Technical_Specifications,_(Revised_Section)_35_20_23.pdf

PDF 64 KB Posted

Attached to
Stilling Basin and Abutment Support Wall, Charleroi L/D Federal contract opportunity
Solicitation number
W911WN18B8010
Issued by
Department of the Army Corps of Engineers Engineering District Pittsburgh

About this file

Revised Section 35 20 23

View the file

Other files for this federal contract opportunity

Other files attached to Stilling Basin and Abutment Support Wall, Charleroi L/D, newest first.
File Type Posted
Bid_Opening,_Attendance_Register.pdf PDF
Bid_Abstract.xlsx XLSX spreadsheet
Bid_Results.pdf PDF
Attachment_3,_(Revised)_Davis_Bacon_Wage_Determination,_PA180004_08-24-2018_PA4.pdf PDF
Drawings,_(Revised),_Sheet_04_110-B.pdf PDF
W911WN18B8010-0002.pdf PDF
Technical_Specifications,_(Revised_Section)_01_45_01.pdf PDF
Technical_Specifications,_(Revised_Section)_01_22_00.00_10.pdf PDF
Attachment_3,_(Revised)_Davis_Bacon_Wage_Determination,_PA180004_08-17-2018.pdf PDF
Technical_Specifications,_(Revised_Section)_35_43_29.pdf PDF
Drawings,_(Revised),_Selected_Sheets.pdf PDF
Bid_Schedule_(Revised).xls XLS spreadsheet
Technical_Specifications,_(Revised_Section)_01_57_20.00_10.pdf PDF
W911WN18B8010-0001.pdf PDF
Technical_Specifications,_(Revised_Section)_01_78_02.00_15.pdf PDF
Technical_Specifications,_(Revised_Section)_03_31_01.00_10.pdf PDF
Pre-Bid_Contracting_Discussion,_Site_Visit.pdf PDF
Sign-In_Sheet,_Site_Visit.pdf PDF
Agenda,_Pre-Bid_Site_Visit.pdf PDF
Bid_Schedule.xls XLS spreadsheet
W911WN18B8010.pdf PDF
Attachment_1,_Technical_Specifications_Certified_Final.pdf PDF
Attachment_4,_Davis_Bacon_Wage_Determination,_PA180050_01-05-2018_PA50.pdf PDF
Attachment_3,_Davis_Bacon_Wage_Determination,_PA180004_06-15-2018_PA4.pdf PDF
Attachment_2,_Drawings,_Certified_Final.pdf PDF
Show all 25

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Char l er oi Locks and Dam St i l l i ng Basi n & Abut ment Pr ot ect i on Wal l

SECTI ON TABLE OF CONTENTS

DI VI SI ON 35 - WATERWAY AND MARI NE CONSTRUCTI ON

SECTI ON 35 20 23

DREDGING

PART 1 GENERAL

1. 1 WORK COVERED BY THI S SECTI ON

1. 1. 1 Excavat i on f or St i l l i ng Basi n and Abut ment Pr ot ect i on Wal l

1. 1. 2 Removal of Exi st i ng Tr ai ni ng Di ke

1. 1. 3 Removal of Exi st i ng Der r i ck St one

1. 1. 4 Fl oodway and Appr oach Dr edgi ng

1. 1. 5 Excavat i on of Ar ea C

1. 2 REFERENCES

1. 3 ORDER OF WORK AND DREDGI NG RESTRI CTI ONS

1. 3. 1 Excavat i on f or St i l l i ng Basi n and Abut ment Pr ot ect i on Wal l

1. 3. 2 Fl oodway and Appr oach Dr edgi ng

1. 4 SUBMI TTALS

1. 5 TYPE OF MATERI AL TO BE REMOVED

1. 6 SI TE CONDI TI ONS

1. 7 DREDGI NG PERSONNEL QUALI FI CATI ONS

1. 8 DI FFERENTI AL GLOBAL POSI TI ONI NG SYSTEM ( DGPS) EQUI PMENT

1. 9 CLAMSHELL BUCKET POSI TI ONI NG

1. 10 GOVERNMENT PLANT

1. 11 QUANTI TY OF MATERI AL

1. 11. 1 Excavat i on f or St i l l i ng Basi n and Abut ment Pr ot ect i on Wal l

1. 11. 2 Fl oodway and Appr oach Dr edgi ng

1. 12 FUEL OI L HANDLI NG

1. 13 QUALI TY ASSURANCE

1. 14 FI NAL EXAMI NATI ON AND ACCEPTANCE

1. 14. 1 Excavat i on f or St i l l i ng Basi n and Abut ment Pr ot ect i on Wal l

1. 14. 2 Fl oodway and Appr oach Dr edgi ng

1. 14. 3 Fi nal Accept ance

1. 15 CONTI NUI TY OF WORK

1. 16 SHOALI NG

PART 2 PRODUCTS

PART 3 EXECUTI ON

3. 1 I NSPECTI ON

3. 2 DI SPOSAL OF EXCAVATED MATERI AL

3. 2. 1 Gener al

3. 2. 2 Mi spl aced Mat er i al

3. 2. 3 Di sposal of Excavat ed Dr edgi ng Mat er i al

3. 2. 3. 1 Hopper Dr edgi ng

3. 2. 3. 2 Hydr aul i c Dr edgi ng

3. 2. 3. 3 Mechani cal Dr edgi ng

3. 2. 3. 4 Gover nment Qual i t y Cont r ol Moni t or

3. 2. 4 Pl ant Removal

SECTI ON 35 20 23 Page 1 Cer t i f i ed Fi nal Document s Revi sed by Amendment 0002

