Technical_Specifications,_(Revised_Section)_01_22_00.00_10.pdf

PDF 62 KB Posted

Attached to
Stilling Basin and Abutment Support Wall, Charleroi L/D Federal contract opportunity
Solicitation number
W911WN18B8010
Issued by
Department of the Army Corps of Engineers Engineering District Pittsburgh

About this file

01 22 00.00 10 Price and Payment Procedures (Various Minor Updates)

View the file

Other files for this federal contract opportunity

Other files attached to Stilling Basin and Abutment Support Wall, Charleroi L/D, newest first.
File Type Posted
Bid_Opening,_Attendance_Register.pdf PDF
Bid_Abstract.xlsx XLSX spreadsheet
Bid_Results.pdf PDF
Attachment_3,_(Revised)_Davis_Bacon_Wage_Determination,_PA180004_08-24-2018_PA4.pdf PDF
Drawings,_(Revised),_Sheet_04_110-B.pdf PDF
W911WN18B8010-0002.pdf PDF
Technical_Specifications,_(Revised_Section)_35_20_23.pdf PDF
Technical_Specifications,_(Revised_Section)_01_45_01.pdf PDF
Bid_Schedule_(Revised).xls XLS spreadsheet
Attachment_3,_(Revised)_Davis_Bacon_Wage_Determination,_PA180004_08-17-2018.pdf PDF
Technical_Specifications,_(Revised_Section)_35_43_29.pdf PDF
Drawings,_(Revised),_Selected_Sheets.pdf PDF
Technical_Specifications,_(Revised_Section)_01_57_20.00_10.pdf PDF
W911WN18B8010-0001.pdf PDF
Technical_Specifications,_(Revised_Section)_01_78_02.00_15.pdf PDF
Technical_Specifications,_(Revised_Section)_03_31_01.00_10.pdf PDF
Pre-Bid_Contracting_Discussion,_Site_Visit.pdf PDF
Sign-In_Sheet,_Site_Visit.pdf PDF
Agenda,_Pre-Bid_Site_Visit.pdf PDF
Bid_Schedule.xls XLS spreadsheet
W911WN18B8010.pdf PDF
Attachment_1,_Technical_Specifications_Certified_Final.pdf PDF
Attachment_2,_Drawings,_Certified_Final.pdf PDF
Attachment_4,_Davis_Bacon_Wage_Determination,_PA180050_01-05-2018_PA50.pdf PDF
Attachment_3,_Davis_Bacon_Wage_Determination,_PA180004_06-15-2018_PA4.pdf PDF
Show all 25

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Char l er oi Locks and Dam St i l l i ng Basi n & Abut ment Pr ot ect i on Wal l

SECTI ON TABLE OF CONTENTS

DI VI SI ON 01 - GENERAL REQUI REMENTS

SECTI ON 01 22 00. 00 10

PRI CE AND PAYMENT PROCEDURES

PART 1 GENERAL

1. 1 SI NGLE JOB PAYMENT I TEMS

1. 1. 1 Bonds

1. 1. 1. 1 Payment

1. 1. 1. 2 Uni t of Measur e

1. 1. 1. 3 Payment I t em

1. 1. 2 Mobi l i zat i on and Demobi l i zat i on

1. 1. 2. 1 Payment

1. 1. 2. 2 Uni t of Measur e

1. 1. 2. 3 Payment I t em

1. 1. 3 Sampl i ng And Test i ng Ar ea " C"

1. 1. 3. 1 Payment

1. 1. 3. 2 Uni t of Measur e

1. 1. 3. 3 Payment I t em

1. 1. 4 Demonst r at i on Pr oj ect s

1. 1. 4. 1 Payment

1. 1. 4. 2 Uni t of Measur e

1. 1. 4. 3 Payment I t em

1. 1. 5 I nst r ument at i on I nst al l at i on

1. 1. 5. 1 Payment

1. 1. 5. 2 Uni t of Measur e

1. 1. 5. 3 Payment I t ems

1. 2 UNI T PRI CE PAYMENT I TEMS

1. 2. 1 Di gi t al Pr ogr ess I mages

1. 2. 1. 1 Payment

1. 2. 1. 2 Measur ement

1. 2. 1. 3 Uni t of Measur e

1. 2. 1. 4 Payment I t em

1. 2. 2 Removal and Pl acement of Exi st i ng Tr ai ni ng Di ke St one and

Der r i ck St one

1. 2. 2. 1 Payment

1. 2. 2. 2 Measur ement

1. 2. 2. 3 Uni t of Measur e

1. 2. 2. 4 Payment I t ems

1. 2. 3 Dr edgi ng

1. 2. 3. 1 Payment

1. 2. 3. 2 Measur ement

1. 2. 3. 3 Uni t of Measur e

1. 2. 3. 4 Payment I t ems

1. 2. 4 Di sposal of Cont ami nat ed Excavat ed Mat er i al

1. 2. 4. 1 Payment

1. 2. 4. 2 Measur ement

1. 2. 4. 3 Uni t of Measur e

1. 2. 4. 4 Payment I t ems

1. 2. 5 Abut ment Suppor t Wal l Sheet , Pi pe, and End Pi l es

SECTI ON 01 22 00. 00 10 Page 1 Cer t i f i ed Fi nal Document s Revi sed by Amendment 0001

1. 2. 5. 1 Payment

1. 2. 5. 2 Measur ement

1. 2. 5. 3 Uni t of Measur e

1. 2. 5. 4 Payment I t ems

1. 2. 6 Abut ment Pr ot ect i on Wal l Ki ng Pi l es

1. 2. 6. 1 Payment

1. 2. 6. 2 Measur ement

1. 2. 6. 3 Uni t of Measur e

1. 2. 6. 4 Payment I t em

1. 2. 7 Abut ment Pr ot ect i on Wal l Al l uvi um Excavat i on and Rock Socket s

