Attachment_1,_Technical_Specifications_Certified_Final.pdf

PDF 3 MB Posted

Attached to
Stilling Basin and Abutment Support Wall, Charleroi L/D Federal contract opportunity
Solicitation number
W911WN18B8010
Issued by
Department of the Army Corps of Engineers Engineering District Pittsburgh

About this file

Technical Specifications, Certifed Final, June 2018

View the file

Other files for this federal contract opportunity

Other files attached to Stilling Basin and Abutment Support Wall, Charleroi L/D, newest first.
File Type Posted
Bid_Abstract.xlsx XLSX spreadsheet
Bid_Opening,_Attendance_Register.pdf PDF
Bid_Results.pdf PDF
Drawings,_(Revised),_Sheet_04_110-B.pdf PDF
W911WN18B8010-0002.pdf PDF
Technical_Specifications,_(Revised_Section)_35_20_23.pdf PDF
Attachment_3,_(Revised)_Davis_Bacon_Wage_Determination,_PA180004_08-24-2018_PA4.pdf PDF
Technical_Specifications,_(Revised_Section)_01_57_20.00_10.pdf PDF
W911WN18B8010-0001.pdf PDF
Technical_Specifications,_(Revised_Section)_01_78_02.00_15.pdf PDF
Technical_Specifications,_(Revised_Section)_03_31_01.00_10.pdf PDF
Attachment_3,_(Revised)_Davis_Bacon_Wage_Determination,_PA180004_08-17-2018.pdf PDF
Technical_Specifications,_(Revised_Section)_35_43_29.pdf PDF
Drawings,_(Revised),_Selected_Sheets.pdf PDF
Bid_Schedule_(Revised).xls XLS spreadsheet
Technical_Specifications,_(Revised_Section)_01_45_01.pdf PDF
Technical_Specifications,_(Revised_Section)_01_22_00.00_10.pdf PDF
Sign-In_Sheet,_Site_Visit.pdf PDF
Agenda,_Pre-Bid_Site_Visit.pdf PDF
Pre-Bid_Contracting_Discussion,_Site_Visit.pdf PDF
Bid_Schedule.xls XLS spreadsheet
Attachment_4,_Davis_Bacon_Wage_Determination,_PA180050_01-05-2018_PA50.pdf PDF
Attachment_3,_Davis_Bacon_Wage_Determination,_PA180004_06-15-2018_PA4.pdf PDF
Attachment_2,_Drawings,_Certified_Final.pdf PDF
W911WN18B8010.pdf PDF
Show all 25

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W911WN18B8010

Stilling Basin and Abutment Protection Wall Charleroi Locks and Dam Monongahela River, PA

Certified Final Documents Technical Specifications June 2018

Char l er oi Locks and Dam St i l l i ng Basi n & Abut ment Pr ot ect i on Wal l

PROJECT TABLE OF CONTENTS

DI VI SI ON 01 - GENERAL REQUI REMENTS

01 22 00. 00 10 PRI CE AND PAYMENT PROCEDURES

01 30 00. 00 08 ADMI NI STRATI VE REQUI REMENTS

01 32 01. 00 10 PROJECT SCHEDULE

01 32 23. 00 08 SURVEY AND ALI GNMENT CONTROL

01 32 33 DI GI TAL PROGRESS I MAGES

01 33 00 SUBMI TTAL PROCEDURES

01 35 00. 00 08 SPECI AL PROCEDURES

01 35 26 GOVERNMENTAL SAFETY REQUI REMENTS

01 42 00 SOURCES FOR REFERENCE PUBLI CATI ONS

01 45 00. 15 10 RESI DENT MANAGEMENT SYSTEM CONTRACTOR MODE( RMS CM)

01 45 01 USACE QUALI TY CONTROL

01 57 20. 00 10 ENVI RONMENTAL PROTECTI ON

01 74 19. 00 08 CONSTRUCTI ON AND DEMOLI TI ON WASTE MANAGEMENT

01 74 19. 10 08 VI CTORY HOLLOW SI TE

01 78 02. 00 15 CLOSEOUT SUBMI TTALS ( AS- BUI LT DRAWI NGS)

DI VI SI ON 02 - EXI STI NG CONDI TI ONS

02 32 16. 00 08 SAMPLI NG, ANALYSES, AND STAGI NG OF SEDI MENT MATERI ALS

DI VI SI ON 03 - CONCRETE

03 11 13. 00 10 STRUCTURAL CAST- I N- PLACE CONCRETE FORMI NG

03 20 00. 00 10 CONCRETE REI NFORCI NG

03 30 00. 20 08 CONCRETE: FI ELD DEMONSTRATI ONS

03 31 01. 00 10 CAST- I N- PLACE STRUCTURAL CONCRETE FOR CI VI L WORKS

DI VI SI ON 05 - METALS

05 50 14 STRUCTURAL METAL FABRI CATI ONS

05 50 15 CI VI L WORKS FABRI CATI ONS

DI VI SI ON 13 - SPECI AL CONSTRUCTI ON

13 51 00. 10 08 INSTRUMENTATION

DI VI SI ON 31 - EARTHWORK

31 05 19. 19 GEOGRI D REI NFORCEMENT

31 41 16 METAL SHEET PI LI NG

31 62 23. 13 CAST- I N- PLACE CONCRETE PI LES

DI VI SI ON 35 - WATERWAY AND MARI NE CONSTRUCTI ON

35 20 23 DREDGING

35 31 19. 20 ARTI CULATI NG CONCRETE BLOCK REVETMENTS

35 43 29 GROUT BAG SCOUR PROTECTI ON

35 43 29. 15 GROUT BAG DEMONSTRATI ON PROJECT

- - End of Pr oj ect Tabl e of Cont ent s - -

PROJECT TABLE OF CONTENTS Page 1 Cer t i f i ed Fi nal Document s

SECTI ON TABLE OF CONTENTS

DI VI SI ON 01 - GENERAL REQUI REMENTS

SECTI ON 01 22 00. 00 10

PRI CE AND PAYMENT PROCEDURES

PART 1 GENERAL

1. 1 SI NGLE JOB PAYMENT I TEMS

1. 1. 1 Bonds

1. 1. 1. 1 Payment

1. 1. 1. 2 Uni t of Measur e

1. 1. 1. 3 Payment I t em

1. 1. 2 Mobi l i zat i on and Demobi l i zat i on

1. 1. 2. 1 Payment

1. 1. 2. 2 Uni t of Measur e

1. 1. 2. 3 Payment I t em

1. 1. 3 Sampl i ng And Test i ng Ar ea " C"

1. 1. 3. 1 Payment

1. 1. 3. 2 Uni t of Measur e

1. 1. 3. 3 Payment I t em

1. 1. 4 Demonst r at i on Pr oj ect s

1. 1. 4. 1 Payment

1. 1. 4. 2 Uni t of Measur e

1. 1. 4. 3 Payment I t em

1. 1. 5 I nst r ument at i on I nst al l at i on

1. 1. 5. 1 Payment

1. 1. 5. 2 Uni t of Measur e

1. 1. 5. 3 Payment I t ems

1. 2 UNI T PRI CE PAYMENT I TEMS

1. 2. 1 Di gi t al Pr ogr ess I mages

1. 2. 1. 1 Payment

1. 2. 1. 2 Measur ement

1. 2. 1. 3 Uni t of Measur e

1. 2. 1. 4 Payment I t em

1. 2. 2 Removal and Pl acement of Exi st i ng Tr ai ni ng Di ke St one and

Der r i ck St one

1. 2. 2. 1 Payment

1. 2. 2. 2 Measur ement

1. 2. 2. 3 Uni t of Measur e

1. 2. 2. 4 Payment I t ems

1. 2. 3 Dr edgi ng

1. 2. 3. 1 Payment

1. 2. 3. 2 Measur ement

1. 2. 3. 3 Uni t of Measur e

1. 2. 3. 4 Payment I t ems

1. 2. 4 Di sposal of Cont ami nat ed Excavat ed Mat er i al

1. 2. 4. 1 Payment

1. 2. 4. 2 Measur ement

1. 2. 4. 3 Uni t of Measur e

1. 2. 4. 4 Payment I t ems

1. 2. 5 Abut ment Suppor t Wal l Sheet , Pi pe, and End Pi l es

SECTI ON 01 22 00. 00 10 Page 1

1. 2. 5. 1 Payment

1. 2. 5. 2 Measur ement

1. 2. 5. 3 Uni t of Measur e

1. 2. 5. 4 Payment I t ems

1. 2. 6 Abut ment Pr ot ect i on Wal l Ki ng Pi l es

1. 2. 6. 1 Payment

1. 2. 6. 2 Measur ement

1. 2. 6. 3 Uni t of Measur e

1. 2. 6. 4 Payment I t em

1. 2. 7 Abut ment Pr ot ect i on Wal l Al l uvi um Excavat i on and Rock Socket s

1. 2. 7. 1 Payment

1. 2. 7. 2 Measur ement

1. 2. 7. 3 Uni t of Measur e

1. 2. 7. 4 Payment I t em

1. 2. 8 Abut ment Pr ot ect i on Wal l Concr et e I nf i l l

1. 2. 8. 1 Payment

1. 2. 8. 2 Measur ement

1. 2. 8. 3 Uni t of Measur e

1. 2. 8. 4 Payment I t ems

1. 2. 9 Beddi ng Mat er i al

1. 2. 9. 1 Payment

1. 2. 9. 2 Measur ement

1. 2. 9. 3 Uni t of Measur e

1. 2. 9. 4 Payment I t em

1. 2. 10 Geogr i d Rei nf or cement

1. 2. 10. 1 Payment

1. 2. 10. 2 Measur ement

1. 2. 10. 3 Uni t of Measur e

1. 2. 10. 4 Payment I t em

1. 2. 11 Gr out Bags

1. 2. 11. 1 Payment

1. 2. 11. 2 Measur ement

1. 2. 11. 3 Uni t of Measur e

1. 2. 11. 4 Payment I t ems

1. 2. 12 Concr et e Ti e- I n El ement

1. 2. 12. 1 Payment

1. 2. 12. 2 Measur ement

1. 2. 12. 3 Uni t of Measur e

1. 2. 12. 4 Payment I t em

1. 2. 13 Gr out Bag Tempor ar y Ter mi nat i on

1. 2. 13. 1 Payment

1. 2. 13. 2 Measur ement

1. 2. 13. 3 Uni t of Measur e

1. 2. 13. 4 Sub Ti t l e

PART 2 PRODUCTS

PART 3 EXECUTI ON

3. 1 CONTRACT COST BREAKDOWN

- - End of Sect i on Tabl e of Cont ent s - -

SECTI ON 01 22 00. 00 10 Page 2

SECTI ON 01 22 00. 00 10

PRI CE AND PAYMENT PROCEDURES

PART 1 GENERAL

1. 1 SI NGLE JOB PAYMENT I TEMS

Payment i t ems f or t he wor k of t hi s cont r act f or whi ch cont r act j ob payment s wi l l be made ar e l i s t ed i n t he BIDDING SCHEDULE and descr i bed bel ow. Al l cost s f or i t ems of wor k, whi ch ar e not speci f i cal l y ment i oned t o be i ncl uded i n a par t i cul ar j ob or uni t pr i ce payment i t em, ar e i ncl uded i n t he l i s t ed j ob i t em most c l osel y associ at ed wi t h t he wor k i nvol ved. The j ob pr i ce and payment made f or each i t em l i st ed const i t ut es f ul l compensat i on f or f ur ni shi ng al l pl ant , l abor , mat er i al s, and equi pment , and per f or mi ng any associ at ed Cont r act or qual i t y cont r ol , envi r onment al pr ot ect i on, meet i ng saf et y r equi r ement s, t est s and r epor t s, and f or per f or mi ng al l wor k r equi r ed f or whi ch separ at e payment i s not ot her wi se pr ovi ded.

1. 1. 1 Bonds

1. 1. 1. 1 Payment

Payment f or t hi s i t em shal l const i t ut e f ul l compensat i on f or t he act ual pr emi um cost f or obt ai ni ng Per f or mance and Payment Bonds i n accor dance wi t h Sect i on 01 73 00 SUPPLEMENTARY CONDI TI ONS, par agr aph PAYMENT FOR

PERFORMANCE AND PAYMENT BONDS.

1. 1. 1. 2 Uni t of Measur e

Uni t of Measur e: Job

1. 1. 1. 3 Payment I t em

0001 REI MBURSEMENT FOR ACTUAL PERFORMANCE AND PAYMENT BONDS PREMI UMS,

BASE CONTRACT

1001 REI MBURSEMENT FOR ACTUAL PERFORMANCE AND PAYMENT BONDS PREMI UMS,

OPTION

1. 1. 2 Mobi l i zat i on and Demobi l i zat i on

1. 1. 2. 1 Payment

Payment f or mobi l i zat i on and demobi l i zat i on wi l l be made i n accor dance wi t h Sect i on 00 73 00 SUPPLEMENTARY CONDI TI ONS, DFARS 252. 236- 7004 PAYMENT FOR MOBI LI ZATI ON AND DEMOBI LI ZATI ON. Payment f or mobi l i zat i on wi l l be made upon compl et i on of mobi l i zat i on t o t he s i t e. Payment f or demobi l i zat i on wi l l be made upon compl et i on of wor k and demobi l i zat i on f r om t he si t e. Si xt y per cent of t he cost of t hi s i t em wi l l be pai d when mobi l i zat i on i s compl et e. The r emai ni ng f or t y per cent wi l l be pai d once f ul l y demobi l i zed.

SECTI ON 01 22 00. 00 10 Page 3

1. 1. 2. 2 Uni t of Measur e

Uni t of measur e: Job.

1. 1. 2. 3 Payment I t em

0002 MOBI LI ZATI ON AND DEMOBI LI ZATI ON

1. 1. 3 Sampl i ng And Test i ng Ar ea " C"

1. 1. 3. 1 Payment

Payment f or sampl i ng and t est i ng t he excavat ed mat er i al shal l const i t ut e f ul l compensat i on f or al l l abor , equi pment , mat er i al and suppl y cost s f or per f or mi ng t he speci f i ed act i v i t i es and f ur ni shi ng t est r esul t s as specified.

1. 1. 3. 2 Uni t of Measur e

Uni t of measur e: Job.

1. 1. 3. 3 Payment I t em

0007 SAMPLI NG AND TESTI NG AREA " C"

1. 1. 4 Demonst r at i on Pr oj ect s

1. 1. 4. 1 Payment

Payment shal l const i t ut e f ul l compensat i on f or al l cost s i n associ at i on wi t h per f or mi ng a demonst r at i on pr oj ect f or t he abut ment pr ot ect i on wal l and abut ment pr ot ect i on s l ab pl acement and gr out bag scour pr ot ect i on i n accor dance wi t h speci f i cat i on Sect i ons 03 30 00. 20 08 CONCRETE: FI ELD DEMONSTRATI ONS and 35 43 29. 15 GROUT BAG DEMONSTRATI ON PROJECT. Payment must i ncl ude al l l abor , equi pment s, mat er i al s, bar ges, suppl i es and i nci dent al cost s t o const r uct t he demonst r at i on sect i on. Payment must i ncl ude al l sampl i ng and t est i ng r equi r ed f or t he demonst r at i on pr oj ect as speci f i ed i n Sect i on 35 43 29. 15 GROUT BAG DEMONSTRATI ON PROJECT.

1. 1. 4. 2 Uni t of Measur e

Uni t of Measur e: Job.

1. 1. 4. 3 Payment I t em

0011 ABUTMENT PROTECTI ON WALL DEMONSTRATI ON PROJECT

0012 SCOUR PROTECTI ON DEMONSTRATI ON PROJECT

1. 1. 5 I nst r ument at i on I nst al l at i on

1. 1. 5. 1 Payment

Payment wi l l be made f or cost s associ at ed wi t h f ur ni shi ng and i nst al l i ng new i nst r ument at i on i n accor dance wi t h Sect i on 13 51 00. 10 08

INSTRUMENTATION.

1. 1. 5. 2 Uni t of Measur e

Uni t of measur e: Job

SECTI ON 01 22 00. 00 10 Page 4

1. 1. 5. 3 Payment I t ems

0029 I NSTRUMENTATI ON

1. 2 UNI T PRI CE PAYMENT I TEMS

Payment i t ems f or t he wor k of t hi s cont r act on whi ch t he cont r act uni t pr i ce payment s wi l l be made ar e l i s t ed i n t he BIDDING SCHEDULE and descr i bed bel ow. The uni t pr i ce and payment made f or each i t em l i st ed const i t ut es f ul l compensat i on f or f ur ni shi ng al l pl ant , l abor , mat er i al s, and equi pment , and per f or mi ng any associ at ed Cont r act or qual i t y cont r ol , envi r onment al pr ot ect i on, meet i ng saf et y r equi r ement s, t est s and r epor t s, and f or per f or mi ng al l wor k r equi r ed f or each of t he uni t pr i ce i t ems.

1. 2. 1 Di gi t al Pr ogr ess I mages

1. 2. 1. 1 Payment

Payment f or mont hl y pr oj ect i mages shal l be based on each set appr oved by t he Cont r act i ng Of f i cer , and must i ncl ude al l wor k t o t ake t he i mages, pr ocess t he i mages, downl oad t he i mages on t he Gover nment f i el d of f i ce comput er , and pr oduce t he of f i c i al r ecor d copy of t he i mages on a compact di sk ( CD) or di gi t al v i deo di sk ( DVD) as speci f i ed i n Sect i on 01 32 33

DI GI TAL PROGRESS I MAGES.

1. 2. 1. 2 Measurement

Measur ement f or mont hl y pr oj ect i mages must be based on each set of phot ogr aphs appr oved by t he Cont r act i ng Of f i cer , as speci f i ed.

1. 2. 1. 3 Uni t of Measur e

Uni t of measur e: Set s.

1. 2. 1. 4 Payment I t em

0003 DI GI TAL PROGRESS I MAGES

1. 2. 2 Removal and Pl acement of Exi st i ng Tr ai ni ng Di ke St one and Der r i ck Stone

1. 2. 2. 1 Payment

Payment f or t hi s i t em shal l const i t ut e f ul l compensat i on f or al l l abor , equi pment , mat er i al and suppl y cost s f or t he f ol l owi ng:

a. Removal of t he exi st i ng R- 7 and R- 8 st one at t he t r ai ni ng di ke and der r i ck st one at t he St i l l i ng Basi n and at t he Abut ment Pr ot ect i on Wal l as speci f i ed, i ncl udi ng al l f l oat i ng pl ant s, di v i ng ser vi ces, and l i f t i ng equi pment necessar y f or pr oper r emoval .

b. St agi ng of t he r emoved st one as shown on t he dr awi ngs or as di r ect ed by t he Cont r act i ng Of f i cer .

c. Reuse of t he R- 7 and R- 8 st one and der r i ck st one at t he l ocat i ons shown on t he dr awi ngs, pl acement of R- 7 and R- 8 st one and der r i ck st one not r e- used at t he l ocat i on shown on t he dr awi ngs, and as speci f i ed, i ncl udi ng al l f l oat i ng pl ant s, di v i ng ser vi ces, and l i f t i ng

SECTI ON 01 22 00. 00 10 Page 5 equi pment necessar y f or pr oper r epl acement .

d. Payment shal l i ncl ude per f or mi ng measur ement s f or payment and al l ot her i nci dent al cost s i n connect i on wi t h t hese aspect s of t he wor k under t hi s cont r act . The exi st i ng t r ai ni ng di ke st one must be r emoved, st aged, and r eused i n accor dance wi t h Sect i on 35 20 23 DREDGI NG, and as shown on t he dr awi ngs.

1. 2. 2. 2 Measurement

Measur ement f or t he r emoval , st agi ng, and r euse or pl acement of t he exi st i ng t r ai ni ng di ke st one and der r i ck st one shal l be based on t he act ual number of cubi c yar ds of gr aded st one r emoved, st aged, and r eused as det er mi ned by t he Cont r act or per f or med soundi ngs or sweepi ngs t aken bef or e and af t er l oadi ng of t he t r ai ni ng di ke st one, as wi t nessed by t he Cont r act i ng Of f i cer .

1. 2. 2. 3 Uni t of Measur e

Uni t of measur e: Cubi c Yar ds.

1. 2. 2. 4 Payment I t ems

0004 REMOVAL AND PLACEMENT OF EXI STI NG TRAI NI NG DI KE STONE

0005 REMOVAL AND PLACEMENT OF DERRI CK STONE

1. 2. 3 Dredging

1. 2. 3. 1 Payment

Payment f or t hi s i t em shal l const i t ut e f ul l compensat i on f or al l l abor , equi pment , mat er i al and suppl y cost s f or per f or mi ng t he wor k, i ncl udi ng per f or mi ng measur ement s f or payment and al l ot her i nci dent al cost s i n connect i on wi t h t hese aspect s of t he wor k under t hi s cont r act .

Adj ust ment s i n cont r act pr i ce f or obst r uct i ons encount er ed dur i ng dr edgi ng oper at i ons shal l be as speci f i ed i n Sect i on 35 20 23 DREDGI NG. The Cont r act or i s r esponsi bl e f or any addi t i onal dr edgi ng r equi r ed t o br i ng t he ar ea wi t hi n t he t ol er ances speci f i ed i n Sect i on 35 20 23 DREDGI NG, or shown on t he dr awi ngs, pr i or t o begi nni ng any wor k upon whi ch t he dr edgi ng depends, at no addi t i onal cost t o t he Gover nment , and no addi t i onal measur ement or payment wi l l be made f or such addi t i onal dr edgi ng. Payment shal l al so i ncl ude cost of t r anspor t i ng t he excavat ed mat er i al t o t he Vi ct or y Hol l ow Si t e f or of f l oadi ng and pl acement by ot her s as speci f i ed i n Sect i on 01 74 19. 10 08 VI CTORY HOLLOW SI TE. Excavat i on and di sposal of al l uvi um f r om Abut ment Pr ot ect i on Wal l pi pe pi l es wi l l be pai d f or as speci f i ed i n par agr aph Abut ment Pr ot ect i on Wal l Al l uvi um Excavat i on and Rock Socket s.

1. 2. 3. 2 Measurement

Al l measur ement s f or payment wi l l be based on i nf or mat i on gat her ed f r om sur veys ( soundi ngs or sweepi ngs) t aken by s i ngl e beam acoust i c sur vey met hods, 200 kHz soni c met hods, as det er mi ned by t he Gover nment and as per f or med by t he Cont r act or , and wi t nessed by t he Cont r act i ng Of f i cer , at t he pr oj ect s i t e pr i or t o commencement of dr edgi ng oper at i ons and agai n af t er compl et i on of dr edgi ng. Ar eas sounded mor e t han 30 cal endar days pr i or t o dr edgi ng must be r esounded i f r equest ed by t he Cont r act i ng Of f i cer . The Cont r act or must not i f y t he Cont r act i ng Of f i cer at l east 2 wor ki ng days bef or e soundi ngs or sweepi ngs ar e made. No measur ement wi l l

SECTI ON 01 22 00. 00 10 Page 6 be made f or r emoval of any mat er i al s beyond t hat i ndi cat ed on t he cont r act dr awi ngs and t ol er ances speci f i ed i n Sect i on 35 20 23 DREDGI NG. The Cont r act or must sound t he r i ver bed over t he ar ea t o be dr edged by a met hod, and wi t h equi pment , accept abl e t o t he Cont r act i ng Of f i cer . Any ar eas not conf or mi ng wi t h t he speci f i ed t ol er ances must be cor r ect ed and r esounded, at t he Cont r act or ' s expense. The Cont r act or must per f or m addi t i onal soundi ngs or sweepi ngs as necessar y dur i ng t he pr ogr ess of t he wor k t o ver i f y dept hs. Al l soundi ng or sweepi ng dat a must be f ur ni shed t o t he Cont r act i ng Of f i cer pr ompt l y af t er t he i nf or mat i on has been obt ai ned and compi l ed. I ni t i al soundi ngs or sweepi ngs shal l const i t ut e t he or i gi nal cr oss- sect i ons f r om whi ch al l measur ement s wi l l be based t o cal cul at e t he quant i t y of dr edgi ng accompl i shed, wi t hout r egar d t o any changes i n t he sur f ace t hat may occur dur i ng t he per f or mance of t he wor k.

The second set of soundi ngs or sweepi ngs shal l const i t ut e t he f i nal cr oss- sect i ons f r om whi ch measur ement wi l l be made, and shal l be used t o ver i f y t hat t he speci f i ed bot t om el evat i ons and sl opes have been achi eved. However , no measur ement f or payment wi l l be made f or any mat er i al over dr edged beyond t hat per mi t t ed by t he al l owabl e t ol er ances f or t he speci f i ed bot t om el evat i on or speci f i ed s i de s l opes. Unl ess ot her wi se speci f i ed and/ or appr oved, quant i t i es must be cal cul at ed i n cubi c yar ds by t he aver age end ar ea met hod based on i ni t i al and f i nal soundi ngs or sweepings.

1. 2. 3. 3 Uni t of Measur e

Uni t of measur e: Cubi c Yar ds.

1. 2. 3. 4 Payment I t ems

0006 UNDERWATER ALLUVI UM EXCAVATI ON FOR SCOUR PROTECTI ON, ABUTMENT

PROTECTI ON WALL, AND ABUTMENT PROTECTI ON GROUT BAGS

0008 DREDGI NG, AREA " C"

0009 DREDGI NG, DOWNSTREAM FLOODWAY AND APPROACH

1002 DREDGI NG, UPSTREAM FLOODWAY AND APPROACH, OPTI ON

1. 2. 4 Di sposal of Cont ami nat ed Excavat ed Mat er i al

1. 2. 4. 1 Payment

Payment wi l l be made f or di sposal of excavat ed mat er i al s whi ch ar e det er mi ned t o not meet t he c l ean f i l l r equi r ement s, based on t he r esul t s of t he speci f i ed sampl i ng and t est i ng. Payment f or t hi s i t em shal l const i t ut e f ul l compensat i on f or al l l abor , equi pment , mat er i al and suppl y cost s f or per f or mi ng t he wor k i ncl udi ng t r anspor t i ng, of f l oadi ng and di sposal of excavat ed mat er i al s at a commer ci al l y avai l abl e l i censed l andf i l l , and al l ot her i nci dent al cost s i n connect i on wi t h t hi s aspect of t he wor k. The payment shal l i ncl ude cost s of di sposal f ees at l i censed landfills.

1. 2. 4. 2 Measurement

Measur ement f or payment f or di sposal wi l l be based on t he appl i cabl e excavat i on quant i t i es f or t he mat er i al bei ng di sposed.

1. 2. 4. 3 Uni t of Measur e

Uni t of measur e: Cubi c Yar ds.

SECTI ON 01 22 00. 00 10 Page 7

1. 2. 4. 4 Payment I t ems

0010 DI SPOSAL OF CONTAMI NATED DREDGED MATERI AL

1. 2. 5 Abut ment Suppor t Wal l Sheet , Pi pe, and End Pi l es

1. 2. 5. 1 Payment

Payment f or t hese i t ems shal l i ncl ude al l mat er i al i nst al l at i ons necessar y f or const r uct i on of t he new abut ment combi nat i on wal l pi l i ng adj acent t o t he exi st i ng abut ment wal l . Al l mat er i al s must be pl aced i n accor dance wi t h Sect i on 31 41 16 METAL SHEET PI LI NG, Sect i on 31 62 23. 13 CAST- I N- PLACE CONCRETE PI LES, and appl i cabl e speci f i cat i ons. Payment shal l const i t ut e f ul l compensat i on f or al l l abor , equi pment , t ool s, and suppl i es, f or t he f ol l owi ng:

a. Fur ni shi ng and i nst al l i ng al l pi pe pi l es, i ncl udi ng al l associ at ed dr i v i ng, pul l i ng, r edr i v i ng, and t est i ng as speci f i ed i n t hese speci f i cat i ons and as shown on t he dr awi ngs. Payment shal l i ncl ude r emoval of over bur den and cl eani ng of t he pi l es af t er compl et i on of pi pe pi l e dr i v i ng and r ock socket const r uct i on t o accommodat e k i ng pi l e i nst al l at i on and concr et e pl acement .

b. Fur ni shi ng and i nst al l i ng al l met al sheet pi l es, i ncl udi ng al l associ at ed dr i v i ng, pul l i ng, r edr i v i ng, and t est i ng as speci f i ed i n t hese speci f i cat i ons and as shown on t he dr awi ngs.

c. Fur ni shi ng and i nst al l i ng end pi l es ( t er mi nat i on col umns) , i ncl udi ng al l associ at ed dr i v i ng, pul l i ng, r edr i v i ng, and t est i ng as speci f i ed i n t hese speci f i cat i ons and as shown on t he dr awi ngs.

d. Fur ni shi ng and oper at i ng al l dr i v i ng equi pment , i ncl udi ng hammer s, gui de t empl at es, chi sel s ( f or obst r uct i ons) , and pi l e dr i v i ng accessories.

1. 2. 5. 2 Measurement

Measur ement of new abut ment combi nat i on wal l pi pe pi l es, sheet pi l es, and end pi l es f or payment shal l be based on t he act ual l engt h of per manent pi l i ng i n- pl ace f r om t he t i p el evat i on t o t he f i nal per manent cut of f el evat i on t o t he near est l i near f oot . No separ at e payment wi l l be made f or cut of f or spl i c i ng of per manent pi l i ng. Al l measur es must be appr oved by t he Cont r act i ng Of f i cer .

1. 2. 5. 3 Uni t of Measur e

Uni t of measur e: Li near Feet .

1. 2. 5. 4 Payment I t ems

0013 ABUTMENT PROTECTI ON WALL, 48- I NCH DI AMETER BY 1/ 2- I NCH THI CK

PI PE PI LE

0014 ABUTMENT PROTECTI ON WALL, PZC 18 METAL SHEET PI LI NG

0015 ABUTMENT PROTECTI ON WALL, HP12x53 END PI LE

SECTI ON 01 22 00. 00 10 Page 8

1. 2. 6 Abut ment Pr ot ect i on Wal l Ki ng Pi l es

1. 2. 6. 1 Payment

Payment shal l const i t ut e f ul l compensat i on f or al l l abor , equi pment , t ool s, mat er i al s, and suppl i es f or f ur ni shi ng and i nst al l i ng t he k i ng pi l es, bot h st i f f ened and unst i f f ened, i n t he abut ment combi nat i on wal l as shown on t he dr awi ngs, i n accor dance wi t h Sect i on 31 62 23. 13 CAST- I N- PLACE CONCRETE PI LES, and as f ol l ows:

a. Fur ni shi ng al l k i ng pi l e mat er i al s, i ncl udi ng r ei nf or ci ng beams, web st i f f ener s, and f l ange pl at es.

b. Fabr i cat i ng al l k i ng pi l es i nt o s i ngl e uni t s, i ncl udi ng wel di ng of web st i f f ener s and f l ange pl at es t o t he r ei nf or ci ng beams, as shown on t he dr awi ngs. Fabr i cat i on of k i ng pi l es must be i n accor dance wi t h Sect i on 05 50 14 STRUCTURAL METAL FABRI CATI ONS and Sect i on 05 50 15

CI VI L WORKS FABRI CATI ONS.

c. I nst al l i ng al l k i ng pi l es, i ncl udi ng al l associ at ed dr i v i ng, pul l i ng, r edr i v i ng, and t est i ng as speci f i ed and as shown on t he dr awi ngs.

d. Fur ni shi ng and oper at i ng al l dr i v i ng equi pment , i ncl udi ng hammer s, gui de t empl at es, chi sel s ( f or obst r uct i ons) , and dr i v i ng accessor i es.

1. 2. 6. 2 Measurement

Measur ement of new abut ment combi nat i on wal l k i ng pi l es f or payment shal l be based on t he act ual number and t ype of k i ng pi l e uni t s, i ncl udi ng r ei nf or ci ng beams, f l ange pl at es, and angl es, f abr i cat ed, f ur ni shed, and i nst al l ed by t he Cont r act or , as appr oved by t he Cont r act i ng Of f i cer . Al l measur es shal l be appr oved by t he Cont r act i ng Of f i cer .

1. 2. 6. 3 Uni t of Measur e

Uni t of measur e: Each.

1. 2. 6. 4 Payment I t em

Uni t Pr i ce i t ems l i s t ed i n t he BI D SCHEDULE i ncl ude:

0016 ABUTMENT PROTECTI ON WALL, W33x291 KI NG PI LES 1 TO 21 0017 ABUTMENT PROTECTI ON WALL, W33x291 KI NG PI LES 22 TO 38

1. 2. 7 Abut ment Pr ot ect i on Wal l Al l uvi um Excavat i on and Rock Socket s

1. 2. 7. 1 Payment

Payment shal l const i t ut e f ul l compensat i on f or al l l abor , equi pment , t ool s, and suppl i es f or dr i l l i ng of r ock socket s, as shown on t he dr awi ngs and as speci f i ed i n Sect i on 31 62 23. 13 CAST- I N- PLACE CONCRETE PI LES, and any necessar y t est i ng and i nspect i on associ at ed wi t h r ock socket s.

Payment shal l i ncl ude cl eani ng t he bot t oms of t he r ock socket s f or subsequent concr et e pl acement .

1. 2. 7. 2 Measurement

Measur ement of r ock socket s f or payment shal l be based on t he act ual l engt h of al l uvi um or r ock socket dr i l l ed i nt o bedr ock t o t he near est

SECTI ON 01 22 00. 00 10 Page 9 l i near f oot .

1. 2. 7. 3 Uni t of Measur e

Uni t of measur e: Li near Feet .

1. 2. 7. 4 Payment I t em

Uni t Pr i ce i t em l i st ed i n t he BI D SCHEDULE i ncl ude:

0018 ABUTMENT PROTECTI ON WALL PI PE PI LE, ALLUVI UM EXCAVATI ON

0019 ABUTMENT PROTECTI ON WALL, 42- I NCH DI AMETER ROCK SOCKET

1. 2. 8 Abut ment Pr ot ect i on Wal l Concr et e I nf i l l

1. 2. 8. 1 Payment

Payment f or t hese i t ems shal l i ncl ude al l new concr et e wor k f or const r uct i on of t he new abut ment pr ot ect i on wal l i n accor dance wi t h Sect i on 31 62 23. 13 CAST- I N- PLACE CONCRETE PI LES. Payment shal l const i t ut e f ul l compensat i on f or al l l abor , equi pment , t ool s, and suppl i es, f or f ur ni shi ng and pl aci ng of concr et e f or cast - i n- pl ace concr et e pi l es

1. 2. 8. 2 Measurement

Measur ement of concr et e pl acement and ot her concr et e wor k f or payment shal l be based on t he act ual vol ume of concr et e i n cubi c yar ds of i n- pl ace concr et e f or t he var i ous component s of t he new abut ment combi nat i on wal l .

1. 2. 8. 3 Uni t of Measur e

Uni t of measur e: Cubi c Yar ds.

1. 2. 8. 4 Payment I t ems

Uni t Pr i ce i t ems l i s t ed i n t he BI D SCHEDULE i ncl ude:

0020 ABUTMENT PROTECTI ON WALL, CONCRETE FOR CAST- I N- PLACE CONCRETE

PILES

1. 2. 9 Beddi ng Mat er i al

1. 2. 9. 1 Payment

Payment f or beddi ng mat er i al of t he gr out bag scour pr ot ect i on shal l const i t ut e f ul l compensat i on f or al l cost s i n connect i on wi t h compl et i ng gr out bag i nst al l at i on, i ncl udi ng f ur ni shi ng, pl aci ng and pr ot ect i on of beddi ng mat er i al bef or e and dur i ng gr out bag i nst al l at i on i n accor dance wi t h Sect i on 35 43 29 GROUT BAG SCOUR PROTECTI ON. The Cont r act or must pl ace and pr ot ect t he speci f i ed mat er i al t o t he l i nes and gr ades shown, and as speci f i ed.

1. 2. 9. 2 Measurement

Measur ement of beddi ng mat er i al f or gr out bag scour pr ot ect i on shal l be per f or med by t he Cont r act or i n accor dance wi t h a met hod( s) appr oved by t he Cont r act i ng Of f i cer .

SECTI ON 01 22 00. 00 10 Page 10

1. 2. 9. 3 Uni t of Measur e

Uni t of measur e: Cubi c Yar ds.

1. 2. 9. 4 Payment I t em

0021 ABUTMENT PROTECTI ON, BEDDI NG MATERI AL

0024 SCOUR PROTECTI ON, BEDDI NG MATERI AL

1. 2. 10 Geogr i d Rei nf or cement

1. 2. 10. 1 Payment

Payment f or geogr i d r ei nf or cement beneat h t he gr out bag scour pr ot ect i on shal l const i t ut e f ul l compensat i on f or al l cost s i n connect i on wi t h compl et i ng gr out bag i nst al l at i on, i ncl udi ng f ur ni shi ng al l mat er i al , l abor , equi pment , suppl i es and i nci dent al s, pl acement , and pr ot ect i on of geogr i d r ei nf or cement bef or e and dur i ng gr out bag scour pr ot ect i on pl acement i n accor dance wi t h Sect i on 31 05 19. 19 GEOGRI D REI NFORCEMENT.

The Cont r act or must pl ace and pr ot ect t he speci f i ed mat er i al t o t he l i nes and gr ades shown, and as speci f i ed.

1. 2. 10. 2 Measurement

Measur ement of geogr i d r ei nf or cement beneat h t he gr out bag scour pr ot ect i on shal l be per f or med by t he Cont r act or i n accor dance wi t h a met hod( s) appr oved by t he Cont r act i ng Of f i cer . Over l aps and spl i ces ( i f al l owed) and f or t he Cont r act or ' s conveni ence wi l l not be measur ed f or payment.

1. 2. 10. 3 Uni t of Measur e

Uni t of measur e: Squar e Yar ds.

1. 2. 10. 4 Payment I t em

0022 ABUTMENT PROTECTI ON, GEOGRI D REI NFORCEMENT

0025 SCOUR PROTECTI ON, GEOGRI D REI NFORCEMENT

1. 2. 11 Gr out Bags

1. 2. 11. 1 Payment

Payment shal l const i t ut e f ul l compensat i on f or al l l abor , equi pment , t ool s, and suppl i es f or f ur ni shi ng and i nst al l i ng gr out bags f or scour pr ot ect i on, i ncl udi ng t he f ol l owi ng, i n accor dance wi t h Sect i on 35 43 29

GROUT BAG SCOUR PROTECTI ON:

a. Pr ot ect i on of beddi ng mat er i al and geogr i d r ei nf or cement beneat h t he gr out bags dur i ng pl acement of t he gr out bag panel s and gr out i nf i l l .

b. Fur ni shi ng al l manuf act ur ed f abr i c gr out bag si zes speci f i ed her ei n, i ncl udi ng st andar d 6 f oot wi de and speci al 9 f oot wi de si zes. Speci al f abr i c gr out bags f ur ni shed by t he Cont r act or ar e f or i nst al l at i on al ong t he abut ment combi nat i on wal l s as shown on t he dr awi ngs.

St andar d f abr i c gr out bag si zes f ur ni shed by t he Cont r act or ar e f or i nst al l at i on at al l ot her l ocat i ons. Fabr i c must be f ur ni shed as speci f i ed i n Sect i on 35 43 29 GROUT BAG SCOUR PROTECTI ON.

SECTI ON 01 22 00. 00 10 Page 11

c. Fur ni shi ng al l gr out bag accessor i es, i ncl udi ng sel f - seal i ng f i l l i ng val ves, i nt er nal ver t i cal st r ap t i es, shape cor ds and cabl es, gr ommet s, and zi pper s t o be i nst al l ed i n each f abr i c gr out bag.

d. Fur ni shi ng al l gr out i nf i l l , i ncl udi ng al l admi xt ur es, t o be pl aced i nsi de t he gr out bags. Payment f or gr out i nf i l l shal l i ncl ude al l Por t l and cement , f i ne aggr egat e, pozzol an or f l y ash, and pl ast i c i z i ng and ai r ent r ai ni ng admi xt ur es ( i f used) t o meet t he st r engt h r equi r ement s speci f i ed i n Sect i on 35 43 29 GROUT BAG SCOUR PROTECTI ON.

e. I nst al l i ng shop assembl ed gr out bag panel s, f abr i cat ed by t he gr out bag manuf act ur er , as shown on t he dr awi ngs. Gr out bag panel s shal l be f abr i cat ed by t he manuf act ur er , i ncl udi ng al l f abr i c f or ms and accessor i es. The Cont r act or must be r esponsi bl e f or connect i on of gr out bag panel s.

f . Fur ni shi ng al l panel j i gs, f l oat i ng pl ant , cr anes, and di v i ng ser vi ces r equi r ed f or pr oper i nst al l at i on of t he gr out bag panel s.

g. Pl aci ng al l under wat er gr out i nf i l l i nt o t he gr out bags by pumpi ng met hods. Payment shal l i ncl ude al l pumpi ng equi pment capabl e of pumpi ng t he gr out mi xt ur e speci f i ed i n Sect i on 35 43 29 GROUT BAG

SCOUR PROTECTI ON.

1. 2. 11. 2 Measurement

Measur ement of gr out bags f or scour pr ot ect i on shal l be based on t he act ual number of cubi c yar ds of gr out cont ai ned wi t hi n each gr out bag f ur ni shed and i nst al l ed by t he Cont r act or , compl et e wi t h accessor i es, i n accor dance wi t h speci f i cat i on Sect i on 35 43 29 GROUT BAG SCOUR PROTECTI ON. Measur ement wi l l be made t o t he neat l i nes shown on t he dr awi ngs, as ver i f i ed by t he conf i r mat i on speci f i ed i n Sect i on 35 43 29 GROUT BAG SCOUR PROTECTI ON, par agr aph Const r uct i on Tol er ances. Al l gr out bags pl aced by t he Cont r act or must be appr oved by t he Cont r act i ng Of f i cer .

1. 2. 11. 3 Uni t of Measur e

Uni t of measur e: Cubi c Yar ds.

1. 2. 11. 4 Payment I t ems

Uni t Pr i ce i t ems l i s t ed i n t he BI D SCHEDULE i ncl ude:

0023 ABUTMENT PROTECTI ON, FURNI SH AND I NSTALL GROUT BAGS WI TH

ACCESSORI ES AND GROUT I NFI LL

0026 SCOUR PROTECTI ON, FURNI SH AND I NSTALL GROUT BAGS WI TH

ACCESSORI ES AND GROUT I NFI LL

1. 2. 12 Concr et e Ti e- I n El ement

1. 2. 12. 1 Payment

Payment shal l const i t ut e f ul l compensat i on f or al l l abor , equi pment , t ool s, and suppl i es f or const r uct i on of t he apr on t i e- i n el ement , i ncl udi ng t he f ol l owi ng:

a. Fur ni shi ng and i nst al l i ng al l r ei nf or cement as speci f i ed i n Sect i on 35 43 29 GROUT BAG SCOUR PROTECTI ON and as shown on t he dr awi ngs.

SECTI ON 01 22 00. 00 10 Page 12

b. Fur ni shi ng and pl aci ng gr out speci f i ed i n Sect i on 35 43 29 GROUT BAG SCOUR PROTECTI ON. Payment shal l i ncl ude t he t r anspor t at i on, pl acement , and cur i ng met hods of gr out .

1. 2. 12. 2 Measurement

Measur ement of gr out f or t he apr on t i e- i n el ement f or payment shal l be based on t he act ual number of cubi c yar ds of gr out pl aced by t he Cont r act or , as appr oved by t he Cont r act i ng Of f i cer .

1. 2. 12. 3 Uni t of Measur e

Uni t of measur e: Cubi c Yar ds.

1. 2. 12. 4 Payment I t em

0027 SCOUR PROTECTI ON, APRON TI E- I N ELEMENT

1. 2. 13 Gr out Bag Tempor ar y Ter mi nat i on

1. 2. 13. 1 Payment

Payment shal l const i t ut e f ul l compensat i on f or al l cost s i n associ at i on wi t h pr ovi di ng t he t empor ar y f l ank pr ot ect i on scheme f or gr out bags i nst al l ed as speci f i ed i n Sect i on 35 31 19. 20 ARTI CULATI NG CONCRETE BLOCK REVETMENTS i n t he event t hat const r uct i on of t he gr out bag scour pr ot ect i on i s t er mi nat ed f or ext ended per i ods of t i me. Payment shal l i ncl ude al l l abor , equi pment , mat er i al s, suppl i es and i nci dent al cost s t o const r uct t he f l ank pr ot ect i on as shown on t he dr awi ngs.

1. 2. 13. 2 Measurement

Measur ement of gr out bag f l ank pr ot ect i on f or payment shal l be based on t he act ual number of f l ank pr ot ect i on i nst al l at i ons pl aced by t he Cont r act or , as appr oved by t he Cont r act i ng Of f i cer .

1. 2. 13. 3 Uni t of Measur e

Uni t of measur e: Each.

1. 2. 13. 4 Sub Ti t l e

0028 SCOUR PROTECTI ON, TEMPORARY TERMI NATI ON

PART 2 PRODUCTS

Not Used

PART 3 EXECUTI ON

3. 1 CONTRACT COST BREAKDOWN

The Cont r act or must f ur ni sh wi t hi n 30 cal endar days af t er t he dat e of Not i ce t o Pr oceed, and pr i or t o t he submi ssi on of i t s f i r st par t i al payment est i mat e, a br eakdown of i t s s i ngl e j ob pay i t em or i t ems whi ch wi l l be r evi ewed by t he Cont r act i ng Of f i cer as t o pr opr i et y of di st r i but i on of t he t ot al cost t o t he var i ous account s. Any unbal anced i t ems as bet ween ear l y and l at e payment i t ems or ot her di scr epanci es wi l l be r evi sed by t he Cont r act i ng Of f i cer t o agr ee wi t h a r easonabl e cost of

SECTI ON 01 22 00. 00 10 Page 13 t he wor k i ncl uded i n t he var i ous i t ems. Thi s cont r act cost br eakdown wi l l t hen be ut i l i zed as t he basi s f or pr ogr ess payment s t o t he Cont r act or .

- - End of Sect i on - -

SECTI ON 01 22 00. 00 10 Page 14

DI VI SI ON 01 - GENERAL REQUI REMENTS

SECTI ON 01 30 00. 00 08

ADMI NI STRATI VE REQUI REMENTS

PART 1 GENERAL

1. 1 SUMMARY

1. 2 REFERENCES

1. 3 ACRONYMS

1. 4 FEDERAL HOLI DAYS

1. 5 TI ME ZONE

1. 6 USACE ACQUI SI TI ON I NSTRUCTI ONS ( UAI )

1. 6. 1 UAI 5122. 1302- 100 EQUAL OPPORTUNI TY FOR VETERANS. UAI

5122.1302-100

1. 6. 2 UAI 5152. 231- 9000 5152. 231- 9000 EQUI PMENT OWNERSHI P AND

OPERATI NG EXPENSE SCHEDULE

1. 6. 3 5152. 236- 9009 PARTNERI NG ( FEB 2000)

1. 6. 4 5136. 249- 9000 BASI S FOR SETTLEMENT OF PROPOSALS ( MAR 2009)

1. 7 SUPERVI SI ON

1. 7. 1 Mi ni mum Communi cat i on Requi r ement s

1. 7. 2 Super i nt endent Qual i f i cat i ons

1. 7. 2. 1 Dut i es

1. 7. 3 Non- Compl i ance Act i ons

1. 8 PRECONSTRUCTI ON CONFERENCE

1. 9 PARTNERI NG

1. 9. 1 For mal Par t ner i ng

PART 2 PRODUCTS

PART 3 EXECUTI ON

- - End of Sect i on Tabl e of Cont ent s - -

SECTI ON 01 30 00. 00 08 Page 1

SECTI ON 01 30 00. 00 08

ADMI NI STRATI VE REQUI REMENTS

PART 1 GENERAL

1. 1 SUMMARY

Thi s sect i ons cont ai ns cont r act admi ni st r at i ve r equi r ement s whi ch ar e not cover ed i n Sect i on 00 70 00 CONDI TI ONS OF THE CONTRACT or Sect i on 00 73 00

SUPPLEMENTARY CONDI TI ONS.

1. 2 REFERENCES

The publ i cat i ons l i s t ed bel ow f or m a par t of t hi s speci f i cat i on t o t he ext ent r ef er enced. The publ i cat i ons ar e r ef er r ed t o wi t hi n t he t ext by t he basi c desi gnat i on onl y.

U. S. ARMY CORPS OF ENGI NEERS ( USACE)

EM 385- 1- 1 ( 2014) Saf et y and Heal t h Requi r ement s Manual

EP 1110- 1- 8 ( 2016) Const r uct i on Equi pment Owner shi p and Oper at i ng Expense Schedul e

1. 3 ACRONYMS

DFARS - Def ense Feder al Acqui s i t i on Regul at i ons Suppl ement EP - Engi neer Pamphl et FAR - Feder al Acqui s i t i on Regul at i ons UAI - USACE Acqui s i t i on I nst r uct i ons

1. 4 FEDERAL HOLI DAYS

The t en Feder al hol i days obser ved ar e:

New Year ' s Day ( Januar y 1st ) Mar t i n Lut her Ki ng Day ( 3r d Monday i n Januar y) Pr esi dent ' s Day ( 3r d Monday i n Febr uar y) Memor i al Day ( Last Monday i n May) I ndependence Day ( Jul y 4t h) Labor Day ( 1st Monday i n Sept ember ) Col umbus Day ( 2nd Monday i n Oct ober ) Vet er ans Day ( November 11t h) Thanksgi v i ng Day ( 4t h Thur sday i n November ) Chr i st mas Day ( December 25t h)

When one of t he above desi gnat ed hol i days f al l s on a Sunday, t he f ol l owi ng Monday i s obser ved as a l egal hol i day. When a l egal hol i day f al l s on a Sat ur day, t he pr ecedi ng Fr i day i s obser ved as a hol i day. Wor k shal l be schedul ed ar ound t he above l i s t ed Feder al hol i days except as speci f i ed her ei n or as appr oved by t he Cont r act i ng Of f i cer .

SECTI ON 01 30 00. 00 08 Page 2

1. 5 TI ME ZONE

Unl ess ot her wi se not ed, al l t i mes ar e East er n Ti me Zone.

1. 6 USACE ACQUI SI TI ON I NSTRUCTI ONS ( UAI )

1. 6. 1 UAI 5122. 1302- 100 EQUAL OPPORTUNI TY FOR VETERANS. UAI 5122. 1302- 100

I n addi t i on t o compl yi ng wi t h t he r equi r ement s out l i ned i n Sect i on 00 70 00

CONDI TI ONS OF THE CONTRACT, FAR 22. 13 EQUAL OPPORTUNI TY FOR VETERANS, FAR

52. 222- 35EQUAL OPPORTUNI TY FOR VETERANS , FAR 52. 222- 37 EQUAL OPPORTUNI TY

FOR VETERANS and Depar t ment of Labor r egul at i ons, U. S. Ar my Cor ps of Engi neer s ( USACE) cont r act or s and subcont r act or s at al l t i er s ar e encour aged t o pr omot e t he t r ai ni ng and empl oyment of U. S. vet er ans whi l e per f or mi ng under a USACE cont r act . Whi l e no set - asi de, eval uat i on pr ef er ence, or i ncent i ve appl i es t o t he sol i c i t at i on or per f or mance under t he r esul t ant cont r act , USACE cont r act or s ar e encour aged t o seek out hi ghl y qual i f i ed vet er ans t o per f or m ser vi ces under t hi s cont r act . The f ol l owi ng r esour ces ar e avai l abl e t o assi st USACE cont r act or s i n t hei r out r each ef f or t s:

U. S. Depar t ment of Labor Vet er ans empl oyment : www. vet s. gov/

Feder al vet er an empl oyment i nf or mat i on: www.fedshirevets.gov/index.aspx

Vet er ans' Empl oyment and Tr ai ni ng Ser vi ce ( VETS) :

http://www.dol.gov/vets /

Vet er ans Oppor t uni t y t o Wor k ( VOW) Pr ogr am: http://benefits.va.gov/vow/

Hi r i ng Our Her oes i ni t i at i ve:

www.uschamberfoundation.org/hiring-our-heroes

Gui de t o Hi r i ng Vet er ans:

https://obamawhitehouse.archives.gov/sites/default/files/ docs/white_house_business_council_-_guide_to_hiring_veterans_0.pdf

1. 6. 2 UAI 5152. 231- 9000 5152. 231- 9000 EQUI PMENT OWNERSHI P AND OPERATI NG

EXPENSE SCHEDULE

( a) Thi s c l ause does not appl y t o t er mi nat i ons. See UAI 5152. 249- 9000, Basi s f or Set t l ement of Pr oposal s, and Feder al Acqui s i t i on Regul at i on ( FAR) par t 49.

( b) Al l owabl e cost s f or const r uct i on and mar i ne pl ant and equi pment i n sound wor kabl e condi t i on owned or cont r ol l ed and f ur ni shed by a cont r act or or subcont r act or at any t i er must be based on act ual cost dat a f or each pi ece of equi pment or gr oups of s i mi l ar ser i al and ser i es f or whi ch t he Gover nment can det er mi ne bot h owner shi p and oper at i ng cost s f r om t he cont r act or ' s account i ng r ecor ds. When bot h owner shi p and oper at i ng cost s cannot be det er mi ned f or any pi ece of equi pment or gr oups of s i mi l ar ser i al or ser i es equi pment f r om t he cont r act or ' s account i ng r ecor ds, cost s f or t hat equi pment must be based upon t he appl i cabl e pr ovi s i ons of EP 1110- 1- 8, Regi on I .

Wor ki ng condi t i ons shal l be consi der ed t o be aver age f or det er mi ni ng equi pment r at es usi ng t he schedul e unl ess speci f i ed ot her wi se by t he cont r act i ng of f i cer . For equi pment not i ncl uded i n t he schedul e, SECTI ON 01 30 00. 00 08 Page 3 r at es f or compar abl e pi eces of equi pment may be used or a r at e may be devel oped usi ng t he f or mul a pr ovi ded i n t he schedul e. For f or war d pr i c i ng, t he schedul e i n ef f ect at t he t i me of negot i at i ons must appl y. For r et r oact i ve pr i c i ng, t he schedul e i n ef f ect at t he t i me t he wor k was per f or med must appl y.

( c) Equi pment r ent al cost s ar e al l owabl e, subj ect t o t he pr ovi s i ons of FAR 31. 105( d) ( i i ) CONSTRUCTI ON AND ARCHI TECT- ENGI NEER CONTRACTS and FAR 31. 205- 36 SELECTED COSTS. Rat es f or equi pment r ent ed f r om an or gani zat i on under common cont r ol , l ease- pur chase ar r angement s, and sal e- l easeback ar r angement s, wi l l be det er mi ned usi ng t he schedul e, except t hat act ual r at es wi l l be used f or equi pment l eased f r om an or gani zat i on under common cont r ol t hat has an est abl i shed pr act i ce of l easi ng t he same or s i mi l ar equi pment t o unaf f i l i at ed l essees.

( d) When act ual equi pment cost s ar e pr oposed and t he t ot al amount of t he pr i c i ng act i on exceeds t he si mpl i f i ed acqui s i t i on t hr eshol d ( SAT) , t he Cont r act i ng Of f i cer shal l r equest t he Cont r act or t o submi t ei t her cer t i f i ed cost or pr i c i ng dat a, or par t i al / l i mi t ed dat a, as appr opr i at e. The dat a must be submi t t ed on St andar d For m 1411, Cont r act Pr i c i ng Pr oposal Cover Sheet .

1. 6. 3 5152. 236- 9009 PARTNERI NG ( FEB 2000)

I n or der t o most ef f ect i vel y accompl i sh t hi s cont r act , t he Gover nment pr oposes t o f or m a par t ner shi p wi t h t he Cont r act or t o devel op a cohesi ve bui l di ng t eam. I t i s ant i c i pat ed t hat t hi s par t ner shi p woul d i nvol ve t he Cont r act or , pr i mar y subcont r act or s and desi gner s, and t he Cor ps of Engi neer s. Thi s par t ner shi p woul d st r i ve t o devel op a cooper at i ve management t eam dr awi ng on t he st r engt hs of each t eam member i n an ef f or t t o achi eve a qual i t y pr oj ect wi t hi n budget and on schedul e. Thi s par t ner shi p woul d be bi l at er al i n member shi p and par t i c i pat i on wi l l be compl et el y vol unt ar y. Any cost associ at ed wi t h ef f ect uat i ng t hi s par t ner shi p, excl udi ng t r avel and l odgi ng cost of Gover nment per sonnel , wi l l be bor ne by each par t y.

The par t ner i ng meet i ngs shal l be hel d i n a pl ace accept abl e t o bot h par t i es. Cost s associ at ed wi t h par t ner i ng wi l l be negot i at ed bi l at er al l y af t er awar d.

1. 6. 4 5136. 249- 9000 BASI S FOR SETTLEMENT OF PROPOSALS ( MAR 2009)

Act ual cost s wi l l be used t o det er mi ne equi pment cost s f or a set t l ement pr oposal submi t t ed on t he t ot al cost basi s under Feder al Acqui s i t i on Regul at i on ( FAR) 49. 206- 2( b) BASI S FOR SETTLEMENT OF PROPOSALS. I n eval uat i ng a t er mi nat i on set t l ement pr oposal usi ng t he t ot al cost basi s, t he f ol l owi ng pr i nci pl es wi l l be appl i ed t o det er mi ne al l owabl e equi pment costs:

( a) Act ual cost s f or each pi ece of equi pment , or gr oups of s i mi l ar ser i al or ser i es equi pment , need not be avai l abl e i n t he cont r act or ' s account i ng r ecor ds t o det er mi ne t ot al act ual equi pment cost s.

( b) I f equi pment cost s have been al l ocat ed t o a cont r act usi ng pr edet er mi ned r at es, t hose char ges wi l l be adj ust ed t o act ual cost s.

( c) Recor ded j ob cost s adj ust ed f or unal l owabl e expenses wi l l be used t o det er mi ne equi pment oper at i ng expenses.

SECTI ON 01 30 00. 00 08 Page 4

( d) Owner shi p cost s ( depr eci at i on) wi l l be det er mi ned usi ng t he cont r act or ' s depr eci at i on schedul e ( subj ect t o t he pr ovi s i ons of Feder al Acqui s i t i on Regul at i on ( FAR) 31. 205- 11 DEPRECI ATI ON.

( e) Li cense, t axes, st or age and i nsur ance cost s ar e nor mal l y r ecover ed as an i ndi r ect expense and unl ess t he cont r act or char ges t hese cost s di r ect l y t o cont r act s, t hey wi l l be r ecover ed t hr ough t he i ndi r ect expense r at e.

1. 7 SUPERVISION

1. 7. 1 Mi ni mum Communi cat i on Requi r ement s

Have at l east one qual i f i ed super i nt endent , or compet ent al t er nat e, capabl e of r eadi ng, wr i t i ng, and conver si ng f l uent l y i n t he Engl i sh l anguage, on t he j ob- si t e at al l t i mes dur i ng t he per f or mance of cont r act wor k. I n addi t i on, i f a Qual i t y Cont r ol ( QC) r epr esent at i ve i s r equi r ed on t he cont r act , t hen t hat i ndi v i dual must al so have f l uent Engl i sh communi cat i on ski l l s .

1. 7. 2 Super i nt endent Qual i f i cat i ons

The pr oj ect super i nt endent must have a mi ni mum of 10 year s exper i ence i n const r uct i on wi t h at l east 5 of t hose year s as a super i nt endent on pr oj ect s s i mi l ar i n s i ze and compl exi t y. The i ndi v i dual must be f ami l i ar wi t h t he r equi r ement s of EM 385- 1- 1 and have exper i ence i n t he ar eas of hazar d i dent i f i cat i on and saf et y compl i ance. The i ndi v i dual must be capabl e of i nt er pr et i ng a cr i t i cal pat h schedul e and const r uct i on dr awi ngs. The qual i f i cat i on r equi r ement s f or t he al t er nat e super i nt endent ar e t he same as f or t he pr oj ect super i nt endent . The Cont r act i ng Of f i cer may r equest pr oof of t he super i nt endent ' s qual i f i cat i ons at any poi nt i n t he pr oj ect i f t he per f or mance of t he super i nt endent i s i n quest i on.

1. 7. 2. 1 Duties

The pr oj ect super i nt endent i s pr i mar i l y r esponsi bl e f or managi ng and coor di nat i ng day- t o- day pr oduct i on and schedul e adher ence on t he pr oj ect .

The super i nt endent i s r equi r ed t o at t end par t ner i ng meet i ngs, and qual i t y cont r ol meet i ngs. The super i nt endent or qual i f i ed al t er nat i ve must be on- si t e at al l t i mes dur i ng t he per f or mance of t hi s cont r act unt i l t he wor k i s compl et ed and accept ed.

1. 7. 3 Non- Compl i ance Act i ons

The Pr oj ect Super i nt endent i s subj ect t o r emoval by t he Cont r act i ng Of f i cer f or non- compl i ance wi t h r equi r ement s speci f i ed i n t he cont r act and f or f ai l ur e t o manage t he pr oj ect t o i nsur e t i mel y compl et i on.

Fur t her mor e, t he Cont r act i ng Of f i cer may i ssue an or der st oppi ng al l or par t of t he wor k unt i l sat i sf act or y cor r ect i ve act i on has been t aken. No par t of t he t i me l ost due t o such st op or der s i s accept abl e as t he subj ect of c l ai m f or ext ensi on of t i me f or excess cost s or damages by t he Contractor.

1. 8 PRECONSTRUCTION CONFERENCE

Af t er awar d of t he cont r act but pr i or t o commencement of any wor k at t he s i t e, meet wi t h t he Cont r act i ng Of f i cer t o di scuss and devel op a mut ual under st andi ng r el at i ve t o t he admi ni st r at i on of t he val ue engi neer i ng and saf et y pr ogr am, pr epar at i on of t he schedul e of pr i ces or ear ned val ue

SECTI ON 01 30 00. 00 08 Page 5 r epor t , shop dr awi ngs, and ot her submi t t al s, schedul i ng pr ogr ammi ng, pr osecut i on of t he wor k, and cl ear expect at i ons of t he " I nt er i m DD For m 1354" Submi t t al . Maj or subcont r act or s who wi l l engage i n t he wor k must al so at t end.

1. 9 PARTNERING

To most ef f ect i vel y accompl i sh t hi s cont r act , t he Gover nment r equi r es t he f or mat i on of a cohesi ve par t ner shi p wi t hi n t he Pr oj ect Team whose member s ar e f r om t he Gover nment , t he Cont r act or and t hei r Subcont r act or s. Key per sonnel f r om t he Suppor t ed Command, t he End User ( who wi l l occupy t he f aci l i t y) , t he Gover nment Desi gn and Const r uct i on t eam and Subj ect Mat t er Exper t s, t he I nst al l at i on, t he Cont r act or and Subcont r act or s, and t he Desi gner of Recor d wi l l be i nvi t ed t o par t i c i pat e i n t he Par t ner i ng pr ocess. The Par t ner shi p wi l l dr aw on t he st r engt h of each or gani zat i on i n an ef f or t t o achi eve a pr oj ect t hat i s wi t hout any saf et y mi shaps, conf or ms t o t he Cont r act , and st ays wi t hi n budget and on schedul e.

The Cont r act i ng Of f i cer wi l l pr ovi de I nf or mat i on on t he Par t ner i ng Pr ocess and a l i s t of key and opt i onal per sonnel who shoul d at t end t he Par t ner i ng meeting.

1. 9. 1 For mal Par t ner i ng

Pr ovi de and host t he Par t ner i ng sessi ons wi t h key per sonnel of t he Pr oj ect Team, i ncl udi ng Cont r act or per sonnel and Gover nment per sonnel . Pay al l cost s associ at ed wi t h t he Par t ner i ng ef f or t i ncl udi ng t he Faci l i t at or , t he meet i ng r oom, and ot her i nci dent al i t ems. I n except i on, each par t i c i pant bear s t hei r own cost s f or meal s, l odgi ng, and t r anspor t at i on associ at ed wi t h t he Par t ner i ng sessi ons.

Bef or e a Par t ner i ng sessi on, coor di nat e wi t h t he Faci l i t at or al l r equi r ement s f or i nci dent al i t ems ( such as audi o- vi sual equi pment , easel s, f l i pchar t paper , col or ed mar ker s, not e paper , pens/ penci l s, col or ed f l ash car ds) , and have t hese i t ems avai l abl e at t he Par t ner i ng sessi on. Pr ovi de copi es of document s f or di st r i but i on t o al l at t endees. Pr ovi de a Faci l i t at or exper i enced i n conduct i ng Par t ner i ng Wor kshops, and who i s accept abl e t o bot h t he Gover nment and t he Cont r act or . The Faci l i t at or i s r esponsi bl e f or l eadi ng t he t eam i n a t i mel y manner and maki ng sur e t hat i ssues ar e i dent i f i ed and r esol ved. A l i s t of Par t ner i ng Faci l i t at or s i s avai l abl e f r om t he Cont r act i ng Of f i cer .

a. Schedul e t he I ni t i al Par t ner i ng Sessi on f or a dur at i on of one day mi ni mum. Locat e t hi s sessi on at a pl ace of f t he const r uct i on s i t e, as agr eed t o by t he Cont r act i ng Of f i cer and t he Cont r act or . I t may t ake pl ace concur r ent l y wi t h t he Pr e- Const r uct i on Meet i ng.

b. Schedul e f ol l ow- on Par t ner i ng Sessi ons f or a maxi mum of 4 hour s.

Schedul e t hem at no mor e t han 3 t o s i x mont h i nt er val s. Par t i c i pant s ar e encour aged t o ut i l i ze el ect r oni c means t o expedi t e meet i ngs.

Meet i ngs may be hel d at a l ocat i on of f - Base, at t he pr oj ect s i t e, or i n a Gover nment Faci l i t y on Base. Fol l ow- on meet i ngs may be hel d concur r ent l y wi t h ot her schedul ed meet i ngs. At t endees need onl y be t hose r equi r ed t o r esol ve cur r ent i ssues. Recommend usi ng t he same Faci l i t at or f r om t he I ni t i al Par t ner i ng sessi on t o achi eve best r esul t s and f or cont i nui t y.

SECTI ON…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.