Attachment_3_Performance_Requirements_Summary_Table_1_Part_2_15-R-0002_Ft_Carson_9_Aug_16.xlsx

XLSX spreadsheet 14 KB Posted

Attached to
Solicitation for Fort Carson Base Operations Support
Solicitation number
W911RZ-15-R-0002
Issued by

About this file

Attachment 3 Performance Requirements Summary Table 1 Part 2 15-R-0002 Ft Carson 9 Aug 16

View the file

Other files

File Type Posted
Amendment_8_W911RZ-15-R-0002 _Fort_Carson_BOS_30_Sep_16.pdf PDF
Amendment_7_W911RZ-15-R-0002 _Fort_Carson_BOS_22_Sep_16.pdf PDF
Attachment_1_-W911RZ-15-R-0002_PWS_Ft_Carson_BOS_-_20_Sep_2016.docx DOCX document
Q A_4_Amended_W911RZ-15-R-0002_Ft_Carson_BOS __22_Sep_2016.pdf PDF
Q A_3_(Amended_)_W911RZ-15-R-0002_Ft_Carson_BOS __22_Sep_2016.pdf PDF
Amendment_6_W911RZ-15-R-0002 _Fort_Carson_BOS_15_Sep_16.pdf PDF
Attachment_13_CBA _15-R-0002 _Ft._Carson _BASEOPS _30Sep16.pdf PDF
Attachment_4_DD254 _15-R-0002 _Fort_Carson_BASEOPS _12Sep16.pdf PDF
Attachment_1_-W911RZ-15-R-0002_PWS_Ft_Carson_BOS_-_12_Sep_2016.docx DOCX document
Attachment_13_CBA _15-R-0002 _Ft._Carson _BASEOPS _30Sep16.pdf PDF
Amendment_5_W911RZ-15-R-0002 _Fort_Carson_BOS_12_Sep_16.pdf PDF
Q A_4_Amended_W911RZ-15-R-0002_Ft_Carson_BOS __12_Sep_2016.pdf PDF
Q A_3_(Amended_)_W911RZ-15-R-0002_Ft_Carson_BOS __12_Sep_2016.pdf PDF
Amendment_4_W911RZ-15-R-0002 _Fort_Carson_BOS _31_Aug_16.pdf PDF
Amendment_3_W911S8-15-R-0002 _Ft_Carson_BOS _26_Aug_16.pdf PDF
TE-1_8_4_3_Subcontract_Report.xlsx XLSX spreadsheet
Attachment_2_-_Performance_Word_Statement_Technical_Exhibit_Listing(1).xlsx XLSX spreadsheet
TE-1_8_3B_CLIN_Structure_.xlsx XLSX spreadsheet
Attachment_18_Relevant_Contracts _15-R-0002 _Ft._Carson _BASEOPS _19_Aug_16.docx DOCX document
Attachment_21_Base_Line_Staffing_15-R-0002_Ft_Carson_BASEOPS_9_Aug_16.docx DOCX document
TE-5_3_2_O M-Plans.doc DOC document
Attachment_16_Pricing_and_Labor_Mix_15-R-0002_Ft__Carson_BASEOPS.xlsx XLSX spreadsheet
TE-5_13_7_1_Oil_Water_Separator_Locations.docx DOCX document
Attachment_4_DD254 _15-R-0002 _Fort_Carson_BASEOPS _19_Aug_2016.pdf PDF
Attachment_1_-W911RZ-15-R-0002_PWS_Ft_Carson_BOS_-_9_Aug_2016.docx DOCX document
Attachment_3_Performance_Requirements_Summary_Part_1_15-R-0002_Ft_Carson_9_Aug_16.docx DOCX document
Q A_4_W911RZ-15-R-0002_Ft_Carson_BOS __24_Aug_2016.pdf PDF
Q A_3_W911RZ-15-R-0002_Ft_Carson_BOS _16_Aug_2016.pdf PDF
QA_2_W911RZ-15-R-0002_Ft_Carson_BOS_3_Aug_2016.pdf PDF
Q A_1_W911RZ-15-R-0002_Ft_Carson_BOS__5_August_2016.pdf PDF
Amendment_02 _W911RZ-15-R-0002_Ft_Carson_BOS _30_June_2016.pdf PDF
Pre-proposal_Conf_Tour_Map_W911RZ-15-R-0002_Carson_BOS_22_June_2016.pdf PDF
Pre-proposal_Conf_Slides_ _Sign-in_W911RZ-15-R-0002_Carson_BOS_22_June_2016.pdf PDF
Amendment_01 _W911RZ-15-R-0002_Ft_Carson_BOS _16_June_2016.pdf PDF
TE-5_4_3_4_A_Down_Range_Mowing_Maps_53-56.zip ZIP file
TE-5_4_3_4_A_Down_Range_Mowing_Maps_5-8.zip ZIP file
TE-5_4_3_4_A_Down_Range_Mowing_Maps_25-28.zip ZIP file
TE-5_4_3_4_A_Down_Range_Mowing_Maps_1-4.zip ZIP file
Attachments_W911RZ-15-R-0002 _Fort_Carson_BOS.zip ZIP file
TE-5_4_3_4_A_Down_Range_Mowing_Maps_17-20.zip ZIP file
TE-5_4_3_4_A_Down_Range_Mowing_Maps_41-44.zip ZIP file
TE-5_4_3_4_A_Down_Range_Mowing_Maps_69-72.zip ZIP file
TE-5_4_3_4_A_Down_Range_Mowing_Maps_21-24.zip ZIP file
TE-5_4_3_4_A_Down_Range_Mowing_Maps_49-52.zip ZIP file
TE-5_4_3_4_A_Down_Range_Mowing_Maps_33-36.zip ZIP file
Technical_Exhibits_Group_1 _W911RZ-15-R-0002 _Fort_Carson_BOS.zip ZIP file
TE-5_4_3_4_A_Down_Range_Mowing_Maps_73_ _74.zip ZIP file
TE-5_4_3_4_A_Down_Range_Mowing_Maps_29-32.zip ZIP file
TE-5_4_3_4_A_Down_Range_Mowing_Maps_9-12.zip ZIP file
TE-5_4_3_4_A_Down_Range_Mowing_Maps_37-40.zip ZIP file
Show 40 more