1. 2. 7. 1 Payment

1. 2. 7. 2 Measur ement

1. 2. 7. 3 Uni t of Measur e

1. 2. 7. 4 Payment I t em

1. 2. 8 Abut ment Pr ot ect i on Wal l Concr et e I nf i l l

1. 2. 8. 1 Payment

1. 2. 8. 2 Measur ement

1. 2. 8. 3 Uni t of Measur e

1. 2. 8. 4 Payment I t ems

1. 2. 9 Beddi ng Mat er i al

1. 2. 9. 1 Payment

1. 2. 9. 2 Measur ement

1. 2. 9. 3 Uni t of Measur e

1. 2. 9. 4 Payment I t em

1. 2. 10 Geogr i d Rei nf or cement

1. 2. 10. 1 Payment

1. 2. 10. 2 Measur ement

1. 2. 10. 3 Uni t of Measur e

1. 2. 10. 4 Payment I t em

1. 2. 11 Gr out Bags

1. 2. 11. 1 Payment

1. 2. 11. 2 Measur ement

1. 2. 11. 3 Uni t of Measur e

1. 2. 11. 4 Payment I t ems

1. 2. 12 Concr et e Ti e- I n El ement

1. 2. 12. 1 Payment

1. 2. 12. 2 Measur ement

1. 2. 12. 3 Uni t of Measur e

1. 2. 12. 4 Payment I t em

1. 2. 13 Gr out Bag Tempor ar y Ter mi nat i on

1. 2. 13. 1 Payment

1. 2. 13. 2 Measur ement

1. 2. 13. 3 Uni t of Measur e

1. 2. 13. 4 Sub Ti t l e

PART 2 PRODUCTS

PART 3 EXECUTI ON

3. 1 CONTRACT COST BREAKDOWN

- - End of Sect i on Tabl e of Cont ent s - -

SECTI ON 01 22 00. 00 10 Page 2

SECTI ON 01 22 00. 00 10

PRI CE AND PAYMENT PROCEDURES

PART 1 GENERAL

1. 1 SI NGLE JOB PAYMENT I TEMS

Payment i t ems f or t he wor k of t hi s cont r act f or whi ch cont r act j ob payment s wi l l be made ar e l i s t ed i n t he BIDDING SCHEDULE and descr i bed bel ow. Al l cost s f or i t ems of wor k, whi ch ar e not speci f i cal l y ment i oned t o be i ncl uded i n a par t i cul ar j ob or uni t pr i ce payment i t em, ar e i ncl uded i n t he l i s t ed j ob i t em most c l osel y associ at ed wi t h t he wor k i nvol ved. The j ob pr i ce and payment made f or each i t em l i st ed const i t ut es f ul l compensat i on f or f ur ni shi ng al l pl ant , l abor , mat er i al s, and equi pment , and per f or mi ng any associ at ed Cont r act or qual i t y cont r ol , envi r onment al pr ot ect i on, meet i ng saf et y r equi r ement s, t est s and r epor t s, and f or per f or mi ng al l wor k r equi r ed f or whi ch separ at e payment i s not ot her wi se pr ovi ded.

1. 1. 1 Bonds

1. 1. 1. 1 Payment

Payment f or t hi s i t em shal l const i t ut e f ul l compensat i on f or t he act ual pr emi um cost f or obt ai ni ng Per f or mance and Payment Bonds i n accor dance wi t h Sect i on 01 73 00 SUPPLEMENTARY CONDI TI ONS, par agr aph PAYMENT FOR

PERFORMANCE AND PAYMENT BONDS.

1. 1. 1. 2 Uni t of Measur e

Uni t of Measur e: Job

1. 1. 1. 3 Payment I t em

0001 REI MBURSEMENT FOR ACTUAL PERFORMANCE AND PAYMENT BONDS PREMI UMS,

BASE CONTRACT

1001 REI MBURSEMENT FOR ACTUAL PERFORMANCE AND PAYMENT BONDS PREMI UMS,

OPTION

1. 1. 2 Mobi l i zat i on and Demobi l i zat i on

1. 1. 2. 1 Payment

Payment f or mobi l i zat i on and demobi l i zat i on wi l l be made i n accor dance wi t h Sect i on 00 73 00 SUPPLEMENTARY CONDI TI ONS, DFARS 252. 236- 7004 PAYMENT FOR MOBI LI ZATI ON AND DEMOBI LI ZATI ON. Payment f or mobi l i zat i on wi l l be made upon compl et i on of mobi l i zat i on t o t he s i t e. Payment f or demobi l i zat i on wi l l be made upon compl et i on of wor k and demobi l i zat i on f r om t he si t e. Si xt y per cent of t he cost of t hi s i t em wi l l be pai d when mobi l i zat i on i s compl et e. The r emai ni ng f or t y per cent wi l l be pai d once f ul l y demobi l i zed.

SECTI ON 01 22 00. 00 10 Page 3

1. 1. 2. 2 Uni t of Measur e

Uni t of measur e: Job.

1. 1. 2. 3 Payment I t em

0002 MOBI LI ZATI ON AND DEMOBI LI ZATI ON

1. 1. 3 Sampl i ng And Test i ng Ar ea " C"

1. 1. 3. 1 Payment

Payment f or sampl i ng and t est i ng t he excavat ed mat er i al shal l const i t ut e f ul l compensat i on f or al l l abor , equi pment , mat er i al and suppl y cost s f or per f or mi ng t he speci f i ed act i v i t i es and f ur ni shi ng t est r esul t s as specified.

1. 1. 3. 2 Uni t of Measur e

Uni t of measur e: Job.

1. 1. 3. 3 Payment I t em

0007 SAMPLI NG AND TESTI NG AREA " C"

1. 1. 4 Demonst r at i on Pr oj ect s

1. 1. 4. 1 Payment

Payment shal l const i t ut e f ul l compensat i on f or al l cost s i n associ at i on wi t h per f or mi ng a demonst r at i on pr oj ect f or t he abut ment pr ot ect i on wal l and abut ment pr ot ect i on s l ab pl acement and gr out bag scour pr ot ect i on i n accor dance wi t h speci f i cat i on Sect i ons 03 30 00. 20 08 CONCRETE: FI ELD DEMONSTRATI ONS and 35 43 29. 15 GROUT BAG DEMONSTRATI ON PROJECT. Payment must i ncl ude al l l abor , equi pment s, mat er i al s, bar ges, suppl i es and i nci dent al cost s t o const r uct t he demonst r at i on sect i on. Payment must i ncl ude al l sampl i ng and t est i ng r equi r ed f or t he demonst r at i on pr oj ect as speci f i ed i n Sect i on 35 43 29. 15 GROUT BAG DEMONSTRATI ON PROJECT.