3. 2. 5 Di sposal of Der r i ck St one and Tr ai ni ng Di ke Rock

3. 3 ACCESS TO THE OFF- LOADI NG FACI LI TY

3. 4 DREDGI NG FOR STI LLI NG BASI N AND ABUTMENT PROTECTI ON WALL

3. 4. 1 Li mi t s of Wor k

3. 4. 2 Removal of Obst r uct i ons

3. 4. 3 Sal vaged Mat er i al

3. 4. 4 Saf et y of St r uct ur es

3. 5 FLOODWAY AND APPROACH DREDGI NG

3. 5. 1 Over dept h Dr edgi ng And Si de Sl opes

3. 5. 1. 1 Gener al

3. 5. 1. 2 Over dept h Dr edgi ng

3. 5. 1. 3 Si de and End Sl opes

3. 5. 1. 3. 1 Excessi ve Dr edgi ng

3. 5. 2 Conduct Of Dr edgi ng Wor k

3. 5. 2. 1 I nt er f er ence wi t h Navi gat i on

3. 5. 2. 2 Ranges, Gages, and Li nes

3. 5. 2. 3 Pl ant

3. 5. 2. 4 Saf et y of St r uct ur es

3. 5. 2. 5 Pl ant Removal

3. 6 RECORDS

- - End of Sect i on Tabl e of Cont ent s - -

SECTI ON 35 20 23 Page 2

SECTI ON 35 20 23

DREDGING

PART 1 GENERAL

1. 1 WORK COVERED BY THI S SECTI ON

1. 1. 1 Excavat i on f or St i l l i ng Basi n and Abut ment Pr ot ect i on Wal l

The wor k cover ed by t hi s sect i on, and i ncl uded i n t he payment i t em DREDGI NG FOR SCOUR PROTECTI ON AND ABUTMENT PROTECTI ON WALL, i ncl udes r emovi ng der r i ck st ones ( 150 - 12, 000 pounds each) and dr edgi ng and l oadi ng of exi st i ng r i ver bed mat er i al t o t he l i nes, gr ades, and el evat i ons shown on t he dr awi ngs t o f or m t he 3H: 1V sl ope r equi r ed f or gr out bag i nst al l at i on and pr e- excavat i on f or const r uct i on of t he abut ment pr ot ect i on wal l . The r emoved der r i ck st ones may be used f or scour pr ot ect i on as shown on t he dr awi ngs.

1. 1. 2 Removal of Exi st i ng Tr ai ni ng Di ke

The wor k cover ed by t hi s sect i on, and i ncl uded i n t he payment i t em REMOVAL AND PLACEMENT OF EXI STI NG TRAI NI NG DI KE STONE, i ncl udes r emoval of t he exi st i ng t r ai ni ng di ke downst r eam of Gat e Bay No. 2 and pl acement of t he r emoved R- 7 and R- 8 der r i ck st one as speci f i ed and as shown on t he dr awi ngs.

1. 1. 3 Removal of Exi st i ng Der r i ck St one

The wor k cover ed by t hi s sect i on, and i ncl uded i n t he payment i t em REMOVAL AND PLACEMENT OF DERRI CK STONE, i ncl udes r emoval of t he exi st i ng der r i ck st one downst r eam of t he dam and adj acent t o t he exi st i ng abut ment wal l and pl acement of t he r emoved der r i ck st one as speci f i ed and as shown on t he dr awi ngs.

1. 1. 4 Fl oodway and Appr oach Dr edgi ng

The wor k cover ed by t hi s sect i on, and i ncl uded i n t he payment i t em DREDGI NG, i ncl udes dr edgi ng bet ween t he downst r eam l i mi t s of excavat i on f or t he st i l l i ng basi n and abut ment pr ot ect i on wal l and t he downst r eam l i mi t s shown on t he dr awi ngs, dr edgi ng upst r eam of t he dam, and dr edgi ng l ock appr oaches and t r anspor t i ng t he mat er i al t o t he Vi ct or y Hol l ow Si t e f or of f l oadi ng and pl acement by ot her s. The payment i t em does not i ncl ude r emoval of l edge r ock, gener al debr i s, r ock f r agment s, wr ecks, snags, st umps, and pi l es whi ch cannot be r emoved or bur i ed bel ow pr oj ect dept h wi t hout bl ast i ng. Shoul d l edge r ock or ot her mat er i al whi ch cannot be r emoved wi t hout bl ast i ng be encount er ed, r emove t her ef r om al l over l y i ng mat er i al whi ch i n t he j udgment of t he Cont r act i ng Of f i cer can be r emoved.

Not hi ng i n t hi s par agr aph shal l be const r ued as pr ohi bi t i ng t he r emoval of except ed mat er i al by speci al means at pr i ces agr eed upon and appr oved i n accor dance wi t h Sect i on 00 70 00 CONDI TI ONS OF THE CONTRACT, FAR 52. 236- 2

DI FFERI NG SI TE CONDI TI ONS.

1. 1. 5 Excavat i on of Ar ea C

The wor k cover ed by t hi s sect i on, and i ncl uded i n t he payment i t em

SECTI ON 35 20 23 Page 3

DREDGI NG AREA C, i ncl udes dr edgi ng i n Ar ea C, as desi gnat ed on Dr awi ng 83/ 30, and di sposal . Thi s ar ea may cont ai n cont ami nat ed mat er i al . The l i mi t s of t he cont ami nat ed ar ea wi l l be del i neat ed by r andom i n- si t u sampl i ng as speci f i ed i n Sect i on 02 32 16. 00 08 SAMPLI NG, ANALYSES, AND STAGI NG OF SEDI MENT MATERI ALS. Cont ami nat ed mat er i al may must be di sposed at a per mi t t ed sol i d wast e di sposal f aci l i t y as speci f i ed i n Sect i on 01 74 19. 00 08 CONSTRUCTI ON AND DEMOLI TI ON WASTE MANAGEMENT. Payment f or di sposal of cont ami nat ed mat er i al wi l l be made under payment I t em

DI SPOSAL OF CONTAMI NATED DREDGED MATERI AL.

1. 2 REFERENCES

The publ i cat i ons l i s t ed bel ow f or m a par t of t hi s speci f i cat i on t o t he ext ent r ef er enced. The publ i cat i ons ar e r ef er r ed t o i n t he t ext by basi c desi gnat i on onl y.

