TE-12_MCTP_WFX_Generic_Models_Timeline.pdf
PDF 96 KB Posted
- Attached to
- Mission Command Training Program (MCTP) Federal contract opportunity
- Solicitation number
- W911S0-16-R-0007
About this file
TE-12
View the file
Other files for this federal contract opportunity
Show all 50
Mission Command Training Program (MCTP) has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Today:
MCT Start Date:
MCT End Date:
Warfighter Start Date:
Warfighter End Date:
Note: All days after Day 0 incorporate all Meeting, Huddles and Rehearsals to include day to day troubleshooting, maintenance issues and Training
Audiences/ECG directed changes or requests to support operations. These tasks are in the IOM category of normal network operations for Installation, Operation and Maintnenace of 24-7 Networks and Simulations support.
EVENT SUSPENSE DATES DATES
Status OCONUS/CONUS SEMINAR CONUS OCONUS Seminar
WFX Equipment Shipment to WFX Site W-19 ####### Advance Party Deploys W-15/18 #######
TECH Advance Party Deploys(50% Commo FST) Status W-16/18 ####### #########
Advance Party Procedures W-15 Tech ADVON ARRIVES W-15
Equipment Arrives W-15 ####### ######### Unpack/Accountability/Roll Out W-15 #######
Site Coordinator Meeting W-15 ####### Tables and Chairs on Hand W-15 #######
Minimum of four telephones operational W-15 ####### Send initial report to MCTP HQs W-15 #######
Advance Party Composition W-15 ####### Safe Available W-15 #######
COMSEC/CCI Available W-15 ####### MCTP OPS DetailReports for Duty W-15 #######
Conduct Operations Detail In-Brief W-15 ####### Set Up Table and Chairs W-15 #######
Off-load of Shipment W-15 ####### Confirm Life Support Facilities W-15 ####### Confirm MCTC Climate Control W-15 #######
Set Up "Working Issues" and "To Do-Checklist" Charts. W-15 ####### Arrange Daily Site Coordination Meetings W-15 #######
Establish the WAN Begin LAN buildout for all Enclaves
Host the Models and Simulation Techicnal Information Forum(MASTIF) Attend Primary training audience Technical Integration Meeting
Calculate Simulations Up and Down time and Update slides Update daily synch slides
Conduct twice daily Simulations Update over Technical Bridge Attend Daily ECG meeting
10% of Work Completed Status Advance Party Procedures W-14 #######
OSPGRPS ADVON ARRIVES 1A W-14 #######
Equipment arrives, begin setup W-14
Site Coordinator Meeting W-14 Establish MCTP Operations/Admin Area W-14
Installation/Configuration/Test of Workstation/FWD Suites/C2 Adapter W-14 Confirm Copier Installation W-14
Establish Distribution Center W-14 Confirm VOQs for VIPs W-14
Contact Protocol W-14 WAN Operational W-14
Continue LAN buildout for all Enclaves W-14 Host the Models and Simulation Techicnal Information Forum(MASTIF)
Attend Primary training audience Technical Integration Meeting Calculate Simulations Up and Down time and Update slides
Update daily synch slides Conduct twice daily Simulations Update over Technical Bridge
Personal Computer Ready for Installation W-14 20% of Work Completed Status
Advance Party Procedures W-13 ####### Establish MCTP Admin Area & AAR Prep Room W-13
Installation/Configuration/Test of Workstation/FWD Suites/C2 Adapter W-13 C4I TiWGs Begin W-13
Production & Test Federation Golden Checkpoint All Models W-13 Connect ADMIN Fax Machine W-13
Establish VIP Offices W-13 Establish AAR Room/AAR Overflow Areas W-13
Host the Models and Simulation Techicnal Information Forum(MASTIF) Attend Primary training audience Technical Integration Meeting
Calculate Simulations Up and Down time and Update slides Update daily synch slides
Conduct twice daily Simulations Update over Technical Bridge Attend Daily ECG meeting
MCTP WFX Generic Models Timeline Milestones and Meetings Schedule
EVENT SUSPENSE DATES DATES
Status OCONUS/CONUS SEMINAR CONUS OCONUS Seminar
30 % of Work Completed Status Advance Party Procedures W-12 #######
Site Coordinator Meeting W-12 Establish MCTP Operations/Admin Area W-12
Installation/Configuration/Test of Workstation/FWD Suites/C2 Adapter W-12 Limited DSN/NIPR Services Established W-12 #######
