AT-3 Facility List-Job Orders REVISED.xlsx
XLSX spreadsheet 845 KB Posted
- Attached to
- Fort Riley Custodial Services Federal contract opportunity
- Solicitation number
- W911RX-25-R-A004
About this file
This file consists of a detailed facility list and task orders spreadsheet for custodial services at Fort Riley, combined with a federal contract opportunity notice (W911RX-25-R-A004). The spreadsheet breaks down cleaning requirements for multiple buildings including specific square footage, floor types, and cleaning frequencies for tasks like trash collection, sweeping, mopping, vacuuming, restroom cleaning, and other custodial duties.
The contract opportunity, managed by the Army Materiel Command at Fort Hood, covers custodial services for approximately 130 buildings totaling over 1 million square feet at Fort Riley, Kansas. The facilities include 8 child/youth development centers, 70 administrative buildings, 12 high-use administrative/community facilities, 13 training/education facilities, and 16 other facilities including major headquarters buildings. This has been an AbilityOne-SourceAmerica contract for over 10 years. The contractor must provide all personnel, equipment, supplies, facilities, transportation, tools, materials, and supervision necessary to perform the specified custodial tasks according to the defined frequencies and performance standards.
View the file
Other files for this federal contract opportunity
Show all 42
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PWS TASKS
| PWS # | Task | Standard |
| 5.3.1 - Collect and Remove Trash Indoors and Outdoors | Empty waste baskets; recycle bins; diaper containers; and other waste containers up to 32 gallons in size within the building and return them to their original locations. Waste containers in rest rooms shall be emptied each time rest rooms are cleaned including sanitary napkin receptacles in all toilet enclosures. Ensure that waste containers containing liquids do not spill onto floor surfaces. Clean up spills resulting from leaking waste container liners and waste containers. All waste from waste containers shall be removed from the building and emptied into the closest dumpster in such a manner as to prevent the adjacent area from becoming littered by the waste. Plastic waste container liners for waste containers shall be replaced each time the waste containers are emptied. Waste containers shall be cleaned, inside and outside, to remove soil and spills. Excess amounts of trash such as furniture and equipment boxes, boxes of files or publications, fluorescent tubes, and other waste and debris resulting from building occupants' "house cleaning campaigns" are not required to be removed by the Contractor. Trash receptacle liners shall be not less than 1.5 mills thick. | Waste containers are free of waste, liquid, and soil inside and outside, and be fitted with new waste container liners. |
| 5.3.2 - Sweep and/or Dust Mop Floors and Stairways | Sweep non-carpeted floor and stairway surfaces, including areas under desks, work stations, tables, chairs, equipment, radiators and convectors, waste and recycling containers, area rugs, and entrance mats. Move movable furniture and equipment, waste and recycling containers, area rugs, and entrance mats in order to accomplish the task and return moved items to their original locations. In Child Development Centers, also move children's toys in order to accomplish the task and place toys off the floor. Remove soil, spills, litter, gum, tar, and other sticky substances from the floor surfaces prior to sweeping. Clean entrance mats and restore the resiliency of the carpet pile whether indicated on floor plan drawings or not. | Non-carpeted floor and stairway surfaces and associated baseboards including surfaces adjacent to stairway balustrade balusters are clean and free of dust, soil, grit, litter, and spots caused by spills. Entrance mats are clean and free of soil and grit. |
