Stilling Basin and Abutment Support Wall, Charleroi L/D Federal contract opportunity
Solicitation number
W911WN18B8010
Issued by
Department of the Army Corps of Engineers Engineering District Pittsburgh

About this file

Detailed Bid Abstract by Line Items Bids received and opened at Bid Opening held on Friday, 31 August 2018, 11:00 AM ET

View the file

Other files for this federal contract opportunity

Other files attached to Stilling Basin and Abutment Support Wall, Charleroi L/D, newest first.
File Type Posted
Bid_Opening,_Attendance_Register.pdf PDF
Bid_Results.pdf PDF
Attachment_3,_(Revised)_Davis_Bacon_Wage_Determination,_PA180004_08-24-2018_PA4.pdf PDF
Drawings,_(Revised),_Sheet_04_110-B.pdf PDF
W911WN18B8010-0002.pdf PDF
Technical_Specifications,_(Revised_Section)_35_20_23.pdf PDF
Technical_Specifications,_(Revised_Section)_01_45_01.pdf PDF
Technical_Specifications,_(Revised_Section)_01_22_00.00_10.pdf PDF
Attachment_3,_(Revised)_Davis_Bacon_Wage_Determination,_PA180004_08-17-2018.pdf PDF
Technical_Specifications,_(Revised_Section)_35_43_29.pdf PDF
Drawings,_(Revised),_Selected_Sheets.pdf PDF
Technical_Specifications,_(Revised_Section)_01_57_20.00_10.pdf PDF
W911WN18B8010-0001.pdf PDF
Technical_Specifications,_(Revised_Section)_01_78_02.00_15.pdf PDF
Technical_Specifications,_(Revised_Section)_03_31_01.00_10.pdf PDF
Bid_Schedule_(Revised).xls XLS spreadsheet
Pre-Bid_Contracting_Discussion,_Site_Visit.pdf PDF
Sign-In_Sheet,_Site_Visit.pdf PDF
Agenda,_Pre-Bid_Site_Visit.pdf PDF
Bid_Schedule.xls XLS spreadsheet
W911WN18B8010.pdf PDF
Attachment_1,_Technical_Specifications_Certified_Final.pdf PDF
Attachment_4,_Davis_Bacon_Wage_Determination,_PA180050_01-05-2018_PA50.pdf PDF
Attachment_3,_Davis_Bacon_Wage_Determination,_PA180004_06-15-2018_PA4.pdf PDF
Attachment_2,_Drawings,_Certified_Final.pdf PDF
Show all 25

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

9/4/18
Solicitation Number W911WN18B8010
New Stilling Basin and Abutment Protection Wall
Charleroi Locks and Dam

IGE JOSEPH B. FAY COMPANY C.J. MAHAN CONSTRUCTION COMPANY, LLC TRUMBULL CORP & BRAYMAN CONSTRUCTION CORP JV KOKOSING INDUSTRIAL, INC

ITEM NO. LINE ITEM DESCRIPTION QTY U/M Unit Price Total Cost Unit Price Total Cost Unit Price Total Cost Unit Price Total Cost Unit Price Total Cost