PENNSYLVANI A DEPARTMENT OF TRANSPORTATI ON ( PDT)

PDT 408 ( 2016) Speci f i cat i ons

U. S. ARMY CORPS OF ENGI NEERS ( USACE)

EM 385- 1- 1 ( 2014) Saf et y and Heal t h Requi r ement s Manual

EM 1110- 2- 1003 ( 2013) Hydr ogr aphi c Sur veyi ng

U. S. NATI ONAL ARCHI VES AND RECORDS ADMI NI STRATI ON ( NARA)

33 CFR 156 ( 2008) Navi gat i on and Navi gabl e Wat er s, Oi l and Hazar dous Mat er i al Tr ansf er Operations

1. 3 ORDER OF WORK AND DREDGI NG RESTRI CTI ONS

1. 3. 1 Excavat i on f or St i l l i ng Basi n and Abut ment Pr ot ect i on Wal l

a. Remove der r i ck st ones f r om t he pl anned f oot pr i nt of st i l l i ng basi n and abut ment pr ot ect i on wal l .

b. Excavat i on f or t he st i l l i ng basi n and abut ment pr ot ect i on wal l must commence at t he Lef t Bank and pr oceed acr oss t he dam t owar d t he l ock. Excavat i on must be conf i ned t o t he l i mi t s shown f or each phase of const r uct i on.

c. Excavat i on wi l l not be per mi t t ed beyond t he l i mi t s of const r uct i on whi ch cannot be compl et ed pr i or t o wi nt er suspensi on of wor k i n each phase wi t hout pr i or appr oval of t he Cont r act i ng Of f i cer .

d. Removal of t he t r ai ni ng di ke may be per f or med at any t i me dur i ng whi ch i t i s possi bl e t o c l ose t he associ at ed dam gat es. See al so Sect i on 01 35 00. 00 08 SPECI AL PROCEDURES, par agr aph DAM GATE

OPERATI NG SCHEDULE.

e. Ther e ar e no r est r i ct i ons on excavat i on f or t he st i l l i ng basi n and abut ment pr ot ect i on wal l f or f i sh spawni ng.

SECTI ON 35 20 23 Page 4

1. 3. 2 Fl oodway and Appr oach Dr edgi ng

a. Dr edgi ng downst r eam of t he St i l l i ng Basi n and Abut ment Pr ot ect i on Wal l , f l oodway dr edgi ng, and appr oach dr edgi ng must shall not commence unt i l t he abut ment pr ot ect i on wal l and scour pr ot ect i on havehas been compl et ed and accept ed.

b. Remove der r i ck st ones f r om t he pl anned f oot pr i nt of st i l l i ng basi n and abut ment pr ot ect i on wal l .

c. Dr edgi ng of t he downst r eam f l oodway and appr oach must shall st ar t at t he downst r eam end of t he st i l l i ng basi n and pr oceed downst r eam.

Thi s or der of wor k may be adj ust ed by t he Gover nment based on unf or eseen ci r cumst ances and a modi f i cat i on t o t he cont r act may be required.

d. Dr edgi ng of mat er i al under t hi s cont r act must onl y be per f or med by mechani cal dr edgi ng.

e. Dr edgi ng downst r eam of t he St i l l i ng Basi n and Abut ment Pr ot ect i on Wal l wi l l not be per mi t t ed f r om 1 Apr i l t hr ough 1 Jul y, due t o f i sh spawning.

1. 4 SUBMITTALS

Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" desi gnat i on;

submi t t al s not havi ng a " G" desi gnat i on ar e f or i nf or mat i on onl y. When used, a desi gnat i on f ol l owi ng t he " G" desi gnat i on i dent i f i es t he of f i ce t hat wi l l r evi ew t he submi t t al f or t he Gover nment . Submi t t he f ol l owi ng i n accor dance wi t h Sect i on 01 33 00 SUBMI TTAL PROCEDURES:

SD- 01 Pr econst r uct i on Submi t t al s

Dr edgi ng Per sonnel Qual i f i cat i ons; G, RO

Submi t f or appr oval t he qual i f i cat i ons of al l per sonnel oper at i ng t he bucket dr edge.

Vessel s And Equi pment ; G, RO

SD- 06 Test Repor t s

Sur vey Repor t s; G, RO

DGPS Posi t i oni ng; G, RO

The r eal t i me posi t i oni ng of t he dr edge must be r ecor ded, by DGPS, on a comput er di sk ever y 1 mi nut e and submi t t ed on a dai l y basis.

Dai l y Cl amshel l Bucket Posi t i oni ng Recor ds; G, RO

I nspect or ' s Repor t ; G, RO

1. 5 TYPE OF MATERI AL TO BE REMOVED

The mat er i al t o be r emoved under t hi s cont r act i s mai nl y new mat er i al wi t h some mi nor shoal i ng t hat has occur r ed si nce t he channel was l ast dr edged.

SECTI ON 35 20 23 Page 5

The mat er i al consi st s pr i mar i l y of sands and gr avel , and may cont ai n l esser amount s of cobbl es, boul der s, coal f i nes, s i l t s and cl ays. The t ype of t he mat er i al i s bel i eved t o be as i ndi cat ed by t he r esul t s of Gover nment - conduct ed sampl i ng.

The exi st i ng t r ai ni ng di ke l ocat ed gener al l y downst r eam of Pi er 2, i s const r uct ed of PDT 408 si ze R- 7 and R- 8 st one. The st one f r om t he t r ai ni ng di ke may be ut i l i zed f or scour pr ot ect i on.

I f dur i ng dr edgi ng oper at i ons, t he Cont r act or encount er s mat er i al suspect ed of cont ami nat i on by pet r ol eum pr oduct s or ot her mat er i al s, t he Cont r act or must st op oper at i ons and not i f y t he Cont r act i ng Of f i cer .

Cont ami nat ed mat er i al encount er ed out si de of Ar ea C as desi gnat ed on Dr awi ng 83/ 30 wi l l be handl ed as a modi f i cat i on t o t he cont r act .

