Bid_Abstract.xlsx

XLSX spreadsheet 18 KB Posted

Attached to
Stilling Basin and Abutment Support Wall, Charleroi L/D
Solicitation number
W911WN18B8010
Issued by

About this file

Detailed Bid Abstract by Line Items Bids received and opened at Bid Opening held on Friday, 31 August 2018, 11:00 AM ET

View the file

Other files

File Type Posted
Bid_Opening,_Attendance_Register.pdf PDF
Bid_Results.pdf PDF
W911WN18B8010-0002.pdf PDF
Drawings,_(Revised),_Sheet_04_110-B.pdf PDF
Technical_Specifications,_(Revised_Section)_35_20_23.pdf PDF
Attachment_3,_(Revised)_Davis_Bacon_Wage_Determination,_PA180004_08-24-2018_PA4.pdf PDF
Drawings,_(Revised),_Selected_Sheets.pdf PDF
W911WN18B8010-0001.pdf PDF
Technical_Specifications,_(Revised_Section)_01_22_00.00_10.pdf PDF
Technical_Specifications,_(Revised_Section)_01_45_01.pdf PDF
Technical_Specifications,_(Revised_Section)_01_78_02.00_15.pdf PDF
Technical_Specifications,_(Revised_Section)_01_57_20.00_10.pdf PDF
Bid_Schedule_(Revised).xls XLS spreadsheet
Technical_Specifications,_(Revised_Section)_03_31_01.00_10.pdf PDF
Technical_Specifications,_(Revised_Section)_35_43_29.pdf PDF
Attachment_3,_(Revised)_Davis_Bacon_Wage_Determination,_PA180004_08-17-2018.pdf PDF
Sign-In_Sheet,_Site_Visit.pdf PDF
Agenda,_Pre-Bid_Site_Visit.pdf PDF
Pre-Bid_Contracting_Discussion,_Site_Visit.pdf PDF
Bid_Schedule.xls XLS spreadsheet
Attachment_1,_Technical_Specifications_Certified_Final.pdf PDF
Attachment_2,_Drawings,_Certified_Final.pdf PDF
W911WN18B8010.pdf PDF
Attachment_4,_Davis_Bacon_Wage_Determination,_PA180050_01-05-2018_PA50.pdf PDF
Attachment_3,_Davis_Bacon_Wage_Determination,_PA180004_06-15-2018_PA4.pdf PDF
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

9/4/18
Solicitation Number W911WN18B8010
New Stilling Basin and Abutment Protection Wall
Charleroi Locks and Dam

IGE JOSEPH B. FAY COMPANY C.J. MAHAN CONSTRUCTION COMPANY, LLC TRUMBULL CORP & BRAYMAN CONSTRUCTION CORP JV KOKOSING INDUSTRIAL, INC

ITEM NO. LINE ITEM DESCRIPTION QTY U/M Unit Price Total Cost Unit Price Total Cost Unit Price Total Cost Unit Price Total Cost Unit Price Total Cost

