01 50 10.pdf
PDF 18 KB Posted
- Attached to
- Sewer Line Rehabilitation Homestead Run
- Solicitation number
- W911WN10B0008
About this file
Technical Spec 01 50 10 Change
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W911WN10C0014 Mod P00001.pdf | ||
| Bid results for 10B0008.doc | DOC document | |
| Amendment 0002 Summary of Changes.pdf | ||
| 33 01 99.pdf | ||
| 01 57 20.00 10.pdf | ||
| Bidder Questions and Answers.doc | DOC document | |
| MSSMA Manhole Rehabilitation Schedule Am 2.pdf | ||
| 01 22 00.00 10.pdf | ||
| PA Programmatic General Permit | — | |
| MSSMA Manhole Schedule.pdf | ||
| W911WN10B0008 Amendment 0001.pdf | ||
| 01 10 00.pdf | ||
| 01 35 26.pdf | ||
| Pre Bid Attendance Register.pdf | ||
| Sheet 8.pdf | ||
| Schedule Sheet 1 .pdf | ||
| Sheet 10.pdf | ||
| Sheet 1.pdf | ||
| Cover 1 .pdf | ||
| Sheet 6.pdf | ||
| Sheet 2.pdf | ||
| Sheet 5.pdf | ||
| Sheet 7.pdf | ||
| Sheet 4.pdf | ||
| Sheet 3.pdf | ||
| Sheet 9.pdf | ||
| Technical Specifications.pdf | ||
| W911WN10B0008.pdf |
Show all 28
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Section 219, Homestead Run Sewer Lining Project, Munhall, PA
SECTION TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 50 10
PROJECT SIGNS
PART 1 GENERAL
1.1 SUMMARY
1.2 APPLICABLE PUBLICATIONS
1.3 CONSTRUCTION PROJECT SIGNS
1.3.1 Project Identification Sign
PART 2 PRODUCTS
2.1 MATERIALS
2.1.1 Wood
2.1.2 Sign Face
2.1.3 Fasteners
PART 3 EXECUTION
3.1 INSTALLATION
3.2 MAINTENANCE
-- End of Section Table of Contents --
SECTION 01 50 10 Page 1 W911WN-10-B-0008 Revised by Amendment 0001
SECTION 01 50 10
PROJECT SIGNS
PART 1 GENERAL
1.1 SUMMARY
The work covered by this Section consists of fabricating, erecting and maintaining the Project Identification signs. The the signs shall be installed within 15 calendar days after Notice to Proceed and shall be maintained in good condition throughout the construction period. All items will remain the property of the Contractor and shall be removed at the end of the contract.
1.2 APPLICABLE PUBLICATIONS
The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by basic designation only.
U.S. ARMY CORPS OF ENGINEERS (USACE)
EP 310-1-6a (2006) Sign Standards Manual, Volume 1
1.3 CONSTRUCTION PROJECT SIGNS
Construction project signs shall be coordinated with the Contracting Officer. The signs shall include one Project Identification Sign and one Safety Sign. The layout of all signs shall be in accordance with the standards specified in EP 310-1-6a, (Part 16 attached), the attached Project and Safety Sign Standards, and the requirements specified herein, except that the the post embedment may be 36" and the concrete embedment is not required. Relevant portions of the manual are attached.
1.3.1 Project Identification Sign
One project identification sign constructed in accordance with EP 310-1-6a, Section 16, except the layout of the sign shall be as shown on the attached ARRA Project Sign Requirements. The following information shall be used for the Project Identification Sign:
Corps relationship to project:
Design and Construction Supervised by:
Division/District
Pittsburgh District
One to three line title to describe work
HOMESTEAD RUN SEWER LINING PROJECT
SECTION 219 PROJECT
MUNHALL, PENNSYLVANIA
One to two line identification of project or name of sponsoring department:
SECTION 01 50 10 Page 2
MUNHALL SANITARY SEWER MUNICIPALITY AUTHORITY
MUNHALL, PENNSYLVANIA
One to five line identification of prime contractors - this information is optional.
PART 2 PRODUCTS
2.1 MATERIALS
2.1.1 Wood
Wood material for the posts shall be preservative treated, structural grade Douglas Fir or No. 1 Southern Pine, or better. All other wood members shall be of well seasoned, kiln dried, clear redwood, bald cypress, red cedar, Douglas fir, spruce, tulip poplar, or white pine. The lumber materials shall be free of splits, wane, and loose knots or pitch pockets.
All members of the sign shall be fastened with screws or bolts of type, size, number, and spacing to provide rigid construction and neat appearance. If the vertical supports system does not rigidly support the sign due to local soil conditions and/or wind loading additional bracing of the sign supports shall be provided. This additional bracing shall be composed of 2" x 4" bracing bolted to the inside face of each 4" x 4" support post and firmly anchored to the ground behind the sign. This additional bracing is not required to be treated lumber. Two-inch x four-inch struts shall be installed between the 4" x 4" support posts to reinforce the top and bottom edges of the sign panels.
2.1.2 Sign Face
The sign faces shall be electronically printed on white non-reflective vinyl decals four mils thick. The sign face decals shall be mounted on panels of 3/4" thick high density overlay exterior plywood with single-sided vinyl facing. The entire circumference of the sign panels will be sealed and protected with white vinyl trim cap. A protective overlaminate film shall be applied over the sign face decals capable of minimizing the deteriorating effects of ultraviolet radiation and providing additional protection against weathering and application of graffiti. The ARRA symbol is shown on the attached Recovery Emblem Guide. The ARRA Recovery Emblem shall be 6-inch diameter.
2.1.3 Fasteners
All bolts shall be 0.375" diameter and 4" long Allen head bolts, threaded to match T-nuts.
PART 3 EXECUTION
3.1 INSTALLATION
The Contractor shall affix the panels to the posts with the Allen head bolts prior to erection of the signs, including drilling counter-sunk 0.375 inch diameter holes in the posts to match the T-nut locations. The Contractor shall take all precautions necessary to protect the faces of the signs from damage during assembly and construction. The signs shall be installed upon commencement of the work under this contract. The location in which each sign is to be installed shall be cleared and leveled to facilitate the installation of, and provide easy visual contact with, the
SECTION 01 50 10 Page 3 signs. Installation and positioning of the sign plate and posts shall be as indicated on the attached Project and Safety Sign Standards. Excavation and backfilling of the holes for posts and installation of the posts, braces, and stakes shall be such that signs are installed plumb and level.
3.2 MAINTENANCE
The Contractor shall maintain the signs in good condition and the sign site in a neat condition throughout the construction period.
-- End of Section --
SECTION 01 50 10 Page 4
| 01 50 10 - PROJECT SIGNS |
| 01 50 10 - PROJECT SIGNS |
| PART 1 GENERAL |
| 1.1 SUMMARY |
| 1.2 APPLICABLE PUBLICATIONS |
| 1.3 CONSTRUCTION PROJECT SIGNS |
| 1.3.1 Project Identification Sign |
| PART 2 PRODUCTS |
| 2.1 MATERIALS |
| 2.1.1 Wood |
| 2.1.2 Sign Face |
| 2.1.3 Fasteners |
| PART 3 EXECUTION |
| 3.1 INSTALLATION |
| 3.2 MAINTENANCE |
File details come from the government source that posted it. Updated .