Bid_Schedule.xls

XLS spreadsheet 41 KB Posted

Attached to
Stilling Basin and Abutment Support Wall, Charleroi L/D Federal contract opportunity
Solicitation number
W911WN18B8010
Issued by
Department of the Army Corps of Engineers Engineering District Pittsburgh

About this file

Bid Schedule. To Complete and Return with Bid Package.

View the file

Other files for this federal contract opportunity

Other files attached to Stilling Basin and Abutment Support Wall, Charleroi L/D, newest first.
File Type Posted
Bid_Opening,_Attendance_Register.pdf PDF
Bid_Abstract.xlsx XLSX spreadsheet
Bid_Results.pdf PDF
Attachment_3,_(Revised)_Davis_Bacon_Wage_Determination,_PA180004_08-24-2018_PA4.pdf PDF
Drawings,_(Revised),_Sheet_04_110-B.pdf PDF
W911WN18B8010-0002.pdf PDF
Technical_Specifications,_(Revised_Section)_35_20_23.pdf PDF
Bid_Schedule_(Revised).xls XLS spreadsheet
Technical_Specifications,_(Revised_Section)_01_45_01.pdf PDF
Technical_Specifications,_(Revised_Section)_01_22_00.00_10.pdf PDF
Attachment_3,_(Revised)_Davis_Bacon_Wage_Determination,_PA180004_08-17-2018.pdf PDF
Technical_Specifications,_(Revised_Section)_35_43_29.pdf PDF
Drawings,_(Revised),_Selected_Sheets.pdf PDF
Technical_Specifications,_(Revised_Section)_01_57_20.00_10.pdf PDF
W911WN18B8010-0001.pdf PDF
Technical_Specifications,_(Revised_Section)_01_78_02.00_15.pdf PDF
Technical_Specifications,_(Revised_Section)_03_31_01.00_10.pdf PDF
Pre-Bid_Contracting_Discussion,_Site_Visit.pdf PDF
Sign-In_Sheet,_Site_Visit.pdf PDF
Agenda,_Pre-Bid_Site_Visit.pdf PDF
Attachment_2,_Drawings,_Certified_Final.pdf PDF
W911WN18B8010.pdf PDF
Attachment_1,_Technical_Specifications_Certified_Final.pdf PDF
Attachment_4,_Davis_Bacon_Wage_Determination,_PA180050_01-05-2018_PA50.pdf PDF
Attachment_3,_Davis_Bacon_Wage_Determination,_PA180004_06-15-2018_PA4.pdf PDF
Show all 25

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Price Schedule

BID SCHEDULE
ITEMDESCRIPTIONQuantityUnitUnit PriceTotal
BASE CONTRACT
0001REIMBURSEMENT FOR ACTUAL PERFORMANCE AND PAYMENT BOND PREMIUMS, BASE CONTRACT1JOB$________$________
0002MOBILIZATION AND DEMOBILIZATION1JOB$________$________
0003DIGITAL PROGRESS IMAGES33SETS$________$________
4REMOVAL AND PLACEMENT EXISTING TRAINING DIKE STONE14,300CUBIC YARDS$________$________
5REMOVAL AND PLACEMENT OF DERRICK STONE11,200CUBIC YARDS$________$________
6UNDERWATER ALLUVIUM EXCAVATION FOR SCOUR PROTECTION, ABUTMENT PROTECTION WALL AND ABUTMENT PROTECTION GROUT BAGS32,300CUBIC YARDS$________$________
0007SAMPLING AND TESTING AREA "C"1JOB$________$________
0008DREDGING, AREA "C"13,630CUBIC YARDS$________$________
0009DREDGING, DOWNSTREAM FLOODWAY AND APPROACH137,830CUBIC YARDS$________$________
0010DISPOSAL OF CONTAMINATED DREDGED MATERIAL13,630CUBIC YARDS$________$________
0011ABUTMENT PROTECTION WALL DEMONSTRATION PROJECT1JOB$________$________
0012SCOUR PROTECTION DEMONSTRATION PROJECT1JOB$________$________
0013ABUTMENT PROTECTION WALL, 48-INCH DIAMETER BY 1/2-INCH THICK PIPE PILE1,140LINEAR FEET$________$________
14ABUTMENT PROTECTION WALL, PZC 18 METAL SHEET PILING2,280LINEAR FEET$________$________
15ABUTMENT PROTECTION WALL, HP12x53 END PILE30LINEAR FEET$________$________
16ABUTMENT PROTECTION WALL, W33x291 KING PILES 1 to 2121EACH$________$________
17ABUTMENT PROTECTION WALL, W33x291 KING PILES 22 to 2817EACH$________$________
18ABUTMENT PROTECTION WALL PIPE PILE, ALLUVIUM EXCAVATION950LINEAR FEET$________$________
0019ABUTMENT PROTECTION WALL, 42-INCH DIAMETER ROCK SOCKET988LINEAR FEET$________$________
0020ABUTMENT PROTECTION WALL, CONCRETE FOR CAST-IN-PLACE CONCRETE PILES836CUBIC YARDS$________$________
0021ABUTMENT PROTECTION, BEDDING MATERIAL170CUBIC YARDS$________$________
0022ABUTMENT PROECTION, GEOGRID REINFORCEMENT910SQUARE YARDS$________$________
0023ABUTMENT PROTECTION, FURNISH AND INSTALL GROUT BAGS WITH ACCESSORIES AND GROUT INFILL1,365CUBIC YARDS$________$________
0024SCOUR PROTECTION, BEDDING MATERIAL2355CUBIC YARDS$________$________
0025SCOUR PROTECTION, GEOGRID REINFORCEMENT4,710SQUARE YARDS$________$________
0026SCOUR PROTECTION, FURNISH AND INSTALL GROUT BAGS WITH ACCESSORIES AND GROUT INFILL6,275CUBIC YARDS$________$________
0027SCOUR PROTECTION, APRON TIE-IN ELEMENT302CUBIC YARDS$________$________
0028SCOUR PROTECTION, TEMPORARY TERMINATION2EACH$________$________
0029INSTRUMENTATION1JOB$________$________
TOTAL, BASE CONTRACT, ITEMS 0001 THROUGH 0029$________
AWARDABLE OPTION
1001REIMBURSEMENT FOR ACTUAL PERFORMANCE AND PAYMENT BOND PREMIUMS, BASE CONTRACT1JOB$________$________
1002DREDGING, UPSTREAM FLOODWAY AND APPROACH81,840CUBIC YARDS$________$________
TOTAL, AWARDABLE CONTRACT, ITEMS 1001 AND 1002$________

&CCHARLEROI LOCK AND DAMS

STILLING BASIN AND ABUTMENT SUPPORT WALL

Section 00 10 00 Solicitation Contract Line Item Number Schedule &C&P