Revised Section 01 22 00.00 10 by Amend 0002

View the file

Other files

File Type Posted
W911WN10C0014 Mod P00001.pdf PDF
Bid results for 10B0008.doc DOC document
Amendment 0002 Summary of Changes.pdf PDF
33 01 99.pdf PDF
01 57 20.00 10.pdf PDF
Bidder Questions and Answers.doc DOC document
MSSMA Manhole Rehabilitation Schedule Am 2.pdf PDF
PA Programmatic General Permit —
MSSMA Manhole Schedule.pdf PDF
W911WN10B0008 Amendment 0001.pdf PDF
01 10 00.pdf PDF
01 35 26.pdf PDF
01 50 10.pdf PDF
Pre Bid Attendance Register.pdf PDF
Sheet 8.pdf PDF
Schedule Sheet 1 .pdf PDF
Sheet 10.pdf PDF
Sheet 1.pdf PDF
Cover 1 .pdf PDF
Sheet 6.pdf PDF
Sheet 2.pdf PDF
Sheet 5.pdf PDF
Sheet 7.pdf PDF
Sheet 4.pdf PDF
Sheet 3.pdf PDF
Sheet 9.pdf PDF
Technical Specifications.pdf PDF
W911WN10B0008.pdf PDF
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Section 219, Homestead Run Sewer Lining Project, Munhall, PA

SECTION TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

SECTION 01 22 00.00 10

MEASUREMENT AND PAYMENT

PART 1 GENERAL

1.1 LUMP SUM PAYMENT ITEMS

1.1.1 Bypass Pumping

1.1.1.1 Payment

1.1.1.2 Unit of Measure

1.1.1.3 Payment Item

1.1.2 Erosion and Sedimentation Control

1.1.2.1 Payment

1.1.2.2 Unit of Measure

1.1.2.3 Payment Item

1.1.3 Project Sign

1.1.3.1 Payment

1.1.3.2 Unit of Measure

1.1.3.3 Payment Item

1.2 UNIT PRICE PAYMENT ITEMS

1.2.1 Cured-in-Place Pipe Lining

1.2.1.1 Payment

1.2.1.2 Measurement

1.2.1.3 Unit of Measure

1.2.1.4 Payment Item

1.2.2 Manhole Rehabilitation

1.2.2.1 Payment

1.2.2.2 Measurement

1.2.2.3 Unit of Measure

1.2.2.4 Payment Item

1.2.3 Service Reconnections

1.2.3.1 Payment

1.2.3.2 Measurement

1.2.3.3 Unit of Measure

1.2.3.4 Payment Item

1.2.4 Tab Break-in Cutting

1.2.4.1 Payment

1.2.4.2 Measurement

1.2.4.3 Unit of Measure

1.2.4.4 Payment Item

1.2.5 Seeding

1.2.5.1 Payment

1.2.5.2 Measurement

1.2.5.3 Unit of Measure

1.2.5.4 Payment Item

1.2.6 Heavy Cleaning of Sanitary Sewers

1.2.6.1 Payment

1.2.6.2 Measurement

1.2.6.3 Unit of Measure

1.2.6.4 Payment Items

1.2.7 Clearing & Grubbing

1.2.7.1 Payment

SECTION 01 22 00.00 10 Page 1 W911WN-10-B-0008 Revised by Amendment 0002

1.2.7.2 Measurement

1.2.7.3 Unit of Measure

1.2.7.4 Payment Items

PART 2 PRODUCTS (NOT APPLICABLE)

PART 3 EXECUTION (NOT APPLICABLE)

-- End of Section Table of Contents --

SECTION 01 22 00.00 10 Page 2

SECTION 01 22 00.00 10

MEASUREMENT AND PAYMENT

PART 1 GENERAL

1.1 LUMP SUM PAYMENT ITEMS

Payment items for the work of this contract for which contract lump sum payments will be made are listed in the BIDDING SCHEDULE in Section 00010 SUPPLIES OR SERVICES AND PRICES/COSTS and described below. All costs for items of work, which are not specifically mentioned to be included in a particular lump sum payment item, shall be included in the listed lump sum item most closely associated with the work involved. The lump sum price and payment made for each item listed shall constitute full compensation for furnishing all plant, labor, materials, and equipment, and performing any associated Contractor quality control, environmental protection, meeting safety requirements, tests and reports, and for performing all work required for which separate payment is not otherwise provided.