| 5.3.2 - Sweep Open Porches, Outdoor Stairs, and Sidewalks | Sweep open concrete or wood porches, outdoor stairs, and sidewalks as specified in paragraph 5.3.2. | Porch, stair, and sidewalk surfaces are clean and free of soil, trash and debris. |
| 5.3.4 - Mop Floors and Stairways (Except Rest Rooms) | Mop non-carpeted floor and stairway surfaces, including areas under desks, work stations, tables, chairs, equipment, radiators and convectors, waste and recycling containers, area rugs, and entrance mats. This includes wood floor surfaces when indicated on task orders. Wood floors shall be damp mopped to prevent damage to the floor. Utilize an appropriate cleaner for the type of floor surface. Move movable furniture and equipment, waste and recycling containers, area rugs, and entrance mats in order to accomplish the task and return moved items to their original locations. In Child Development Centers, also move children's toys in order to accomplish the task and place toys off the floor. Sweep floor surfaces in accordance with paragraph 3.4.2 prior to mopping. In Child Development Centers. (1) Use a double bucket mop system to prevent dirty rinse water from being spread back over the floors during cleaning. (2) Use buckets with at least a 9-gallon capacity. (3) Use clean mop heads for each cleaning shift. Label mop heads "FOR CHILD CARE ONLY". | Non-carpeted floor and stairway surfaces including surfaces adjacent to stairway balustrade balusters are clean and free of any soil and removable stains and have a uniform appearance with no streaks, swirl marks, detergent, or residue. Baseboards, walls, doors, or other non-floor surfaces are free of splash marks, mop streaks, or dirt residue. |
| 5.3.5 - Machine Scrub Hard Surface Floors | Machine scrub hard surface floors including grouted ceramic, porcelain, and quarry tile floor surfaces and grout lines; seamless sheet vinyl, rubber tile, rubber and vinyl stair treads and cove bases. Move movable furniture and equipment, waste and recycling containers, and entrance mats in order to accomplish the task and return moved items to their original locations. Sweep and mop floor surfaces in accordance with paragraphs 5.3.2 and 5.3.4 prior to machine scrubbing. Use the appropriate cleaning solution for the type of floor. | Hard surface floors including grouted ceramic, porcelain, and quarry tile floor surfaces and grout lines; seamless sheet vinyl, rubber tile, rubber and vinyl stair treads, and cove bases have a uniform appearance, free of dirt, grime, scuff marks, heel marks, and other stains. |
| 5.3.6 - Spray and Buff Resilient and Terrazzo Floor Surfaces | Spray and machine buff resilient and terrazzo floor surfaces, including areas under desks, work stations, tables, chairs, equipment, radiators and convectors, waste and recycling containers, area rugs, and entrance mats. Move movable furniture and equipment, waste and recycling containers, area rugs, and entrance mats in order to accomplish the task and return moved items to their original locations. Sweep and mop floor surfaces in accordance with paragraphs 5.3.2 and 5.3.4 prior to spray-buffing. Spray-buff solution shall be the same type as the finish already on the floor. Resweep floor surfaces following spray-buffing. Remove spray-buff solution overspray from baseboards, walls, doors, and other non-floor surfaces. | Resilient and terrazzo floor surfaces have a uniform, glossy appearance, free of scuff marks, heel marks, and other stains, and have a uniform coating of floor finish. Baseboards, walls, doors, and other non-floor surfaces are free of wax. Floors are free of wax build-up. |
