Technical_Specifications,_(Revised_Section)_03_31_01.00_10.pdf

PDF 103 KB Posted

Attached to
Stilling Basin and Abutment Support Wall, Charleroi L/D Federal contract opportunity
Solicitation number
W911WN18B8010
Issued by
Department of the Army Corps of Engineers Engineering District Pittsburgh

About this file

03 31 01.00 10 Cast in Place Concrete (Added section for interrupted placements)

View the file

Other files for this federal contract opportunity

Other files attached to Stilling Basin and Abutment Support Wall, Charleroi L/D, newest first.
File Type Posted
Bid_Abstract.xlsx XLSX spreadsheet
Bid_Opening,_Attendance_Register.pdf PDF
Bid_Results.pdf PDF
Attachment_3,_(Revised)_Davis_Bacon_Wage_Determination,_PA180004_08-24-2018_PA4.pdf PDF
Drawings,_(Revised),_Sheet_04_110-B.pdf PDF
W911WN18B8010-0002.pdf PDF
Technical_Specifications,_(Revised_Section)_35_20_23.pdf PDF
Technical_Specifications,_(Revised_Section)_01_45_01.pdf PDF
Technical_Specifications,_(Revised_Section)_01_22_00.00_10.pdf PDF
Attachment_3,_(Revised)_Davis_Bacon_Wage_Determination,_PA180004_08-17-2018.pdf PDF
Technical_Specifications,_(Revised_Section)_35_43_29.pdf PDF
Drawings,_(Revised),_Selected_Sheets.pdf PDF
Technical_Specifications,_(Revised_Section)_01_57_20.00_10.pdf PDF
W911WN18B8010-0001.pdf PDF
Technical_Specifications,_(Revised_Section)_01_78_02.00_15.pdf PDF
Bid_Schedule_(Revised).xls XLS spreadsheet
Pre-Bid_Contracting_Discussion,_Site_Visit.pdf PDF
Sign-In_Sheet,_Site_Visit.pdf PDF
Agenda,_Pre-Bid_Site_Visit.pdf PDF
Bid_Schedule.xls XLS spreadsheet
W911WN18B8010.pdf PDF
Attachment_1,_Technical_Specifications_Certified_Final.pdf PDF
Attachment_4,_Davis_Bacon_Wage_Determination,_PA180050_01-05-2018_PA50.pdf PDF
Attachment_3,_Davis_Bacon_Wage_Determination,_PA180004_06-15-2018_PA4.pdf PDF
Attachment_2,_Drawings,_Certified_Final.pdf PDF
Show all 25

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Char l er oi Locks and Dam St i l l i ng Basi n & Abut ment Pr ot ect i on Wal l

SECTI ON TABLE OF CONTENTS

DI VI SI ON 03 - CONCRETE

SECTI ON 03 31 01. 00 10

CAST- I N- PLACE STRUCTURAL CONCRETE FOR CI VI L WORKS

PART 1 GENERAL

1. 1 SUMMARY

1. 2 REFERENCES

1. 3 DESI GN REQUI REMENTS

1. 3. 1 Concr et e Mi x Desi gns

1. 3. 2 Ai r Cont ent

1. 3. 3 Sl ump

1. 3. 3. 1 Under wat er Concr et e

1. 3. 4 Concr et e St r engt h

1. 3. 5 Maxi mum Wat er - Cement i t i ous Mat er i al ( W/ C) Rat i o

1. 3. 6 Ti me of Set

1. 3. 7 Washout

1. 3. 8 Const r uct i on Tol er ances

1. 3. 8. 1 Appear ance

1. 4 MODI FI CATI ON TO REFERENCE

1. 5 SUBMI TTALS

1. 6 QUALI TY ASSURANCE

1. 6. 1 Cer t i f i cat es: Recor d Requi r ement

1. 7 DELI VERY, STORAGE, AND HANDLI NG

1. 8 CONCRETE WORK PLANS

1. 8. 1 Under wat er Concr et e

PART 2 PRODUCTS

2. 1 MATERI ALS

2. 1. 1 Cement i t i ous Mat er i al s

2. 1. 1. 1 Por t l and Cement

2. 1. 1. 2 Fl y Ash

2. 1. 1. 3 Gr ound Gr anul at ed Bl ast - Fur nace Sl ag

2. 1. 1. 4 Si l i ca Fume

2. 1. 2 Aggr egat es

2. 1. 2. 1 Aggr egat e Expansi on

2. 1. 2. 2 Unf avor abl e Pr oper t i es

2. 1. 3 Chemi cal Admi xt ur es

2. 1. 3. 1 Ai r - Ent r ai ni ng Admi xt ur e

2. 1. 3. 2 Accel er at i ng Admi xt ur e

2. 1. 3. 3 Wat er - Reduci ng or Ret ar di ng Admi xt ur e

2. 1. 3. 3. 1 Wat er - Reduci ng or Ret ar di ng Admi xt ur es

2. 1. 3. 3. 2 Hi gh- Range Wat er Reduci ng Admi xt ur e

2. 1. 3. 4 Vi scosi t y Modi f y i ng or Ant i - Washout Admi xt ur e

2. 1. 4 Wat er

2. 1. 5 St r uct ur al St eel

2. 1. 6 Nonshr i nk Gr out

2. 1. 7 Bond Br eaker

2. 2 EQUI PMENT

SECTI ON 03 31 01. 00 10 Page 1 Cer t i f i ed Fi nal Document s Revi sed by Amendment 0001

2. 2. 1 Conveyi ng Equi pment

2. 2. 1. 1 Bucket s

2. 2. 1. 2 Tr ansf er Hopper s

2. 2. 1. 3 Tr ucks

2. 2. 1. 4 Chut es

2. 2. 1. 5 Bel t Conveyor s

2. 2. 1. 6 Concr et e Pumps

2. 2. 2 Vi br at or s

2. 2. 3 Wor k Pl at f or ms

2. 2. 4 Tr emi e Equi pment

PART 3 EXECUTI ON

3. 1 PREPARATI ON FOR PLACI NG

3. 1. 1 Embedded I t ems

3. 1. 2 Concr et e on Ear t h Foundat i ons

3. 2 CONVEYI NG AND PLACI NG CONCRETE

3. 2. 1 Gener al

3. 2. 2 Ti me I nt er val Bet ween Mi xi ng and Pl aci ng

3. 2. 3 Ambi ent Condi t i ons

3. 2. 4 Pr ot ect i on of Concr et e

3. 2. 5 Col d- Weat her Requi r ement s

3. 2. 6 Hot - Weat her Requi r ement s

3. 2. 7 Under wat er Concr et e Pl acement

3. 2. 7. 1 Gener al

3. 2. 7. 2 Pl acement of Concr et e

3. 2. 8 I nt er r upt ed Concr et e Pl acement

3. 3 CONSOLI DATI ON OF CONCRETE

3. 4 FI NI SHI NG

3. 5 TESTS AND I NSPECTI ONS

3. 5. 1 Gener al

3. 5. 2 Test i ng and I nspect i on Requi r ement s

3. 5. 2. 1 Concr et e Mi xt ur e

3. 5. 2. 1. 1 Sl ump and Sl ump Fl ow Test i ng

3. 5. 2. 1. 2 Temper at ur e

3. 5. 2. 1. 3 Compr essi ve- St r engt h Speci mens

3. 5. 2. 1. 4 Ther mal I nt egr i t y Pr of i l i ng

3. 5. 2. 1. 4. 1 Shaf t Pr epar at i on

3. 5. 2. 1. 4. 2 TI P I nst al l at i on and Recor di ng

3. 5. 2. 1. 4. 3 TI P Per sonnel and Repor t i ng Requi r ement s

3. 5. 2. 1. 5 St r engt h Det er mi nat i on Usi ng Mat ur i t y Met hod

3. 5. 2. 2 I nspect i on Bef or e Pl aci ng

3. 5. 2. 3 Pl aci ng

3. 5. 2. 3. 1 Pl aci ng I nspect i on

3. 5. 2. 4 Vi br at or s

3. 5. 2. 4. 1 Vi br at or Test i ng and Use

3. 5. 2. 4. 2 Vi br at or Cor r ect i ve Act i on

3. 5. 3 Repor t s

3. 6 CONSTRUCTI ON RECORDS

- - End of Sect i on Tabl e of Cont ent s - -

SECTI ON 03 31 01. 00 10 Page 2

SECTI ON 03 31 01. 00 10

CAST- I N- PLACE STRUCTURAL CONCRETE FOR CI VI L WORKS

PART 1 GENERAL

1. 1 SUMMARY

Thi s sect i on speci f i es t he r equi r ement s f or al l st r uct ur al concr et e and concr et e f or cast - i n- pl ace concr et e pi l es t o be pl aced under t hi s cont r act . St r uct ur al concr et e shal l i ncl ude, but not be l i mi t ed t o, t he gr out bag t i e- i n el ement , abut ment pr ot ect i on wal l pi l e f i l l . Gr out f or t he gr out bag scour pr ot ect i on i s speci f i ed i n Sect i on 35 43 29 GROUT BAG

SCOUR PROTECTI ON.