1.1.1 Bypass Pumping

1.1.1.1 Payment

This work is specified in Section 33 01 99 CURED-IN-PLACE PIPE LINE REHABILITATION. Payment for bypass pumping will be made at the contract lump sum price. Payment shall include all costs for labor, equipment, and materials required for performing the work as specified.

1.1.1.2 Unit of Measure

Unit of measure: Lump Sum.

1.1.1.3 Payment Item

0001CK ARRA - Bypass Pumping 0002BD ARRA - Bypass Pumping 0003AS ARRA - Bypass Pumping

1.1.2 Erosion and Sedimentation Control

1.1.2.1 Payment

This work is specified in Section 01 30 00.15 MSSMA GENERAL REQUIREMENTS.

Payment for Erosion and Sedimentation controls shall be made at the contract lump sum price. Payment shall include all costs for labor, equipment, and materials required for Erosion and Sedimentation controls as specified.

1.1.2.2 Unit of Measure

Unit of measure: Lump Sum.

1.1.2.3 Payment Item

0001CM ARRA - E & S Control 0002BF ARRA - E & S Control

SECTION 01 22 00.00 10 Page 3

0003AU ARRA - E & S Control

1.1.3 Project Sign

1.1.3.1 Payment

Payment will be made for costs associated with furnishing, installing, maintaining and removing project sign as specified in Section 01 50 10

PROJECT SIGNS.

1.1.3.2 Unit of Measure

Unit of measure: lump sum.

1.1.3.3 Payment Item

0001CP ARRA - Project and Safety Signs

1.2 UNIT PRICE PAYMENT ITEMS

Payment items for the work of this contract on which the contract unit price payments will be made are listed in the BIDDING SCHEDULE and described below. All costs for items of work, which are not specifically mentioned to be included in a particular unit price payment item, shall be included in the listed unit price item most closely associated with the work involved. The unit price and payment made for each item listed shall constitute full compensation for furnishing all plant, labor, materials, and equipment, and performing any associated Contractor quality control, environmental protection, meeting safety requirements, tests and reports, and for performing all work required for each of the unit price items.

1.2.1 Cured-in-Place Pipe Lining

1.2.1.1 Payment

This work is specified in Section 33 01 99 CURED-IN-PLACE PIPE LINE REHABILITATION. Payment shall include, but not limited to, by-pass pumping, root cutting, groutingsealing of service connections, all cleaning and televising of said lines, submitting pre and post rehabilitation CCTV DVD's from manhole to manhole to the owner, necessary to complete said item as indicated in the specifications. Maintenance of traffic needed is incidental and paid for under this bid item.

1.2.1.2 Measurement

Payment quantities for "CURED-IN-PLACE PIPE LINE REHABILITATION" shall be determined on the basis of the linear feet of main line sewer completely rehabilitated from manhole to manhole by this method. Measurement will be made from center of manhole to center of manhole.

1.2.1.3 Unit of Measure

Unit of measure: Linear Feet.