Latest 50 of 62 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TE 1-4b PRS

ATTACHMENT 1: PRS Part 1 Table
9-Aug-16Base Operations and Maintenance (W911RZ-15-R-0002) PERFORMANCE REQUIREMENT SUMMARY (PRS)
PWs SectionPERFORMANCE STANDARDCritical itemsAQLCONSEQUENCES OF FAILURE TO MEET PERFORMANCE STANDARD
C.1All data on documents and reports supplied to the Government shall meet requirements of the identified paragraph. Information supplied shall be accurate with only minor typographical errors and on time. There shall be no accounting errors on financial documentsC.1.7.15 C.1.8.4.1 C.1.8.4.2 C.1.8.4.3 C.1.8.4.41 failure of 5 critical items or 2 failures of noncritical itemsContract Deficiency Report and reflected in the Contractor Performance Assessment Reporting System
C.5.1All documents and materials supplied to the Government shall meet requirements of the identified paragraph. Information supplied shall be accurate with only minor typographical errors and on time. Repairs to identified critical items shall be made as a priority without delays. Limitation to repair authority shall be applicable to all repairs. Response and repair times to respective DMO priorities shall be met.C.5.1.1 C.5.1.4.6 C.5.1.7.1.2 C.5.1.7.1.4 C.5.1.7.1.6 C.5.1.16 C.5.1.18 C.5.1.222 failures of 8 critical items or 4 failures of noncritical itemsContract Deficiency Report and reflected in the Contractor Performance Assessment Reporting System
C.5.2All data provided in the MIS shall meet requirements of the identified paragraph. Information supplied shall be accurate with only minor typographical errors and on time.C.5.2.20 failure of 1 critical items or 2 failures of noncritical itemsContract Deficiency Report and reflected in the Contractor Performance Assessment Reporting System
C.5.3All data provided on documents and reports supplied to the Government shall meet requirements of the identified paragraph. Information supplied shall be accurate with only minor typographical errors and on time. Maintenance plans submitted shall be accurate and followed by shop personnel.C.5.3.21 failure of 1 critical items or 2 failures of noncritical itemsContract Deficiency Report and reflected in the Contractor Performance Assessment Reporting System
C.5.4All data provided on documents and reports supplied to the Government shall meet requirements of the identified paragraph. Information supplied shall be accurate with only minor typographical errors and on time. Properly irrigate turf to prevent disease and undo stress. Pesticides used shall be IAW manufacturer and law. Use and store only approved pesticides.C.5.4.6.2 C.5.4.11.8 C.5.4.11.101 failure of 3 critical items or 3 failures of noncritical itemsContract Deficiency Report and reflected in the Contractor Performance Assessment Reporting System
C.5.5All data provided on documents and reports supplied to the Government shall meet requirements of the identified paragraph. Asphalt stripping shall not hinder traffic flow during peak times. Railroad track shall be properly maintained so there is no interruption of train movements.C.5.5.2.1.15 C.5.5.3.11 failure of 2 critical items or 3 failures of noncritical itemsContract Deficiency Report and reflected in the Contractor Performance Assessment Reporting System
C.5.6All data provided on documents and reports supplied to the Government shall meet requirements of the identified paragraph. Repairs to Firefighting and Recycle/Refuse equipment shall have priority above other competing requirements. All stand by generators shall properly maintained and have required fuel for use at any time.C.5.6.5 C.5.6.10.21 failure of 2 critical items or 2 failures of noncritical itemsContract Deficiency Report and reflected in the Contractor Performance Assessment Reporting System
C.5.7All data provided on documents and reports supplied to the Government shall meet requirements of the identified paragraph. Disruptions in electric power to a building or the post, shall not be caused by the Contractor's action/inaction. Substations shall be properly maintained and secured. Airfield lighting shall be maintained so not to disrupt flying operations. Emergency generators shall be operational to perform as needed. UPS systems shall properly work when a power outage occurs.C.5.7.1 C.5.7.1.9 C.5.7.3.3.2 C.5.7.5 C.5.7.72 failures of 5 critical items or 4 failures of noncritical itemsContract Deficiency Report and reflected in the Contractor Performance Assessment Reporting System