1. 2 REFERENCES

The publ i cat i ons l i s t ed bel ow f or m a par t of t hi s speci f i cat i on t o t he ext ent r ef er enced. The publ i cat i ons ar e r ef er r ed t o wi t hi n t he t ext by t he basi c desi gnat i on onl y.

AMERI CAN CONCRETE I NSTI TUTE I NTERNATI ONAL ( ACI )

ACI 117 ( 2010; Er r at a 2011) Speci f i cat i ons f or Tol er ances f or Concr et e Const r uct i on and Mat er i al s and Comment ar y

ACI 301 ( 2016) Speci f i cat i ons f or St r uct ur al Concrete

ACI 305R ( 2010) Gui de t o Hot Weat her Concr et i ng

ACI 306R ( 2016) Gui de t o Col d Weat her Concr et i ng

ACI SP- 15 ( 2011) Fi el d Ref er ence Manual : St andar d Speci f i cat i ons f or St r uct ur al Concr et e ACI 301- 05 wi t h Sel ect ed ACI Ref er ences

ASTM I NTERNATI ONAL ( ASTM)

ASTM A992/ A992M ( 2011) St andar d Speci f i cat i on f or St r uct ur al St eel Shapes

ASTM C1240 ( 2014) St andar d Speci f i cat i on f or Si l i ca Fume Used i n Cement i t i ous Mi xt ur es

ASTM C1064/ C1064M ( 2017) St andar d Test Met hod f or Temper at ur e of Fr eshl y Mi xed Hydr aul i c- Cement Concr et e

ASTM C1074 ( 2011) St andar d Pr act i ce f or Est i mat i ng Concr et e St r engt h by t he Mat ur i t y Met hod

ASTM C1107/ C1107M ( 2017) St andar d Speci f i cat i on f or Packaged Dr y, Hydr aul i c- Cement Gr out ( Nonshr i nk)

SECTI ON 03 31 01. 00 10 Page 3

ASTM C1240 ( 2014) St andar d Speci f i cat i on f or Si l i ca Fume Used i n Cement i t i ous Mi xt ur es

ASTM C1260 ( 2014) St andar d Test Met hod f or Pot ent i al Al kal i React i v i t y of Aggr egat es ( Mor t ar - Bar Met hod)

ASTM C143/ C143M ( 2015) St andar d Test Met hod f or Sl ump of Hydr aul i c- Cement Concr et e

ASTM C150/ C150M ( 2017) St andar d Speci f i cat i on f or Por t l and Cement

ASTM C1567 ( 2013) St andar d Test Met hod f or Pot ent i al Al kal i - Si l i ca React i v i t y of Combi nat i ons of Cement i t i ous Mat er i al s and Aggr egat e ( Accel er at ed Mor t ar - Bar Met hod)

ASTM C1602/ C1602M ( 2012) St andar d Speci f i cat i on f or Mi xi ng Wat er Used i n Pr oduct i on of Hydr aul i c Cement Concr et e

ASTM C1611/ C1611M ( 2014) St andar d Test Met hod f or Sl ump Fl ow of Sel f - Consol i dat i ng Concr et e

ASTM C172/ C172M ( 2017) St andar d Pr act i ce f or Sampl i ng Fr eshl y Mi xed Concr et e

ASTM C231/ C231M ( 2017a) St andar d Test Met hod f or Ai r Cont ent of Fr eshl y Mi xed Concr et e by t he Pr essur e Met hod

ASTM C260/ C260M ( 2010a; R 2016) St andar d Speci f i cat i on f or Ai r - Ent r ai ni ng Admi xt ur es f or Concr et e

ASTM C295/ C295M ( 2012) Pet r ogr aphi c Exami nat i on of Aggr egat es f or Concr et e

ASTM C31/ C31M ( 2018) St andar d Pr act i ce f or Maki ng and Cur i ng Concr et e Test Speci mens i n t he Fi el d

ASTM C33/ C33M ( 2016) St andar d Speci f i cat i on f or Concr et e Aggregates

ASTM C39/ C39M ( 2018) St andar d Test Met hod f or Compr essi ve St r engt h of Cyl i ndr i cal Concr et e Speci mens

ASTM C494/ C494M ( 2017) St andar d Speci f i cat i on f or Chemi cal Admi xt ur es f or Concr et e

ASTM C618 ( 2017a) St andar d Speci f i cat i on f or Coal Fl y Ash and Raw or Cal c i ned Nat ur al Pozzol an f or Use i n Concr et e

ASTM C94/ C94M ( 2017a) St andar d Speci f i cat i on f or Ready- Mi xed Concr et e

SECTI ON 03 31 01. 00 10 Page 4

ASTM C989/ C989M ( 2017) St andar d Speci f i cat i on f or Sl ag Cement f or Use i n Concr et e and Mor t ar s

ASTM D75/ D75M ( 2014) St andar d Pr act i ce f or Sampl i ng Aggregates

ASTM D7949 ( 2014) St andar d Test Met hods f or Ther mal I nt egr i t y Pr of i l i ng of Concr et e Deep Foundations

CONCRETE REI NFORCI NG STEEL I NSTI TUTE ( CRSI )

CRSI 10MSP ( 2009; 28t h Ed; Er r at a) Manual of St andar d Practice

NATI ONAL READY MI XED CONCRETE ASSOCI ATI ON ( NRMCA)

NRMCA CPMB 100 ( 2000; R 2006) Concr et e Pl ant St andar ds

U. S. ARMY CORPS OF ENGI NEERS ( USACE)

COE CRD- C 521 ( 1981) St andar d Test Met hod f or Fr equency and Ampl i t ude of Vi br at or s f or Concr et e

COE CRD- C 61 ( 1989A) Test Met hod f or Det er mi ni ng t he Resi st ance of Fr eshl y Mi xed Concr et e t o Washi ng Out i n Wat er

COE CRD- C 661 ( 2006) Speci f i cat i on f or Ant i washout Admi xt ur es f or Concr et e

1. 3 DESI GN REQUI REMENTS

Desi gn i n accor dance wi t h ACI 301, Sect i on 4. Submi t concr et e mi x desi gns wi t h t he f ol l owi ng pr oper t i es.

1. 3. 1 Concr et e Mi x Desi gns

A mi ni mum of 30 cal endar days pr i or t o concr et e pl acement , submi t a mi x desi gn f or each st r engt h and t ype of concr et e. Submi t a compl et e l i s t of mat er i al s i ncl udi ng t ype, br and, sour ce, and amount of cement , f l y ash, pozzol ans, gr ound sl ag, and admi xt ur es, and appl i cabl e r ef er ence speci f i cat i ons. Pr ovi de mi x pr opor t i on dat a usi ng at l east t hr ee di f f er ent wat er - cement r at i os f or each cl ass and t ype of concr et e r equi r ed. I f sour ce mat er i al changes, r esubmi t mi x pr opor t i on dat a usi ng r evi sed sour ce mat er i al . No mat er i al shal l be pr ovi ded unl ess pr oven by t r i al mi x st udi es t o meet t he r equi r ement s of t hi s speci f i cat i on, unl ess ot her wi se appr oved i n wr i t i ng by t he Cont r act i ng Of f i cer . The submi t t al must c l ear l y i ndi cat e wher e each mi x desi gn wi l l be used when mor e t han one mi x desi gn i s submi t t ed. Submi t addi t i onal dat a r egar di ng concr et e aggr egat es i f t he sour ce of aggr egat es changes.