1.2.1.4 Payment Item

0001AB ARRA - 36” Diameter CIPP Lining 0001AC ARRA - 24” Diameter CIPP Lining 0001AD ARRA - 18” Diameter CIPP Lining

SECTION 01 22 00.00 10 Page 4

0001AE ARRA - 15” Diameter CIPP Lining 0002AB ARRA - 24” Diameter CIPP Lining 0003AB ARRA - 24” Diameter CIPP Lining 0003AC ARRA - 18” Diameter CIPP Lining

1.2.2 Manhole Rehabilitation

1.2.2.1 Payment

This work is specified in Sections 33 01 30.75 GENERAL MANHOLE REHABILITATION. Payment shall shall constitute full compensation for all labor, equipment, material and supply costs for completing the manhole rehabilitation as specified.

a. Manhole Frame And Cover - Payment shall include all costs in connection with furnishing and erecting the same complete as specified and shown on the respective standard numbers. Unit Price bid shall include, but not be limited to, the required number of stainless steel bolts installed as specified.

b. Hinged Manhole Frame And Cover - Payment shall include all costs in connection with furnishing and erecting the LiftMate Hinge System Frame and Cover as per Neenah Foundry.

c. Watertight Manhole Frame And Cover - Payment shall include all costs in connection with furnishing and erecting the same complete as specified and shown on the respective standard drawing numbers. Unit Price bid shall include, but not be limited to, the required number of stainless steel bolts installed as specified.

d. Sealing Of Interior/Exterior Manhole Walls - Payment shall include interior/exterior sealing of each manhole along with any external grouting necessary to seal the manhole wall complete.

e. Sealing Of Manhole Invert - Payment quantities for "SEALING OF MANHOLE INVERT" shall be include interior rehabilitation as specified.

1.2.2.2 Measurement

Payment quantities shall be determined on the basis of the actual number of manholes in need of interior/exterior rehabilitation and as noted on the manhole schedule

1.2.2.3 Unit of Measure

Unit of measure: Each.

1.2.2.4 Payment Item

0001AF thru 0001CE ARRA - Manhole Rehabilitation 0002AC thru 0002AZ ARRA - Manhole Rehabilitation 0003AD thru 0003AN ARRA - Manhole Rehabilitation

1.2.3 Service Reconnections

1.2.3.1 Payment

This work is specified in Section 33 01 99 CURED-IN-PLACE PIPE LINE REHABILITATION. Unit cost shall include all labor, equipment, goods, SECTION 01 22 00.00 10 Page 5 services, including, but not limited to, CCTV work, and other necessary appurtenances to render a complete installation as indicated in the Specifications except for grouting.

1.2.3.2 Measurement

Measurement for this item shall be based on the number of service reconnections satisfactorily completed.

1.2.3.3 Unit of Measure

Unit of measure: Each.

1.2.3.4 Payment Item

0001CF ARRA - Service Reconnections (6") 0001CG ARRA - Service Reconnections (18") 0002BA ARRA - Service Reconnections 0003AP ARRA - Service Reconnections

1.2.4 Tab Break-in Cutting

1.2.4.1 Payment

This work is specified in Section 33 01 99 CURED-IN-PLACE PIPE LINE REHABILITATION. Unit cost shall include all labor, equipment, goods, services, including, but not limited to, traffic control, debris removal, and other necessary appurtenances as indicated in the Specifications.

1.2.4.2 Measurement

Measurement for this item shall be based on the number of break-in connections cut complete.

1.2.4.3 Unit of Measure

Unit of measure: Each.

1.2.4.4 Payment Item

0001CH ARRA - Tap Break-in Cutting 0002BB ARRA - Tap Break-in Cutting 0003AQ ARRA - Tap Break-in Cutting

1.2.5 Seeding

1.2.5.1 Payment

This work is specified in Section 32 92 19 SEEDING. Payment shall shall constitute full compensation for all labor, equipment, material and supply costs for completing restoration as specified.

1.2.5.2 Measurement

Payment quantities for "Seeding" bid items shall be determined on the basis of the square yards of restoration complete. Quantities shown in the Price Schedule are estimated quantities only. Payment quantities shall be determined on the basis of actual field measurements.

SECTION 01 22 00.00 10 Page 6

1.2.5.3 Unit of Measure

Unit of measure: Square Yard.

