Appendix_3v4-2016-12-20__3_Int._Munns_Corner_SPECS_REGISTER_100_percent.pdf

PDF 159 KB Posted

Attached to
Fort Drum MATOC (Construction)
Solicitation number
W911S2-17-R-0002
Issued by

About this file

Appendix 3v4 - SPECS REGISTER

View the file

Other files

File Type Posted
W911S2-17-R-0002_Amendment_0003,_Ft_Drum_MATOC.pdf PDF
Conformed_Copy,_W911S2-17-R-0002-0009.pdf PDF
Amendment_0009,_W911S2-17-R-0002,_Fort_Drum.pdf PDF
Conformed_Solicitation_W911S2-17-R-0002_through_Amendment_0008.pdf PDF
Attachment_1_-_Seed_Project_PW_SOW_EE-20008-5J,_Seed_Task_Order_Drum_REV02.pdf PDF
Amendment_0008,_W911S2-17-R-0008.pdf PDF
Revised_Appendix_3v1_-_2016-12-20_3_Int_Munns_100_percent_-_CIVIL_31_May_2017_(FCS).pdf PDF
Conformed_W911S2-17-R-0002_thru_Amendment_0007.pdf PDF
Revised_Appendix_3v1_-_2016-12-20_3_Int_Munns_100_percent_-_ELEC_31_May_2017_(fcs).pdf PDF
Amendment_0007_W911S2-17-R-0002.pdf PDF
W911S2-17-R-0002_Conformed.pdf PDF
Amendment_0006_W911S2-17-R-0002.pdf PDF
Conformed_W911S2-17-R-0002_thru_Amendment_0005.pdf PDF
Appendix_3v5_-_2016-12-20__3_Int._Munns_Corner_SWPPP_100_percent.pdf PDF
Amendment_0005_W911S2-17-R-0002.pdf PDF
Attachment_1_-_Seed_Project_PW_SOW_EE-20008-5J,_Seed_Task_Order_Drum_REV01.pdf PDF
Attachment_4_-__W911S2-17-R-0002_MATOC_Site_Visit_Sign_In_Sheet_21_Mar_2017.pdf PDF
Amendment_0004_W911S2-17-R-0002.pdf PDF
Revised_Appendix_3v1_-_2016-12-20_3_Int_Munns_100_percent_-_CIVIL_18_May_2017.pdf PDF
Revised_Appendix_3v1_-_2016-12-20_3_Int_Munns_100_percent_-_ELEC_18_May_2017.pdf PDF
Exhibit_B_-_Price_Proposal_Worksheet,_v1_(Revised_Amd_0004).xlsx XLSX spreadsheet
Conformed_W911S2-17-R-0002_thru_Amendment_0004.pdf PDF
Attachment_3_-_Site_Visit_Roster_W911S2-17-R-0002_06_MAR_17.pdf PDF
Amendment_0002,_17-R-0002,_Ft_Drum_MATOC,_16_Mar_17.pdf PDF
Solicitation_W911S2-17-R-0002_Through_Amendment_0002.pdf PDF
Solicitation_W911S2-17-R-0002_Through_Amendment_0001.pdf PDF
Amendment_0001_W911S2-17-R-0002_Ft_Drum_MATOC.pdf PDF
Exhibit_B-Price_Proposal_Worksheet_v1.xlsx XLSX spreadsheet
Appendix_3v1-2016-12-20_3_Int_Munns_100_percent_-_ELEC.pdf PDF
Appendix_3v3-2016-11-23__3_Int._NARRATIVE_100_percent.pdf PDF
Appendix_3v6-2016-12-20_3_Int._GEO-TECH_-_SIGNED_-_2.PDF PDF
Appendix_3v1-2016-12-20_3_Int_Munns_100_percent_-_CIVIL.pdf PDF
Appendix_3v1-2016-12-20_3_Int_Munns_100_percent_-_COVER.pdf PDF
Exhibit_D11_CDRL_45-48,17-R-0002,Fort_Drum,Construction_MAIDIQ,5Feb17.pdf PDF
Exhibit_E_Application_and_Certificate_for_Payment.pdf PDF
Exhibit_D05_CDRL_20-23,17-R-0002,Fort_Drum,Construction_MAIDIQ,5Feb17.pdf PDF
Appendix_3v2-2016-12-20__3_Int._Munns_Corner_SPECS_100_percent.pdf PDF
Exhibit_C-Fort_Drum's_SOP_for_Electrical_Outages.pdf PDF
Exhibit_D03_CDRL_11-15,17-R-0002,Fort_Drum,Construction_MAIDIQ,8Feb17.pdf PDF
Exhibit_D07_CDRL_28-31,17-R-0002,Fort_Drum,Construction_MAIDIQ,5Feb17.pdf PDF
Attachment_1-Seed_Project_PW_SOW_EE-20008-5J_Seed_Task_Order_Drum.pdf PDF
Exhibit_D04_CDRL_16-19,17-R-0002,Fort_Drum,Construction_MAIDIQ,8Feb17.pdf PDF
Exhibit_G_Biological_Opinion.pdf PDF
W911S2-17-R-0002_Drum_CONMATOC_SOL.pdf PDF
Exhibit_D02_CDRL_5-10,17-R-0002,Fort_Drum,Construction_MAIDIQ,23Feb17.pdf PDF
Exhibit_D01_CDRL_1-4_17-R-0002,Fort_Drum,Construction_MAIDIQ,5Feb17.pdf PDF
Appendix_3v8-PEWS_015-As-Built_Record_Drawings.pdf PDF
Exhibit_D09_CDRL_37-40,17-R-0002,Fort_Drum,Construction_MAIDIQ,5Feb17.pdf PDF
Appendix_3v8-PEWS_002-Clearing_and_Grubbing.pdf PDF
Exhibit_D10_CDRL_41-44,17-R-0002,Fort_Drum,Construction_MAIDIQ,5Feb17.pdf PDF
Show 40 more