1. 1. 4. 2 Uni t of Measur e

Uni t of Measur e: Job.

1. 1. 4. 3 Payment I t em

0011 ABUTMENT PROTECTI ON WALL DEMONSTRATI ON PROJECT

0012 SCOUR PROTECTI ON DEMONSTRATI ON PROJECT

1. 1. 5 I nst r ument at i on I nst al l at i on

1. 1. 5. 1 Payment

Payment wi l l be made f or cost s associ at ed wi t h f ur ni shi ng and i nst al l i ng new i nst r ument at i on i n accor dance wi t h Sect i on 13 51 00. 10 08

INSTRUMENTATION.

1. 1. 5. 2 Uni t of Measur e

Uni t of measur e: Job

SECTI ON 01 22 00. 00 10 Page 4

1. 1. 5. 3 Payment I t ems

0029 I NSTRUMENTATI ON

1. 2 UNI T PRI CE PAYMENT I TEMS

Payment i t ems f or t he wor k of t hi s cont r act on whi ch t he cont r act uni t pr i ce payment s wi l l be made ar e l i s t ed i n t he BIDDING SCHEDULE and descr i bed bel ow. The uni t pr i ce and payment made f or each i t em l i st ed const i t ut es f ul l compensat i on f or f ur ni shi ng al l pl ant , l abor , mat er i al s, and equi pment , and per f or mi ng any associ at ed Cont r act or qual i t y cont r ol , envi r onment al pr ot ect i on, meet i ng saf et y r equi r ement s, t est s and r epor t s, and f or per f or mi ng al l wor k r equi r ed f or each of t he uni t pr i ce i t ems.

1. 2. 1 Di gi t al Pr ogr ess I mages

1. 2. 1. 1 Payment

Payment f or mont hl y pr oj ect i mages shal l be based on each set appr oved by t he Cont r act i ng Of f i cer , and must i ncl ude al l wor k t o t ake t he i mages, pr ocess t he i mages, downl oad t he i mages on t he Gover nment f i el d of f i ce comput er , and pr oduce t he of f i c i al r ecor d copy of t he i mages on a compact di sk ( CD) or di gi t al v i deo di sk ( DVD) as speci f i ed i n Sect i on 01 32 33

DI GI TAL PROGRESS I MAGES.

1. 2. 1. 2 Measurement

Measur ement f or mont hl y pr oj ect i mages must be based on each set of phot ogr aphs appr oved by t he Cont r act i ng Of f i cer , as speci f i ed.

1. 2. 1. 3 Uni t of Measur e

Uni t of measur e: Set s.

1. 2. 1. 4 Payment I t em

0003 DI GI TAL PROGRESS I MAGES

1. 2. 2 Removal and Pl acement of Exi st i ng Tr ai ni ng Di ke St one and Der r i ck Stone

1. 2. 2. 1 Payment

Payment f or t hi s i t em shal l const i t ut e f ul l compensat i on f or al l l abor , equi pment , mat er i al and suppl y cost s f or t he f ol l owi ng:

a. Removal of t he exi st i ng R- 7 and R- 8 st one at t he t r ai ni ng di ke and der r i ck st one at t he St i l l i ng Basi n and at t he Abut ment Pr ot ect i on Wal l as speci f i ed, i ncl udi ng al l f l oat i ng pl ant s, di v i ng ser vi ces, and l i f t i ng equi pment necessar y f or pr oper r emoval .

b. St agi ng of t he r emoved st one as shown on t he dr awi ngs or as di r ect ed by t he Cont r act i ng Of f i cer .

c. Reuse of t he R- 7 and R- 8 st one and der r i ck st one at t he l ocat i ons shown on t he dr awi ngs, pl acement of R- 7 and R- 8 st one and der r i ck st one not r e- used at t he l ocat i on shown on t he dr awi ngs, and as speci f i ed, i ncl udi ng al l f l oat i ng pl ant s, di v i ng ser vi ces, and l i f t i ng

SECTI ON 01 22 00. 00 10 Page 5 equi pment necessar y f or pr oper r epl acement .

d. Payment shal l i ncl ude per f or mi ng measur ement s f or payment and al l ot her i nci dent al cost s i n connect i on wi t h t hese aspect s of t he wor k under t hi s cont r act . The exi st i ng t r ai ni ng di ke st one must be r emoved, st aged, and r eused i n accor dance wi t h Sect i on 35 20 23 DREDGI NG, and as shown on t he dr awi ngs.

1. 2. 2. 2 Measurement

Measur ement f or t he r emoval , st agi ng, and r euse or pl acement of t he exi st i ng t r ai ni ng di ke st one and der r i ck st one shal l be based on t he act ual number of cubi c yar ds of gr aded st one r emoved, st aged, and r eused as det er mi ned by t he Cont r act or per f or med soundi ngs or sweepi ngs t aken bef or e and af t er l oadi ng of t he t r ai ni ng di ke st one, as wi t nessed by t he Cont r act i ng Of f i cer .

1. 2. 2. 3 Uni t of Measur e

Uni t of measur e: Cubi c Yar ds.

1. 2. 2. 4 Payment I t ems

0004 REMOVAL AND PLACEMENT OF EXI STI NG TRAI NI NG DI KE STONE

0005 REMOVAL AND PLACEMENT OF DERRI CK STONE

1. 2. 3 Dredging

1. 2. 3. 1 Payment

Payment f or t hi s i t em shal l const i t ut e f ul l compensat i on f or al l l abor , equi pment , mat er i al and suppl y cost s f or per f or mi ng t he wor k, i ncl udi ng per f or mi ng measur ement s f or payment and al l ot her i nci dent al cost s i n connect i on wi t h t hese aspect s of t he wor k under t hi s cont r act .