0001REIMBURSEMENT FOR ACTUAL PERFORMANCE AND PAYMENT BOND PREMIUMS, BASE CONTRACT1JOB$220,270.00$220,270.00$150,520.00$150,520.00$217,234.00$217,234.00$190,000.00$190,000.00$220,000.00$220,000.00
0002MOBILIZATION AND DEMOBILIZATION1JOB$151,110.00$151,110.00$278,460.00$278,460.00$2,075,000.00$2,075,000.00$300,000.00$300,000.00$1,470,000.00$1,470,000.00
0003DIGITAL PROGRESS IMAGES33SETS$660.00$21,780.00$860.00$28,380.00$850.00$28,050.00$350.00$11,550.00$600.00$19,800.00
4REMOVAL AND PLACEMENT EXISTING TRAINING DIKE STONE14,300CUBIC YARDS$64.70$925,210.00$52.50$750,750.00$50.00$715,000.00$40.00$572,000.00$100.00$1,430,000.00
5REMOVAL AND PLACEMENT OF DERRICK STONE11,200CUBIC YARDS$106.40$1,191,680.00$75.50$845,600.00$70.00$784,000.00$120.00$1,344,000.00$95.00$1,064,000.00
6UNDERWATER ALLUVIUM EXCAVATION FOR SCOUR PROTECTION, ABUTMENT PROTECTION WALL AND ABUTMENT PROTECTION GROUT BAGS25,600CUBIC YARDS$33.80$865,280.00$40.00$1,024,000.00$65.00$1,664,000.00$56.00$1,433,600.00$24.00$614,400.00
0007SAMPLING AND TESTING AREA "C"1JOB$54,925.00$54,925.00$65,000.00$65,000.00$175,000.00$175,000.00$75,000.00$75,000.00$325,000.00$325,000.00
0008DREDGING, AREA "C"6,000CUBIC YARDS$40.80$244,800.00$27.00$162,000.00$15.00$90,000.00$25.00$150,000.00$23.00$138,000.00
0009DREDGING, DOWNSTREAM FLOODWAY AND APPROACH84,200CUBIC YARDS$22.90$1,928,180.00$18.00$1,515,600.00$40.00$3,368,000.00$25.00$2,105,000.00$17.00$1,431,400.00
0010DISPOSAL OF CONTAMINATED DREDGED MATERIAL6,000CUBIC YARDS$206.00$1,236,000.00$88.50$531,000.00$145.00$870,000.00$90.00$540,000.00$180.00$1,080,000.00
0011ABUTMENT PROTECTION WALL DEMONSTRATION PROJECT1JOB$362,000.00$362,000.00$310,500.00$310,500.00$1,031,500.00$1,031,500.00$3,000,000.00$3,000,000.00$1,200,000.00$1,200,000.00
0012SCOUR PROTECTION DEMONSTRATION PROJECT1JOB$622,600.00$622,600.00$395,900.00$395,900.00$1,296,000.00$1,296,000.00$5,150,000.00$5,150,000.00$1,400,000.00$1,400,000.00
0013ABUTMENT PROTECTION WALL, 48-INCH DIAMETER BY 1/2-INCH THICK PIPE PILE1,140LINEAR FEET$1,135.00$1,293,900.00$850.00$969,000.00$1,600.00$1,824,000.00$1,800.00$2,052,000.00$1,400.00$1,596,000.00
14ABUTMENT PROTECTION WALL, PZC 18 METAL SHEET PILING2,280LINEAR FEET$295.00$672,600.00$120.00$273,600.00$550.00$1,254,000.00$400.00$912,000.00$300.00$684,000.00
15ABUTMENT PROTECTION WALL, HP12x53 END PILE30LINEAR FEET$248.00$7,440.00$1,020.00$30,600.00$950.00$28,500.00$1,100.00$33,000.00$1,200.00$36,000.00
16ABUTMENT PROTECTION WALL, W33x291 KING PILES 1 to 2121EACH$44,620.00$937,020.00$22,000.00$462,000.00$39,000.00$819,000.00$55,000.00$1,155,000.00$20,000.00$420,000.00
17ABUTMENT PROTECTION WALL, W33x291 KING PILES 22 to 2817EACH$36,560.00$621,520.00$17,000.00$289,000.00$32,000.00$544,000.00$55,000.00$935,000.00$18,000.00$306,000.00
18ABUTMENT PROTECTION WALL PIPE PILE, ALLUVIUM EXCAVATION950LINEAR FEET$720.00$684,000.00$240.00$228,000.00$350.00$332,500.00$300.00$285,000.00$300.00$285,000.00
0019ABUTMENT PROTECTION WALL, 42-INCH DIAMETER ROCK SOCKET988LINEAR FEET$1,275.00$1,259,700.00$385.00$380,380.00$950.00$938,600.00$475.00$469,300.00$800.00$790,400.00
0020ABUTMENT PROTECTION WALL, CONCRETE FOR CAST-IN-PLACE CONCRETE PILES840CUBIC YARDS$835.00$701,400.00$600.00$504,000.00$1,450.00$1,218,000.00$2,000.00$1,680,000.00$1,700.00$1,428,000.00
0021ABUTMENT PROTECTION, BEDDING MATERIAL170CUBIC YARDS$545.00$92,650.00$380.00$64,600.00$950.00$161,500.00$1,047.00$177,990.00$800.00$136,000.00
0022NOT USED
0023ABUTMENT PROTECTION, FURNISH AND INSTALL GROUT BAGS WITH ACCESSORIES AND GROUT INFILL1,500CUBIC YARDS$955.00$1,432,500.00$1,150.00$1,725,000.00$2,000.00$3,000,000.00$1,250.00$1,875,000.00$1,500.00$2,250,000.00
0024SCOUR PROTECTION, BEDDING MATERIAL2,000CUBIC YARDS$248.00$496,000.00$405.00$810,000.00$300.00$600,000.00$333.00$666,000.00$245.00$490,000.00
0025SCOUR PROTECTION, GEOGRID REINFORCEMENT3,500SQUARE YARDS$63.00$220,500.00$1.25$4,375.00$15.00$52,500.00$15.00$52,500.00$150.00$525,000.00
0026SCOUR PROTECTION, FURNISH AND INSTALL GROUT BAGS WITH ACCESSORIES AND GROUT INFILL6,300CUBIC YARDS$925.00$5,827,500.00$1,400.00$8,820,000.00$2,100.00$13,230,000.00$1,710.00$10,773,000.00$1,400.00$8,820,000.00
0027SCOUR PROTECTION, APRON TIE-IN ELEMENT310CUBIC YARDS$2,050.00$635,500.00$4,300.00$1,333,000.00$8,000.00$2,480,000.00$6,500.00$2,015,000.00$5,500.00$1,705,000.00
0028SCOUR PROTECTION, TEMPORARY TERMINATION2EACH$50,000.00$100,000.00$65,000.00$130,000.00$45,000.00$90,000.00$65,000.00$130,000.00$30,000.00$60,000.00
0029INSTRUMENTATION1JOB$85,000.00$85,000.00$165,000.00$165,000.00$499,000.00$499,000.00$437,000.00$437,000.00$600,000.00$600,000.00
TOTAL, BASE CONTRACT, ITEMS 0001 THROUGH 0029$22,891,065.00$22,246,265.00$39,385,384.00$38,518,940.00$30,524,000.00

AWARDABLE OPTION

1001REIMBURSEMENT FOR ACTUAL PERFORMANCE AND PAYMENT BOND PREMIUMS, BASE CONTRACT1.0JOB$21,145.00$21,145.00$6,271.00$6,271.00$11,200.00$11,200.00$4,950.00$4,950.00$10,000.00$10,000.00
1002DREDGING, UPSTREAM FLOODWAY AND APPROACH53,900CY$23.00$1,239,700.00$19.40$1,045,660.00$40.00$2,156,000.00$19.00$1,024,100.00$25.00$1,347,500.00
TOTAL, AWARDABLE OPTION ITEMS 1001 AND 1002$1,260,845.00$1,051,931.00$2,167,200.00$1,029,050.00$1,357,500.00

TOTAL OF BASE BID AND AWARDABLE OPTION (ITEMS NOS. 0001 THROUGH 1002) $24,151,910.00 $23,298,196.00 $41,552,584.00 $39,547,990.00 $31,881,500.00