Latest 50 of 57 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 14 PAGES

3 Int. Project - Hangar Access/Munns Corners

01 33 00 SD-01 Preconstruction Submittals

Submittal Register

01 78 00 SD-03 Product Data

Warranty Management Plan

Warranty Tags

1.3Spare Parts Data

SD-08 Manufacturer’s Instructions

Instructions

SD-10 Operation and Maintenance

Data

3.3Operation and Maintenance

Manuals

SD-11 Closeout Submittals

3.1As-Built Drawings

3.2Record Drawings

Final Approved Shop Drawings

Construction Contract

Specifications

2.1Certification of EPA Designated

Items

01 78 23 SD-10 Operation and Maintenance

Data

1.3O&M Database

3.1.1Training Plan

3.1.3Training Outline

3.1.2Training Content

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I

C A T I

O N

G O V

R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I

D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I

D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 14 PAGES

01 78 23 SD-11 Closeout Submittals

3.1.4Training Video Recording

3.1.6Validation of Training Completion

09 96 00 SD-03 Product Data

2.1.1Heat-Resistant Coatings

2.2.1Epoxy Coatings

2.2.2Polyurethane Coatings

SD-07 Certificates

3.1.4Manufacturer's Printed

Instructions

26 05 00.00 40 SD-01 Preconstruction Submittals

2.1Material, Equipment, and Fixture

Lists

SD-03 Product Data

2.1.1Conduits and Raceways

2.1.2Wire and Cable

3.2.1.5Splices and Connectors

2.1.3Switches

Outlets, Outlet Boxes, and Pull

Boxes

2.1.6Circuit Breakers

2.1.5Panelboards

2.1.7Lamps and Lighting Fixtures

SD-06 Test Reports

3.3Continuity Test

3.3Phase-Rotation Tests

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I

C A T I

O N

G O

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I

D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I

D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 14 PAGES

26 05 00.00 40 3.3Insulation Resistance Test

SD-07 Certificates

1.4Certification

SD-08 Manufacturer’s Instructions

Part 2Manufacturer's Instructions

26 05 13.00 40 SD-03 Product Data

2.2.1Single-Conductor Shielded

Cables

SD-06 Test Reports

3.2Dielectric Absorption Tests

3.2Medium-Voltage Tests

3.2Radiographic Tests

SD-07 Certificates

2.4Certificates

Minimum Bending Radius

3.2Medium-Voltage Tests

3.2Dielectric Absorption Tests

1.5Cable Splicers

SD-08 Manufacturer’s Instructions

1.4Medium-Voltage Power Cables

1.4Pothead Terminations

26 09 23.00 40 SD-03 Product Data

2.1.1Lighting Contactor

Time Switch

2.1.2Photocell Switch

26 12 19.10 SD-02 Shop Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I

C A T I

O N

G O

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I

D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I

D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 14 PAGES

26 12 19.10 1.5.1Pad-mounted transformer drawings

SD-03 Product Data

2.2Pad-mounted transformers

SD-06 Test Reports

3.7.1Acceptance checks and tests

SD-07 Certificates

2.2.2.1Transformer Efficiencies

SD-09 Manufacturer’s Field

Reports

2.8.2design tests

SD-10 Operation and Maintenance

Data

1.6.1Transformer(s)