1. 3. 2 Ai r Cont ent

Ai r cont ent bet ween 4 and 7 per cent as del i ver ed t o t he f or ms and as det er mi ned by ASTM C231/ C231M, except t hat when t he nomi nal maxi mum- si ze coar se aggr egat e i s 3/ 4 i nch, bet ween 4. 5 and 7. 5 per cent . Ai r cont ent i s not r equi r ed f or t r emi e concr et e.

SECTI ON 03 31 01. 00 10 Page 5

1. 3. 3 Slump

1. 3. 3. 1 Under wat er Concr et e

Sl ump of t he concr et e, as del i ver ed t o t he poi nt of pl acement , must be wi t hi n t he l i mi t s f or a r equi r ed sl ump of 9 i nches ( ++/- 1- i nch) , wi t h a mi ni mum sl ump of 7- 1/ 2 i nches at 90 mi nut es. Sl ump must be det er mi ned i n accor dance wi t h ASTM C143/ C143M. Adequat e s l ump f l ow must be mai nt ai ned over t i me t o accommodat e mi xi ng, t r anspor t , pl acement , and consol i dat i on of t he f ul l l i f t of concr et e.

Sl ump f l ow of f l owabl e concr et e mi xt ur es, as del i ver ed t o t he poi nt of pl acement , must be wi t hi n t he l i mi t s f or a r equi r ed sl ump f l ow of 20 i nches ( + 3 i nches) . Sl ump f l ow must be det er mi ned i n accor dance wi t h ASTM C1611/ C1611M. Adequat e s l ump must be mai nt ai ned over t i me t o accommodat e mi xi ng, t r anspor t , pl acement , and consol i dat i on of t he f ul l l i f t of concr et e.

1. 3. 4 Concr et e St r engt h

Pr ovi de speci f i ed compr essi ve st r engt h f ' c as f ol l ows:

COMPRESSI VE STRENGTH ( PSI ) STRUCTURE OR PORTI ON OF STRUCTURE

5, 000 @ 28 days St r uct ur al concr et e, abut ment pr ot ect i on wal l pi l es

1. 3. 5 Maxi mum Wat er - Cement i t i ous Mat er i al ( W/ C) Rat i o

Maxi mum W/ C al l owed as f ol l ows:

WATER- CEMENT RATI O,

BY MASS

STRUCTURE OR PORTI ON OF STRUCTURE

0.45 St r uct ur al concr et e, abut ment pr ot ect i on wal l pi l es and abut ment pr ot ect i on sl ab

These W/ C' s may cause hi gher st r engt hs t han t hat r equi r ed by par agr aph

CONCRETE STRENGTH.

1. 3. 6 Ti me of Set

I ni t i al t i me of set f or cast - i n- pl ace concr et e pi l e f i l l and i nf i l l concr et e must be r est r i ct ed t o a r ange of 6 hour s t o 24 hour s. Fi nal set must be achi eved i n l ess t han 30 hour s. I n addi t i on, t he t i me of set must be appr opr i at e t o accommodat e mi xi ng, t r anspor t , pl acement , and consol i dat i on of t he f ul l l i f t of concr et e.

1. 3. 7 Washout

Washout f or cast - i n- pl ace concr et e pi l e f i l l and i nf i l l concr et e must be

SECTI ON 03 31 01. 00 10 Page 6 no gr eat er t han 8 per cent and shal l be det er mi ned i n accor dance wi t h

COE CRD- C 61.

1. 3. 8 Const r uct i on Tol er ances

Except as speci f i ed ot her wi se, a pl us t ol er ance i ncr eases and a mi nus t ol er ance decr eases t he di mensi on t o whi ch i t appl i es. A t ol er ance wi t hout s i gn means pl us or mi nus. Wher e onl y one si gn i s speci f i ed, t her e i s no l i mi t i n t he ot her di r ect i on. Tol er ances ar e not cumul at i ve. The most r est r i ct i ve t ol er ance wi l l cont r ol . Tol er ances can not ext end t he st r uct ur e beyond l egal boundar i es.

a. Make l evel and gr ade t ol er ance measur ement s of s l abs as soon as possi bl e af t er f i ni shi ng. When f or ms or shor i ng ar e used, make t he measur ement s pr i or t o r emoval .

b. Const r uct i on t ol er ances must meet t he r equi r ement s of ACI 117 and any of t he f ol l owi ng r equi r ement s t hat ar e appl i cabl e.

1. 3. 8. 1 Appearance

Cl ean per manent l y exposed sur f aces, i f st ai ned or ot her wi se di scol or ed, by a met hod t hat does not har m t he concr et e and t hat i s appr oved by t he Cont r act i ng Of f i cer .

1. 4 MODI FI CATI ON TO REFERENCE

I n t he ACI publ i cat i ons, t he advi sor y pr ovi s i ons shal l be consi der ed t o be mandat or y, as t hough t he wor d " shal l " has been subst i t ut ed f or " shoul d" wher ever i t appear s; r ef er ence t o t he " Bui l di ng Of f i c i al " , t he " St r uct ur al Engi neer " , and t he " Ar chi t ect / Engi neer " shal l be i nt er pr et ed t o mean t he Cont r act i ng Of f i cer .

1. 5 SUBMITTALS

Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" desi gnat i on;

submi t t al s not havi ng a " G" desi gnat i on ar e f or i nf or mat i on onl y. When used, a desi gnat i on f ol l owi ng t he " G" desi gnat i on i dent i f i es t he of f i ce t hat wi l l r evi ew t he submi t t al f or t he Gover nment . Submi t t he f ol l owi ng i n accor dance wi t h Sect i on 01 33 00 SUBMI TTAL PROCEDURES:

SD- 01 Pr econst r uct i on Submi t t al s

Concr et e Wor k Pl ans; G, DO Wor k Pl at f or ms; G, DO

SD- 02 Shop Dr awi ngs

Rei nf or ci ng st eel ; G, DO

SD- 03 Pr oduct Dat a

Concr et e Mi x Desi gns; G, DO Conveyi ng Equi pment Pl aci ng Equi pment Col d- Weat her Requi r ement s; G, DO Hot - Weat her Requi r ement s; G, DO St r uct ur al St eel Nonshr i nk Gr out

SECTI ON 03 31 01. 00 10 Page 7

Mechani cal Rei nf or ci ng Bar Connect or s; G, DO

SD- 06 Test Repor t s

Aggr egat es; G, DO Mi l l Test Repor t s Test s and I nspect i ons Qual i t y of Aggr egat es; G, DO Water

SD- 07 Cer t i f i cat es

Concr et e Fi el d Test i ng Techni c i ans Concr et e Const r uct i on I nspect or ( CCI ) Cement i t i ous Mat er i al s Bat ch Ti cket

SD- 08 Manuf act ur er ' s I nst r uct i ons

Cur i ng Compound

SD- 11 Cl oseout Submi t t al s

Const r uct i on Recor ds

1. 6 QUALI TY ASSURANCE

The Gover nment wi l l sampl e and t est aggr egat es and concr et e t o det er mi ne compl i ance wi t h t he speci f i cat i ons. Pr ovi de f aci l i t i es and l abor as may be necessar y f or pr ocur ement of r epr esent at i ve t est sampl es. Sampl es of aggr egat es wi l l be obt ai ned at t he poi nt of bat chi ng i n accor dance wi t h ASTM D75/ D75M. Concr et e wi l l be sampl ed i n accor dance wi t h ASTM C172/ C172M.