| 5.3.7 - Scrub and Rewax Resilient and Terrazzo Floor Surfaces | Scrub, rewax, and polish resilient and terrazzo floor surfaces, including areas under desks, work stations, tables, chairs, equipment, radiators and convectors, waste and recycling containers, area rugs, and entrance mats. Move movable furniture and equipment, waste and recycling containers, area rugs, and entrance mats in order to accomplish the task and return moved items to their original locations. Sweep floor surfaces in accordance with paragraph 5.3.2 prior to scrubbing and rewaxing. Apply 2 coats of wax to all floor surfaces. Wax shall be water emulsion type, non-skid type, manufactured specifically for resilient and terrazzo floor surfaces. Rewaxing shall begin immediately after the mopping operation has thoroughly dried. Remove wax splatters from baseboards, walls, doors, and other non-floor surfaces. Machine buffing operations shall begin immediately after wax is thoroughly dry. Floor surfaces shall be free of dust and dirt prior to buffing operations. | Resilient and terrazzo floor surfaces have a uniform, glossy appearance, free of streaks, swirls, scuff marks, heel marks, and other stains, and have a uniform appearance over the entire floor area. Baseboards, walls, doors, and other non-floor surfaces are free of wax. Floors are free of wax build-up. |
| 5.3.8 - Strip and Rewax Resilient and Terrazzo Floor Surfaces | Strip, rewax, and polish resilient and terrazzo floor surfaces, including areas under desks, work stations, tables, chairs, equipment, radiators and convectors, waste and recycling containers, area rugs, and entrance mats. Move movable furniture and equipment, waste and recycling containers, area rugs, and entrance mats in order to accomplish the task and return moved items to their original locations. Floor surfaces shall be completely stripped of existing floor finishes, toughly rinsed to remove stripping solution and old finishes, and allowed to dry completely prior to rewaxing. Remove stripping solution and wax splatters from baseboards, walls, doors, and other non-floor surfaces. Apply a minimum of 2 coats of sealer and 2 coats of wax to all floor areas. Rewax and machine buff floors in accordance with paragraph 5.3.7. | Resilient and terrazzo floor surfaces have a uniform, glossy appearance, free of streaks, swirls, scuff marks, heel marks, and other stains, and have a uniform appearance over the entire floor area. Baseboards, walls, doors, and other non-floor surfaces are free of stripping solution and wax. Floors are free of wax build-up. |
| 5.3.9 - Vacuum Carpet, Rugs, and Throw Rugs | Vacuum carpeted floor areas, including areas under desks, work stations, tables, chairs, equipment, radiators and convectors, waste and recycling containers, entrance mats, and infant crawl areas in the Child Development Centers. Move movable furniture and equipment, waste and recycling containers, and entrance mats in order to accomplish the task and return moved items to their original locations. In Child Development Centers, also move children's toys in order to accomplish the task and place toys off the floor. Police carpeted areas to remove all surface litter such as paper, gum, rubber bands, paper clips, staples, etc. prior to vacuuming. Vacuum cleaners shall conform to paragraph 4.4. Disinfect carpet in the Child Development Centers after vacuuming as part of this task. | All carpeted floor areas are clean and free of all visible soil and litter. |
