Amendment 0002 Summary of Changes.pdf

PDF 20 KB Posted

Attached to
Sewer Line Rehabilitation Homestead Run
Solicitation number
W911WN10B0008
Issued by

About this file

Summary of Changes for Amendment 0002

View the file

Other files

File Type Posted
W911WN10C0014 Mod P00001.pdf PDF
Bid results for 10B0008.doc DOC document
33 01 99.pdf PDF
01 57 20.00 10.pdf PDF
Bidder Questions and Answers.doc DOC document
MSSMA Manhole Rehabilitation Schedule Am 2.pdf PDF
01 22 00.00 10.pdf PDF
PA Programmatic General Permit —
MSSMA Manhole Schedule.pdf PDF
W911WN10B0008 Amendment 0001.pdf PDF
01 10 00.pdf PDF
01 35 26.pdf PDF
01 50 10.pdf PDF
Pre Bid Attendance Register.pdf PDF
Sheet 8.pdf PDF
Schedule Sheet 1 .pdf PDF
Sheet 10.pdf PDF
Sheet 1.pdf PDF
Cover 1 .pdf PDF
Sheet 6.pdf PDF
Sheet 2.pdf PDF
Sheet 5.pdf PDF
Sheet 7.pdf PDF
Sheet 4.pdf PDF
Sheet 3.pdf PDF
Sheet 9.pdf PDF
Technical Specifications.pdf PDF
W911WN10B0008.pdf PDF
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W81ET400077760

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The follow ing changes w ill be made by this amendment:

SEE PAGE TWO FOR SUMMARY OF CHANGE DETAILS.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 59

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 23-Mar-2010

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W911WN-10-B-0008

X 9B. DATED (SEE ITEM 11)

25-Feb-2010

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

23-Mar-2010

CODE

U.S. ARMY ENGINEER DISTRICT, PITTSBURGH

CONTRACTING BRANCH

W S MOORHEAD FEDERAL BUILDING

1000 LIBERTY AVENUE 21ST FLOOR

PITTSBURGH PA 15222-4186

W911WN 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W911WN-10-B-0008

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

Bid Schedule

Change Item 0001CA from "NON ARRA Manhole Rehabilitation Manhole 209 Each" to "NON ARRA Manhole Rehabilitation Manhole 209 1 Each"

Specifications

The following sections have been revised to address the attached answers to Bidder questions. Delete the existing sections and substitute the attached revised sections:

01 22 00.00 10 MEASUREMENT AND PAYMENT

01 57 20.00 10 ENVIRONMENTAL PROTECTION

33 01 99 CURED-IN-PLACE PIPE LINE REHABILITATION

Insert the attached PA Programmatic General Permit (PASPGP-3) following BWM-GP-11 General Permit Registration at the end of Section 01 57 20.00 10 ENVIRONMENTAL PROTECTION.

Delete the existing MSMMA Manhole Rehabilitation Schedule at the end of Section 31 01 30.75 GENERAL MANHOLE REHABILITATION and substitute the attached MSMMA Manhole Rehabilitation Schedule Am2.

Drawings

On the SCHEDULE SHEET, under MANHOLE SCHEDULES, in the table titled “AWARDABLE ITEM B” (MH 361 TO MH 397), change the Manhole Depth for Manhole Number 374 from 6.30 to 30.00.

SECTION 00010 - SOLICITATION CONTRACT FORM

SUBCLIN 0001CA

The CLIN extended description has changed from Manhole to Manhole 209.

The pricing detail quantity has decreased by 208.00 from 209.00 to 1.00.

(End of Summary of Changes)

File details come from the government source that posted it. Updated .