1. 6 SI TE CONDI TI ONS

Bi dder s ar e expect ed t o exami ne t he si t e of t he wor k and deci de f or t hemsel ves as t o t he condi t i ons af f ect i ng t hei r oper at i ons. See Sect i on

00 70 00 CONDI TI ONS OF THE CONTRACT, FAR 52. 236- 3 SI TE I NVESTI GATI ON AND

CONDI TI ONS AFFECTI NG THE WORK. The ent i r e wor k s i t e i s desi gnat ed as a har d hat ar ea i n accor dance wi t h EM 385- 1- 1.

1. 7 DREDGI NG PERSONNEL QUALI FI CATI ONS

Al l per sonnel oper at i ng t he bucket dr edge must have a mi ni mum of 5 year s exper i ence usi ng t he equi pment , i ncl udi ng exper i ence usi ng t he comput er i zed posi t i oni ng syst em on t he bucket dr edge. Land based exper i ence usi ng GPS bucket excavat i on wi l l be al l owed.

1. 8 DI FFERENTI AL GLOBAL POSI TI ONI NG SYSTEM ( DGPS) EQUI PMENT

The Cont r act or must have a di f f er ent i al GPS, and must conduct hi s sur vey wor k i n accor dance wi t h t he r equi r ement s f or a Cl ass 1 Sur vey, as def i ned i n t he U. S. Ar my Cor ps of Engi neer s EM 1110- 2- 1003. Pr ovi de r eal t i me DGPS posi t i oni ng of t he dr edge, on a comput er scr een dur i ng dr edgi ng oper at i ons, and have t he capabi l i t y of pl ayback i n 1 mi nut e i nt er val s.

Recor d t he dr edge posi t i on on a di sk ever y 1 mi nut e and submi t t hi s t o t he Cont r act i ng Of f i cer on a dai l y basi s. Pr ovi de dat a i n ESRI Ar cGI S 10. x Shapef i l e f or mat ( . shp) , i ncl udi ng al l component s and ext ensi ons, or i n a Spat i al Dat a St andar d compl i ant geodat abase. Real t i me posi t i oni ng dat a must i ncl ude nor t hi ng, east i ng, el evat i on, dat e and t i me of i nf or mat i on.

1. 9 CLAMSHELL BUCKET POSI TI ONI NG

For al l dr edgi ng and f or each dr edge empl oyed under t hi s Cont r act , a comput er i zed posi t i oni ng syst em capabl e of r epr esent i ng t he hor i zont al and ver t i cal posi t i on of t he c l amshel l bucket at any gi ven t i me t hr oughout t he dr edgi ng cycl e must be ut i l i zed. Hor i zont al and ver t i cal posi t i oni ng of t he bucket must be r ecor ded at i nt er val s not gr eat er t han one mi nut e i n dur at i on. The hor i zont al and ver t i cal ( x, y, z) posi t i ons of t he bucket must be pr ovi ded t o t he Cont r act i ng Of f i cer i n an appr oved el ect r oni c f or mat . Commer ci al l y avai l abl e syst ems such as t hose of f er ed by compani es under t he r egi st er ed t r ademar ks of Dr edgepak, Wi nops, or s i mi l ar pr opr i et ar y syst ems devel oped by t he Cont r act or woul d be consi der ed sat i sf act or y. The syst em must pr oduce a r ecor d of t he hor i zont al and ver t i cal wor ki ng l ocat i ons, of t he bucket , i n a cont i nual di spl ay and i n a submi t t al sat i sf act or y t o t he Cont r act i ng Of f i cer .

SECTI ON 35 20 23 Page 6

1. 10 GOVERNMENT PLANT

The Gover nment r eser ves t he r i ght t o ut i l i ze anot her pl ant i n any of t he wor k ar eas dur i ng t he cont r act per i od.

1. 11 QUANTI TY OF MATERI AL

1. 11. 1 Excavat i on f or St i l l i ng Basi n and Abut ment Pr ot ect i on Wal l

The t ot al est i mat ed amount of mat er i al t o be r emoved f r om wi t hi n t he speci f i ed l i mi t s of t he st i l l i ng basi n and abut ment pr ot ect i on wal l i s shown on t he Bi d Schedul e.

1. 11. 2 Fl oodway and Appr oach Dr edgi ng

The quant i t i es l i s t ed ar e est i mat es onl y.

1. 12 FUEL OI L HANDLI NG

Ensur e t hat al l f uel oi l t r ansf er oper at i ons t o or f r om t he pl ant compl y wi t h al l Feder al , st at e, and muni ci pal l aws, codes and r egul at i ons.

I ncor por at e i n t he acci dent pr event i on pr ogr am, submi t t ed i n compl i ance wi t h Sect i on 00 70 00 CONDI TI ONS OF THE CONTRACT, FAR 52. 236- 13 ACCI DENT PREVENTI ON, suf f i c i ent i nf or mat i on t o demonst r at e compl i ance wi t h 33 CFR 156 and any ot her appl i cabl e l aws, codes, and r egul at i ons.

1. 13 QUALI TY ASSURANCE

Submi t a compl et e l i s t of al l vessel s and equi pment t o be used dur i ng t he cont r act , i ncl udi ng al l dr edgi ng pl ant s, suppor t i ng vessel s, and equi pment . I ncl ude on t he l i s t t he t ypes, t he number s of each, t he dr af t of each, and al l ot her per t i nent i nf or mat i on. The capaci t y of al l bar ges must be i ncl uded i n t he equi pment l i s t . Al so i ncl ude i n t he l i s t t he sur vey vessel , sur vey cr ew, t ype of sur vey equi pment , and sof t war e t hat may be used.