SD-11 Closeout Submittals

2.8.1Transformer test schedule

26 18 23.00 40 SD-02 Shop Drawings

Part 2Fabrication Drawings

3.1Installation Drawings

SD-03 Product Data

Part 2Equipment and Performance

Data

2.1.3Mounting Brackets

SD-08 Manufacturer’s Instructions

1.3.1Installation Instructions

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I

C A T I

O N

G O

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I

D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I

D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 14 PAGES

26 18 23.00 40 SD-10 Operation and Maintenance

Data

1.3.2Operation and Maintenance

Manuals

26 28 00.00 10 SD-02 Shop Drawings

Drawings

Shop Drawings

2.6Panelboards

SD-03 Product Data

1.4Equipment

2.7Factory Tests

SD-06 Test Reports

2.7Factory Tests

31 00 00 SD-01 Preconstruction Submittals

3.3 GShoring

1.6.2 GDewatering Work Plan

SD-03 Product Data

3.7 GUtilization of Excavated Materials

3.2Opening of any Excavation or

Borrow Pit

3.13Shoulder Construction

SD-06 Test Reports

3.15Testing

2.1Borrow Site Testing

SD-07 Certificates

3.15Testing

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I

C A T I

O N

G O

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I

D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I

D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 14 PAGES

31 05 19 SD-03 Product Data

2.1.2Thread

2.2Manufacturing Quality Control

Sampling and Testing

SD-04 Samples

3.1Quality Assurance Samples and

Tests

SD-07 Certificates

2.1.1Geotextile

31 11 00 SD-03 Product Data

3.6.1 GNonsaleable Materials

SD-04 Samples

2.1Tree wound paint

2.2Herbicide

31 32 11 SD-02 Shop Drawings

3.2.3Obstructions Below Ground

2.3.1.1Seed Establishment Period

3.6Maintenance Record

SD-03 Product Data

2.1.3Wood Cellulose Fiber

2.1.4Paper Fiber

2.1.9Hydraulic Mulch

2.2Geotextile Fabrics

1.1Equipment

3.1.1Finished Grade

2.3Erosion Control Blankets

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I

C A T I

O N

G O

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I

D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I

D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 14 PAGES

31 32 11 SD-04 Samples

2.1Mulch

2.1.9Hydraulic mulch

2.2Geotextile fabrics

2.3Erosion control blankets

SD-06 Test Reports

2.1.9Hydraulic Mulch

2.2Geotextile Fabrics

2.3Erosion Control Blankets

SD-07 Certificates

2.1Mulch

2.1.9Hydraulic Mulch

2.2Geotextile Fabrics

1.5.1Installer's Qualification

2.3.1Seed

2.1.6Wood By-Products

SD-10 Operation and Maintenance

Data

3.6.2Maintenance Instructions

2.1.8Mulch Control Netting and Filter

Fabric

2.5Aggregate (Stone Check Dams)

32 05 33 SD-01 Preconstruction Submittals

2.4 GIntegrated Pest Management

Plan

SD-03 Product Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I

C A T I

O N

G O

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I

D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I

D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 14 PAGES

32 05 33 2.1 GFertilizer

2.3Mulches Topdressing

2.3.1Organic Mulch Materials

SD-07 Certificates

3.4.1Maintenance inspection report

3.4.2 GPlant quantities

SD-11 Closeout Submittals

3.4.3Tree, staking and guying removal

32 11 26 SD-03 Product Data

1.1.3Waybills and delivery tickets

SD-06 Test Reports

1.4.1Sampling and testing

32 12 10 SD-03 Product Data

1.1.3Waybills and Delivery Tickets

SD-06 Test Reports

3.7Sampling and Testing

32 12 21 SD-03 Product Data

1.1.3Waybills and Delivery Tickets

32 16 13 SD-03 Product Data

2.1Concrete

SD-06 Test Reports

3.6Field Quality Control

32 17 24.00 10 SD-03 Product Data

1.3 GEquipment

Composition Requirements

1.5.1Qualifications

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I

C A T I

O N

G O

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I

D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I

D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 14 PAGES

32 17 24.00 10 SD-06 Test Reports

2.4Sampling and Testing

SD-07 Certificates

Volatile Organic Compound

(VOC)