Adj ust ment s i n cont r act pr i ce f or obst r uct i ons encount er ed dur i ng dr edgi ng oper at i ons shal l be as speci f i ed i n Sect i on 35 20 23 DREDGI NG. The Cont r act or i s r esponsi bl e f or any addi t i onal dr edgi ng r equi r ed t o br i ng t he ar ea wi t hi n t he t ol er ances speci f i ed i n Sect i on 35 20 23 DREDGI NG, or shown on t he dr awi ngs, pr i or t o begi nni ng any wor k upon whi ch t he dr edgi ng depends, at no addi t i onal cost t o t he Gover nment , and no addi t i onal measur ement or payment wi l l be made f or such addi t i onal dr edgi ng. Payment shal l al so i ncl ude cost of t r anspor t i ng t he excavat ed mat er i al t o t he Vi ct or y Hol l ow Si t e f or of f l oadi ng and pl acement by ot her s as speci f i ed i n Sect i on 01 74 19. 10 08 VI CTORY HOLLOW SI TE. Excavat i on and di sposal of al l uvi um f r om Abut ment Pr ot ect i on Wal l pi pe pi l es wi l l be pai d f or as speci f i ed i n par agr aph Abut ment Pr ot ect i on Wal l Al l uvi um Excavat i on and Rock Socket s.

1. 2. 3. 2 Measurement

Al l measur ement s f or payment wi l l be based on i nf or mat i on gat her ed f r om sur veys ( soundi ngs or sweepi ngs) t aken by s i ngl e beam acoust i c sur vey met hods, 200 kHz soni c met hods, as det er mi ned by t he Gover nment and as per f or med by t he Cont r act or , and wi t nessed by t he Cont r act i ng Of f i cer , at t he pr oj ect s i t e pr i or t o commencement of dr edgi ng oper at i ons and agai n af t er compl et i on of dr edgi ng. Ar eas sounded mor e t han 30 cal endar days pr i or t o dr edgi ng must be r esounded i f r equest ed by t he Cont r act i ng Of f i cer . The Cont r act or must not i f y t he Cont r act i ng Of f i cer at l east 2 wor ki ng days bef or e soundi ngs or sweepi ngs ar e made. No measur ement wi l l

SECTI ON 01 22 00. 00 10 Page 6 be made f or r emoval of any mat er i al s beyond t hat i ndi cat ed on t he cont r act dr awi ngs and t ol er ances speci f i ed i n Sect i on 35 20 23 DREDGI NG. The Cont r act or must sound t he r i ver bed over t he ar ea t o be dr edged by a met hod, and wi t h equi pment , accept abl e t o t he Cont r act i ng Of f i cer . Any ar eas not conf or mi ng wi t h t he speci f i ed t ol er ances must be cor r ect ed and r esounded, at t he Cont r act or ' s expense. The Cont r act or must per f or m addi t i onal soundi ngs or sweepi ngs as necessar y dur i ng t he pr ogr ess of t he wor k t o ver i f y dept hs. Al l soundi ng or sweepi ng dat a must be f ur ni shed t o t he Cont r act i ng Of f i cer pr ompt l y af t er t he i nf or mat i on has been obt ai ned and compi l ed. I ni t i al soundi ngs or sweepi ngs shal l const i t ut e t he or i gi nal cr oss- sect i ons f r om whi ch al l measur ement s wi l l be based t o cal cul at e t he quant i t y of dr edgi ng accompl i shed, wi t hout r egar d t o any changes i n t he sur f ace t hat may occur dur i ng t he per f or mance of t he wor k.

The second set of soundi ngs or sweepi ngs shal l const i t ut e t he f i nal cr oss- sect i ons f r om whi ch measur ement wi l l be made, and shal l be used t o ver i f y t hat t he speci f i ed bot t om el evat i ons and sl opes have been achi eved. However , no measur ement f or payment wi l l be made f or any mat er i al over dr edged beyond t hat per mi t t ed by t he al l owabl e t ol er ances f or t he speci f i ed bot t om el evat i on or speci f i ed s i de s l opes. Unl ess ot her wi se speci f i ed and/ or appr oved, quant i t i es must be cal cul at ed i n cubi c yar ds by t he aver age end ar ea met hod based on i ni t i al and f i nal soundi ngs or sweepings.

1. 2. 3. 3 Uni t of Measur e

Uni t of measur e: Cubi c Yar ds.

1. 2. 3. 4 Payment I t ems

0006 UNDERWATER ALLUVI UM EXCAVATI ON FOR SCOUR PROTECTI ON, ABUTMENT

PROTECTI ON WALL, AND ABUTMENT PROTECTI ON GROUT BAGS

0008 DREDGI NG, AREA " C"

0009 DREDGI NG, DOWNSTREAM FLOODWAY AND APPROACH

1002 DREDGI NG, UPSTREAM FLOODWAY AND APPROACH, OPTI ON

1. 2. 4 Di sposal of Cont ami nat ed Excavat ed Mat er i al

1. 2. 4. 1 Payment

Payment wi l l be made f or di sposal of excavat ed mat er i al s whi ch ar e det er mi ned t o not meet t he c l ean f i l l r equi r ement s, based on t he r esul t s of t he speci f i ed sampl i ng and t est i ng. Payment f or t hi s i t em shal l const i t ut e f ul l compensat i on f or al l l abor , equi pment , mat er i al and suppl y cost s f or per f or mi ng t he wor k i ncl udi ng t r anspor t i ng, of f l oadi ng and di sposal of excavat ed mat er i al s at a commer ci al l y avai l abl e l i censed l andf i l l , and al l ot her i nci dent al cost s i n connect i on wi t h t hi s aspect of t he wor k. The payment shal l i ncl ude cost s of di sposal f ees at l i censed landfills.

