01 10 00.pdf
PDF 14 KB Posted
- Attached to
- Sewer Line Rehabilitation Homestead Run
- Solicitation number
- W911WN10B0008
About this file
Technical Spec 01 10 00 Change
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W911WN10C0014 Mod P00001.pdf | ||
| Bid results for 10B0008.doc | DOC document | |
| Amendment 0002 Summary of Changes.pdf | ||
| 33 01 99.pdf | ||
| 01 57 20.00 10.pdf | ||
| Bidder Questions and Answers.doc | DOC document | |
| MSSMA Manhole Rehabilitation Schedule Am 2.pdf | ||
| 01 22 00.00 10.pdf | ||
| PA Programmatic General Permit | — | |
| MSSMA Manhole Schedule.pdf | ||
| W911WN10B0008 Amendment 0001.pdf | ||
| 01 35 26.pdf | ||
| 01 50 10.pdf | ||
| Pre Bid Attendance Register.pdf | ||
| Sheet 8.pdf | ||
| Schedule Sheet 1 .pdf | ||
| Sheet 10.pdf | ||
| Sheet 1.pdf | ||
| Cover 1 .pdf | ||
| Sheet 6.pdf | ||
| Sheet 2.pdf | ||
| Sheet 5.pdf | ||
| Sheet 7.pdf | ||
| Sheet 4.pdf | ||
| Sheet 3.pdf | ||
| Sheet 9.pdf | ||
| Technical Specifications.pdf | ||
| W911WN10B0008.pdf |
Show all 28
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Section 219, Homestead Run Sewer Lining Project, Munhall, PA
SECTION TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 10 00
SCOPE OF WORK
PART 1 GENERAL
1.1 SCOPE OF WORK
1.1.1 General
1.1.2 Subcontractors
PART 2 PRODUCTS
PART 3 EXECUTION
-- End of Section Table of Contents --
SECTION 01 10 00 Page 1 W911WN-10-B-0008 Revised by Amendment 0001
SECTION 01 10 00
SCOPE OF WORK
PART 1 GENERAL
1.1 SCOPE OF WORK
1.1.1 General
Under this Division, the Contractor for this Contract shall furnish all materials, labor, plant and equipment necessary to perform the work related to rehabilitation, etc., as shown on the drawings or specified herein.
Base Bid (MH 935A to MH A608)
Base Bid will involve the rehabilitation of approximately 588 linear feet of 36-inch diameter, 2,042 linear feet of 24-inch diameter, 103 linear feet of 18-inch diameter, and 191 linear feet of 15-inch diameter gravity sewer pipe by method of sliplining; rehabilitation of 48 manholes; 28 (6-inch service) reconnections; 2 (18-inch) service reconnections; 9 tap break-in cuts; seeding; by-pass pumping; heavy cleaning; erosion and sedimentation control; and clearing and grubbing.
Awardable Option Item A (MH 1021 to MH 359A)
Awardable Option Item A will involve the rehabilitation of approximately 3,354 linear feet of 24-inch diameter gravity sewer pipe by method of sliplining; rehabilitation of 22 manholes; 7 service reconnections; 5 tap break-in cuts; seeding; by-pass pumping; heavy cleaning; erosion and sedimentation control; and clearing and grubbing.
Awardable Option Item B (MH 361 to MH 397)
AdditiveAwardable Option Item B will involve the rehabilitation of approximately 1,444 linear feet of 24-inch diameter and 1,505 linear feet of 18-inch diameter gravity sewer pipe by method of sliplining;
rehabilitation of 10 manholes; 1 service reconnection; 1 tap break-in cut; seeding; by-pass pumping; heavy cleaning; erosion and sedimentation control; and clearing and grubbing.
1.1.2 Subcontractors
Each subcontractor shall adhere to any applicable parts of the specifications as it relates to the work specified to be done under his/her contract.
PART 2 PRODUCTS
Not Applicable
PART 3 EXECUTION
Not Applicable
SECTION 01 10 00 Page 2
-- End of Section --
SECTION 01 10 00 Page 3
| 01 10 00 - SCOPE OF WORK |
| 01 10 00 - SCOPE OF WORK |
| PART 1 GENERAL |
| 1.1 SCOPE OF WORK |
| 1.1.1 General |
| 1.1.2 Subcontractors |
| PART 2 PRODUCTS |
| PART 3 EXECUTION |
File details come from the government source that posted it. Updated .