Do not use a mat er i al unt i l t he Cont r act i ng Of f i cer gi ves not i ce t hat t est r esul t s ar e sat i sf act or y. The Gover nment wi l l sampl e and t est chemi cal admi xt ur es, cur i ng compounds, and cement i t i ous mat er i al s. The i ndi v i dual s who sampl e and t est concr et e or t he const i t uent s of concr et e as r equi r ed i n t hi s speci f i cat i on must have demonst r at ed a knowl edge and abi l i t y t o per f or m t he necessar y t est pr ocedur es equi val ent t o t he ACI mi ni mum gui del i nes f or cer t i f i cat i on of Concr et e Fi el d Test i ng Techni c i ans, Gr ade I . The i ndi v i dual s who per f or m t he i nspect i on of concr et e const r uct i on must have demonst r at ed a knowl edge and abi l i t y equi val ent t o t he ACI mi ni mum gui del i nes f or cer t i f i cat i on of Concr et e Const r uct i on I nspect or ( CCI ) . Submi t st at ement s t hat t he concr et e t est i ng t echni c i ans and t he concr et e i nspect or s meet t he speci f i ed r equi r ement s. Mai nt ai n a copy of ACI SP- 15 and CRSI 10MSP at pr oj ect s i t e.

1. 6. 1 Cer t i f i cat es: Recor d Requi r ement

ASTM C94/ C94M. Submi t mandat or y bat ch t i cket i nf or mat i on f or each l oad of r eady- mi xed concr et e.

1. 7 DELI VERY, STORAGE, AND HANDLI NG

Ret est chemi cal admi xt ur es t hat have been i n st or age at t he pr oj ect s i t e f or l onger t han 6 mont hs or t hat have been subj ect ed t o f r eezi ng and r ej ect i f t est r esul t s ar e not sat i sf act or y. Chemi cal admi xt ur es wi l l be accept ed based on compl i ance wi t h t he r equi r ement s of par agr aph CHEMI CAL

ADMIXTURES.

SECTI ON 03 31 01. 00 10 Page 8

1. 8 CONCRETE WORK PLANS

Submi t compr ehensi ve wor k pl ans t o t he Cont r act i ng Of f i cer f or comment and appr oval at l east 90 cal endar days pr i or t o t he st ar t of pr oduct i on of any concr et e. Or gani ze t he pl an t o show and descr i be t he equi pment and met hods pr oposed f or t he t ype of concr et e t o be pl aced ( i . e. , st r uct ur al concr et e, r epai r concr et e, under wat er concr et e, et c. ) . The Gover nment wi l l r equi r e 45 cal endar days f or r evi ew of t he pl ans.

1. 8. 1 Under wat er Concr et e

The cover age f or under wat er concr et e must i ncl ude, but not be l i mi t ed t o, t he f ol l owi ng:

1. Bat chi ng, i ncl udi ng t he t i mi ng of t he i nt r oduct i on of t he constituents.

2. I nst al l at i on of anchor r ei nf or ci ng.

3. I nst al l at i on of f or mwor k, i f r equi r ed

4. Tr uck Mi xi ng, i ncl udi ng speed and dur at i on.

5. Tr anspor t at i on and conveyance f r om t he t r uck mi xer t o t he poi nt of placement.

6. Sampl i ng and Test i ng.

7. Di v i ng Ser vi ces.

8. Pl acement equi pment , i ncl udi ng r equi r ed wor k pl at f or ms.

9. Pr ocedur es f or under wat er pl acement .

10. Pr ocedur es f or i nt er r upt ed concr et e pl acement s.

11. Cont i ngency pl ans t o addr ess pot ent i al i nt er r upt i ons wi t h pr oposed actions:

a. Pot ent i al br eakdown of t r emi e or pumpi ng equi pment .

b. Pot ent i al pl uggi ng of t he t r emi e pi pe or pump l i ne.

c. Pot ent i al br eakdown of concr et e conveyi ng syst ems.

The t i mi ng and sequence of t he var i ous st eps f or each t ype of concr et e must al so be descr i bed. The pl an must be of suf f i c i ent det ai l t o demonst r at e t hat equi pment and met hods ar e appr opr i at e f or t he speci f i c t ype of concr et e, and t hat t he wor k conf or ms t o t he r equi r ement s of Di v i s i on 3 - CONCRETE. The pl an must be subj ect t o r evi ew and comment by t he Cont r act i ng Of f i cer . Once appr oved, t he Cont r act or must f ol l ow al l pr ocedur es set f or t h i n t he pl an. Any r evi s i ons t o t he pl an shal l be submi t t ed t o t he Cont r act i ng Of f i cer f or appr oval .

PART 2 PRODUCTS

2. 1 MATERIALS

Mi x desi gn and mat er i al sel ect i on ar e t he r esponsi bi l i t y of t he Cont r act or . I t i s not r equi r ed t hat t he concr et e mi xes cont ai n al l t he mat er i al s l i s t ed i n t he f ol l owi ng par agr aphs. I f a mat er i al i s used i n t he mi x, submi t mi l l t est r epor t s at t est i ng t hat mat er i al s meet t he r equi r ement s of t he speci f i cat i on under whi ch t hey ar e f ur ni shed.

Cer t i f i cat i on and mi l l t est r epor t s must be f r om sampl es t aken f r om t he par t i cul ar l ot f ur ni shed.

2. 1. 1 Cement i t i ous Mat er i al s

Cement i t i ous mat er i al s ar e por t l and cement , por t l and- pozzol an cement , por t l and bl ast - f ur nace sl ag cement , por t l and cement i n combi nat i on wi t h pozzol an or GGBF sl ag conf or mi ng t o appr opr i at e speci f i cat i ons l i s t ed

SECTI ON 03 31 01. 00 10 Page 9 below.

2. 1. 1. 1 Por t l and Cement

ASTM C150/ C150M, Type I I , l ow al kal i when used wi t h aggr egat es l i s t ed at t he end of t hi s sect i on whi ch r equi r e i t .

2. 1. 1. 2 Fl y Ash

ASTM C618, Cl ass F, wi t h t he opt i onal r equi r ement s f or mul t i pl e f act or , dr y i ng shr i nkage, and uni f or mi t y of Tabl e 2. Tabl e 3 r equi r ement s f or maxi mum al kal i s shal l appl y when used wi t h aggr egat es l i s t ed at t he end of t hi s sect i on t o r equi r e l ow- al kal i cement .

2. 1. 1. 3 Gr ound Gr anul at ed Bl ast - Fur nace Sl ag

Conf or m t o ASTM C989/ C989M, Gr ade 100 or 200.

2. 1. 1. 4 Si l i ca Fume

Conf or m t o ASTM C1240.

2. 1. 2 Aggregates

ASTM C33/ C33M, except as modi f i ed her ei n. Pr ovi de aggr egat es t hat do not cont ai n any subst ance whi ch may be del et er i ousl y r eact i ve wi t h t he al kal i es i n t he cement . Submi t t est r epor t showi ng compl i ance wi t h

ASTM C33/ C33M.

2. 1. 2. 1 Aggr egat e Expansi on

Pr ovi de f i ne and coar se aggr egat es wi t h expansi ons l ess t han 0. 08 per cent at 28 days af t er cast i ng when t est i ng i n accor dance wi t h ASTM C1260.

Shoul d t he t est dat a i ndi cat e an expansi on of 0. 08 per cent or gr eat er , r ej ect t he aggr egat e( s) or per f or m addi t i onal t est i ng usi ng ASTM C1567 and usi ng t he pr oposed mi x desi gn. I n t hi s case, i ncl ude t he mi x desi gn l ow al kal i por t l and cement and one of t he f ol l owi ng suppl ement ar y cement i t i ous materials:

a. GGBF sl ag at a mi ni mum of 40 per cent of t ot al cement i t i ous

b. Fl y ash or nat ur al pozzol an at a mi ni mum of t ot al cement i t i ous of

( 1) 30 per cent i f ( Si O2 pl us Al 2O3 pl us Fe2O3) i s 65 per cent or mor e, ( 2) 25 per cent i f ( Si O2 pl us Al 2O3 pl us Fe2O3) i s 70 per cent or mor e, ( 3) 20 per cent i f ( Si O2 pl us Al 2O3 pl us Fe2O3) i s 80 per cent or mor e, ( 4) 15 per cent i f ( Si O2 pl us Al 2O3 pl us Fe2O3) i s 90 per cent or mor e.

I f a combi nat i on of t hese mat er i al s i s chosen, t he mi ni mum amount must be a l i near combi nat i on of t he mi ni mum amount s above. I ncl ude t hese mat er i al s i n suf f i c i ent pr opor t i on t o show l ess t han 0. 08 per cent expansi on at 28 days af t er cast i ng when t est ed i n accor dance wi t h

ASTM C1567.