1. 2. 4. 2 Measurement

Measur ement f or payment f or di sposal wi l l be based on t he appl i cabl e excavat i on quant i t i es f or t he mat er i al bei ng di sposed.

1. 2. 4. 3 Uni t of Measur e

Uni t of measur e: Cubi c Yar ds.

SECTI ON 01 22 00. 00 10 Page 7

1. 2. 4. 4 Payment I t ems

0010 DI SPOSAL OF CONTAMI NATED DREDGED MATERI AL

1. 2. 5 Abut ment Suppor t Wal l Sheet , Pi pe, and End Pi l es

1. 2. 5. 1 Payment

Payment f or t hese i t ems shal l i ncl ude al l mat er i al i nst al l at i ons necessar y f or const r uct i on of t he new abut ment combi nat i on wal l pi l i ng adj acent t o t he exi st i ng abut ment wal l . Al l mat er i al s must be pl aced i n accor dance wi t h Sect i on 31 41 16 METAL SHEET PI LI NG, Sect i on 31 62 23. 13 CAST- I N- PLACE CONCRETE PI LES, and appl i cabl e speci f i cat i ons. Payment shal l const i t ut e f ul l compensat i on f or al l l abor , equi pment , t ool s, and suppl i es, f or t he f ol l owi ng:

a. Fur ni shi ng and i nst al l i ng al l pi pe pi l es, i ncl udi ng al l associ at ed dr i v i ng, pul l i ng, r edr i v i ng, and t est i ng as speci f i ed i n t hese speci f i cat i ons and as shown on t he dr awi ngs. Payment shal l i ncl ude r emoval of over bur den and cl eani ng of t he pi l es af t er compl et i on of pi pe pi l e dr i v i ng and r ock socket const r uct i on t o accommodat e k i ng pi l e i nst al l at i on and concr et e pl acement .

b. Fur ni shi ng and i nst al l i ng al l met al sheet pi l es, i ncl udi ng al l associ at ed dr i v i ng, pul l i ng, r edr i v i ng, and t est i ng as speci f i ed i n t hese speci f i cat i ons and as shown on t he dr awi ngs.

c. Fur ni shi ng and i nst al l i ng end pi l es ( t er mi nat i on col umns) , i ncl udi ng al l associ at ed dr i v i ng, pul l i ng, r edr i v i ng, and t est i ng as speci f i ed i n t hese speci f i cat i ons and as shown on t he dr awi ngs.

d. Fur ni shi ng and oper at i ng al l dr i v i ng equi pment , i ncl udi ng hammer s, gui de t empl at es, chi sel s ( f or obst r uct i ons) , and pi l e dr i v i ng accessories.

1. 2. 5. 2 Measurement

Measur ement of new abut ment combi nat i on wal l pi pe pi l es, sheet pi l es, and end pi l es f or payment shal l be based on t he act ual l engt h of per manent pi l i ng i n- pl ace f r om t he t i p el evat i on t o t he f i nal per manent cut of f el evat i on t o t he near est l i near f oot . No separ at e payment wi l l be made f or cut of f or spl i c i ng of per manent pi l i ng. Al l measur es must be appr oved by t he Cont r act i ng Of f i cer .

1. 2. 5. 3 Uni t of Measur e

Uni t of measur e: Li near Feet .

1. 2. 5. 4 Payment I t ems

0013 ABUTMENT PROTECTI ON WALL, 48- I NCH DI AMETER BY 1/ 2- I NCH THI CK

PI PE PI LE

0014 ABUTMENT PROTECTI ON WALL, PZC 18 METAL SHEET PI LI NG

0015 ABUTMENT PROTECTI ON WALL, HP12x53 END PI LE

SECTI ON 01 22 00. 00 10 Page 8

1. 2. 6 Abut ment Pr ot ect i on Wal l Ki ng Pi l es

1. 2. 6. 1 Payment

Payment shal l const i t ut e f ul l compensat i on f or al l l abor , equi pment , t ool s, mat er i al s, and suppl i es f or f ur ni shi ng and i nst al l i ng t he k i ng pi l es, bot h st i f f ened and unst i f f ened, i n t he abut ment combi nat i on wal l as shown on t he dr awi ngs, i n accor dance wi t h Sect i on 31 62 23. 13 CAST- I N- PLACE CONCRETE PI LES, and as f ol l ows:

a. Fur ni shi ng al l k i ng pi l e mat er i al s, i ncl udi ng r ei nf or ci ng beams, web st i f f ener s, and f l ange pl at es.

b. Fabr i cat i ng al l k i ng pi l es i nt o s i ngl e uni t s, i ncl udi ng wel di ng of web st i f f ener s and f l ange pl at es t o t he r ei nf or ci ng beams, as shown on t he dr awi ngs. Fabr i cat i on of k i ng pi l es must be i n accor dance wi t h Sect i on 05 50 14 STRUCTURAL METAL FABRI CATI ONS and Sect i on 05 50 15

CI VI L WORKS FABRI CATI ONS.

c. I nst al l i ng al l k i ng pi l es, i ncl udi ng al l associ at ed dr i v i ng, pul l i ng, r edr i v i ng, and t est i ng as speci f i ed and as shown on t he dr awi ngs.

d. Fur ni shi ng and oper at i ng al l dr i v i ng equi pment , i ncl udi ng hammer s, gui de t empl at es, chi sel s ( f or obst r uct i ons) , and dr i v i ng accessor i es.

1. 2. 6. 2 Measurement

Measur ement of new abut ment combi nat i on wal l k i ng pi l es f or payment shal l be based on t he act ual number and t ype of k i ng pi l e uni t s, i ncl udi ng r ei nf or ci ng beams, f l ange pl at es, and angl es, f abr i cat ed, f ur ni shed, and i nst al l ed by t he Cont r act or , as appr oved by t he Cont r act i ng Of f i cer . Al l measur es shal l be appr oved by t he Cont r act i ng Of f i cer .

1. 2. 6. 3 Uni t of Measur e

Uni t of measur e: Each.