| 5.3.10 - Clean and Disinfect Carpet in Infant Crawl Areas | (Child Development Centers Only). Clean and disinfect carpet in infant crawl areas by the dry foam shampooing method. Relocate movable items in order to accomplish the task and return moved items to their original locations. Vacuum carpeted floor areas both prior to and following carpet cleaning with a vacuum cleaner conforming to the requirements of paragraph 5.3.9. Remove stains from carpet prior to cleaning. Dry foam shampooing materials and equipment shall conform to paragraph 4.4. Disinfect carpet after cleaning. | Carpets are clean and free of streaks, stains, and spots, and have a bright uniform appearance. |
| 5.3.11 - Clean Carpet, Rugs, and Throw Rugs | Clean carpeted floor areas by the hot water extraction method, including areas under desks, work stations, tables, chairs, equipment, radiators and convectors, waste and recycling containers, entrance mats. Carpet, rugs, and throw rugs in the Child Development Centers shall also be disinfected as part of this task. Move movable furniture and equipment, waste and recycling containers, and entrance mats in order to accomplish the task and return moved items to their original locations. Vacuum carpeted floor areas both prior to and following carpet cleaning with a vacuum cleaner conforming to paragraph 5.3.9. Remove stains from carpet prior to cleaning. Hot water extraction materials and equipment shall conform to paragraph 4.4. Disinfect carpet in the Child Development Centers after cleaning as part of this task. | Carpets are clean and free of streaks, stains, and spots, and have a bright uniform appearance. |
| 5.3.12 - Clean and Rewax Wood Floor Surfaces | Clean, wax, and polish all wood floor surfaces, including areas under desks, work stations, tables, chairs, equipment, radiators and convectors, waste and recycling containers, area rugs, and entrance mats. Move movable furniture and equipment, waste and recycling containers, area rugs, and entrance mats in order to accomplish the task and return moved items to their original locations. Sweep and mop floor surfaces in accordance with paragraphs 5.3.2 and 5.3.4 prior to waxing. Clean and remove chewing gum, heel marks, and stains prior to waxing. Wax shall be liquid or paste solvent spirit type manufactured specifically for wood floor surfaces. Machine buffing operations shall begin immediately after wax is thoroughly dry. Floor surfaces shall be free of dust and dirt before buffing operations. | Wood floor surfaces have a uniform, glossy appearance, free of scuff marks, heel marks, and other stains, and have a uniform coating of floor finish. Baseboards, walls, doors, and other non-floor surfaces are free of wax. Floors are free of wax build-up. |
| 5.3.13 - Sweep and Scrub Resilient Athletic Surfacing | Sweep and scrub resilient athletic surfacing, including areas under furniture, equipment, radiators and convectors, waste and recycling containers, and entrance mats. Move movable furniture, equipment, waste and recycling containers, and entrance mats in order to accomplish the task and return moved items to their original locations. Remove soil, spills, scuff marks, gum, tar, and other sticky substances from the surface prior to sweeping and scrubbing athletic surfaces. | Resilient athletic floor surfaces are clean and free of soil, stains, oily film, and cleaning chemical residue, and have a uniform appearance with no streaks, swirl marks, detergent or dirt residue. Baseboards, walls, doors, and other non-floor surfaces are free of splash marks, streaks, and dirt residue. |
| 5.3.14 - Dust Furnishings and Structural Elements Up To 7-1/2 Feet Above Finished Floor (AFF) | Dust furnishings and structural elements up to 7-1/2 feet AFF. Do not dust desk and workstation worktops, drafting boards; computer keyboards, CPUs, and monitors; typewriters, adding machines, copiers, scanners, printers or similar equipment; and at child development centers, child activity furnishings, items, and toys. | Surfaces requiring dusting are clean and have a uniform appearance, free of dust, lint, litter, oily film, cobwebs, etc. |