2. 1. 2. 2 Unf avor abl e Pr oper t i es

Do not pr ovi de aggr egat es possessi ng pr oper t i es or const i t uent s t hat ar e known t o have speci f i c unf avor abl e ef f ect s i n concr et e when t est ed i n accor dance wi t h ASTM C295/ C295M.

SECTI ON 03 31 01. 00 10 Page 10

2. 1. 3 Chemi cal Admi xt ur es

Pr ovi de chemi cal admi xt ur es, when r equi r ed or per mi t t ed, t hat conf or m t o t he appr opr i at e speci f i cat i on l i s t ed.

2. 1. 3. 1 Ai r - Ent r ai ni ng Admi xt ur e

Conf or m t o ASTM C260/ C260M and consi st ent l y cause t he concr et e t o have an ai r cont ent i n t he speci f i ed r anges under f i el d condi t i ons.

2. 1. 3. 2 Accel er at i ng Admi xt ur e

Meet t he r equi r ement s of ASTM C494/ C494M, Type C or E, except t hat cal c i um chl or i de or admi xt ur es cont ai ni ng cal c i um chl or i de i s not per mi t t ed.

2. 1. 3. 3 Wat er - Reduci ng or Ret ar di ng Admi xt ur e

2. 1. 3. 3. 1 Wat er - Reduci ng or Ret ar di ng Admi xt ur es

ASTM C494/ C494M, Type A, B, or D, except t hat t he 6- mont h and 1- year compr essi ve st r engt h t est s ar e wai ved.

2. 1. 3. 3. 2 Hi gh- Range Wat er Reduci ng Admi xt ur e

ASTM C494/ C494M, Type F or G except t hat t he 6- mont h and 1- year st r engt h r equi r ement s ar e wai ved. The admi xt ur e may be used onl y when appr oved by t he Cont r act i ng Of f i cer , such appr oval bei ng cont i ngent upon par t i cul ar mi xt ur e cont r ol as descr i bed i n t he Cont r act or ' s Qual i t y Cont r ol Pl an.

2. 1. 3. 4 Vi scosi t y Modi f y i ng or Ant i - Washout Admi xt ur e

Conf or m t o ASTM C494/ C494MA, Type S. Ant i washout admi xt ur e shal l al so conf or m t o COE CRD- C 661.

2. 1. 4 Water

Pr ovi de wat er f or mi xi ng and cur i ng compl i ance wi t h t he r equi r ement s of ASTM C1602/ C1602M; pot abl e, and f r ee of i nj ur i ous amount s of oi l , aci d, sal t , or al kal i . Submi t t est r epor t showi ng wat er compl i es wi t h

ASTM C1602/ C1602M.

2. 1. 5 St r uct ur al St eel

ASTM A992/ A992M.

2. 1. 6 Nonshr i nk Gr out

Conf or m t o ASTM C1107/ C1107M and a commer ci al f or mul at i on sui t abl e f or t he appl i cat i on pr oposed.

2. 1. 7 Bond Br eaker

Bond br eaker f or t he scour pr ot ect i on t i e- i n el ement shal l be pl ast i c sheet hel d i n pl ace wi t h wat er pr oof t ape, under wat er appl i ed f l exi bl e coat i ng or ot her met hod appr oved by t he Cont r act i ng Of f i cer .

SECTI ON 03 31 01. 00 10 Page 11

2. 2 EQUIPMENT

Submi t dat a on pl aci ng equi pment and met hods. Conf or m t he bat ch pl ant t o t he r equi r ement s of NRMCA CPMB 100 and as speci f i ed; however , r at i ng pl at es at t ached t o bat ch pl ant equi pment ar e not r equi r ed. Submi t bat ch pl ant dat a f or conf or mance wi t h appl i cabl e speci f i cat i ons.

2. 2. 1 Conveyi ng Equi pment

Submi t dat a on t he conveyi ng equi pment and met hods f or t r anspor t i ng, handl i ng, and deposi t i ng t he concr et e. Conf or m t he conveyi ng equi pment t o t he f ol l owi ng r equi r ement s:

2. 2. 1. 1 Buckets

The i nt er i or hopper s l ope must be not l ess t han 58 degr ees f r om t he hor i zont al , t he mi ni mum di mensi on of t he c l ear gat e openi ng must be at l east f i ve t i mes t he nomi nal maxi mum- si ze aggr egat e, and t he ar ea of t he gat e openi ng must not be l ess t han 2 squar e f eet . The maxi mum di mensi on of t he gat e openi ng must not be gr eat er t han t wi ce t he mi ni mum di mensi on.

The bucket gat es must be essent i al l y gr out t i ght when cl osed and may be manual l y, pneumat i cal l y, or hydr aul i cal l y oper at ed except t hat bucket s l ar ger t han 2 cubi c yar ds must not be manual l y oper at ed. The desi gn of t he bucket must pr ovi de means f or posi t i ve r egul at i on of t he amount and r at e of deposi t of concr et e i n each dumpi ng posi t i on.

2. 2. 1. 2 Tr ansf er Hopper s

Concr et e may be char ged i nt o nonagi t at i ng hopper s f or t r ansf er t o ot her conveyi ng devi ces. Tr ansf er hopper s must be capabl e of r ecei v i ng concr et e di r ect l y f r om del i ver y vehi c l es and have coni cal - shaped di schar ge f eat ur es. Equi p t he t r ansf er hopper wi t h a hydr aul i cal l y oper at ed gat e and wi t h a means of ext er nal v i br at i on t o ef f ect compl et e di schar ge. Do not hol d concr et e i n nonagi t at i ng t r ansf er hopper s mor e t han 30 mi nut es.

2. 2. 1. 3 Trucks

Tr uck mi xer s oper at i ng at agi t at i ng speed or t r uck agi t at or s used f or t r anspor t i ng pl ant - mi xed concr et e must conf or m t o t he r equi r ement s of ASTM C94/ C94M. Al l t r ucks used t o t r anspor t concr et e or gr out shal l be PA DOT i nspect ed and cer t i f i ed f or use. Nonagi t at i ng equi pment may be used f or t r anspor t i ng pl ant - mi xed concr et e over a smoot h r oad when t he haul i ng t i me i s l ess t han 15 mi nut es. Bodi es of nonagi t at i ng equi pment must be smoot h, wat er t i ght , met al cont ai ner s speci f i cal l y desi gned t o t r anspor t concr et e, shaped wi t h r ounded cor ner s t o mi ni mi ze segr egat i on, and equi pped wi t h gat es t hat wi l l per mi t posi t i ve cont r ol of t he di schar ge of t he concr et e.

2. 2. 1. 4 Chutes

When concr et e can be pl aced di r ect l y f r om a t r uck mi xer , agi t at or , or nonagi t at i ng equi pment , t he chut es at t ached t o t hi s equi pment by t he manuf act ur er may be used. Use a di schar ge def l ect or when r equi r ed by t he Cont r act i ng Of f i cer . Separ at e chut es and ot her s i mi l ar equi pment wi l l not be per mi t t ed f or conveyi ng concr et e.

2. 2. 1. 5 Bel t Conveyor s

The Gover nment - owned conveyor s i nst al l ed at t he s i t e ar e avai l abl e f or

SECTI ON 03 31 01. 00 10 Page 12

Cont r act or use. Use of t he Gover nment - owned conveyor s must be coor di nat ed wi t h ongoi ng wor k f or t he M- 22 and Ri ver Chamber Compl et i on cont r act s.

Desi gn and oper at e t o assur e a uni f or m f l ow of concr et e f r om mi xer t o f i nal pl ace of deposi t wi t hout segr egat i on of i ngr edi ent s or l oss of mor t ar and pr ovi de wi t h posi t i ve means f or pr event i ng segr egat i on of t he concr et e at t he t r ansf er poi nt s and t he poi nt of pl aci ng. Const r uct bel t conveyor s such t hat t he i dl er spaci ng does not exceed 36 i nches. The bel t speed must be a mi ni mum of 350 f eet per mi nut e and a maxi mum of 700 f eet per mi nut e. I f concr et e i s t o be pl aced t hr ough i nst al l ed hor i zont al or s l opi ng r ei nf or ci ng bar s, di schar ge t he conveyor concr et e i nt o a pi pe or el ephant t r unk t hat i s l ong enough t o ext end t hr ough t he r ei nf or ci ng bar s.