1. 2. 6. 4 Payment I t em

Uni t Pr i ce i t ems l i s t ed i n t he BI D SCHEDULE i ncl ude:

0016 ABUTMENT PROTECTI ON WALL, W33x291 KI NG PI LES 1 TO 21 0017 ABUTMENT PROTECTI ON WALL, W33x291 KI NG PI LES 22 TO 38

1. 2. 7 Abut ment Pr ot ect i on Wal l Al l uvi um Excavat i on and Rock Socket s

1. 2. 7. 1 Payment

Payment shal l const i t ut e f ul l compensat i on f or al l l abor , equi pment , t ool s, and suppl i es f or dr i l l i ng of r ock socket s, as shown on t he dr awi ngs and as speci f i ed i n Sect i on 31 62 23. 13 CAST- I N- PLACE CONCRETE PI LES, and any necessar y t est i ng and i nspect i on associ at ed wi t h r ock socket s.

Payment shal l i ncl ude cl eani ng t he bot t oms of t he r ock socket s f or subsequent concr et e pl acement .

1. 2. 7. 2 Measurement

Measur ement of r ock socket s f or payment shal l be based on t he act ual l engt h of al l uvi um or r ock socket dr i l l ed i nt o bedr ock t o t he near est

SECTI ON 01 22 00. 00 10 Page 9 l i near f oot .

1. 2. 7. 3 Uni t of Measur e

Uni t of measur e: Li near Feet .

1. 2. 7. 4 Payment I t em

Uni t Pr i ce i t em l i st ed i n t he BI D SCHEDULE i ncl ude:

0018 ABUTMENT PROTECTI ON WALL PI PE PI LE, ALLUVI UM EXCAVATI ON

0019 ABUTMENT PROTECTI ON WALL, 42- I NCH DI AMETER ROCK SOCKET

1. 2. 8 Abut ment Pr ot ect i on Wal l Concr et e I nf i l l

1. 2. 8. 1 Payment

Payment f or t hese i t ems shal l i ncl ude al l new concr et e wor k f or const r uct i on of t he new abut ment pr ot ect i on wal l i n accor dance wi t h Sect i on 31 62 23. 13 CAST- I N- PLACE CONCRETE PI LES. Payment shal l const i t ut e f ul l compensat i on f or al l l abor , equi pment , t ool s, and suppl i es, f or f ur ni shi ng and pl aci ng of concr et e f or cast - i n- pl ace concr et e pi l es

1. 2. 8. 2 Measurement

Measur ement of concr et e pl acement and ot her concr et e wor k f or payment shal l be based on t he act ual vol ume of concr et e i n cubi c yar ds of i n- pl ace concr et e f or t he var i ous component s of t he new abut ment combi nat i on wal l .

1. 2. 8. 3 Uni t of Measur e

Uni t of measur e: Cubi c Yar ds.

1. 2. 8. 4 Payment I t ems

Uni t Pr i ce i t ems l i s t ed i n t he BI D SCHEDULE i ncl ude:

0020 ABUTMENT PROTECTI ON WALL, CONCRETE FOR CAST- I N- PLACE CONCRETE

PILES

1. 2. 9 Beddi ng Mat er i al

1. 2. 9. 1 Payment

Payment f or beddi ng mat er i al of t he gr out bag scour pr ot ect i on shal l const i t ut e f ul l compensat i on f or al l cost s i n connect i on wi t h compl et i ng gr out bag i nst al l at i on, i ncl udi ng f ur ni shi ng, pl aci ng and pr ot ect i on of beddi ng mat er i al bef or e and dur i ng gr out bag i nst al l at i on i n accor dance wi t h Sect i on 35 43 29 GROUT BAG SCOUR PROTECTI ON. The Cont r act or must pl ace and pr ot ect t he speci f i ed mat er i al t o t he l i nes and gr ades shown, and as speci f i ed.

1. 2. 9. 2 Measurement

Measur ement of beddi ng mat er i al f or gr out bag scour pr ot ect i on shal l be per f or med by t he Cont r act or i n accor dance wi t h a met hod( s) appr oved by t he Cont r act i ng Of f i cer .

SECTI ON 01 22 00. 00 10 Page 10

1. 2. 9. 3 Uni t of Measur e

Uni t of measur e: Cubi c Yar ds.

1. 2. 9. 4 Payment I t em

0021 ABUTMENT PROTECTI ON, BEDDI NG MATERI AL

0024 SCOUR PROTECTI ON, BEDDI NG MATERI AL

1. 2. 10 Geogr i d Rei nf or cement

1. 2. 10. 1 Payment

Payment f or geogr i d r ei nf or cement beneat h t he gr out bag scour pr ot ect i on shal l const i t ut e f ul l compensat i on f or al l cost s i n connect i on wi t h compl et i ng gr out bag i nst al l at i on, i ncl udi ng f ur ni shi ng al l mat er i al , l abor , equi pment , suppl i es and i nci dent al s, pl acement , and pr ot ect i on of geogr i d r ei nf or cement bef or e and dur i ng gr out bag scour pr ot ect i on pl acement i n accor dance wi t h Sect i on 31 05 19. 19 GEOGRI D REI NFORCEMENT.

The Cont r act or must pl ace and pr ot ect t he speci f i ed mat er i al t o t he l i nes and gr ades shown, and as speci f i ed.

1. 2. 10. 2 Measurement

Measur ement of geogr i d r ei nf or cement beneat h t he gr out bag scour pr ot ect i on shal l be per f or med by t he Cont r act or i n accor dance wi t h a met hod( s) appr oved by t he Cont r act i ng Of f i cer . Over l aps and spl i ces ( i f al l owed) and f or t he Cont r act or ' s conveni ence wi l l not be measur ed f or payment.

1. 2. 10. 3 Uni t of Measur e

Uni t of measur e: Squar e Yar ds.

