This solicitation is for an indefinite delivery/indefinite quantity construction contract to support the U.S. Army Garrison Fort Benning, Georgia. The contract will have a minimum guarantee of $5,000 and a maximum order value of $5 million for construction, repair, and related services at Fort Benning and satellite sites over one five-year ordering period. The work includes site preparation, cleanup, reporting, and record keeping. The solicitation will be available on January 28, 2019 with proposals due February 28, 2019. The contract will be set aside for total small business and have a NAICS code of 236220 for commercial and institutional building construction and a size standard of $36.5 million. The point of contact for any questions is Jackie Peacock at 706-545-2409.

View the file

Other files

File Type Posted
W911SF18R00220003.pdf PDF
Clarification__for_Question_135_from_Amendment_0003.pdf PDF
W911SF18R00220002.pdf PDF
43632m12_(Revised_11_June_2019).pdf PDF
43632p4_(Revised_11_June_2019).pdf PDF
Key_Personnel_Price_Worksheet.xlsx XLSX spreadsheet
43632p3_(Revised_11_June_2019).pdf PDF
Level_of_Design_Matrix.pdf PDF
43632m10_(Revised_11_June_2019).pdf PDF
43632m4_(Revised_15_May_2019).pdf PDF
S1.pdf PDF
A03.pdf PDF
43632m3_(Revised_11_JUNE_2019).pdf PDF
43632a2_(Revised_11_June_2019).pdf PDF
SOW_BLDG_2882_-_Revised_11_June_2019.pdf PDF
Construction_MATOC_SOW_11_June_2019.pdf PDF
Questions_for_Amendment_0002.pdf PDF
Addendum__Memo__Four.pdf PDF
COVER_SHEET_-_SPECIFICATIONS_(REVISED_11_JUNE_2019).pdf PDF
S5.pdf PDF
COVER_SHEET_-_DRAWINGS_(REVISED_11_JUNE_2019).pdf PDF
43632m11_(Revised_11_June_2019).pdf PDF
FP03_Life_Safety_Notes.pdf PDF
08_14_00_Wood_Doors.pdf PDF
08_11_13_Steel_Doors_and_Frames.pdf PDF
MATOC_Questions.pdf PDF
Fire_Alarm_Review_Submittal_for_CM_Building_14_7_Nov_2016.pdf PDF
COVER_SHEET_-_DRAWINGS_Revised_(1).pdf PDF
Fort_Benning_Fire_Protection_Requirements_Effective_1_Dec_016_(4_Nov_016).pdf PDF
43632p4_(Revised_15_May_2019).pdf PDF
ufc_4_021_01_Chng1.pdf PDF
A04_Wall_Sections.pdf PDF
Questions_From_Industry_-_DPW_051719.pdf PDF
Fire_Alarm_System_SOP.pdf PDF
Military_Installations_to_NFPA_780__2016.pdf PDF
A07_Medium_COF_Roof_Plan.pdf PDF
43632a5_(Revised_15_May_2019).pdf PDF
ENCL_1_-_SOW_BLDG_2882_-_Revised_15_May_2019.pdf PDF
S7_Masonry_Details.pdf PDF
Door_Hardware.pdf PDF
Addendum_2_JACE_8000_Series_Specs_for_Niagara_AX_Server_Installation.pdf PDF
S4_Building_Sections.pdf PDF
A02_Elevations.pdf PDF
Attendance_Roster_Site_Visit_7_May_2019.pdf PDF
10_21_13.pdf PDF
43623a2_(Revised_15_May_2019).pdf PDF
UFC_3-600-01_Fire_Protection_Engineering_for_Facilities_8_August_2016.pdf PDF
Addendum_1.pdf PDF
Addendum_3_Memo.pdf PDF
S3_Framing_Plans.pdf PDF
Show 40 more

Latest 50 of 138 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION 10 44 16 Page 1

SECTION 10 44 16

FIRE

EXTINGUISHERS

05/15

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced . The publications are referred to within the text by the basic designation only.

