ
�Χ
ͺ� ƌĂ ǁ ŝŶ
ŐƐ
Ͱ�
Ͱς
ͰΨ
ŝǀ Ğƌ �Ψ
ĞƐ
ƚŽ ƌĂ ƚŝŽ
ŶͰ
ϯϬ й
�χ ]Ͱ Ϯͺ �Ͳ ξ͘ ξ� �Ͳ ϯ͘ ϭ� Ͳ�.
.χ �Χ
Ψ� γ ξ.
�Ψ ψ� ]ς =σ
�ψ ͘Ě ǁ Ő� ��Χ
ĂLJ
�ϭ ϯ͕ �Ϯ Ϭϭ ϲ� Ͳ�ϰ
͗Ϯ ϳƉ ŵ �9Ă
ŶĞ
ĞŶ
ͺ] ƚĂ ůĚ Ğƌ
00 30' 60'
B - 3.1
BR
EA
CH
IN
G -S
TA
GE
2P
LA
N
JS TR
N
BW DD
D.
DE
VA
UN
3/ 3/1
DE
SI
GN
RE
VI
EW
SIPHON PUMP PAD
REFER TO SHEET B-3.2
TEMPORARY SIPHON
DEWATERING SYSTEM
SEE SHEET B-3.2
CONSTRUCTION ACCESS
SIPHON OUTLET
ENERGY DISSIPATION
REFER TO SHEET B-3.3
AUXILIARY SPILLWAY
STILLING BASIN
REFER TO SHEETS B-7.1 - B-7.4
INITIAL EXCAVATION
CUT FOR FINAL
AUXILIARY SPILLWAY
CONSTRUCTION ACCESS
GB
ς�ρ�Χ�∆χ��ϑγ∆��Ψψ
�ξ.]χ.∆&�Χ�9ϑΨ
&Ψ�����Ψ��;�=.∆�
Ψ.ς�Ψ�ς σ�χ�Ψ�]γΨ%��� �=�ρ�χ.ϑ∆
�ϑ∆]χΨγ�χ.ϑ∆ ����]]�Ψϑ��
�Ψχ.�γ=�χ����=ϑ�;
WSE = APPROX. 635' - 627'
GB&Ψ�����Ψ��;�=.∆�
EXISTING CONCRETE
CORE WALL
�ϑ∆χϑγΨ�=.∆�
�ξ.]χ.∆&�Χ�9ϑΨ �ϑ∆χϑγΨ�=.∆�
DOWNSTREAM
TAILWATER
BERM REFER TO
SHEETS B-7.1 & B-7.4
6/ 3/1
DE
SI
GN
RE
VI
EW
].ς+ϑ∆�ς.ς�]
(4) 36" HDPE PIPES
REFER TO
SHEETS B-7.1 & B-7.4
SIPHON PIPES
AND INTAKE SCREENS
�∆χ.�.ς�χ���σ�χ�Ψ ]γΨ%���
�γ=ρ�Ψχ]
8/
/15
DE
SI
GN
RE
VI
EW
=.Χ.χ]�ϑ%��.]χγΨ��∆��
NOTE:
REFER TO SHEET B-3.2 FOR SPILLWAY DETAILS IN RELATION TO THE CONCRETE CORE WALL.
LIMITS OF DISTURBANCE
σ]��с�σ�χ�Ψ�]γΨ%�����=�ρ�χ.ϑ∆
MOORING BUOYS
SEE SHEET B-3.2
Know what's
R
/23
/1
DE
SI
GN
RE
VI
EW
SHEET
AREA
AUXILIARY SPILLWAY
STILLING BASIN BERM
TOP ELEVATION OF 622'
AUXILIARY SPILLWAY
STILLING BASIN BOTTOM
ELEVATION AT 615''
AUXILIARY SPILLWAY
STILLING BASIN BERM
TOP ELEVATION OF 621'
ς͗
ͰΨ
ĞƐ
ŽƵ
ƌĐ
ĞƐ
Ͱσ
�χ �Ψ
ͺΨ ϑ γ Ψ�
Ͱς ƌŽ ũĞ Đƚ
ƐͰ
ϭϯ ϲϱ ϯϭ ϲϬ
ŽĂ
ƌĚ ŵ
ĂŶ
Ͱ� ϑ �Ψ
�Χ
ͺ� ƌĂ ǁ ŝŶ
ŐƐ
Ͱ�
Ͱς
ͰΨ
ŝǀ Ğƌ �Ψ
ĞƐ
ƚŽ ƌĂ ƚŝŽ
ŶͰ
ϯϬ й
�χ ]Ͱ Ϯͺ �Ͳ ξ͘ ξ� �Ͳ ϯ͘ ϭ� Ͳ�.
.χ �Χ
Ψ� γ ξ.
�Ψ ψ� ]ς =σ
�ψ ͘Ě ǁ Ő� ��Χ
ĂLJ
�ϭ Ϭ͕ �Ϯ Ϭϭ ϲ� Ͳ�ϭ
Ϯ͗ ϭϴ
Ɖŵ �9Ă
ŶĞ
ĞŶ
ͺ] ƚĂ ůĚ Ğƌ
00 20' 40'
B - 3.2
BR
EA
CH
IN
G -S
IP
HO
N
LA
YO
UT
JS TR
N
BW DD
D…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .