Bid_Schedule_(Revised).xls
XLS spreadsheet 41 KB Posted
- Attached to
- Stilling Basin and Abutment Support Wall, Charleroi L/D Federal contract opportunity
- Solicitation number
- W911WN18B8010
About this file
Revised. To Complete and Submit with Bid Package
View the file
Other files for this federal contract opportunity
Show all 25
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Bid Schedule
| BID SCHEDULE | |||||
| ITEM | DESCRIPTION | Quantity | Unit | Unit Price | Total |
| BASE CONTRACT | |||||
| 0001 | REIMBURSEMENT FOR ACTUAL PERFORMANCE AND PAYMENT BOND PREMIUMS, BASE CONTRACT | 1 | JOB | $________ | $________ |
| 0002 | MOBILIZATION AND DEMOBILIZATION | 1 | JOB | $________ | $________ |
| 0003 | DIGITAL PROGRESS IMAGES | 33 | SETS | $________ | $________ |
| 4 | REMOVAL AND PLACEMENT EXISTING TRAINING DIKE STONE | 14,300 | CUBIC YARDS | $________ | $________ |
| 5 | REMOVAL AND PLACEMENT OF DERRICK STONE | 11,200 | CUBIC YARDS | $________ | $________ |
| 6 | UNDERWATER ALLUVIUM EXCAVATION FOR SCOUR PROTECTION, ABUTMENT PROTECTION WALL AND ABUTMENT PROTECTION GROUT BAGS | 25,600 | CUBIC YARDS | $________ | $________ |
| 0007 | SAMPLING AND TESTING AREA "C" | 1 | JOB | $________ | $________ |
| 0008 | DREDGING, AREA "C" | 6,000 | CUBIC YARDS | $________ | $________ |
| 0009 | DREDGING, DOWNSTREAM FLOODWAY AND APPROACH | 84,200 | CUBIC YARDS | $________ | $________ |
| 0010 | DISPOSAL OF CONTAMINATED DREDGED MATERIAL | 6,000 | CUBIC YARDS | $________ | $________ |
| 0011 | ABUTMENT PROTECTION WALL DEMONSTRATION PROJECT | 1 | JOB | $________ | $________ |
| 0012 | SCOUR PROTECTION DEMONSTRATION PROJECT | 1 | JOB | $________ | $________ |
| 0013 | ABUTMENT PROTECTION WALL, 48-INCH DIAMETER BY 1/2-INCH THICK PIPE PILE | 1,140 | LINEAR FEET | $________ | $________ |
| 14 | ABUTMENT PROTECTION WALL, PZC 18 METAL SHEET PILING | 2,280 | LINEAR FEET | $________ | $________ |
| 15 | ABUTMENT PROTECTION WALL, HP12x53 END PILE | 30 | LINEAR FEET | $________ | $________ |
| 16 | ABUTMENT PROTECTION WALL, W33x291 KING PILES 1 to 21 | 21 | EACH | $________ | $________ |
| 17 | ABUTMENT PROTECTION WALL, W33x291 KING PILES 22 to 28 | 17 | EACH | $________ | $________ |
| 18 | ABUTMENT PROTECTION WALL PIPE PILE, ALLUVIUM EXCAVATION | 950 | LINEAR FEET | $________ | $________ |
| 0019 | ABUTMENT PROTECTION WALL, 42-INCH DIAMETER ROCK SOCKET | 988 | LINEAR FEET | $________ | $________ |
| 0020 | ABUTMENT PROTECTION WALL, CONCRETE FOR CAST-IN-PLACE CONCRETE PILES | 840 | CUBIC YARDS | $________ | $________ |
| 0021 | ABUTMENT PROTECTION, BEDDING MATERIAL | 170 | CUBIC YARDS | $________ | $________ |
| 0022 | NOT USED | ||||
| 0023 | ABUTMENT PROTECTION, FURNISH AND INSTALL GROUT BAGS WITH ACCESSORIES AND GROUT INFILL | 1,500 | CUBIC YARDS | $________ | $________ |
| 0024 | SCOUR PROTECTION, BEDDING MATERIAL | 2,000 | CUBIC YARDS | $________ | $________ |
| 0025 | SCOUR PROTECTION, GEOGRID REINFORCEMENT | 3,500 | SQUARE YARDS | $________ | $________ |
| 0026 | SCOUR PROTECTION, FURNISH AND INSTALL GROUT BAGS WITH ACCESSORIES AND GROUT INFILL | 6,300 | CUBIC YARDS | $________ | $________ |
| 0027 | SCOUR PROTECTION, APRON TIE-IN ELEMENT | 310 | CUBIC YARDS | $________ | $________ |
| 0028 | SCOUR PROTECTION, TEMPORARY TERMINATION | 2 | EACH | $________ | $________ |
| 0029 | INSTRUMENTATION | 1 | JOB | $________ | $________ |
| TOTAL, BASE CONTRACT, ITEMS 0001 THROUGH 0029 | $________ | ||||
| AWARDABLE OPTION | |||||
| 1001 | REIMBURSEMENT FOR ACTUAL PERFORMANCE AND PAYMENT BOND PREMIUMS, BASE CONTRACT | 1 | JOB | $________ | $________ |
| 1002 | DREDGING, UPSTREAM FLOODWAY AND APPROACH | 53,900 | CUBIC YARDS | $________ | $________ |
| TOTAL, AWARDABLE CONTRACT, ITEMS 1001 AND 1002 | $________ |
&CCHARLEROI LOCK AND DAMS
STILLING BASIN AND ABUTMENT SUPPORT WALL
Section 00 10 00 Solicitation Contract Line Item Number Schedule &C&P