1. 2. 10. 4 Payment I t em

0022 ABUTMENT PROTECTI ON, GEOGRI D REI NFORCEMENT

0025 SCOUR PROTECTI ON, GEOGRI D REI NFORCEMENT

1. 2. 11 Gr out Bags

1. 2. 11. 1 Payment

Payment shal l const i t ut e f ul l compensat i on f or al l l abor , equi pment , t ool s, and suppl i es f or f ur ni shi ng and i nst al l i ng gr out bags f or scour pr ot ect i on, i ncl udi ng t he f ol l owi ng, i n accor dance wi t h Sect i on 35 43 29

GROUT BAG SCOUR PROTECTI ON:

a. Pr ot ect i on of beddi ng mat er i al and geogr i d r ei nf or cement beneat h t he gr out bags dur i ng pl acement of t he gr out bag panel s and gr out i nf i l l .

b. Fur ni shi ng al l manuf act ur ed f abr i c gr out bag si zes speci f i ed her ei n, i ncl udi ng st andar d 6 f oot wi de and speci al 9 f oot wi de si zes. Speci al f abr i c gr out bags f ur ni shed by t he Cont r act or ar e f or i nst al l at i on al ong t he abut ment combi nat i on wal l s as shown on t he dr awi ngs.

St andar d f abr i c gr out bag si zes f ur ni shed by t he Cont r act or ar e f or i nst al l at i on at al l ot her l ocat i ons. Fabr i c must be f ur ni shed as speci f i ed i n Sect i on 35 43 29 GROUT BAG SCOUR PROTECTI ON.

SECTI ON 01 22 00. 00 10 Page 11

c. Fur ni shi ng al l gr out bag accessor i es, i ncl udi ng sel f - seal i ng f i l l i ng val ves, i nt er nal ver t i cal st r ap t i es, shape cor ds and cabl es, gr ommet s, and zi pper s t o be i nst al l ed i n each f abr i c gr out bag.

d. Fur ni shi ng al l gr out i nf i l l , i ncl udi ng al l admi xt ur es, t o be pl aced i nsi de t he gr out bags. Payment f or gr out i nf i l l shal l i ncl ude al l Por t l and cement , f i ne aggr egat e, pozzol an or f l y ash, and pl ast i c i z i ng and ai r ent r ai ni ng admi xt ur es ( i f used) t o meet t he st r engt h r equi r ement s speci f i ed i n Sect i on 35 43 29 GROUT BAG SCOUR PROTECTI ON.

e. I nst al l i ng shop assembl ed gr out bag panel s, f abr i cat ed by t he gr out bag manuf act ur er , as shown on t he dr awi ngs. Gr out bag panel s shal l be f abr i cat ed by t he manuf act ur er , i ncl udi ng al l f abr i c f or ms and accessor i es. The Cont r act or must be r esponsi bl e f or connect i on of gr out bag panel s.

f . Fur ni shi ng al l panel j i gs, f l oat i ng pl ant , cr anes, and di v i ng ser vi ces r equi r ed f or pr oper i nst al l at i on of t he gr out bag panel s.

g. Pl aci ng al l under wat er gr out i nf i l l i nt o t he gr out bags by pumpi ng met hods. Payment shal l i ncl ude al l pumpi ng equi pment capabl e of pumpi ng t he gr out mi xt ur e speci f i ed i n Sect i on 35 43 29 GROUT BAG

SCOUR PROTECTI ON.

1. 2. 11. 2 Measurement

Measur ement of gr out bags f or scour pr ot ect i on shal l be based on t he act ual number of cubi c yar ds of gr out cont ai ned wi t hi n each gr out bag f ur ni shed and i nst al l ed by t he Cont r act or , compl et e wi t h accessor i es, i n accor dance wi t h speci f i cat i on Sect i on 35 43 29 GROUT BAG SCOUR PROTECTI ON. Measur ement wi l l be made t o t he neat l i nes shown on t he dr awi ngs, as ver i f i ed by t he conf i r mat i on speci f i ed i n Sect i on 35 43 29 GROUT BAG SCOUR PROTECTI ON, par agr aph Const r uct i on Tol er ances. Al l gr out bags pl aced by t he Cont r act or must be appr oved by t he Cont r act i ng Of f i cer .

1. 2. 11. 3 Uni t of Measur e

Uni t of measur e: Cubi c Yar ds.

1. 2. 11. 4 Payment I t ems

Uni t Pr i ce i t ems l i s t ed i n t he BI D SCHEDULE i ncl ude:

0023 ABUTMENT PROTECTI ON, FURNI SH AND I NSTALL GROUT BAGS WI TH

ACCESSORI ES AND GROUT I NFI LL

0026 SCOUR PROTECTI ON, FURNI SH AND I NSTALL GROUT BAGS WI TH

ACCESSORI ES AND GROUT I NFI LL

1. 2. 12 Concr et e Ti e- I n El ement

1. 2. 12. 1 Payment

Payment shal l const i t ut e f ul l compensat i on f or al l l abor , equi pment , t ool s, and suppl i es f or const r uct i on of t he apr on t i e- i n el ement , i ncl udi ng t he f ol l owi ng:

a. Fur ni shi ng and i nst al l i ng al l r ei nf or cement as speci f i ed i n Sect i on 35 43 29 GROUT BAG SCOUR PROTECTI ON and as shown on t he dr awi ngs.

SECTI ON 01 22 00. 00 10 Page 12

b. Fur ni shi ng and pl aci ng gr out speci f i ed i n Sect i on 35 43 29 GROUT BAG SCOUR PROTECTI ON. Payment shal l i ncl ude t he t r anspor t at i on, pl acement , and cur i ng met hods of gr out .

1. 2. 12. 2 Measurement

Measur ement of gr out f or t he apr on t i e- i n el ement f or payment shal l be based on t he act ual number of cubi c yar ds of gr out pl aced by t he Cont r act or , as appr oved by t he Cont r act i ng Of f i cer .

1. 2. 12. 3 Uni t of Measur e

Uni t of measur e: Cubi c Yar ds.