1. 14 FI NAL EXAMI NATI ON AND ACCEPTANCE

1. 14. 1 Excavat i on f or St i l l i ng Basi n and Abut ment Pr ot ect i on Wal l

I mmedi at el y bef or e commenci ng any ot her wor k r equi r i ng under wat er excavat i on oper at i ons t o be compl et ed, t he excavat ed ar ea shal l be t hor oughl y exami ned by t he Cont r act or under t he di r ect i on of t he Cont r act i ng Of f i cer by soundi ng or by sweepi ng, or bot h, as det er mi ned by t he Cont r act i ng Of f i cer . The Cont r act i ng Of f i cer or hi s aut hor i zed r epr esent at i ve shal l be not i f i ed when soundi ngs and/ or sweepi ngs ar e t o be made, and shal l be per mi t t ed t o accompany t he sur vey par t y. The Cont r act or shal l f ur ni sh t he r esul t s of al l sur veys t o t he Cont r act i ng Of f i cer i n accor dance wi t h par agr aph I NSPECTI ON REPORTS bel ow. I f any poi nt s i dent i f i ed on t he sur vey sect i ons do not meet t he speci f i ed cont r act t empl at e, t he Cont r act or shal l be r equi r ed t o r emove addi t i onal mat er i al , and t he ar ea shal l be r e- sur veyed. Al l sur vey i nf or mat i on shal l be submi t t ed and t he ar eas accept ed by t he Cont r act i ng Of f i cer bef or e commenci ng any ot her const r uct i on oper at i ons i n t he ar ea whi ch ar e dependent on t he compl et i on of t he under wat er excavat i on oper at i ons. The sur vey r epor t s f or al l sur veys conduct ed by t he Cont r act or , shal l be del i ver ed t o t he Cont r act i ng Of f i cer . These r equi r ement s do not r el i eve t he Cont r act or of t he obl i gat i on t o r epor t f ai l ur es i mmedi at el y. Such r epor t s of f ai l ur es and t he act i on t aken shal l be conf i r med i n wr i t i ng.

SECTI ON 35 20 23 Page 7

The Cont r act or shal l per f or m sur veys ( soundi ngs or sweepi ngs) of t he dr edgi ng oper at i ons and shal l r epor t t he gener al pr ogr ess of al l dr edgi ng oper at i ons t o t he Cont r act i ng Of f i cer no l at er t han 24 hour s f ol l owi ng t he compl et i on of t he sur vey.

1. 14. 2 Fl oodway and Appr oach Dr edgi ng

As soon as pr act i cabl e af t er t he compl et i on of t he ent i r e wor k or any sect i on t her eof ( i f t he wor k i s di v i ded i nt o sect i ons) as i n t he opi ni on of t he Cont r act i ng Of f i cer wi l l not be subj ect t o damage by f ur t her oper at i ons under t he cont r act , such wor k wi l l be t hor oughl y exami ned at t he cost and expense of t he Gover nment by soundi ng or by sweepi ng, or bot h, as det er mi ned by t he Cont r act i ng Of f i cer . Shoul d any shoal s, l umps, or ot her l ack of cont r act dept h be di scl osed by t hi s exami nat i on t he Cont r act or wi l l be r equi r ed t o r emove same by dr aggi ng t he bot t om or by dr edgi ng at t he cont r act r at e f or dr edgi ng, but i f t he bot t om i s sof t and t he shoal ar eas ar e smal l and f or m no mat er i al obst r uct i on t o navi gat i on, t he r emoval of such shoal may be wai ved by t he di scr et i on of t he Cont r act i ng Of f i cer . The Cont r act or or hi s aut hor i zed r epr esent at i ve wi l l be not i f i ed when soundi ngs and/ or sweepi ngs ar e t o be made, and wi l l be per mi t t ed t o accompany t he sur vey par t y. Shoul d mor e t han t wo soundi ngs or sweepi ng oper at i ons by t he Gover nment over an ar ea be necessar y by r eason of wor k f or t he r emoval of shoal s di scl osed at a pr i or soundi ng or sweepi ng, t he cost of such t hi r d and any subsequent soundi ng or sweepi ng oper at i ons wi l l be char ged agai nst t he Cont r act or . The r at e of each day i n whi ch t he Gover nment pl ant i s engaged i n such soundi ng or sweepi ng oper at i ons and/ or i s enr out e t o or f r om t he si t e or hel d, f or t he Cont r act or ' s conveni ence, at or near t he s i t e f or t hese oper at i ons shal l be $5, 500. 00, except on Sat ur day, Sunday and hol i days when t he r at e shal l be $6, 000. 00.

1. 14. 3 Fi nal Accept ance

Fi nal accept ance of t he whol e or a par t of t he wor k and t he deduct i ons or cor r ect i ons of deduct i ons made t her eon wi l l not be r eopened af t er havi ng once been made, except on evi dence of col l usi on, f r aud, or obvi ous er r or , and t he accept ance of a compl et ed sect i on must not change t he t i me of payment of t he r et ai ned per cent ages of t he whol e or any par t of t he wor k.

1. 15 CONTI NUI TY OF WORK

No payment wi l l be made f or wor k done i n any ar ea desi gnat ed by t he Cont r act i ng Of f i cer unt i l t he f ul l dept h r equi r ed under t he cont r act i s secur ed i n t he whol e of such ar ea, unl ess pr event ed by l edge r ock, nor wi l l payment be made f or excavat i on i n any ar ea not adj acent t o and i n pr ol ongat i on of ar eas wher e f ul l dept h has been secur ed except by deci s i on of t he Cont r act i ng Of f i cer . Shoul d any such nonadj acent ar ea be excavat ed t o f ul l dept h dur i ng t he oper at i ons car r i ed on under t he cont r act , payment f or al l wor k t her ei n may be def er r ed unt i l t he r equi r ed dept h has been made i n t he ar ea i nt er veni ng. The Cont r act or may be r equi r ed t o suspend dr edgi ng at any t i me when f or any r eason t he gages or r anges cannot be seen or pr oper l y f ol l owed.

1. 16 SHOALING

I f bef or e t he cont r act i s compl et ed, shoal i ng occur s i n any sect i on pr evi ousl y accept ed, i ncl udi ng shoal i ng i n t he f i ni shed channel , because of t he nat ur al l ower i ng of t he s i de sl opes, r edr edgi ng at cont r act pr i ce, wi t hi n t he l i mi t s of avai l abl e f unds, may be done i f agr eeabl e t o bot h t he

SECTI ON 35 20 23 Page 8

Cont r act or and t he Cont r act i ng Of f i cer .

PART 2 PRODUCTS

Not used.

