Attachment_31_TL5.3-3_LLRC_Inspection_Checklist.xlsx
XLSX spreadsheet 13 KB Posted
- Solicitation number
- W911SA12R0017
About this file
Attachment_31_TL5.3-3_LLRC_Inspection_Checklist.xlsx
View the file
Other files
Show all 46
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TL 5.3-3
| Logistics Base Operations Support Services | ||||||||||||||
| FORT McCOY, WISCONSIN | ||||||||||||||
| ATTACHMENT 31: TL 5.3-3 LLRC INSPECTION CHECKLIST | ||||||||||||||
| Location: __________________ LLRC INSPECTION CHECKLIST Sheet ___ of ___ | ||||||||||||||
| # | NIIN | Serial No. | Desiccant Port Y/N | Date Checked | Initial Humidity Indicator Status | Replaced Desiccant in Desiccant port | OPENED LLRC | Final Humidity Indicator Status* | Contacted PSCC Y/N | Initials | Comments | |||
| Good | Bad | 1st Time | 2nd Time | Good | Bad** | |||||||||
| 1 | ||||||||||||||
| 2 | ||||||||||||||
| 3 | ||||||||||||||
| 4 | ||||||||||||||
| 5 | ||||||||||||||
| 6 | ||||||||||||||
| 7 | ||||||||||||||
| 8 | ||||||||||||||
| 9 | ||||||||||||||
| 10 | ||||||||||||||
| 11 | ||||||||||||||
| 12 | ||||||||||||||
| 13 | ||||||||||||||
| 14 | ||||||||||||||
| 15 | ||||||||||||||
| 16 | ||||||||||||||
| 17 | ||||||||||||||
| 18 | ||||||||||||||
| 19 | ||||||||||||||
| 20 | ||||||||||||||
| * Final Humidity Indicator Status after replacing desiccant in desiccant port and/or Opening LLRC one time | ||||||||||||||
| ** If Final Humidity Indicator Status is "BAD", Contact PSCC |
File details come from the government source that posted it. Updated .