2. 2. 1. 6 Concr et e Pumps

Concr et e may be conveyed by posi t i ve di spl acement pump when appr oved. The pumpi ng equi pment must be pi st on or squeeze pr essur e. The pi pel i ne must be r i gi d st eel pi pe or heavy- dut y f l exi bl e hose. The i nsi de di amet er of t he pi pe must be at l east t hr ee t i mes t he nomi nal maxi mum- si ze coar se aggr egat e i n t he concr et e mi xt ur e t o be pumped but not l ess t han 4 i nches.

Do not use al umi num pi pe.

2. 2. 2 Vibrators

Al l concr et e i n t he scope of t hi s cont r act i s expect ed t o be sel f - consol i dat i ng and pl aced vi a t r emi e. Thi s par agr aph shal l appl y onl y i f t he Cont r act or pr oposes an al t er nat e const r uct i on met hod t hat r equi r e v i br at or s f or consol i dat i on.

Use vi br at or s of t he pr oper s i ze, f r equency, and ampl i t ude f or t he t ype of wor k bei ng per f or med i n conf or mance wi t h t he f ol l owi ng r equi r ement s:

APPLICATION HEAD DI AMETER

(inches)

FREQUENCY

(VPM)

AMPLI TUDE ( i nches)

Thi n wal l s, beams, etc.

1- 1/ 4 t o 2- 1/ 2 9, 000 t o 13, 500 0. 02 t o 0. 04

General construction

2 t o 3- 1/ 2 8, 000 t o 12, 000 0. 025 t o 0. 05

Det er mi ne t he f r equency and ampl i t ude i n accor dance wi t h COE CRD- C 521.

2. 2. 3 Wor k Pl at f or ms

Wor k pl at f or ms f or pl acement s of pi pe pi l e and sl ab concr et e must be desi gned by t he Cont r act or , shown i n t he wor k pl at f or m dr awi ngs, and appr oved by t he Cont r act i ng Of f i cer . The pl at f or m must be desi gned t o suppor t al l l oads i mposed by t he t r emi e equi pment and al l ot her l oad condi t i ons expect ed dur i ng const r uct i on. The Cont r act or must devel op a compl et e t abul at i on of expect ed l oads and anal yses f or r evi ew by t he Cont r act i ng Of f i cer . The Cont r act or must al so sel ect al l necessar y mat er i al s f or const r uct i on of t he pl at f or m. The ext ent and conf i gur at i on of t he pl at f or m may be expanded dur i ng t he pr ogr ess of t he wor k t o accommodat e t he const r uct i on. A compl et e set of det ai l ed dr awi ngs must be submi t t ed f or t he wor k pl at f or m f or t he Cont r act i ng Of f i cer ' s r evi ew.

Addi t i ons/ r evi s i ons t o t he wor k pl at f or m dur i ng l at er phases of t he wor k must al so be suppor t ed wi t h det ai l ed dr awi ngs and comput at i ons.

SECTI ON 03 31 01. 00 10 Page 13

2. 2. 4 Tr emi e Equi pment

Funnel - shaped hopper s of suf f i c i ent vol ume shal l be r equi r ed at t he t op of al l t r emi e pi pes, but must not be l ess t han 2 cubi c yar ds. Hopper s must be of a s i ze capabl e of r ecei v i ng and passi ng t he concr et e i nt o t he t r emi e pi pe at t he capaci t y r at e of t he bat chi ng, mi xi ng, and conveyi ng equi pment . Al umi num pi pe or equi pment must not be used f or pl aci ng concr et e. The t r emi e pi pe must be of t he s i ze( s) i ndi cat ed on t he dr awi ngs t o per mi t a f r ee f l ow of concr et e. Tr emi e pi pes must be spaced and ar r anged as shown. Tr emi e pi pes must be made of st eel and have wat er t i ght j oi nt s. Hoi st i ng equi pment f or r ai s i ng and l ower i ng t r emi e pi pes as t he concr et e i s pl aced and t ool s f or connect i ng t he pi pe sect i ons must be cont i nuousl y avai l abl e and on hand. Each sect i on of t r emi e pi pe must be sui t abl y secur ed t oget her and a gasket used at each j oi nt t o pr event l eakage. The t r emi e pi pe must be mar ked t o al l ow qui ck det er mi nat i on of t he di st ance f r om t he sur f ace of t he wat er t o t he mout h of t he t r emi e. A st abl e pl at f or m must be pr ovi ded t o t r emi e pi pe dur i ng pl acement s. The pl at f or m must be capabl e of suppor t i ng t he t r emi e whi l e sect i ons ar e bei ng r emoved f r om t he upper end of t he t r emi e. A dr y pi pe wi t h a t i ght f i t t i ng pl ast i c cap and st eel r ei nf or ci ng pl at e at t he bot t om t o pr event cont act of t he concr et e and t he wat er i n t he pi pe shal l be r equi r ed t o st ar t each pl acement . Go- devi l s or s i mi l ar devi ces ar e not permitted.

PART 3 EXECUTI ON

3. 1 PREPARATI ON FOR PLACI NG

3. 1. 1 Embedded I t ems

Bef or e pl acement of concr et e, t ake car e t o det er mi ne t hat al l embedded i t ems ar e f i r ml y and secur el y f ast ened i n pl ace as i ndi cat ed on t he dr awi ngs, or r equi r ed. Embedded i t ems must be f r ee of oi l and ot her f or ei gn mat t er such as l oose coat i ngs or r ust , pai nt , and scal e. The embeddi ng of wood i n concr et e wi l l be per mi t t ed onl y when speci f i cal l y aut hor i zed or di r ect ed. Tempor ar i l y f i l l voi ds i n s l eeves, i nser t s, and anchor s l ot s wi t h r eadi l y r emovabl e mat er i al s t o pr event t he ent r y of concr et e i nt o voi ds. Wel di ng, i ncl udi ng t ack wel di ng, wi l l not be per mi t t ed on embedded met al s wi t hi n 2 f eet of t he sur f ace of t he concr et e.

3. 1. 2 Concr et e on Ear t h Foundat i ons

Ear t h sur f aces upon whi ch concr et e i s t o be pl aced must be cl ean, damp, and f r ee f r om debr i s, f r ost , i ce, and st andi ng or r unni ng wat er . Pr i or t o pl acement of concr et e, compact t he ear t h f oundat i on i n accor dance wi t h Sect i on 35 20 23 DREDGI NG.

3. 2 CONVEYI NG AND PLACI NG CONCRETE

Convey and pl ace concr et e i n accor dance wi t h ACI 301, Sect i on 5. Do not r econst i t ut e concr et e t hat has begun t o sol i di f y.

3. 2. 1 General

Al l pl at f or ms, t r emi e pi pes, r amps and wal kways, as r equi r ed, shal l be compl et ed pr i or t o any pl acement s t o al l ow saf e and expedi t i ous access f or concr et e and wor kmen. Snow, i ce, f l owi ng wat er , l oose par t i c l es, debr i s, and f or ei gn mat t er shal l have been r emoved. Rei nf or cement shal l be secur ed i n- pl ace. Anchor s and ot her embedded i t ems shal l have been

SECTI ON 03 31 01. 00 10 Page 14 posi t i oned and anchor ed. The ent i r e pr epar at i on shal l be accept ed by t he Cont r act i ng Of f i cer pr i or t o pl aci ng. Concr et e pl acement s shal l commence i mmedi at el y af t er f i nal i nspect i on of t he ar ea of pl acement , r ock socket r ei nf or cement , and embedded i t ems.

3. 2. 2 Ti me I nt er val Bet ween Mi xi ng and Pl aci ng

Pl ace concr et e wi t hi n 30 mi nut es af t er di schar ge i nt o nonagi t at i ng equi pment . When concr et e i s t r uck- mi xed or when a t r uck mi xer or agi t at or i s used f or t r anspor t i ng concr et e mi xed by a concr et e pl ant mi xer , t he concr et e shal l be del i ver ed t o t he s i t e of t he wor k, and di schar ge shal l be compl et ed wi t hi n 1- 1/ 2 hour s af t er i nt r oduct i on of t he cement t o t he aggr egat es. When t he l engt h of haul makes i t i mpossi bl e t o del i ver t r uck- mi xed concr et e wi t hi n t hese t i me l i mi t s, use set r et ar di ng admi xt ur e t o ext end t he wor ki ng t i me of t he concr et e. .