PART 3 EXECUTI ON

3. 1 INSPECTION

I nspect t he wor k, keep r ecor ds of wor k per f or med, and ensur e t hat gages, t ar get s, r anges, and ot her mar ker s ar e i n pl ace and usabl e f or t he i nt ended pur pose. Fur ni sh, at t he r equest of t he Cont r act i ng Of f i cer , boat s, boat men, l abor er s, and mat er i al s necessar y f or i nspect i ng, super vi s i ng, and sur veyi ng t he wor k.

3. 2 DI SPOSAL OF EXCAVATED MATERI AL

3. 2. 1 General

The mat er i al excavat ed, except mat er i al whi ch i s det er mi ned t o be cont ami nat ed, must be t r anspor t ed t o t he Gover nment - owned Vi ct or y Hol l ow Si t e and dewat er ed ( i f necessar y) pr i or t o of f l oadi ng. The mat er i al wi l l be t r anspor t ed t o Upl and Fi l l Pl acement Ar ea, deposi t ed, and gr aded by ot her s. Cont ami nat ed mat er i al must be di sposed of i n accor dance wi t h Sect i on 01 74 19. 00 08 CONSTRUCTI ON AND DEMOLI TI ON WASTE MANAGEMENT.

3. 2. 2 Mi spl aced Mat er i al

Any mat er i al deposi t ed i n pl aces ot her t han t hose desi gnat ed or appr oved by t he Cont r act i ng Of f i cer , or whi ch escapes f r om such pl aces, i s pr ohi bi t ed, and wi l l not be pai d f or . The Cont r act or may be r equi r ed t o r emove such mi spl aced mat er i al i n accor dance wi t h Sect i on 00 70 00

CONDI TI ONS OF THE CONTRACT, DFARS 252. 236- 7002 OBSTRUCTI ON OF NAVI GABLE

WATERWAYS, and deposi t i t wher e di r ect ed, at no addi t i onal cost t o t he Government.

3. 2. 3 Di sposal of Excavat ed Dr edgi ng Mat er i al

Excavat e dr edge mat er i al by bucket dr edgi ng. Pr ovi de f or saf e t r anspor t at i on and di sposal of dr edged mat er i al s. Tr anspor t dr edged mat er i al t o t he Vi ct or y Hol l ow Si t e f or of f l oadi ng and di sposal by ot her s as speci f i ed i n Sect i on 01 74 19. 10 08 VI CTORY HOLLOW SI TE.

Cont r act or - f ur ni shed di sposal ar eas, r ehandl i ng basi ns or encl osur es wi l l not be per mi t t ed under t hi s cont r act . The deposi t of dr edged mat er i al s i n unaut hor i zed pl aces i s not al l owed. Compl y wi t h r ul es and r egul at i ons of l ocal por t and har bor gover ni ng aut hor i t i es.

3. 2. 3. 1 Hopper Dr edgi ng

Hopper dr edgi ng wi l l not be per mi t t ed under t hi s cont r act .

3. 2. 3. 2 Hydr aul i c Dr edgi ng

Hydr aul i c dr edgi ng wi l l not be per mi t t ed under t hi s cont r act .

3. 2. 3. 3 Mechani cal Dr edgi ng

Excavat e mat er i al by mechani cal dr edgi ng ( bucket , dr ag, or di pper ) , l oaded

SECTI ON 35 20 23 Page 9 t o over f l ow onl y. Mat er i al must be pl aced by a means t hat wi l l pr ecl ude any l oss of mat er i al t o t he r i ver af t er l oadi ng and pr i or t o deposi t i on.

Speci al car e must be t aken t o ensur e t hat scows do not l eak dur i ng any por t i on of t he wor k.

3. 2. 3. 4 Gover nment Qual i t y Cont r ol Moni t or

The Gover nment may pl ace a Gover nment moni t or aboar d t he Cont r act or ' s dr edge( s) or suppor t i ng vessel s t o moni t or qual i t y cont r ol condi t i ons dur i ng dr edgi ng and di sposal oper at i ons.

3. 2. 4 Pl ant Removal

Upon compl et i on of t he wor k, pr ompt l y r emove pl ant , i ncl udi ng r anges, buoys, pi l es, and ot her mar ker s or obst r uct i ons.

3. 2. 5 Di sposal of Der r i ck St one and Tr ai ni ng Di ke Rock

The r emoved der r i ck st ones and R- 7 and R- 8 r ock may be used f or scour pr ot ect i on as shown on t he dr awi ngs.

3. 3 ACCESS TO THE OFF- LOADI NG FACI LI TY

Wat er access t o t he Of f - l oadi ng Faci l i t y at t he Vi ct or y Hol l ow Si t e wi l l be dr edged and mai nt ai ned by t he cont r act or oper at i ng t he Vi ct or y Hol l ow Si t e, as r equi r ed, t o suppor t hi s oper at i ons.

3. 4 DREDGI NG FOR STI LLI NG BASI N AND ABUTMENT PROTECTI ON WALL

3. 4. 1 Li mi t s of Wor k

The f ol l owi ng par agr aphs appl y onl y t o dr edgi ng f or t he St i l l i ng Basi n and Abut ment Pr ot ect i on Wal l . The wor k shal l be l i mi t ed t o a maxi mum l engt h of 250 f eet f r om t he downst r eam edge of t he exi st i ng apr on.

3. 4. 2 Removal of Obst r uct i ons

I t i s ant i c i pat ed t hat much of t he r i ver mat er i al i n t he v i c i ni t y of t he abut ment pr ot ect i on wal l dr i v i ng l i ne consi st s of der r i ck st one, r i pr ap, r andom f i l l and al l uvi um, and mi scel l aneous debr i s ( pi eces of st eel , concr et e r ubbl e, wood, et c. ) , whi ch accumul at ed over t i me. Those mat er i al s posi ng a pot ent i al obst r uct i on t o t he dr i v i ng, dr i l l i ng, or pr oper i nst al l at i on ( e. g. , t o meet necessar y t ol er ances) of t he abut ment pr ot ect i on wal l component s must be i ncr ement al l y r emoved and be concur r ent l y r epl aced t o t he pl anned subgr ade l evel of t he pr ot ect i on wal l cap/ sl ab. The r epl acement f i l l must consi st of obst r uct i on- f r ee, r emnant excavat ed gr anul ar mat er i al and/ or i mpor t ed aggr egat e base cour se mat er i al .

