W911WN10C0014 Mod P00001.pdf
PDF 222 KB Posted
- Attached to
- Sewer Line Rehabilitation Homestead Run
- Solicitation number
- W911WN10B0008
About this file
Modification P00001 - Exercise Awardable Options A and B
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Bid results for 10B0008.doc | DOC document | |
| Amendment 0002 Summary of Changes.pdf | ||
| 33 01 99.pdf | ||
| 01 57 20.00 10.pdf | ||
| Bidder Questions and Answers.doc | DOC document | |
| MSSMA Manhole Rehabilitation Schedule Am 2.pdf | ||
| 01 22 00.00 10.pdf | ||
| PA Programmatic General Permit | — | |
| MSSMA Manhole Schedule.pdf | ||
| W911WN10B0008 Amendment 0001.pdf | ||
| 01 10 00.pdf | ||
| 01 35 26.pdf | ||
| 01 50 10.pdf | ||
| Pre Bid Attendance Register.pdf | ||
| Sheet 8.pdf | ||
| Schedule Sheet 1 .pdf | ||
| Sheet 10.pdf | ||
| Sheet 1.pdf | ||
| Cover 1 .pdf | ||
| Sheet 6.pdf | ||
| Sheet 2.pdf | ||
| Sheet 5.pdf | ||
| Sheet 7.pdf | ||
| Sheet 4.pdf | ||
| Sheet 3.pdf | ||
| Sheet 9.pdf | ||
| Technical Specifications.pdf | ||
| W911WN10B0008.pdf |
Show all 28
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W911WN-10-C-0014
P00001
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00010 - SOLICITATION CONTRACT FORM
The total cost of this contract was increased by $1,650,198.00 from $1,194,438.00 to $2,844,636.00.
SUBCLIN 0002AA
The option status has changed from Option to Option Exercised.
SUBCLIN 0002AB
SUBCLIN 0002AC
The CLIN description has changed from NON ARRA Manhole Rehabilitation to ARRA Manhole Rehabilitation.
SUBCLIN 0002AD
SUBCLIN 0002AE
SUBCLIN 0002AF
SUBCLIN 0002AG
SUBCLIN 0002AH
SUBCLIN 0002AJ
SUBCLIN 0002AK
SUBCLIN 0002AL
SUBCLIN 0002AM
SUBCLIN 0002AN
SUBCLIN 0002AP
SUBCLIN 0002AQ
SUBCLIN 0002AR
SUBCLIN 0002AS
SUBCLIN 0002AT
SUBCLIN 0002AU
SUBCLIN 0002AV
SUBCLIN 0002AW
SUBCLIN 0002AX
SUBCLIN 0002AY
SUBCLIN 0002AZ
SUBCLIN 0002BA
The CLIN description has changed from NON ARRA Service Reconnections to ARRA Service Reconnections.
SUBCLIN 0002BB
The CLIN description has changed from NON ARRA Tap Break-in Cutting to ARRA Tap Break-in Cutting.
SUBCLIN 0002BC
The CLIN description has changed from NON ARRA Seeding to ARRA Seeding.
SUBCLIN 0002BD
The CLIN description has changed from NON ARRA Bypass Pumping to ARRA Bypass Pumping.
SUBCLIN 0002BE
The CLIN description has changed from NON ARRA Heavy Cleaning to ARRA Heavy Cleaning.
SUBCLIN 0002BF
SUBCLIN 0002BG
SUBCLIN 0003AA
SUBCLIN 0003AB
SUBCLIN 0003AC
SUBCLIN 0003AD
SUBCLIN 0003AE
SUBCLIN 0003AF
SUBCLIN 0003AG
SUBCLIN 0003AH
SUBCLIN 0003AJ
SUBCLIN 0003AK
SUBCLIN 0003AL
SUBCLIN 0003AM
SUBCLIN 0003AN
SUBCLIN 0003AP
The CLIN description has changed from NON ARRA Service Reconnections to ARRA Service Reconnections.
SUBCLIN 0003AQ
The CLIN description has changed from NON ARRA Tap Break-in Cutting to ARRA Tap Break-in Cutting.
SUBCLIN 0003AR
The CLIN description has changed from NON ARRA Seeding to ARRA Seeding.
SUBCLIN 0003AS
The CLIN description has changed from NON ARRA Bypass Pumping to ARRA Bypass Pumping.
SUBCLIN 0003AT
The CLIN description has changed from NON ARRA Heavy Cleaning to ARRA Heavy Cleaning.
SUBCLIN 0003AU
SECTION 00800 - SPECIAL CONTRACT REQUIREMENTS
Accounting and Appropriation
Summary for the Payment Office
As a result of this modification, the total funded amount for this document was increased by $1,650,198.00 from $1,194,438.00 to $2,844,636.00.
Contract Level Funding:
AA: 96 NA X 8862.0000 H4 X 08 2439 076340 96364 3230 852LD5 NA 74LD63
was decreased by $741,860.80 from $1,194,438.00 to $452,577.20
AB: 96 NA 2009 3134.0000 H4 2009 08 2439 076340 96364 3230 852LD5 NA JGD285
was increased by $2,392,058.80 from $0.00 to $2,392,058.80 The contract ACRN AB has been added.
(End of Summary of Changes)
File details come from the government source that posted it. Updated .