1. 2. 12. 4 Payment I t em

0027 SCOUR PROTECTI ON, APRON TI E- I N ELEMENT

1. 2. 13 Gr out Bag Tempor ar y Ter mi nat i on

1. 2. 13. 1 Payment

Payment shal l const i t ut e f ul l compensat i on f or al l cost s i n associ at i on wi t h pr ovi di ng t he t empor ar y f l ank pr ot ect i on scheme f or gr out bags i nst al l ed as speci f i ed i n Sect i on 35 31 19. 20 ARTI CULATI NG CONCRETE BLOCK REVETMENTS i n t he event t hat const r uct i on of t he gr out bag scour pr ot ect i on i s t er mi nat ed f or ext ended per i ods of t i me. Payment shal l i ncl ude al l l abor , equi pment , mat er i al s, suppl i es and i nci dent al cost s t o const r uct t he f l ank pr ot ect i on as shown on t he dr awi ngs.

1. 2. 13. 2 Measurement

Measur ement of gr out bag f l ank pr ot ect i on f or payment shal l be based on t he act ual number of f l ank pr ot ect i on i nst al l at i ons pl aced by t he Cont r act or , as appr oved by t he Cont r act i ng Of f i cer .

1. 2. 13. 3 Uni t of Measur e

Uni t of measur e: Each.

1. 2. 13. 4 Sub Ti t l e

0028 SCOUR PROTECTI ON, TEMPORARY TERMI NATI ON

PART 2 PRODUCTS

Not Used

PART 3 EXECUTI ON

3. 1 CONTRACT COST BREAKDOWN

The Cont r act or must f ur ni sh wi t hi n 30 cal endar days af t er t he dat e of Not i ce t o Pr oceed, and pr i or t o t he submi ssi on of i t s f i r st par t i al payment est i mat e, a br eakdown of i t s s i ngl e j ob pay i t em or i t ems whi ch wi l l be r evi ewed by t he Cont r act i ng Of f i cer as t o pr opr i et y of di st r i but i on of t he t ot al cost t o t he var i ous account s. Any unbal anced i t ems as bet ween ear l y and l at e payment i t ems or ot her di scr epanci es wi l l be r evi sed by t he Cont r act i ng Of f i cer t o agr ee wi t h a r easonabl e cost of

SECTI ON 01 22 00. 00 10 Page 13 t he wor k i ncl uded i n t he var i ous i t ems. Thi s cont r act cost br eakdown wi l l t hen be ut i l i zed as t he basi s f or pr ogr ess payment s t o t he Cont r act or .

- - End of Sect i on - -

SECTI ON 01 22 00. 00 10 Page 14

01 22 00.00 10 - PRICE AND PAYMENT PROCEDURES
01 22 00.00 10 - PRICE AND PAYMENT PROCEDURES
PART 1 GENERAL
1.1 SINGLE JOB PAYMENT ITEMS
1.1.1 Bonds
1.1.1.1 Payment
1.1.1.2 Unit of Measure
1.1.1.3 Payment Item
1.1.2 Mobilization and Demobilization
1.1.2.1 Payment
1.1.2.2 Unit of Measure
1.1.2.3 Payment Item
1.1.3 Sampling And Testing Area "C"
1.1.3.1 Payment
1.1.3.2 Unit of Measure
1.1.3.3 Payment Item
1.1.4 Demonstration Projects
1.1.4.1 Payment
1.1.4.2 Unit of Measure
1.1.4.3 Payment Item
1.1.5 Instrumentation Installation
1.1.5.1 Payment
1.1.5.2 Unit of Measure
1.1.5.3 Payment Items
1.2 UNIT PRICE PAYMENT ITEMS
1.2.1 Digital Progress Images
1.2.1.1 Payment
1.2.1.2 Measurement
1.2.1.3 Unit of Measure
1.2.1.4 Payment Item
1.2.2 Removal and Placement of Existing Training Dike Stone and Derrick
1.2.2.1 Payment
1.2.2.2 Measurement
1.2.2.3 Unit of Measure
1.2.2.4 Payment Items
1.2.3 Dredging
1.2.3.1 Payment
1.2.3.2 Measurement
1.2.3.3 Unit of Measure
1.2.3.4 Payment Items
1.2.4 Disposal of Contaminated Excavated Material
1.2.4.1 Payment
1.2.4.2 Measurement
1.2.4.3 Unit of Measure
1.2.4.4 Payment Items
1.2.5 Abutment Support Wall Sheet, Pipe, and End Piles
1.2.5.1 Payment
1.2.5.2 Measurement
1.2.5.3 Unit of Measure
1.2.5.4 Payment Items
1.2.6 Abutment Protection Wall King Piles
1.2.6.1 Payment
1.2.6.2 Measurement
1.2.6.3 Unit of Measure
1.2.6.4 Payment Item
1.2.7 Abutment Protection Wall Alluvium Excavation and Rock Sockets
1.2.7.1 Payment
1.2.7.2 Measurement
1.2.7.3 Unit of Measure
1.2.7.4 Payment Item
1.2.8 Abutment Protection Wall Concrete Infill
1.2.8.1 Payment
1.2.8.2 Measurement
1.2.8.3 Unit of Measure
1.2.8.4 Payment Items
1.2.9 Bedding Material
1.2.9.1 Payment
1.2.9.2 Measurement
1.2.9.3 Unit of Measure
1.2.9.4 Payment Item
1.2.10 Geogrid Reinforcement
1.2.10.1 Payment
1.2.10.2 Measurement
1.2.10.3 Unit of Measure
1.2.10.4 Payment Item
1.2.11 Grout Bags
1.2.11.1 Payment
1.2.11.2 Measurement
1.2.11.3 Unit of Measure
1.2.11.4 Payment Items
1.2.12 Concrete Tie-In Element
1.2.12.1 Payment
1.2.12.2 Measurement
1.2.12.3 Unit of Measure
1.2.12.4 Payment Item
1.2.13 Grout Bag Temporary Termination
1.2.13.1 Payment
1.2.13.2 Measurement
1.2.13.3 Unit of Measure
1.2.13.4 Sub Title
PART 2 PRODUCTS
PART 3 EXECUTION
3.1 CONTRACT COST BREAKDOWN

File details come from the government source that posted it.