1.2.5.4 Payment Item

0001CJ ARRA - Seeding 0002BC ARRA - Seeding 0003AR ARRA - Seeding

1.2.6 Heavy Cleaning of Sanitary Sewers

1.2.6.1 Payment

This work is specified in Section 33 01 99 CURED-IN-PLACE PIPE LINE REHABILITATION. Heavy cleaning is identified as more than two manhole to manhole passes with jetter equipment and/or the required use of bucket or rodding equipment. Payment shall include all costs required to remove and properly dispose of all dirt, sand, roots, grease, and other solid or semi-solid material from all sewers noted in the rehabilitation schedule, payment includes internal televising inspection manhole to manhole.

1.2.6.2 Measurement

Payment quantities shall be determined on the basis of the linear footage of sewers cleaned complete from manhole to manhole where cleaning sanitary sewers is not already required under a separate bid item.

1.2.6.3 Unit of Measure

Unit of measure: Linear Feet.

1.2.6.4 Payment Items

0001CL ARRA - Heavy Cleaning 0002BE ARRA - Heavy Cleaning 0003AT ARRA - Heavy Cleaning

1.2.7 Clearing & Grubbing

1.2.7.1 Payment

This work is specified in Section 31 11 00 CLEARING AND GRUBBING. Payment shall include all costs associated with the construction as specified in the Specifications.

1.2.7.2 Measurement

Payment quantities shall be determined on the basis of the square yards.

1.2.7.3 Unit of Measure

Unit of measure: Square Yards.

1.2.7.4 Payment Items

0001CL ARRA - Clearing & Grubbing 0002BH ARRA - Clearing & Grubbing

SECTION 01 22 00.00 10 Page 7

PART 2 PRODUCTS (NOT APPLICABLE)

PART 3 EXECUTION (NOT APPLICABLE)

-- End of Section --

SECTION 01 22 00.00 10 Page 8

01 22 00.00 10 - MEASUREMENT AND PAYMENT
01 22 00.00 10 - MEASUREMENT AND PAYMENT
PART 1 GENERAL
1.1 LUMP SUM PAYMENT ITEMS
1.1.1 Bypass Pumping
1.1.1.1 Payment
1.1.1.2 Unit of Measure
1.1.1.3 Payment Item
1.1.2 Erosion and Sedimentation Control
1.1.2.1 Payment
1.1.2.2 Unit of Measure
1.1.2.3 Payment Item
1.1.3 Project Sign
1.1.3.1 Payment
1.1.3.2 Unit of Measure
1.1.3.3 Payment Item
1.2 UNIT PRICE PAYMENT ITEMS
1.2.1 Cured-in-Place Pipe Lining
1.2.1.1 Payment
1.2.1.2 Measurement
1.2.1.3 Unit of Measure
1.2.1.4 Payment Item
1.2.2 Manhole Rehabilitation
1.2.2.1 Payment
1.2.2.2 Measurement
1.2.2.3 Unit of Measure
1.2.2.4 Payment Item
1.2.3 Service Reconnections
1.2.3.1 Payment
1.2.3.2 Measurement
1.2.3.3 Unit of Measure
1.2.3.4 Payment Item
1.2.4 Tab Break-in Cutting
1.2.4.1 Payment
1.2.4.2 Measurement
1.2.4.3 Unit of Measure
1.2.4.4 Payment Item
1.2.5 Seeding
1.2.5.1 Payment
1.2.5.2 Measurement
1.2.5.3 Unit of Measure
1.2.5.4 Payment Item
1.2.6 Heavy Cleaning of Sanitary Sewers
1.2.6.1 Payment
1.2.6.2 Measurement
1.2.6.3 Unit of Measure
1.2.6.4 Payment Items
1.2.7 Clearing & Grubbing
1.2.7.1 Payment
1.2.7.2 Measurement
1.2.7.3 Unit of Measure
1.2.7.4 Payment Items
PART 2 PRODUCTS NOT APPLICABLE
PART 3 EXECUTION NOT APPLICABLE