I ncr ement al l y pr e- excavat e t o r emove obst r uct i ons t o el evat i on 715. 0 ( or deeper i f necessar y and appr oved by t he Cont r act i ng Of f i cer ) al ong t he abut ment pr ot ect i on wal l al i gnment and concur r ent l y backf i l l t o r est or e gr ades t o t he pl anned subgr ade l evel of t he pr ot ect i on wal l cap/ sl ab. The pr e- excavat i on and obst r uct i on r emoval may pr ogr ess down t o el evat i on

715. 0 ( base of exi st i ng abut ment wal l ) bef or e t he f ol l owi ng r est r i ct i ons on deeper excavat i on shal l appl y. Pr e- excavat i on bel ow el evat i on 715. 0 must commence at t he apr on and pr ogr ess i ncr ement al l y wi t h concur r ent backf i l l i ng i n a downst r eam di r ect i on, unl ess al t er nat i ve pr ocedur es ar e pr oposed i n wr i t i ng by t he Cont r act or and ar e appr oved by t he Cont r act i ng Of f i cer . The pr e- excavat i on must t ar get a l ocal i zed ar ea and be l i mi t ed

SECTI ON 35 20 23 Page 10 t o a maxi mum excavat i on wi dt h of 15 f eet measur ed per pendi cul ar t o t he dam ( par al l el t o r i ver f l ow) , af t er whi ch t he excavat i on must be i mmedi at el y backf i l l ed wi t h obst r uct i on- f r ee mat er i al t o at l east el evat i on 715. 0 bef or e pr ogr essi ng wi t h pr e- excavat i on, obst r uct i on r emoval , and backf i l l i ng i n t he next adj acent ar ea.

Dr edgi ng f or t he st i l l i ng basi n i ncl udes r emovi ng t he r i ver bed mat er i al s t o gr ades and el evat i ons shown on t he dr awi ngs t o f or m t he 3H: 1V sl ope down f r om t he exi st i ng st i l l i ng basi n f or pl acement of 18" t hi ck gr anul ar subgr ade and gr out bag. I t i s ant i c i pat ed t hat excavat i on i n r ock i s not r equi r ed f or t he pl acement of gr out bags.

3. 4. 3 Sal vaged Mat er i al

Anchor s, chai ns, f i r ear ms, and ot her ar t i c l es of val ue, whi ch ar e br ought t o t he sur f ace dur i ng dr edgi ng oper at i ons, must r emai n or become t he pr oper t y of t he Gover nment and must be deposi t ed on shor e at a conveni ent l ocat i on near t he s i t e of t he wor k, as di r ect ed.

3. 4. 4 Saf et y of St r uct ur es

The pr osecut i on of wor k must ensur e t he st abi l i t y of pi er s, abut ment wal l , bul kheads, and ot her st r uct ur es l y i ng on or adj acent t o t he s i t e of t he wor k, i nsof ar as st r uct ur es may be j eopar di zed by dr edgi ng oper at i ons.

The Cont r act or must r epai r damage r esul t i ng f r om dr edgi ng oper at i ons, i nsof ar as such damage may be caused by var i at i on i n l ocat i ons, dept h of dr edgi ng, or bot h f r om t hat i ndi cat ed or per mi t t ed under t he cont r act .

3. 5 FLOODWAY AND APPROACH DREDGI NG

The f ol l owi ng par agr aphs appl y onl y t o dr edgi ng downst r eam of t he St i l l i ng Basi n and Abut ment Pr ot ect i on Wal l , upst r eam of t he dam, and upst r eam and downst r eam l ock appr oaches.

3. 5. 1 Over dept h Dr edgi ng And Si de Sl opes

3. 5. 1. 1 General

Al l dr edgi ng dept hs ar e r ef er enced t o t he cur r ent Pool El evat i on.

3. 5. 1. 2 Over dept h Dr edgi ng

To cover unavoi dabl e i naccur aci es of dr edgi ng pr ocesses, mat er i al act ual l y r emoved t o a dept h of 1 f oot bel ow t he dept h speci f i ed and wi t hi n t he dr edgi ng l i mi t s wi l l be measur ed and pai d f or at t he cont r act uni t pr i ce f or r emoval and di sposal of mat er i al .

3. 5. 1. 3 Si de and End Sl opes

Si de sl opes of 3H t o 1V must be const r uct ed. Dr edgi ng on si de sl opes must f ol l ow, as c l osel y as pr act i cabl e, t he l i nes i ndi cat ed or speci f i ed.

Comput at i on of payment quant i t i es wi l l be t o t he speci f i ed channel l i mi t s pl us t he di st ance f r om t he channel l i mi t s t o t he i nt er sect i on of t he s i de sl opes wi t h t he sur f ace. The Cont r act or wi l l be per mi t t ed t o per f or m box cut s t o obt ai n t he r equi r ed si de sl opes, however , payment f or channel s i de s l opes wi l l be made st r i ct l y based on t he def i ned payment s l ope of 3H t o 1V f r om t he channel edge. Ther e wi l l not be any compensat ed sl ope cal cul at i ons f or payment , nor any payment f or excessi ve dr edgi ng beyond t he 1 f oot al l owabl e over dept h. The 1 f oot al l owabl e over dept h must be

SECTI ON 35 20 23 Page 11 per f or med as a box cut wi t h no si de sl opes. Tr ansi t i on must be made t o exi st i ng r i ver bot t om at t he upst r eam and downst r eam l i mi t s of t he dr edgi ng ar ea. ( See dr awi ngs f or t ypi cal sect i ons.