| 5.3.15 - Dust Furnishings and Structural Elements Over 7-1/2 Feet (AFF) | Dust furnishings and structural elements over 7-1/2 feet AFF. | Surfaces requiring dusting are clean and have a uniform appearance, free of dust, lint, litter, oily film, cobwebs, etc. |
| 5.3.16 - Polish Metal Work | Polish all brass door hardware including latch sets, locksets, deadbolts, door pulls, push plates, kick plates, hinges, closers, hold open devices, and stops; brass balustrades and handrails; brass name and room number plates; building directory frames; brass or bronze wall mounted building memorialization plaques; brass receptacle and switch wall plates; brass fire extinguishers; and any other brass fittings and fixtures needing polishing. | Brass metal work has a high luster with no dull patches or scratches except for those previously existing. |
| 5.3.17 - Spot Clean Interior Building Surfaces | Spot clean and disinfect interior building surfaces including walls, partitions, and associated woodwork such as baseboards, chair rails, guardrails and handrails; doors, frames, casings, and operating hardware; window sashes, frames, casings, stools, aprons, and operating hardware; furnishings; countertops, cabinets and other casework, and appliances. Disinfect surfaces in child care areas, rest rooms, locker rooms, and food preparation and service areas. | Interior building surfaces are clean and have a uniform appearance, free of soil, handprints, footprints, smudges, and streaks, with no signs of bleaching. |
| 5.3.18 - Clean Walls, Doors, and Windows | Clean walls from floor to ceiling including associated woodwork such as baseboards, chair rails, handrails, guardrails and picture rails; doors, frames, casings, and operating hardware; window sashes, frames, casings, stools, aprons, and operating hardware; HVAC registers, grilles, and devices; electrical outlet and switch plates. Walls shall be dried following washing. | Walls, doors, and windows are clean and free of soil, handprints, footprints, smudges, streaks, and lap marks. |
| 5.3.19 - Clean Window Blinds and Drapes | Clean horizontal and vertical window blinds and drapes, on both sides, including associated horizontal and vertical window elements such as sash rails and styles, sash muntin’s, operating and locking hardware, stools, and surrounding trim. | Window blinds and drapes and associated window elements are clean and have a uniform appearance, free of soil, dust, lint, and cobwebs on both sides. |
| 5.3.20 - Clean Interior Door and Window Glass | Clean interior door and window glass, on both sides including interior doors, transoms, glass on bookcases, show cases, glass window ventilators, mirrors (except rest room mirrors), etc. (does not include either side of exterior window glass). Glass-cleaner splash and drip marks shall be removed from all adjacent surfaces. | Interior door and window glass is spotlessly clean and free of soil, oily film, smudges, and streaks on both sides. |
| 5.3.21 - Clean Exterior Door Glass | Clean exterior door glass, indoors and outdoors. Glass cleaner splash and drip marks shall be removed from all adjacent surfaces. | Exterior door glass is spotlessly clean and free of soil, oily film, smudges, and streaks indoors and outdoors. |
| 5.3.21 - Clean Exterior Window Glass | Clean exterior window glass, including storm windows where present, indoors and outdoors. Remove furnishings, shades, blinds, etc., as necessary to accomplish this task and return the items to their original locations. | Exterior window glass, including storm windows where present, is spotlessly clean and free of soil, oily film, smudges, and streaks indoors and outdoors. |