3. 2. 3 Ambi ent Condi t i ons

Concr et e pl acement shal l not be per mi t t ed when weat her condi t i ons pr event pr oper pl acement and consol i dat i on, or when condi t i ons wi l l adver sel y af f ect t he qual i t y of t he concr et e. Unl ess ot her wi se speci f i ed or appr oved, t he ambi ent t emper at ur e of t he pl acement ar ea and al l sur f aces t o r ecei ve concr et e shal l be 32 degr ees F or above. I n hot weat her , conveyi ng and pl acement equi pment shal l be cool ed, i f necessar y, t o achi eve t he speci f i c concr et e t emper at ur e.

Concr et e shal l be mai nt ai ned at a t emper at ur e above 32 degr ees F at al l t i mes dur i ng t he cur i ng pr ocess.

3. 2. 4 Pr ot ect i on of Concr et e

The t emper at ur e di f f er ent i al of t he concr et e bet ween t he geomet r i c cent er of t he pl acement ( mi d- wi dt h, mi d- l engt h, mi d- hei ght ) and t he cent er of each f ace wi t h t he sensor pl aced 3 i nches bel ow t he concr et e sur f ace shal l be mai nt ai ned at l ess t han 25 degr ees F. Each f ace i ncl udes t he cent er of t he t op sur f ace, bot t om sur f ace, and at t he cent er of al l f our s i de sur f aces. An ext er nal dat a l ogger shal l be mai nt ai ned out si de of t he concr et e t o r ecor d t he ambi ent ai r or wat er t emper at ur e. The t emper at e di f f er ence shal l be det er mi ned bet ween al l i nt er nal sensor l ocat i ons i n t he pl acement and shal l not be al l owed t o exceed 25 degr ees F. I f t he t emper at ur e di f f er ence exceeds t hi s r ange, addi t i onal st eps shal l be t aken t o pr ovi de i nsul at i on or cool i ng, as appr opr i at e, i n accor dance wi t h par agr aphs Col d- Weat her Requi r ement s and Hot - Weat her Requi r ement s.

Once t he concr et e i s pl aced, i nsul at i on or cool i ng shal l not be r emoved unt i l t he hot t est i nt er nal concr et e t emper at ur e i s wi t hi n 25 degr ees F of t he aver age dai l y wat er t emper at ur e. The aver age dai l y wat er t emper at ur e shal l be det er mi ned by moni t or i ng t he 7- day movi ng aver age of t he dai l y mean t emper at ur e f or t he pr evi ous 3 cal endar days, t he pr edi ct ed cur r ent day, and t he pr edi ct ed dai l y mean t emper at ur e f or t he f ol l owi ng 3 cal endar days. The cont r act or shal l pr epar e and submi t a weekl y t emper at ur e moni t or i ng r epor t i n gr aph f or mat f or al l concr et e pl acement s under pr ot ect i on. Equi pment f or moni t or i ng t he i nt er nal concr et e and ext er nal ambi ent t emper at ur e shal l consi st of di gi t al , un- i nt er r upt i bl e and non- al t er abl e dat a l ogger s secur ed i nt o posi t i on and cast i nt o t he concr et e. The equi pment shal l be f ur ni shed by Engui s Const r uct i ve I nt el l i gence, I nt el l i Rock Dat a Loggi ng syst em, or an appr oved equal . I n addi t i on t o adequat e r emot e r eader s f or al l pl acement s bei ng moni t or ed, t he Cont r act or shal l pr ovi de 2 hand hel d dat a r eader s. Remot e r eadi ng

SECTI ON 03 31 01. 00 10 Page 15 devi ces and hand hel d r ecor der s shal l be pr ovi ded t o t he Concr et e QC Manager and t he Cont r act i ng Of f i cer .

No vi br at or y ear t h compact i on equi pment or pi l e- dr i v i ng equi pment shal l be oper at ed wi t hi n 80 f eet hor i zont al l y of concr et e t hat has not at t ai ned a compr essi ve st r engt h of 2000 psi and i s l ess t han 5 cal endar days ol d.

The i n- pl ace compr essi ve st r engt h shal l be as det er mi ned by t he par agr aph St r engt h Det er mi nat i on Usi ng Mat ur i t y Met hod.

3. 2. 5 Col d- Weat her Requi r ement s

Pl ace concr et e i n col d weat her i n accor dance wi t h ACI 306R.

3. 2. 6 Hot - Weat her Requi r ement s

Pl ace concr et e i n hot weat her i n accor dance wi t h ACI 305R.

3. 2. 7 Under wat er Concr et e Pl acement

3. 2. 7. 1 General

Use gr avi t y f ed pi pes t o pl ace under wat er concr et e usi ng t he dr y t ube t r emi e met hod.

3. 2. 7. 2 Pl acement of Concr et e

The di schar ge pi pe shal l f i r st be posi t i oned t o i nt r oduce concr et e at t he shaf t bot t om. Fr ee f al l pl acement of concr et e shal l not be per mi t t ed.

Pl acement of concr et e under wat er shal l be per f or med wi t h a t r emi e pi pe of t he t ype and si ze appr oved by t he Cont r act i ng Of f i cer .

At t he st ar t of t he t r emi e pl acement , t he bot t om of t he t r emi e pi pe shal l be seal ed wi t h a t i ght f i t t i ng pl ast i c cap and st eel r ei nf or ci ng pl at e, or a sacr i f i c i al pl at e and gasket . " Rabbi t s" or " pi gs" wi l l not be per mi t t ed f or seal i ng t he t r emi e pi pe. The pi pe shal l be kept dr y wi t h a seal ed pl at e as i t i s l ower ed i nt o t he shaf t . The Cont r act or ' s CQC st af f shal l ver i f y t hat t he pi pe i s dr y by v i sual exami nat i on or by soundi ng wi t h a wei ght . The t r emi e pi pe shal l be ext ended and shal l r est on t he bot t om of t he shaf t whi l e t he t r emi e pi pe and hopper ar e char ged wi t h concr et e.

Once char ged, t he t r emi e pi pe shal l be r ai sed 6 i nches of f t he bot t om of t he shaf t , and t he seal ed pl at e shal l be r el eased t o i ni t i at e pl acement of t he concr et e. The concr et e shal l be deposi t ed so t hat i t ent er s t he mass of t he pr evi ousl y pl aced concr et e, di spl aci ng wat er wi t h mi ni mum di st ur bance t o t he sur f ace of t he r i s i ng col umn of concr et e.

Concr et e shal l be deposi t ed i nt o t he t r emi e hopper and t he pi pe f ul l y char ged wi t h concr et e. When t he pi pe i s f ul l y f i l l ed wi t h concr et e, t he pl at e shal l be opened and t he concr et e al l owed t o f l ow ont o t he bot t om of t he shaf t . The pi pe shal l be hel d near t he bot t om of t he shaf t unt i l a mi ni mum 4- f oot head of concr et e bui l ds ar ound t he pi pe.

I f a seal i s l ost dur i ng t he pl acement , t he t r emi e pi pe shal l be compl et el y wi t hdr awn, t he seal r epl aced, t he pi pe r eset i nt o t he concr et e, and t he oper at i on r est ar t ed as soon as possi bl e.

When near i ng compl et i on of t he t r emi e pl acement , i t may be necessar y t o r ai se t he t r emi e pi pe posi t i on i n t he concr et e col umn as t he di f f er ent i al head decr eases bet ween t he concr et e i n t he t r emi e pi pe and t he concr et e and wat er col umn i n t he pi pe pi l e.

SECTI ON 03 31 01. 00 10 Page 16

A suf f i c i ent head of concr et e shal l be mai nt ai ned wi t hi n t he t r emi e pi pe t o sust ai n a posi t i ve di f f er ent i al head r el at i ve t o t he sur r oundi ng concr et e and wat er col umn i n t he shaf t . Pl acement shal l pr oceed wi t hout i nt er r upt i on unt i l t he concr et e has been br ought t o t he r equi r ed el evat i on. The t r emi e pi pe shal l not be moved hor i zont al l y dur i ng a pl aci ng oper at i on unl ess r emoved, moved, and pr oper l y r est ar t ed. The si ze and number of t r emi e pi pes shal l be sel ect ed t o pr ovi de ef f ect i ve hor i zont al f l ow of concr et e.