C.5.8All documents and materials supplied to the Government shall meet requirements of the identified paragraph. Information supplied shall be accurate with only minor typographical errors and on time. Ensure boilers/generator operations and maintenance is IAW applicable code. Plant and boilers shall operate 24/7/356 providing required water at temperature. All safety devices shall fully operate as designed. Operational inspection of 9609 and 9651 shall at least 1X/day. Perform summer maintenance and overhaul per Tm 5-650. Ensure heat plant boilers are inspected internally and externally each year. Operators are required to be NIULPE 4th class engineer certified and supervisor is 2nd class engineer certified. There shall be no leaks of natural gas or fuel oil and heating systems shall heat the space to specified temperatures.C.5.8.1.1.2 C.5.8.1.1.3 C.5.8.1.1.4 C.5.8.1.1.10 C.5.8.1.5.1 C.5.8.1.5.3 C.5.8.1.6.1 C.5.8.1.7.22 failures of 8 critical items or 4 failures of noncritical itemsContract Deficiency Report and reflected in the Contractor Performance Assessment Reporting System
C.5.9All documents and materials supplied to the Government shall meet requirements of the identified paragraph. Information supplied shall be accurate with only minor typographical errors and on time. Ensure spa, hot tub, and swimming pool pH levels are maintained between 7.2 – 7.8. Ensure Dry, wet and Clean Agent fire suppression systems are properly maintained and operational at all times.C.5.9.2.8 C.5.9.5.1.1 C.5.9.5.2.1 C.5.9.3.11 failure of 4 critical items or 3 failures of noncritical itemsContract Deficiency Report and reflected in the Contractor Performance Assessment Reporting System
C.5.10All documents and materials supplied to the Government shall meet requirements of the identified paragraph.C.5.10.60 failure of 1 critical items or 2 failures of noncritical itemsContract Deficiency Report and reflected in the Contractor Performance Assessment Reporting System
C.5.11All documents and materials supplied to the Government shall be accurate with only minor typographical errors. Responsibility for NEPA coordination and review lies with the Contractor and IAW AR and FC regulations as identified in the PWS. Requests for repairs as dedscribed in this section shall be submitted for NEPA review and approval.C.5.11.11 failure of 1 critical items or 2 failures of noncritical itemsContract Deficiency Report and reflected in the Contractor Performance Assessment Reporting System
C.5.12Ensure there is a certified operator and all work is performed IAW PWS and CDPHE certification requirements. Maintain operational hours of the CVWF IAW FC Reg 700-5C.5.12.1.2 C.5.12.2.21 failure of 1 critical items or 2 failures of noncritical itemsContract Deficiency Report and reflected in the Contractor Performance Assessment Reporting System
C.5.13STP poeration shall meet requirements of the identified paragraph. Any violation of the NPDES permit standards is not acceptable and shall be reported to the COR within two hours of the incident with a detailed explanation of the noncompliance.C.5.13.1.20 failure of 1 critical items or 3 failures of noncritical itemsContract Deficiency Report and reflected in the Contractor Performance Assessment Reporting System
C.5.14Contractor effort shall meet requirements of the identified paragraph. Errosion protection shall be part of the ditch repair DMO. Storm collection shall be free of obstruction and free flowing to prevent ponding and overflowC.5.14.8 C.5.15.91 failure of 2 critical items or 2 failures of noncritical itemsContract Deficiency Report and reflected in the Contractor Performance Assessment Reporting System
C.5.15The Contractor shall maintain water quality throughout the distribution system to meet current standards of the CDPHE, federal and local standards. Any finding outside established perameters will be unaccepable. All backflow deveises must be current with testing and documentationC.5.15.1.2 C.5.15.3.21 failure of 2 critical items or 2 failures of noncritical itemsContract Deficiency Report and reflected in the Contractor Performance Assessment Reporting System
C.5.18All data provided on documents and reports supplied to the Government shall meet requirements of the identified paragraph. Information supplied shall be accurate with only minor typographical errors and on time. Contractor employee shall be accredited for cathodic protection by NACE. Perform and provide annual survey of gas distribution system.C.5.18.1.2 C.5.18.2.21 failure of 2 critical items or 2 failures of noncritical itemsContract Deficiency Report and reflected in the Contractor Performance Assessment Reporting System
C.5.19All data provided on documents and reports supplied to the Government shall meet requirements of the identified paragraph. Information supplied shall be accurate with only minor typographical errors and on time. Develop and implement a facility maintenance program as described in TM 5-610. Follow requirements of the Manual on Uniform Traffic Devices (MUTCD) for non-facility signsC.5.19.1 C.5.19.6.2.21 failure of 2 critical items or 4 failures of noncritical itemsContract Deficiency Report and reflected in the Contractor Performance Assessment Reporting System
All PWS sections not identified as critical in the PRS are classified as non-critical. This does not mean they are not important in regards to performance.

File details come from the government source that posted it. Updated .