0001REIMBURSEMENT FOR ACTUAL PERFORMANCE AND PAYMENT BOND PREMIUMS, BASE CONTRACT1JOB$220,270.00$220,270.00$150,520.00$150,520.00$217,234.00$217,234.00$190,000.00$190,000.00$220,000.00$220,000.00
0002MOBILIZATION AND DEMOBILIZATION1JOB$151,110.00$151,110.00$278,460.00$278,460.00$2,075,000.00$2,075,000.00$300,000.00$300,000.00$1,470,000.00$1,470,000.00
0003DIGITAL PROGRESS IMAGES33SETS$660.00$21,780.00$860.00$28,380.00$850.00$28,050.00$350.00$11,550.00$600.00$19,800.00
4REMOVAL AND PLACEMENT EXISTING TRAINING DIKE STONE14,300CUBIC YARDS$64.70$925,210.00$52.50$750,750.00$50.00$715,000.00$40.00$572,000.00$100.00$1,430,000.00
5REMOVAL AND PLACEMENT OF DERRICK STONE11,200CUBIC YARDS$106.40$1,191,680.00$75.50$845,600.00$70.00$784,000.00$120.00$1,344,000.00$95.00$1,064,000.00
6UNDERWATER ALLUVIUM EXCAVATION FOR SCOUR PROTECTION, ABUTMENT PROTECTION WALL AND ABUTMENT PROTECTION GROUT BAGS25,600CUBIC YARDS$33.80$865,280.00$40.00$1,024,000.00$65.00$1,664,000.00$56.00$1,433,600.00$24.00$614,400.00
0007SAMPLING AND TESTING AREA "C"1JOB$54,925.00$54,925.00$65,000.00$65,000.00$175,000.00$175,000.00$75,000.00$75,000.00$325,000.00$325,000.00
0008DREDGING, AREA "C"6,000CUBIC YARDS$40.80$244,800.00$27.00$162,000.00$15.00$90,000.00$25.00$150,000.00$23.00$138,000.00
0009DREDGING, DOWNSTREAM FLOODWAY AND APPROACH84,200CUBIC YARDS$22.90$1,928,180.00$18.00$1,515,600.00$40.00$3,368,000.00$25.00$2,105,000.00$17.00$1,431,400.00
0010DISPOSAL OF CONTAMINATED DREDGED MATERIAL6,000CUBIC YARDS$206.00$1,236,000.00$88.50$531,000.00$145.00$870,000.00$90.00$540,000.00$180.00$1,080,000.00
0011ABUTMENT PROTECTION WALL DEMONSTRATION PROJECT1JOB$362,000.00$362,000.00$310,500.00$310,500.00$1,031,500.00$1,031,500.00$3,000,000.00$3,000,000.00$1,200,000.00$1,200,000.00
0012SCOUR PROTECTION DEMONSTRATION PROJECT1JOB$622,600.00$622,600.00$395,900.00$395,900.00$1,296,000.00$1,296,000.00$5,150,000.00$5,150,000.00$1,400,000.00$1,400,000.00
0013ABUTMENT PROTECTION WALL, 48-INCH DIAMETER BY 1/2-INCH THICK PIPE PILE1,140LINEAR FEET$1,135.00$1,293,900.00$850.00$969,000.00$1,600.00$1,824,000.00$1,800.00$2,052,000.00$1,400.00$1,596,000.00
14ABUTMENT PROTECTION WALL, PZC 18 METAL SHEET PILING2,280LINEAR FEET$295.00$672,600.00$120.00$273,600.00$550.00$1,254,000.00$400.00$912,000.00$300.00$684,000.00
15ABUTMENT PROTECTION WALL, HP12x53 END PILE30LINEAR FEET$248.00$7,440.00$1,020.00$30,600.00$950.00$28,500.00$1,100.00$33,000.00$1,200.00$36,000.00
16ABUTMENT PROTECTION WALL, W33x291 KING PILES 1 to 2121EACH$44,620.00$937,020.00$22,000.00$462,000.00$39,000.00$819,000.00$55,000.00$1,155,000.00$20,000.00$420,000.00
17ABUTMENT PROTECTION WALL, W33x291 KING PILES 22 to 2817EACH$36,560.00$621,520.00$17,000.00$289,000.00$32,000.00$544,000.00$55,000.00$935,000.00$18,000.00$306,000.00
18ABUTMENT PROTECTION WALL PIPE PILE, ALLUVIUM EXCAVATION950LINEAR FEET$720.00$684,000.00$240.00$228,000.00$350.00$332,500.00$300.00$285,000.00$300.00$285,000.00
0019ABUTMENT PROTECTION WALL, 42-INCH DIAMETER ROCK SOCKET988LINEAR FEET$1,275.00$1,259,700.00$385.00$380,380.00$950.00$938,600.00$475.00$469,300.00$800.00$790,400.00
0020ABUTMENT PROTECTION WALL, CONCRETE FOR CAST-IN-PLACE CONCRETE PILES840CUBIC YARDS$835.00$701,400.00$600.00$504,000.00$1,450.00$1,218,000.00$2,000.00$1,680,000.00$1,700.00$1,428,000.00
0021ABUTMENT PROTECTION, BEDDING MATERIAL170CUBIC YARDS$545.00$92,650.00$380.00$64,600.00$950.00$161,500.00$1,047.00$177,990.00$800.00$136,000.00
0022NOT USED
0023ABUTMENT PROTECTION, FURNISH AND INSTALL GROUT BAGS WITH ACCESSORIES AND GROUT INFILL1,500CUBIC YARDS$955.00$1,432,500.00$1,150.00$1,725,000.00$2,000.00$3,000,000.00$1,250.00$1,875,000.00$1,500.00$2,250,000.00
0024SCOUR PROTECTION, BEDDING MATERIAL2,000CUBIC YARDS$248.00$496,000.00$405.00$810,000.00$300.00$600,000.00$333.00$666,000.00$245.00$490,000.00
0025SCOUR PROTECTION, GEOGRID REINFORCEMENT3,500SQUARE YARDS$63.00$220,500.00$1.25$4,375.00$15.00$52,500.00$15.00$52,500.00$150.00$525,000.00
0026SCOUR PROTECTION, FURNISH AND INSTALL GROUT BAGS WITH ACCESSORIES AND GROUT INFILL6,300CUBIC YARDS$925.00$5,827,500.00$1,400.00$8,820,000.00$2,100.00$13,230,000.00$1,710.00$10,773,000.00$1,400.00$8,820,000.00
0027SCOUR PROTECTION, APRON TIE-IN ELEMENT310CUBIC YARDS$2,050.00$635,500.00$4,300.00$1,333,000.00$8,000.00$2,480,000.00$6,500.00$2,015,000.00$5,500.00$1,705,000.00
0028SCOUR PROTECTION, TEMPORARY TERMINATION2EACH$50,000.00$100,000.00$65,000.00$130,000.00$45,000.00$90,000.00$65,000.00$130,000.00$30,000.00$60,000.00
0029INSTRUMENTATION1JOB$85,000.00$85,000.00$165,000.00$165,000.00$499,000.00$499,000.00$437,000.00$437,000.00$600,000.00$600,000.00
TOTAL, BASE CONTRACT, ITEMS 0001 THROUGH 0029$22,891,065.00$22,246,265.00$39,385,384.00$38,518,940.00$30,524,000.00

AWARDABLE OPTION

1001REIMBURSEMENT FOR ACTUAL PERFORMANCE AND PAYMENT BOND PREMIUMS, BASE CONTRACT1.0JOB$21,145.00$21,145.00$6,271.00$6,271.00$11,200.00$11,200.00$4,950.00$4,950.00$10,000.00$10,000.00
1002DREDGING, UPSTREAM FLOODWAY AND APPROACH53,900CY$23.00$1,239,700.00$19.40$1,045,660.00$40.00$2,156,000.00$19.00$1,024,100.00$25.00$1,347,500.00
TOTAL, AWARDABLE OPTION ITEMS 1001 AND 1002$1,260,845.00$1,051,931.00$2,167,200.00$1,029,050.00$1,357,500.00

TOTAL OF BASE BID AND AWARDABLE OPTION (ITEMS NOS. 0001 THROUGH 1002) $24,151,910.00 $23,298,196.00 $41,552,584.00 $39,547,990.00 $31,881,500.00