W911S8-19-R-0009-0001.pdf

PDF 142 KB Posted

Attached to
Vertical Transportation Equipment Full Service Maintenance and Repair Services
Solicitation number
W911S8-19-R-0009
Issued by

About this file

Amendment 0001

View the file

Other files

Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to do the follow ing:

1. Extend the response date from 14 Aug 2019 to 20 Aug 2019.

2. Add FAR Clause 52.232-37 Multiple Payment Arrangements, by full text

3. Add FAR Clause 52.232-33 Payment by Electronic Funds Transfer -System for Aw ard Management, by reference

4. Replace Attachment 09 Wage Det 2015-5539, w ith the latest revision dated 16 Jul 19

5. Add CAT 1 Testing (Attachment L3*)

6. Add CAT 5 Testing (Attachment L4A*- L4D*)

7. Add VTE Inspection Report List (Attachment L5*)

8. Post official responses to questions received.

All Other terms and conditions remain unchanged.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 08-Aug-2019

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W911S819R0009

X 9B. DATED (SEE ITEM 11)

18-Jul-2019

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

08-Aug-2019

CODE

MICC-JB LEWIS-MCCHORD

BUILDING 2015

JOINT BASE LEWIS-MCCHORD WA 98433-9500

W911S8 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W911S819R0009

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by reference:

52.232-33 Payment by Electronic Funds Transfer--System for Award

Management

OCT 2018

The following have been added by full text:

52.232-37 MULTIPLE PAYMENT ARRANGEMENTS (MAY 1999)

This contract or agreement provides for payments to the Contractor through several alternative methods. The applicability of specific methods of payment and the designation of the payment office(s) are either stated--

(a) Elsewhere in this contract or agreement; or

(b) In individual orders placed under this contract or agreement.

(End of clause)

SECTION SF 1449 - CONTINUATION SHEET

SOLICITATION/CONTRACT FORM

The required response date/time has changed from 14-Aug-2019 10:00 AM to 20-Aug-2019 10:00 AM.

The following have been modified:

ATTACHMENTS

A. All documents are contractually binding.

B. Document Listing:

Item Title Date PWS Performance Work Statement VTE Full Service Maintenance and Repair Services 9 Jul 19 TE 1 Performance Requirements Summary (PRS) 9 Jul 19 TE 2 Deliverables 9 Jul 19 TE 3 VTE Inventory - JBLM 9 Jul 19 TE 4 VTE Inventory - TWCF 9 Jul 19 TE 5 Hazardous Materials Inventory 9 Jul 19 CBA Collective Bargaining Agreement (CBA) 9 Jul 19 WD Wage Determination 2015-5539, Revision 11 16 Ju1 19 L1* Technical Experience Proposal Form Undated

W911S819R0009

L2* Question Submission Form Undated L3* CAT 1 Testing Undated

L4A* CAT 5 Testing Undated L4B* CAT 5 Testing Undated L4C* CAT 5 Testing Undated L4D* CAT 5 Testing Undated L5* VTE Inspection Report List Undated

*Not contractually binding and will be removed at time of award

(End of Summary of Changes)

File details come from the government source that posted it.