| 5.3.23 - Clean Drinking Fountains | Clean and disinfect drinking fountains, chrome-plated plumbing fixtures, pipes and fittings, and adjacent wall surfaces. Remove litter from fountain basins such as chewing gum, bits of paper, etc. | Drinking fountains, chrome-plated plumbing fixtures, pipes and fittings, and adjacent wall surfaces are clean and free from streaks, stains, spots, smudges, scale, and other obvious removable soil. |
| 5.3.24 - Clean Kitchen and Kitchenette Sinks | Clean and disinfect all surfaces of kitchen and kitchenette sinks, chrome-plated plumbing fixtures, pipes and fittings, and adjacent wall surfaces. | Kitchen and kitchenette sinks, chrome-plated plumbing fixtures, pipes and fittings, and adjacent wall surfaces are clean and bright and free of soil, soap film, removable stains, and cleaning chemical residue. |
| 5.3.25 - Clean Countertops | Clean and disinfect all surfaces of countertops. | Countertops are clean and bright and free of soil, grease, removable stains, and cleaning chemical residue. |
| 5.3.26 - Clean Lavatories, Vanities, Dispensers, Mirrors, and Shelves | Clean and disinfect lavatories, vanities, industrial wash sinks, and associated chrome-plated plumbing fixtures, pipes and fittings, and adjacent wall surfaces. Clean vanity cabinets where present, soap dispensers, mirrors, and shelves adjacent to lavatories, vanities, and wash sinks as part of this task. Empty trash receptacles. | Lavatories, vanities, industrial wash sinks, and associated chrome-plated plumbing fixtures, pipes and fittings, and adjacent wall surfaces are clean and bright and free of soil, soap film, removable stains, and cleaning chemical residue. Vanity cabinets, soap dispensers, mirrors, and shelves are spotlessly clean and free of streaks, smudges, and soil deposits. |
| 5.3.27 - Clean Diaper Stations | Clean and disinfect diaper stations, sinks, chrome-plated plumbing fixtures, pipes and fittings, and adjacent countertop and wall surfaces. Clean cabinets, dispensers, mirrors, and shelves adjacent to diaper stations as part of the task. | Diaper stations, sinks, chrome-plated plumbing fixtures, pipes and fittings, and adjacent countertops and wall surfaces are clean and bright and free of soil, soap film, removable stains, and cleaning chemical residue. Cabinets, dispensers, mirrors, and shelves are spotlessly clean and free of streaks, smudges, and soil deposits. |
| 5.3.28 - Clean Toilets and Seats | Clean and disinfect toilet bowls, inside and outside; toilet seats, both top and bottom; chrome-plated plumbing fixtures, pipes and fittings; and adjacent toilet partitions and wall surfaces. Remove any dirt, writing, lipstick, splash marks, and any other marks from toilet partitions and wall surfaces. Descale toilet bowls as needed to remove scale, scum, mineral deposits, rust, etc. Empty sanitary napkin receptacles in all toilet enclosures. | Toilets inside and outside, toilet seats, chrome-plated plumbing fixtures, pipes and fittings, and adjacent toilet partitions and wall surfaces are clean and bright and free of soil, removable stains, and cleaning chemical residue. Toilets are free of scale build-up, scum, rust, mineral deposits, etc. |
| 5.3.29 - Clean Urinals | Clean and disinfect urinals, chrome-plated plumbing fixtures, pipes and fittings, and adjacent toilet partitions and wall surfaces in same manner as toilets. Where screens over urinal traps are removable, they shall be removed and cleaned. Remove all encrustations. Descale urinals as needed to remove scale, scum, mineral deposits, rust, etc. | Urinals, chrome-plated plumbing fixtures, pipes and fittings, and adjacent toilet partitions and wall surfaces are clean and bright and free of soil, removable stains, and cleaning chemical residue. Urinals are free of scale build-up, scum, rust, mineral deposits, etc. |
