Q A_1_W911RZ-15-R-0002_Ft_Carson_BOS__5_August_2016.pdf

PDF 21 KB Posted

Attached to
Solicitation for Fort Carson Base Operations Support
Solicitation number
W911RZ-15-R-0002
Issued by

About this file

Questions Answers 1 W911RZ-15-R-0002 Ft Carson BOS 5 August 2016

View the file

Other files

File Type Posted
Amendment_8_W911RZ-15-R-0002 _Fort_Carson_BOS_30_Sep_16.pdf PDF
Amendment_7_W911RZ-15-R-0002 _Fort_Carson_BOS_22_Sep_16.pdf PDF
Attachment_1_-W911RZ-15-R-0002_PWS_Ft_Carson_BOS_-_20_Sep_2016.docx DOCX document
Q A_4_Amended_W911RZ-15-R-0002_Ft_Carson_BOS __22_Sep_2016.pdf PDF
Q A_3_(Amended_)_W911RZ-15-R-0002_Ft_Carson_BOS __22_Sep_2016.pdf PDF
Amendment_6_W911RZ-15-R-0002 _Fort_Carson_BOS_15_Sep_16.pdf PDF
Attachment_13_CBA _15-R-0002 _Ft._Carson _BASEOPS _30Sep16.pdf PDF
Attachment_4_DD254 _15-R-0002 _Fort_Carson_BASEOPS _12Sep16.pdf PDF
Attachment_1_-W911RZ-15-R-0002_PWS_Ft_Carson_BOS_-_12_Sep_2016.docx DOCX document
Attachment_13_CBA _15-R-0002 _Ft._Carson _BASEOPS _30Sep16.pdf PDF
Amendment_5_W911RZ-15-R-0002 _Fort_Carson_BOS_12_Sep_16.pdf PDF
Q A_4_Amended_W911RZ-15-R-0002_Ft_Carson_BOS __12_Sep_2016.pdf PDF
Q A_3_(Amended_)_W911RZ-15-R-0002_Ft_Carson_BOS __12_Sep_2016.pdf PDF
Amendment_4_W911RZ-15-R-0002 _Fort_Carson_BOS _31_Aug_16.pdf PDF
Attachment_3_Performance_Requirements_Summary_Table_1_Part_2_15-R-0002_Ft_Carson_9_Aug_16.xlsx XLSX spreadsheet
Amendment_3_W911S8-15-R-0002 _Ft_Carson_BOS _26_Aug_16.pdf PDF
TE-1_8_4_3_Subcontract_Report.xlsx XLSX spreadsheet
Attachment_2_-_Performance_Word_Statement_Technical_Exhibit_Listing(1).xlsx XLSX spreadsheet
TE-1_8_3B_CLIN_Structure_.xlsx XLSX spreadsheet
Attachment_18_Relevant_Contracts _15-R-0002 _Ft._Carson _BASEOPS _19_Aug_16.docx DOCX document
Attachment_21_Base_Line_Staffing_15-R-0002_Ft_Carson_BASEOPS_9_Aug_16.docx DOCX document
TE-5_3_2_O M-Plans.doc DOC document
Attachment_16_Pricing_and_Labor_Mix_15-R-0002_Ft__Carson_BASEOPS.xlsx XLSX spreadsheet
TE-5_13_7_1_Oil_Water_Separator_Locations.docx DOCX document
Attachment_4_DD254 _15-R-0002 _Fort_Carson_BASEOPS _19_Aug_2016.pdf PDF
Attachment_1_-W911RZ-15-R-0002_PWS_Ft_Carson_BOS_-_9_Aug_2016.docx DOCX document
Attachment_3_Performance_Requirements_Summary_Part_1_15-R-0002_Ft_Carson_9_Aug_16.docx DOCX document
Q A_4_W911RZ-15-R-0002_Ft_Carson_BOS __24_Aug_2016.pdf PDF
Q A_3_W911RZ-15-R-0002_Ft_Carson_BOS _16_Aug_2016.pdf PDF
QA_2_W911RZ-15-R-0002_Ft_Carson_BOS_3_Aug_2016.pdf PDF
Amendment_02 _W911RZ-15-R-0002_Ft_Carson_BOS _30_June_2016.pdf PDF
Pre-proposal_Conf_Tour_Map_W911RZ-15-R-0002_Carson_BOS_22_June_2016.pdf PDF
Pre-proposal_Conf_Slides_ _Sign-in_W911RZ-15-R-0002_Carson_BOS_22_June_2016.pdf PDF
Amendment_01 _W911RZ-15-R-0002_Ft_Carson_BOS _16_June_2016.pdf PDF
TE-5_4_3_4_A_Down_Range_Mowing_Maps_53-56.zip ZIP file
TE-5_4_3_4_A_Down_Range_Mowing_Maps_5-8.zip ZIP file
TE-5_4_3_4_A_Down_Range_Mowing_Maps_25-28.zip ZIP file
TE-5_4_3_4_A_Down_Range_Mowing_Maps_1-4.zip ZIP file
Attachments_W911RZ-15-R-0002 _Fort_Carson_BOS.zip ZIP file
TE-5_4_3_4_A_Down_Range_Mowing_Maps_17-20.zip ZIP file
TE-5_4_3_4_A_Down_Range_Mowing_Maps_41-44.zip ZIP file
TE-5_4_3_4_A_Down_Range_Mowing_Maps_69-72.zip ZIP file
TE-5_4_3_4_A_Down_Range_Mowing_Maps_21-24.zip ZIP file
TE-5_4_3_4_A_Down_Range_Mowing_Maps_49-52.zip ZIP file
TE-5_4_3_4_A_Down_Range_Mowing_Maps_33-36.zip ZIP file
Technical_Exhibits_Group_1 _W911RZ-15-R-0002 _Fort_Carson_BOS.zip ZIP file
TE-5_4_3_4_A_Down_Range_Mowing_Maps_73_ _74.zip ZIP file
TE-5_4_3_4_A_Down_Range_Mowing_Maps_29-32.zip ZIP file
TE-5_4_3_4_A_Down_Range_Mowing_Maps_9-12.zip ZIP file
TE-5_4_3_4_A_Down_Range_Mowing_Maps_37-40.zip ZIP file
Show 40 more

Latest 50 of 62 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions & Answers #1 Fort Carson Base Operations Support

W911RZ-15-R-0002

QUESTION 1: Key Control for Barracks.

-Who controls keys

ANSWER: First Sergeant Barracks Program (FSBP) manages the barracks keys with the units.

-Who makes replacements

Answer: The Base Operations Support Contractor is responsible for making replacement keys. PWS paragraph C.5.19.5.1.1 states: “Accept key request letters directly from the customer and cut keys on a service order and keep in a file system as determined by the Contractor. Ensure the key request letter is electronically signed by the customers’ Commander, 1st Sgt, or key control person.”

-How many barracks have magnetic vice keys

Answer: Of the 66 barracks facilities, there are eleven barracks that utilize Onity magnetic key cards.

-co-ed facilities

Answer 1: All barracks are co-ed facilities.

QUESTION 2: How many rollup/bi-fold doors in the maintenance facilities.

ANSWER 2: There are a total of 162 overhead bi-fold doors installed in the motor pools.

QUESTION 3: How long is the runway?

ANSWER 3: With overruns, total length is 4673 LF.