Exhibit_A--Performance_Relevancy.pdf

PDF 36 KB Posted

Attached to
FY16 Boardman Dam Removal and Restoration
Solicitation number
W911XK-16-R-0006
Issued by

About this file

Exhibit A

View the file

Other files

File Type Posted
Revised_Exhibit_B-_Key_Personnel_Information_&_Consent_Form_.pdf PDF
Q&A.pdf PDF
01_29_01_Amendment_0006.pdf PDF
Dam_Safety_Inspection_Report--Boardman_Dam_2015.pdf PDF
W911XK-16-R-0006-0006_FY16_Boardman_River_Dam_Removal_and_Restoration.pdf PDF
Certification_Regarding_Responsibility_Matters.pdf PDF
W911XK-16-R-0006-0005_FY16_Boardman_River_Dam_Removal_and_Restoration.pdf PDF
31_70_00_Amendment_0004.pdf PDF
31_23_00_Amendment_0004.pdf PDF
01_29_01_Amendment_0004.pdf PDF
W911XK-16-R-0006-0004_FY16_Boardman_River_Dam_Removal_and_Restoration.pdf PDF
32_90_00_Amendment_0003.pdf PDF
B-7.1_-_Amendment_0003.pdf PDF
31_36_00_Amendment_0003.pdf PDF
31_20_40_Amendment_0003.pdf PDF
31_40_00_Amendment_0003.pdf PDF
32_60_00_Amendment_0003.pdf PDF
01_29_01_Amendment_0003.pdf PDF
W911XK-16-R-0006-0003_FY16_Boardman_River_Dam_Removal_and_Restoration.pdf PDF
W911XK-16-R-0006-0002_FY16_Boardman_River_Dam_Removal_and_Restoration.pdf PDF
Boardman_Site_Vist_1_November_2016.pdf PDF
W911XK-16-R-0006-0001_FY16_Boardman_Dam_Removal_and_Resotration.pdf PDF
Site_Visit_Sign_in_Sheet_Boardman_Dam.pdf PDF
FY16_Boardman_River_Dam_Removal_ _Restoration_Pre-Proposal_Meeting_Presentation.pptx PPTX presentation
BOARDMAN_FINAL_CERTIFIED_RTA_-PLANS_10.13.2016_24X36_.pdf PDF
BOARDMAN_FINAL_CERTIFIED_RTA_-_PLANS_09.27.2016.pdf PDF
W911XK-16-R-0006_FY16_Boardman_River_Dam_Removal.pdf PDF
Exhibit_B-_Key_Personnel_Information_ _Consent_Form_.pdf PDF
EXHIBIT_E-_Small_Business_Participation_Plan_(Form).pdf PDF
Final_Grading_Surface.zip ZIP file
Exhibit_C_-_Past_Performance_Reference_Questionnaire_revised_17_March_2016.pdf PDF
Boardman_Final_RTA_Specs_9_28_2016_.pdf PDF
Existing_Topo_Surface.zip ZIP file
EXHIBIT_D_-_Requirements_of_the_Small_Business_Subcontracting_Plan.pdf PDF
Show all 34

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FY16 Boardman River Dam Removal and Restoration

RFP W911XK-16-R-0006

EXHIBIT A PERFORMANCE RELEVANCY QUESTIONNAIRE

PART 1: Provide Information

Provide the following information requested in this format for each of the three to five projects/contracts being described. Projects may be on going and cannot have been completed any earlier than 10 years from the solicitation issue date.

Provide frank, concise comments regarding YOUR PERFORMANCE on the contracts you identify.

A. Offeror (Your) Name (Company/Division):

B. Project/Contract Title:

C. Contract Specifics:

1. Description of Effort as Prime or Subcontractor

2. Contract Number

3. Original Contract dollar Value

Current/Final Contract dollar Value

4. If the amounts in number 3 above are different, provide a brief description of the reason:

5. Completion Date:

a. Original Date:

b. Current Schedule_

c. Estimate/Final Completion Date:

d. Primary Cause for Contract Modification(s)

D. Provide a detailed description of the work performed under the contract, to include but not limited to: similarity of the construction methods; size; project scope; cost magnitude and complexity of work performed to those required for the proposed effort as described in Factor 1, Subfactor 1. Also discuss similarity of the client type and/or location at which work was performed to the location(s) at which work will be performed and the key personnel of the referenced project to the performance under the proposed contract.

In addition address the following

1. Describe the specific elements of the work performed by your firm.

2. Indicate what elements of work were performed by your major subcontractors and if those same subcontractors will be used on this project. If you intend to

FY16 Boardman River Dam Removal and Restoration

RFP W911XK-16-R-0006

use these subcontractors please list name and principal areas of work they will perform.

3. Address any technical areas about this project you consider uniquely relevant to this project.

4. If you intend to use any of the same key personnel on this solicitations’ project indicate by name and position those personnel occupied on the referenced contract. (Project Manager, Site Superintendent, Quality Control Manager). Indicate what position they will have on this solicitation’s contract.

5. Describe why you believe the work is very relevant, relevant or semi-relevant to this solicited project. (Use as much space as necessary)

E. List point of Contact for Owner/Government agency Contracting Officer and or inspector; include a current phone number and facsimile number. Email address is also desired.

End of Part 1- Questionnaire Requirements – Prepare and send Exhibit C Package to the reference(s) for each of these projects.