| 5.3.20 - Clean Shower Stalls and/or Bathtubs | Clean and disinfect all surfaces of showers, bathtubs, shower stall and bathtub doors, and chrome-plated plumbing fixtures, pipes and fittings. Remove any dirt, writing, lipstick, splash marks, and any other marks from shower stall and bathtub walls. | All surfaces of showers, bathtubs, shower stall and bathtub doors, and chrome-plated plumbing fixtures, pipes and fittings are clean and bright and free of soil, soap film, removable stains, and cleaning chemical residue. There is no film left by cleaning operations on any surfaces in the shower stall or bathtub. |
| 5.3.21 - Scrub Rest Room Floors | Scrub and disinfect rest room floors. | Rest room floor surfaces including grout lines in ceramic tile floors are clean and have a uniform, bright appearance, and free of stains, urine, scuff marks, heel marks, and cleaning chemical residue. |
| CUSTODIAL SERVICE JOB ORDER | Page 1 of 1 | ||||||
| Project & Contract Numbers & Title: | |||||||
| Building & Location: 3, Barry Ave., Main Post | Square Feet of Floor Area: 4,531 | ||||||
| Price Calculation | |||||||
| PWS | St. Mary's Chapel | Times | Calculated | ||||
| Para- | Quan- | Per | Unit | Price Per | |||
| graph | Custodial Tasks | Freq | tities | Unit | Month | Price | Month |
| 5.3.1 | Collect and Remove Trash Indoors and Outdoors | 1/wk | 2 | ea | 4.33 | $0.00 | $0.00 |
| 5.3.2 | Sweep and/or Dust Mop Floors and Stairways (Note 1) | 1/wk | 3,622 | csf | 4.33 | $0.00 | $0.00 |
| 5.3.4 | Mop Floors and Stairways (Note 1) | 1/wk | 3,622 | csf | 4.33 | $0.00 | $0.00 |
| 5.3.8 | Strip and Rewax Resilient and Terrazzo Floor Surfaces | AO | 45 | csf | $0.00 | $0.00 | |
| 5.3.9 | Vacuum Carpets, Rugs and Throwrugs | 1/wk | 767 | csf | 4.33 | $0.00 | $0.00 |
| 5.3.11 | Clean Carpets, Rugs and Throwrugs | AO | 767 | csf | $0.00 | $0.00 | |
| 5.3.12 | Clean and Rewax Wood Floor Surfaces | AO | 1,639 | csf | $0.00 | $0.00 | |
| 5.3.14 | Dust Furnishings/Structural Elements < 7-1/2' AFF | 4,389 | csf | $0.00 | $0.00 | ||
| 5.3.24 | Clean Kitchen/Kitchenette Sink | 1 | ea | $0.00 | $0.00 | ||
| 5.3.25 | Clean Countertop | 40 | lf | $0.00 | $0.00 | ||
| 5.3.26 | Clean Lavatories, Vanities, Dispensers, Mirrors, and Shelves | 1/wk | 3 | ea | 4.33 | $0.00 | $0.00 |
| 5.3.28 | Clean Toilets and Seats | 1/wk | 2 | ea | 4.33 | $0.00 | $0.00 |
| 5.3.31 | Scrub and Disinfect Rest Room Floors; 2 for | 1/wk | 142 | csf | 4.33 | $0.00 | $0.00 |
| Subtotal | $0.00 | ||||||
| Total Calculated Price Per Month | $0.00 |
| Notes: |
| 1. Includes Wood Strip Flooring. |
| Frequency/Times Per Month Relationship: | Take Off: | Carpet | V-Tile | Wood | RVSTL | C-Tile | Concrete | Restrooms | Totals |
| 1/wk = 52(1)/12 = 4.33 Times Per Month | Basement: | 0 | 0 | 0 | 0 | 2,080 | 0 | 142 | 2,080 |
| 2/wk = 52(2)/12 = 8.66 Times Per Month | 1st Floor: | 767 | 0 | 1,639 | 45 | 0 | 0 | 0 | 2,451 |
| EOD = 52(2.5)/12 = 10.833 Times Per Month | 2nd Floor: | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 5/wk = 52(5)/12 = 21.66 Times Per Month | 3rd Floor: | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 1/yr = 1/12 = 0.0833 Times Per Month | 4th Floor: | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 2/yr = 2/12 = 0.1666 Times Per Month | Totals: | 767 | 0 | 1,639 | 45 | 2,080 | 0 | 142 | 4,531 |
&"Courier,Regular"&7 &"Courier New,Regular"
| CUSTODIAL SERVICE JOB ORDER | Page 1 of 1 | ||||||
| Project & Contract Numbers & Title: | |||||||
| Building & Location: 6, Barry Ave., Main Post | Square Feet of Floor Area: 6,696 | ||||||