The Cont r act or shal l cont i nuousl y measur e and r ecor d t he l evel of concr et e wi t hi n t he pi l e casi ng or s l ab. Concr et e cur ves shal l be moni t or ed by t he Cont r act or ' s CQC st af f dur i ng t he pl acement .

The t r emi e pl acement shal l be cont i nued unt i l concr et e r eaches t he r equi r ed el evat i on.

3. 2. 8 I nt er r upt ed Concr et e Pl acement

Pl ace concr et e i n a cont i nuous, uni nt er r upt ed oper at i on. I f concr et e pl acement i s i nt er r upt ed f or any ci r cumst ances, f ol l ow t he f or mal pr ocedur es submi t t ed f or i nt er r upt ed concr et e pl acement wi t hi n t he appr oved Concr et e Wor k Pl an.

I ncl ude t he f ol l owi ng r equi r ement i n t he pr ocedur e f or i nt er r upt ed concr et e pl acement :

I f concr et e pl acement i s i nt er r upt ed f or a per i od of t i me such t hat t he concr et e al r eady i n pl ace becomes l ess t han 5- i nches, concr et e pl acement wi l l not be cont i nued, t he r ei nf or ci ng shal l be r emoved and t he concr et e shal l be pumped or augur ed out of t he shaf t . The shaf t shal l be c l eaned, pr epar ed, and accept ed bef or e concr et e pl acement i s restarted.

3. 3 CONSOLI DATI ON OF CONCRETE

Concr et e pl aced under wat er shal l be f or mul at ed t o be sel f - consol i dat i ng.

3. 4 FINISHING

No f i ni shi ng i s r equi r ed f or concr et e pl aced under wat er . Pi l e casi ngs t o be cut t o hei ght af t er concr et i ng shal l be st r uck t o t he cut - of f hei ght and excess concr et e r emoved f r om t he pi l e casi ng.

3. 5 TESTS AND I NSPECTI ONS

Submi t t est r esul t s and i nspect i on r epor t s, dai l y and weekl y. Test s and i nspect i n accor dance t he f ol l owi ng:

3. 5. 1 General

Per f or m t he i nspect i ons and t est s descr i bed bel ow, and, based upon t he r esul t s of t hese i nspect i ons and t est s, t ake t he act i on r equi r ed and submi t r epor t s as r equi r ed. When, i n t he opi ni on of t he Cont r act i ng Of f i cer , t he concr et i ng oper at i on i s out of cont r ol , cease concr et e pl acement . Use a USACE val i dat ed l abor at or y f or concr et e and mat er i al testing.

SECTI ON 03 31 01. 00 10 Page 17

3. 5. 2 Test i ng and I nspect i on Requi r ement s

3. 5. 2. 1 Concr et e Mi xt ur e

3. 5. 2. 1. 1 Sl ump and Sl ump Fl ow Test i ng

Conduct s l ump and sl ump f l ow t est i ng once per t r uck f or t he f i r st t hr ee t r ucks i n a shi f t t o est abl i sh mi xt ur e uni f or mi t y. Sl ump and sl ump f l ow t est s shal l al so be conduct ed when compr essi ve st r engt h speci mens ar e f abr i cat ed. Ther eaf t er conduct s l ump and sl ump f l ow t est i ng at l east once f or ever y 50 cubi c yar ds pl aced. Make addi t i onal t est s when excessi ve var i at i on i n wor kabi l i t y i s r epor t ed by t he pl aci ng f or eman or Gover nment qual i t y assur ance r epr esent at i ve. Conduct t est s i n accor dance wi t h ASTM C143/ C143M and ASTM C1611/ C1611M.

3. 5. 2. 1. 2 Temperature

Measur e t he t emper at ur e of t he concr et e when compr essi ve st r engt h speci mens ar e f abr i cat ed. Measur e i n accor dance wi t h ASTM C1064/ C1064M.

Repor t t he t emper at ur e al ong wi t h t he compr essi ve st r engt h dat a.

3. 5. 2. 1. 3 Compr essi ve- St r engt h Speci mens

Obt ai n sampl es and t est concr et e f or qual i t y cont r ol dur i ng pl acement .

Sampl e f r esh concr et e f or t est i ng i n accor dance wi t h ASTM C172/ C172M.

Make si x t est cyl i nder s. Test concr et e f or compr essi ve st r engt h at 7 and 28 days f or each desi gn mi x and f or ever y 100 cubi c yar ds of concr et e.

Test t wo cyl i nder s at 7 days; t wo cyl i nder s at 28 days; and hol d t wo cyl i nder s i n r eser ve. Pr epar e concr et e t est speci mens i n accor dance wi t h ASTM C31/ C31M. Per f or m compr essi ve st r engt h t est i ng i n accor dance wi t h

ASTM C39/ C39M.

3. 5. 2. 1. 4 Ther mal I nt egr i t y Pr of i l i ng

Twel ve of t he t hi r t y ei ght pr oduct i on Abut ment Pr ot ect i on Wal l pi l es and bot h Demonst r at i on Pi l es shal l be i nst r ument ed f or Ther mal I nt egr i t y Pr of i l i ng ( TI P) as descr i bed i n ASTM D7949, Met hod B f or embedded t her mal sensor s. The speci f i c pr oduct i on pi l es t o be i nst r ument ed f or TI P shal l be at t he di r ect i on of t he Cont r act i ng Of f i cer .

The pur pose of TI P i s t o moni t or t he t emper at ur e pr of i l es al ong t he dept h of t he shaf t as t he concr et e hydr at es, wi t h ar eas of l ower t emper at ur e i ndi cat i ng pot ent i al f l aws such as i ncl usi ons, honeycombi ng, or l ack of cement par t i c l es. Ar eas of pot ent i al f l aws shal l be subj ect t o f ur t her i nvest i gat i on of concr et e by cor i ng as di r ect ed by t he Cont r act i ng Of f i cer .

3. 5. 2. 1. 4. 1 Shaf t Pr epar at i on

Embedded t her mal sensor s shal l be secur ed t o and al i gned wi t h t he f our l ongi t udi nal r ei nf or cement bar s i n t he upper por t i on of t he Abut ment Pr ot ect i on Wal l pi l es. I n t he l ower por t i on of t he pi l es, t he sensor s shal l be secur ed t o t he i nsi de f l ange of t he k i ng pi l e. Wi r es connect ed t o t he t her mal sensor s shal l be adequat el y secur ed so t hat t he sensor l ocat i ons ar e not al t er ed dur i ng concr et e pl acement . Sensor s shal l be embedded al ong t he f ul l l engt h of t he pi l e, wi t h t he l owest el evat i on sensor s pl aced wi t hi n 6 i nches of t he bot t om of t he pi l e.

SECTI ON 03 31 01. 00 10 Page 18

3. 5. 2. 1. 4. 2 TI P I nst al l at i on and Recor di ng

Dur i ng i nst al l at i on of pi l es i nst r ument ed f or TI P, t he cont r act or shal l measur e and r ecor d t he dept h t o t he t op of t he concr et e usi ng a wei ght ed t ape measur e f or at l east ever y 5 cubi c yar ds pl aced.

Temper at ur e r ecor di ng shal l st ar t as ear l y af t er concr et e pl acement as pr act i cal and shal l per i odi cal l y r ecor d t emper at ur es at i nt er val s of no gr eat er t han one hour f or up t o 28 cal endar days.

3. 5. 2. 1. 4. 3 TI P Per sonnel and Repor t i ng Requi r ement s

The Cont r act or shal l pr ovi de at hi s expense a speci al i st possessi ng exper i ence wi t h t he i nst al l at i on of TI P wi r es and t he col l ect i on and i nt er pr et at i on of TI P dat a. The speci al i st shal l be pr esent dur i ng t he i ni t i al appl i cat i on of t hese met hods dur i ng t he demonst r at i on pi l e pl acement .

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.