01 10 00.pdf

PDF 14 KB Posted

Attached to
Sewer Line Rehabilitation Homestead Run
Solicitation number
W911WN10B0008
Issued by

About this file

Technical Spec 01 10 00 Change

View the file

Other files

File Type Posted
W911WN10C0014 Mod P00001.pdf PDF
Bid results for 10B0008.doc DOC document
Amendment 0002 Summary of Changes.pdf PDF
33 01 99.pdf PDF
01 57 20.00 10.pdf PDF
Bidder Questions and Answers.doc DOC document
MSSMA Manhole Rehabilitation Schedule Am 2.pdf PDF
01 22 00.00 10.pdf PDF
PA Programmatic General Permit —
MSSMA Manhole Schedule.pdf PDF
W911WN10B0008 Amendment 0001.pdf PDF
01 35 26.pdf PDF
01 50 10.pdf PDF
Pre Bid Attendance Register.pdf PDF
Sheet 8.pdf PDF
Schedule Sheet 1 .pdf PDF
Sheet 10.pdf PDF
Sheet 1.pdf PDF
Cover 1 .pdf PDF
Sheet 6.pdf PDF
Sheet 2.pdf PDF
Sheet 5.pdf PDF
Sheet 7.pdf PDF
Sheet 4.pdf PDF
Sheet 3.pdf PDF
Sheet 9.pdf PDF
Technical Specifications.pdf PDF
W911WN10B0008.pdf PDF
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Section 219, Homestead Run Sewer Lining Project, Munhall, PA

SECTION TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

SECTION 01 10 00

SCOPE OF WORK

PART 1 GENERAL

1.1 SCOPE OF WORK

1.1.1 General

1.1.2 Subcontractors

PART 2 PRODUCTS

PART 3 EXECUTION

-- End of Section Table of Contents --

SECTION 01 10 00 Page 1 W911WN-10-B-0008 Revised by Amendment 0001

SECTION 01 10 00

SCOPE OF WORK

PART 1 GENERAL

1.1 SCOPE OF WORK

1.1.1 General

Under this Division, the Contractor for this Contract shall furnish all materials, labor, plant and equipment necessary to perform the work related to rehabilitation, etc., as shown on the drawings or specified herein.

Base Bid (MH 935A to MH A608)

Base Bid will involve the rehabilitation of approximately 588 linear feet of 36-inch diameter, 2,042 linear feet of 24-inch diameter, 103 linear feet of 18-inch diameter, and 191 linear feet of 15-inch diameter gravity sewer pipe by method of sliplining; rehabilitation of 48 manholes; 28 (6-inch service) reconnections; 2 (18-inch) service reconnections; 9 tap break-in cuts; seeding; by-pass pumping; heavy cleaning; erosion and sedimentation control; and clearing and grubbing.

Awardable Option Item A (MH 1021 to MH 359A)

Awardable Option Item A will involve the rehabilitation of approximately 3,354 linear feet of 24-inch diameter gravity sewer pipe by method of sliplining; rehabilitation of 22 manholes; 7 service reconnections; 5 tap break-in cuts; seeding; by-pass pumping; heavy cleaning; erosion and sedimentation control; and clearing and grubbing.

Awardable Option Item B (MH 361 to MH 397)

AdditiveAwardable Option Item B will involve the rehabilitation of approximately 1,444 linear feet of 24-inch diameter and 1,505 linear feet of 18-inch diameter gravity sewer pipe by method of sliplining;

rehabilitation of 10 manholes; 1 service reconnection; 1 tap break-in cut; seeding; by-pass pumping; heavy cleaning; erosion and sedimentation control; and clearing and grubbing.

1.1.2 Subcontractors

Each subcontractor shall adhere to any applicable parts of the specifications as it relates to the work specified to be done under his/her contract.

PART 2 PRODUCTS

Not Applicable

PART 3 EXECUTION

Not Applicable

SECTION 01 10 00 Page 2

-- End of Section --

SECTION 01 10 00 Page 3

01 10 00 - SCOPE OF WORK
01 10 00 - SCOPE OF WORK
PART 1 GENERAL
1.1 SCOPE OF WORK
1.1.1 General
1.1.2 Subcontractors
PART 2 PRODUCTS
PART 3 EXECUTION

File details come from the government source that posted it. Updated .