32 92 19 SD-03 Product Data

2.5.3Wood cellulose fiber mulch

2.4Fertilizer

SD-06 Test Reports

2.2.3Topsoil composition tests

SD-07 Certificates

2.1seed

SD-08 Manufacturer’s Instructions

2.7Erosion Control Materials

32 93 00 SD-01 Preconstruction Submittals

1.4.3State Landscape Contractor's

License

1.6Time Restrictions and Planting

Conditions

SD-03 Product Data

2.3.5Peat

2.3.8Composted Derivatives

2.7.1Organic Mulch Materials

2.3.9Gypsum

2.7 GMulch

2.8.1.2Ground Stakes

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I

C A T I

O N

G O

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I

D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I

D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 14 PAGES

32 93 00 2.8.1.2Ground Stakes

2.11.1Hose

2.5Fertilizer

1.5.2.4 GWeed control fabric

1.5.2.4 GRoot control barrier

2.8.1Staking Material

2.8.6Metal anchors

2.9Antidesiccants

2.10Erosion control materials

1.4.4 GPhotographs

SD-04 Samples

2.7 GMulch

SD-06 Test Reports

1.4.1Topsoil composition tests

2.2.4Topsoil composition tests

1.4.5Percolation Test

SD-07 Certificates

1.4.2Nursery certifications

2.1.1Nursery certifications

33 11 23 SD-03 Product Data

2.6Valve box

2.4.3Pressure regulator

2.5Gas equipment connectors

2.4Valves

2.8Warning and identification tape

2.2.3Risers

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I

C A T I

O N

G O

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I

D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I

D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 14 PAGES

33 11 23 2.2.4Transition fittings

SD-07 Certificates

1.3.1Welder's qualifications

1.3.2PE welder's qualifications

1.3.1Welder's identification symbols

SD-08 Manufacturer’s Instructions

2.2.2PE pipe and fittings

33 30 00 SD-01 Preconstruction Submittals

1.6Existing Conditions

SD-02 Shop Drawings

1.4.2Drawings

2.3.1Precast concrete manhole

2.3.3Metal items

2.3.3.1Frames, covers, and gratings

SD-03 Product Data

2.1Pipeline materials

SD-06 Test Reports

2.4Reports

33 40 00 SD-03 Product Data

3.3Placing Pipe

SD-04 Samples

2.1Pipe for Culverts and Storm

Drains

SD-07 Certificates

Resin Certification

3.8Pipeline Testing

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I

C A T I

O N

G O

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I

D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I

D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 14 PAGES

33 40 00 2.7Hydrostatic Test on Watertight

Joints

3.7.5Determination of Density

2.3.7Frame and Cover for Gratings

33 71 01 SD-03 Product Data

2.6Conductors

2.5Insulators

2.2.1Wood Poles

3.1.7Pole top switch

Recloser

2.15Sectionalizer

2.12Cutouts

2.11Surge arresters

2.7Guy strand

2.9Anchors

SD-06 Test Reports

1.4.4Wood Crossarm Inspection

Report

1.4.4.1Field Test Plan

3.5Field Quality Control

1.4.3Ground resistance test reports

SD-07 Certificates

2.2.1Wood poles

2.3.1Wood crossarms

SD-10 Operation and Maintenance

Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I

C A T I

O N

G O

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I

D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I

D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 14 PAGES

33 71 01 1.5.1Operation and Maintenance

Manuals

33 71 02 SD-02 Shop Drawings

Aluminum conductors

1.4.1Precast underground structures

SD-03 Product Data

2.5Medium voltage cable

2.7Medium voltage cable joints

2.6Medium voltage cable terminations

2.12.2.1Precast concrete structures

2.12.2.4Sealing Material

3.5.3Pulling-In Irons

2.12.3Manhole frames and covers

2.12.4Handhole frames and covers

2.12.6Composite/fiberglass handholes

2.13Cable supports

SD-06 Test Reports

2.17.2Medium voltage cable qualification and production tests

3.19.1Field Acceptance Checks and

Tests

2.17.1Arc-proofing test

3.3Cable Installation Plan and

Procedure

SD-07 Certificates

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I

C A T I

O N

G O

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I

D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I

D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 14 PAGES

33 71 02 1.4.2Cable splicer/terminator

1.4.3Cable Installer Qualifications

1.4.4Certificate of Conformance

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I

C A T I

O N

G O

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I

D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I

D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

File details come from the government source that posted it. Updated .