Responses_to_Questions.pdf
PDF 95 KB Posted
- Solicitation number
- W911S8-19-R-0009
About this file
Responses to Submitted Questions
View the file
Other files
| File | Type | Posted |
|---|---|---|
| L3_CAT-1.pdf | ||
| W911S8-19-R-0009-0001.pdf | ||
| 09_Wage_Det_2015-5539_Rev_11,_16_Jul_19.pdf | ||
| L5_VTE_Inspection_List.xlsx | XLSX spreadsheet | |
| L4B_CAT-5_Pt_2_Rev_2.pdf | ||
| L4C_CAT-5_Pt_3_Rev_2.pdf | ||
| L4A_CAT-5_Pt_1_Rev_2.pdf | ||
| L4D_CAT-5_Pt_4_Rev_2.pdf | ||
| W911S8-19-R-0009,_Conformed_Copy.pdf | ||
| 08_Collective_Bargaining_Agreement,_9_Jul_19.pdf | ||
| 11_L2_-_Question_Submission_Form.xlsx | XLSX spreadsheet | |
| 05_TE_3_VTE_Inventory_-_JBLM,_9_Jul_19.XLSX | XLSX spreadsheet | |
| 06_TE_4_VTE_Inventory_-_TWCF,_9_Jul_19.XLSX | XLSX spreadsheet | |
| 07_TE_5_HAZMAT_Inventory,_9_Jul_19.xlsx | XLSX spreadsheet | |
| 02_VTE_Maint_Repair_PWS_9_Jul_19_Final.pdf | ||
| 09_Wage_Det_2015-5539_Rev_10,_14_Jun_19.pdf | ||
| 04_TE_2_Deliverables.docx | DOCX document | |
| 03_TE_1_Perfomrance_Requirement_Summary,_9_Jul_19.DOCX | DOCX document | |
| 01_W911S8-19-R-0009,_VTE_Solicitation,_18_Jul_19.pdf | ||
| 10_L1_-_Technical_Experience_Proposal_Form.docx | DOCX document |
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment L2 Question/Comment # Document in Question
(SF 1449, PWS, TE, etc.)
Page/Paragraph in Question (be as specific as possible)
Question/Comment (one per line) Government Response/Disposition
1 N/A N/A
At the site visit we were given an opportunity to review only 6 elevators.
Will the awarded prime contractor be provided a period of time after award to conduct a detailed unit by unit review and qualify pre-existing inspection, testing and maintenance deficiencies that are the responsibility of the government? We ask this question because if this is not available it would significantly increase the prime contractor's risk and consequently significantly increase pricing.
Per PWS paragraph 5.4.1 Condition Assessment, the Contractor, along with the COR, shall determine the working order and condition of all VTE listed in TE's #3 and #4. Further information is provided in the referenced paragraph.
2 N/A N/A Can the government please make available the most recent inspection reports, maintenance logs, and CAT I/CAT 5 test results?
The most recent inspection reports, CAT-1 and/or CAT-5 will be made available through an amendment to the solicitation. See response to question #3 concerning the maintenance logs.
3 N/A N/A Will the Government provide copies of the VTE maintenance records?
No. The inspection reports provided state all of the currently identified deficiencies and areas of concern with the VTE units. The Government does not have all of the maintenance records for each unit dating back to the time of installation. Per the PWS, a condition assessment will be done with the Contractor and Government. The inspection reports will provide the background for this assessment.
File details come from the government source that posted it.