ASTM INTERNATIONAL (ASTM)

ASTM E814 (2013a) Standard Test Method for Fire

Tests of Through-Penetration Fire Stops

NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)

NFPA l (2015; ERTA 2015) Fire Code

NFPA 10 (2013) Standard for Portable Fire

Extinguishers

NFPA 101 (2015; ERTA 2015) Life Safety Code

NFPA 241 (2013; Errata 2015) Standard for

Safeguarding Construction, Alteration, and Demolition Operations

NFPA 303 (2016) Fire Protection Standards for

Marinas and Boatyards

NFPA 385 (2012) Standard for Tank Vehicles for

Flammable and Combustible Liquids

NFPA 409 (2016) Standard on Aircraft Hangars

NFPA 418 (2016) Standard for Heliports

NFPA 505 (2013) Fire Safety Standard for Powered

Industrial Trucks Including Type Designations, Areas of Use, Conversions, Maintenance, and Operations

NFPA 99 (2015) Health Care Facilities Code

U .S . NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)

29 CFR 1910.106 Flammable and Combustible Liquids

29 CFR 1910.157 (2003) Portable Fire

SECTION 10 44 16 Page 2

UNDERWRITERS LABORATORIES (UL)

UL 154 (2005; Reprint May 2014) Carbon- Dioxide Fire Extinguishers

UL 2129 (2017) UL Standard for Safety

Halocarbon Clean Agent Fire

UL 299 (2012) Dry Chemical Fire Extinguishers

UL 626 (2005; Reprint Mar 2012) 2-1/2

Gallon Stored-Pressure, Water-Type Fire Extinguishers

UL 8 (2016) UL Standard for Safety Water

Based Agent Fire Extinguishers

1.2 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are or information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00, SUBM ITTAL PROCEDURES:

SD-01 Preconstruction Submittals

Manufacturer's Data; G

SD-02 Shop Drawings

Fire Extinguishers; G

Cabinets; G

SD-03 Product Data

Cabinets; G

SD-07 Certificates

Manufacturer's Warranty with Inspection Tag; G

SECTION 10 44 16 Page 3

1.3 DELIVERY, STORAGE, AND HANDLING

Protect materials from weather, soil, and damage during delivery, storage, and construction.

Deliver materials in their original packages, containers, or bundles bearing the brand name and the name and type of the material.

Provide portable fire extinguishers in compliance with NFPA 505 for all ancillary vehicles where Fire Safety Standard for Powered Industrial Trucks, including type designations, special conditions relating to areas of use, conversions, maintenance, or specific operations apply.

1.4 WARRANTY

Guarantee that Fire Extinguishers are free of defects in materials, fabrication, finish, and installation and that they will remain so for a period of not less than 5 years after completion.

PART 2 PRODUCTS

Submit fabrication drawings consisting of fabrication and assembly details performed in the factory and product data for the following items: Fire Extinguishers; Accessories, cabinets, Wall Brackets.

2 .1 SYSTEM DESCRIPTION

2 .1.1 Types

Submit certificates that show fire extinguishers comply with local codes and regulations.

Provide fire extinguishers conforming to NFPA 10. Provide quantity and placement in compliance with the applicable sections of NFPA 1, NFPA 101, and 29 CFR 1910.157.

Provide dry chemical type fire extinguishers compliant with UL 299.

Submit manufacturer's data for each type of Fire Extinguisher required, detailing all related Cabinet, Wall Mounting and Accessories information, complete with manufacturer's warranty with inspection tag.

2 .l.2 Material

Provide corrosion-resistant steel extinguisher shell.

2 .1.3 Size

10 pounds extinguishers.

SECTION 10 44 16 Page 10

2.1.4 Accessories

Forged brass valve

Fusible plug

Safety release

Pressure gage

2.2 EQUIPMENT

2 .2.l Cabinets

2 .2.1.l Material

Provide corrosion-resistant steel cabinets.

2 .2.1.2 Type

Provide semi-recessed cabinet for a 4-inch wall.

2 .2 .1.3 Size

Dimension cabinets to accommodate the specified fire extinguishers.

PART 3 EXECUTION

3.1 INSTALLATION

Fire Extinguishers where indicated on the drawings. Verify exact locations prior to installation.

Provide extinguishers which are fully charged and ready for operation upon installation. Provide extinguishers complete with Manufacturer's Warranty with Inspection Tag attached.

Comply with the manufacturer's recommendations for all installations.

3.2 PROTECTION

3.2.l Repairing

Remove and replace damaged and unacceptable port ions of completed work with new work at no additional cost to the Government.

Submit replacement parts list indicating specified items replacement part, replacement cost, and name, address and contact for replacement parts distributor.

3.2.2 Cleaning

Clean all surfaces of the work, and adjacent surfaces which are soiled as a result of the work. Remove from the site all construction equipment, tools, surplus materials and rubbish resulting from the work .