OPSGRPS ADVON 1B ARRIVES W-12 #######
Host the Models and Simulation Techicnal Information Forum(MASTIF)
Attend Primary training audience Technical Integration Meeting Calculate Simulations Up and Down time and Update slides
Update daily synch slides Conduct twice daily Simulations Update over Technical Bridge
Attend Daily ECG meeting 40% of Work Completed Status Advance Party Procedures W-11 #######
Establish White Cell Meeting Area W-11 Installation/Configuration/Test of Workstation/FWD Suites/C2 Adapter W-11
Install Maps/Boards W-11 Verify Telephones W-11
Establish LNO Area W-11 Continue LAN buildout for all Enclaves W-11
Establish Break Area W-11 SIM Specialists & FST Arrive(100%) W-11 ####### Confirmation of Supply Stockages W-11
Establish OC Hooch W-11 Coordinate ENDEX Plaque W-11
Verify Work Cell Supplies are on Hand W-11 Verify Badge System W-11
Install Secure Fax Machines W-11 OCPOC/NCO Arrive W-11
LAN buildout for all Enclaves Complete W-11 Site Coordinator Meeting W-11
Host the Models and Simulation Techicnal Information Forum(MASTIF) Attend Primary training audience Technical Integration Meeting
Calculate Simulations Up and Down time and Update slides Update daily synch slides
Conduct twice daily Simulations Update over Technical Bridge Attend Daily ECG meeting
50% of Work Completed Status Advance Party Procedures W-10 #######
Installation/Configuration/Test of Workstation/FWD Suites/C2 Adapter W-10 Production & Test Federation restored to Golden Checkpoint W-10
Site Coordinator Meeting W-10 Host the Models and Simulation Techicnal Information Forum(MASTIF)
Attend Primary training audience Technical Integration Meeting Calculate Simulations Up and Down time and Update slides
Update daily synch slides
Conduct twice daily Simulations Update over Technical Bridge Attend Daily ECG meeting
60% of Work Completed Status Advance Party Procedures W-9 #######
Installation/Configuration/Test of Workstation/FWD Suites/C2 Adapter
OPSGRP ADVON 2 ARRIVES W-9 #######
CIC DST ARRIVAL W-9 #######
Site Coordinator Meeting
Host the Models and Simulation Techicnal Information Forum(MASTIF) Attend Primary training audience Technical Integration Meeting
Calculate Simulations Up and Down time and Update slides Update daily synch slides
Conduct twice daily Simulations Update over Technical Bridge Attend Daily ECG meeting
70% of Work Completed Status Advance Party Procedures
VoIP Established W-8 #######
Electronic Telephone Book Completed W-8 ####### Test Federation available for Senior Control W-8
Validate that contact information has been shared between: WIM & CSP operators W-8 BE Server / AWSIM to ADSI W-8
C2 Adapter to GCCS-A / AJAX W-8 C2 Adapter to AFATDS W-8
Main Gateway (FT Lee) to DFG W-8 MTI Sim to TGS W-8
Obtain Orders/Make Copies Site Coordinator Meeting
Host the Models and Simulation Techicnal Information Forum(MASTIF) Attend Primary training audience Technical Integration Meeting
Calculate Simulations Up and Down time and Update slides Update daily synch slides
Conduct twice daily Simulations Update over Technical Bridge Attend Daily ECG meeting
80% of Work Completed Status Advance Party Procedures W-7 #######
Inform TA to clear all COPs 2 hours prior W-7 Begin inject point stimulation to Training Audience @0900 W-7 #######
MCTC Secure for Open Storage of COMSEC/CCI W-7 ####### Exercise Control Group Services Available W-7 #######
Email/Portal/MSEL Services Available W-7 ####### Site Coordinator Meeting W-7
Functional Testing Begins W-7 #######
MUSE and MTI Sim available W-7 ####### Provide TA with MUSE Media page link W-7
Map to TOC Sites with Grid Coordiantes & Routes W-7 Host the Models and Simulation Techicnal Information Forum(MASTIF)
Attend Primary training audience Technical Integration Meeting Calculate Simulations Up and Down time and Update slides
Update daily synch slides Conduct twice daily Simulations Update over Technical Bridge
Attend Daily ECG meeting 90% of Work Completed Status Advance Party Procedures W-6 #######
Cellular Phones Ready for Issue Parking Signs Installed