3. 5. 1. 3. 1 Excessi ve Dr edgi ng

Mat er i al t aken f r om beyond t he l i mi t s speci f i ed i n t he Par agr aphs t i t l ed:

Over dept h Dr edgi ng and Si de and End Sl opes, wi l l be deduct ed f r om t he t ot al amount dr edged as excessi ve dr edgi ng f or whi ch payment wi l l not be made. Not hi ng her ei n shal l be const r ued t o pr event payment f or t he r emoval of shoal s per f or med i n accor dance wi t h t he appl i cabl e r equi r ement s speci f i ed i n par agr aphs FI NAL EXAMI NATI ON AND ACCEPTANCE and SHOALI NG.

3. 5. 2 Conduct Of Dr edgi ng Wor k

3. 5. 2. 1 I nt er f er ence wi t h Navi gat i on

Mi ni mi ze i nt er f er ence wi t h t he use of channel s and passages. The Cont r act i ng Of f i cer wi l l di r ect t he shi f t i ng or movi ng of dr edges or t he i nt er r upt i on of dr edgi ng oper at i ons t o accommodat e t he movement of vessel s and f l oat i ng equi pment , i f necessar y.

3. 5. 2. 2 Ranges, Gages, and Li nes

Fur ni sh, set , and mai nt ai n r anges, buoys, and mar ker s needed t o def i ne t he wor k and t o f aci l i t at e i nspect i on. Est abl i sh and mai nt ai n gages i n l ocat i ons obser vabl e f r om each par t of t he wor k so t hat t he dept h may be det er mi ned. Suspend dr edgi ng when t he gages or r anges cannot be seen or f ol l owed. The Cont r act i ng Of f i cer wi l l f ur ni sh, upon r equest by t he Cont r act or , sur vey l i nes, poi nt s, and el evat i ons necessar y f or t he set t i ng of r anges, gages, and buoys.

3. 5. 2. 3 Plant

Mai nt ai n t he pl ant , scows, coami ngs, bar ges, pi pel i nes, and associ at ed equi pment t o meet t he r equi r ement s of t he wor k. Pr ompt l y r epai r l eaks or br eaks al ong pi pel i nes. Remove dr edged mat er i al pl aced due t o l eaks and breaks.

3. 5. 2. 4 Saf et y of St r uct ur es

The pr osecut i on of wor k must ensur e t he st abi l i t y of pi er s, bul kheads, and ot her st r uct ur es l y i ng on or adj acent t o t he s i t e of t he wor k, i nsof ar as st r uct ur es may be j eopar di zed by dr edgi ng oper at i ons. Repai r of damages r esul t i ng f r om dr edgi ng oper at i ons shal l be at t he Cont r act or ' s expense i f t he damage was caused by devi at i on f r om t he cont r act .

3. 5. 2. 5 Pl ant Removal

Upon compl et i on of t he wor k, pr ompt l y r emove pl ant , i ncl udi ng r anges, buoys, pi l es, and ot her mar ker s or obst r uct i ons.

3. 6 RECORDS

Dai l y c l amshel l bucket posi t i oni ng r ecor ds must be t r ansmi t t ed el ect r oni cal l y t o t he Cont r act i ng Of f i cer dai l y at t he same t i me as t he I nspect or ' s Repor t .

- - End of Sect i on - -

SECTI ON 35 20 23 Page 12

SECTI ON 35 20 23 Page 13

35 20 23 - DREDGING
35 20 23 - DREDGING
PART 1 GENERAL
1.1 WORK COVERED BY THIS SECTION
1.1.1 Excavation for Stilling Basin and Abutment Protection Wall
1.1.2 Removal of Existing Training Dike
1.1.3 Removal of Existing Derrick Stone
1.1.4 Floodway and Approach Dredging
1.1.5 Excavation of Area C
1.2 REFERENCES
1.3 ORDER OF WORK AND DREDGING RESTRICTIONS
1.3.1 Excavation for Stilling Basin and Abutment Protection Wall
1.3.2 Floodway and Approach Dredging
1.4 SUBMITTALS
1.5 TYPE OF MATERIAL TO BE REMOVED
1.6 SITE CONDITIONS
1.7 DREDGING PERSONNEL QUALIFICATIONS
1.8 DIFFERENTIAL GLOBAL POSITIONING SYSTEM DGPS EQUIPMENT
1.9 CLAMSHELL BUCKET POSITIONING
1.10 GOVERNMENT PLANT
1.11 QUANTITY OF MATERIAL
1.11.1 Excavation for Stilling Basin and Abutment Protection Wall
1.11.2 Floodway and Approach Dredging
1.12 FUEL OIL HANDLING
1.13 QUALITY ASSURANCE
1.14 FINAL EXAMINATION AND ACCEPTANCE
1.14.1 Excavation for Stilling Basin and Abutment Protection Wall
1.14.2 Floodway and Approach Dredging
1.14.3 Final Acceptance
1.15 CONTINUITY OF WORK
1.16 SHOALING
PART 2 PRODUCTS
PART 3 EXECUTION
3.1 INSPECTION
3.2 DISPOSAL OF EXCAVATED MATERIAL
3.2.1 General
3.2.2 Misplaced Material
3.2.3 Disposal of Excavated Dredging Material
3.2.3.1 Hopper Dredging
3.2.3.2 Hydraulic Dredging
3.2.3.3 Mechanical Dredging
3.2.3.4 Government Quality Control Monitor
3.2.4 Plant Removal
3.2.5 Disposal of Derrick Stone and Training Dike Rock
3.3 ACCESS TO THE OFF-LOADING FACILITY
3.4 DREDGING FOR STILLING BASIN AND ABUTMENT PROTECTION WALL
3.4.1 Limits of Work
3.4.2 Removal of Obstructions
3.4.3 Salvaged Material
3.4.4 Safety of Structures
3.5 FLOODWAY AND APPROACH DREDGING
3.5.1 Overdepth Dredging And Side Slopes
3.5.1.1 General
3.5.1.2 Overdepth Dredging
3.5.1.3 Side and End Slopes
3.5.1.3.1 Excessive Dredging
3.5.2 Conduct Of Dredging Work
3.5.2.1 Interference with Navigation
3.5.2.2 Ranges, Gages, and Lines
3.5.2.3 Plant
3.5.2.4 Safety of Structures
3.5.2.5 Plant Removal

3.6 RECORDS

File details come from the government source that posted it.