COG, BOS Chief, EXCON, and Contractor Main Body Arrive W-6 ####### Install Work Cell Supplies W-6 #######
MCTC Security Sweep W-6 ####### Host the Models and Simulation Techicnal Information Forum(MASTIF)
Attend Primary training audience Technical Integration Meeting Calculate Simulations Up and Down time and Update slides
Update daily synch slides Conduct twice daily Simulations Update over Technical Bridge
Attend Daily ECG meeting WFX Unit and MSC OPORDs to MCTP 100% of Work Completed Status Key Events W-5 W-5 ####### 12 Hour Shifts Begin
DAY ONE of Workstation Training Begins W-5 ####### CIC/ADOBE/CHAT Available W-5 #######
Set-Up Theater for In-Brief Unit Issues Badges
Pre-Exercise Schedule Work Cell OIC In-Brief
Theater In-Brief with Security Check Receive Tactical Vehicles
Driver/NCO Brief Drivers Check Out TOC Sites
Briefing Officers Returns OPS Section establishes two shifts
OPS Detail receives WARSIM Training Host the Models and Simulation Techicnal Information Forum(MASTIF)
Attend Primary training audience Technical Integration Meeting Calculate Simulations Up and Down time and Update slides
Update daily synch slides Conduct twice daily Simulations Update over Technical Bridge
Attend Daily ECG meeting
Status Key Events W-4 W-4 #######
DAY TWO of Workcell Training Begins W-4 Main Body of MCTP and Augmentee OCs Arrive W-4
Precision Targeting Testing with MUSE W-4 MUSE Training / Chat W-4
Confrim Visitor List W-4 MCTP VIP Books Prepared W-4
Cell Phones and Pagers to OCs W-4 WCOPFOR Advance Party Arrives W-4
Senior Observer Escort Officer Brief W-4
Coordinate Preparation of Certificates of Achievements for Support Personnel W-4 Host the Models and Simulation Techicnal Information Forum(MASTIF)
Attend Primary training audience Technical Integration Meeting Calculate Simulations Up and Down time and Update slides
Update daily synch slides Conduct twice daily Simulations Update over Technical Bridge
Attend Daily ECG meeting
Status Key Events W-3 W-3 #######
DAY THREE of Workcell Training Begins
Telephone Cards Made W-3 ####### Host the Models and Simulation Techicnal Information Forum(MASTIF)
Attend Primary training audience Technical Integration Meeting Calculate Simulations Up and Down time and Update slides
Update daily synch slides Conduct twice daily Simulations Update over Technical Bridge
White Cell Rehearsal White Cell
Attend Daily ECG meeting Commander, MCTP Arrives Senior Observer Arrives Status Key Events W-2 W-2 #######
Startup from Golden Checkpoint W-2 Simulation runoff (Gametime =Zulu) W-2
STARTEX DATALOAD BEGINS (Blue & Red) W-2 #######
Host the Models and Simulation Techicnal Information Forum(MASTIF) Attend Primary training audience Technical Integration Meeting
Calculate Simulations Up and Down time and Update slides Update daily synch slides
Conduct twice daily Simulations Update over Technical Bridge White Cell Rehearsal
White Cell Attend Daily ECG meeting
Status Key Events W-1 W-1 #######
STARTEX DATALOAD CONTINUES (Blue & Red) W-1 After Task Org Checkpoint (Platinum) W-1
OPFOR Data Load (Stuff Files) STARTEX Checkpoint after OPFOR Load (Diamond)
Mini-Ex W-1 ####### Host the Models and Simulation Techicnal Information Forum(MASTIF)
Attend Primary training audience Technical Integration Meeting
Calculate Simulations Up and Down time and Update slides Update daily synch slides
Conduct twice daily Simulations Update over Technical Bridge White Cell Rehearsal
White Cell Attend Daily ECG meeting
Status Key Events W Day
Continuation of Mini-Ex W-0 0-Jan-00 Reset Federation to STARTEX Checkpoint W-0
Unlock Approved Workstations W-0 Final Adjustments W-0
Run Time Forward to Zulu W-0 Take WARMSTART Check Point W-0
Confirm PAUSEX Procedures w/ OPS W-0 Begin WARM START / INTEL Build W-0
STARTEX +/- 6 W-0
Host the Models and Simulation Techicnal Information Forum(MASTIF) Attend Primary training audience Technical Integration Meeting
Calculate Simulations Up and Down time and Update slides
File details come from the government source that posted it. Updated .