| Price Calculation | |||||||
| PWS | Main Post Chapel | Times | Calculated | ||||
| Para- | Quan- | Per | Unit | Price Per | |||
| graph | Custodial Tasks | Freq | tities | Unit | Month | Price | Month |
| 5.3.1 | Collect and Remove Trash Indoors and Outdoors | 1/wk | 2 | ea | 4.33 | $0.00 | $0.00 |
| 5.3.2 | Sweep and/or Dust Mop Floors and Stairways (Note 1) | 1/wk | 2,260 | csf | 4.33 | $0.00 | $0.00 |
| 5.3.4 | Mop Floors and Stairways (Note 1) | 1/wk | 2,260 | csf | 4.33 | $0.00 | $0.00 |
| 5.3.8 | Strip and Rewax Resilient and Terrazzo Floor Surfaces | 1/yr | 361 | csf | 0.08 | $0.00 | $0.00 |
| 5.3.9 | Vacuum Carpets, Rugs and Throwrugs | 1/wk | 4,296 | csf | 4.33 | $0.00 | $0.00 |
| 5.3.11 | Clean Carpets, Rugs and Throwrugs (Child Care Room Only) | AO | 407 | csf | $0.00 | $0.00 | |
| 5.3.11 | Clean Carpets, Rugs and Throwrugs | AO | 4,296 | csf | $0.00 | $0.00 | |
| 5.3.12 | Clean and Rewax Wood Floor Surfaces | AO | 2,039 | csf | $0.00 | $0.00 | |
| 5.3.14 | Dust Furnishings/Structural Elements < 7-1/2' AFF | 6,556 | csf | $0.00 | $0.00 | ||
| 5.3.26 | Clean Kitchen/Kitchenette Sink | 1 | ea | $0.00 | $0.00 | ||
| 5.3.27 | Clean Countertop | 6 | lf | $0.00 | $0.00 | ||
| 5.3.26 | Clean Lavatories, Vanities, Dispensers, Mirrors, and Shelves | 1/wk | 4 | ea | 4.33 | $0.00 | $0.00 |
| 5.3.28 | Clean Toilets and Seats | 1/wk | 4 | ea | 4.33 | $0.00 | $0.00 |
| 5.3.29 | Clean Urinals | 1/wk | 1 | ea | 4.33 | $0.00 | $0.00 |
| 5.3.31 | Scrub and Disinfect Rest Room Floors; 2 for | 1/wk | 140 | csf | 4.33 | $0.00 | $0.00 |
| Subtotal | $0.00 | ||||||
| Total Calculated Price Per Month |
| Notes: |
| 1. Includes Wood Strip Flooring. |
| Frequency/Times Per Month Relationship: | Take Off: | Carpet | V-Tile | Wood | RVSTL | C-Tile | Concrete | Restrooms | Totals |
| 1/wk = 52(1)/12 = 4.33 Times Per Month | Basement: | 2,456 | 361 | 0 | 0 | 0 | 0 | 140 | 2,817 |
| 2/wk = 52(2)/12 = 8.66 Times Per Month | 1st Floor: | 1,840 | 0 | 2,039 | 0 | 0 | 0 | 0 | 3,879 |
| EOD = 52(2.5)/12 = 10.833 Times Per Month | 2nd Floor: | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 5/wk = 52(5)/12 = 21.66 Times Per Month | 3rd Floor: | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 1/yr = 1/12 = 0.0833 Times Per Month | 4th Floor: | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 2/yr = 2/12 = 0.1666 Times Per Month | Totals: | 4,296 | 361 | 2,039 | 0 | 0 | 0 | 140 | 6,696 |
&"Courier,Regular"&7 &"Courier New,Regular"
024A
| CUSTODIAL SERVICE JOB ORDER | Page 1 of 1 | ||||||
| Project & Contract Numbers & Title: | |||||||
| Building & Location: 24A, Sheridan Ave., Main Post | Square Feet of Floor Area: 2,318 | ||||||
| Price Calculation | |||||||
| PWS | Custer House Museum | Times | Calculated | ||||
| Para- | Service is only provided from 1 May to 30 Sept. | Quan- | Per | Unit | Price Per | ||
| graph | Custodial Tasks | Freq | tities | Unit | Month | Price | Month |
| 5.3.1 | Collect and Remove Trash Indoors and Outdoors | 1/wk | 1 | ea | 4.33 | $0.00 | $0.00 |
| 5.3.2 | Sweep and/or Dust Mop Floors and Stairways (Note 1) | 1/wk | 1,552 | csf | 4.33 | $0.00 | $0.00 |
| 5.3.4 | Mop Floors and Stairways (Note 1) | 1/wk | 1,552 | csf | 4.33 | $0.00 | $0.00 |
| 5.3.9 | Vacuum Carpets, Rugs and Throwrugs | 1/wk | 706 | csf | 4.33 | $0.00 | $0.00 |
| 5.3.11 | Clean Carpets, Rugs and Throwrugs | AO | 706 | csf | $0.00 | $0.00 | |
| 5.3.12 | Clean and Rewax Wood Floor Surfaces | AO | 2,318 | csf | $0.00 | $0.00 | |
| 5.3.14 | Dust Furnishings/Structural Elements < 7-1/2' AFF | 2,318 | csf | $0.00 | $0.00 | ||
| 5.3.26 | Clean Lavatories, Vanities, Dispensers, Mirrors, and Shelves | 1/wk | 0 | ea | 4.33 | $0.00 | $0.00 |
| 5.3.28 | Clean Toilets and Seats | 1/wk | 0 | ea | 4.33 | $0.00 | $0.00 |
| 5.3.31 | Scrub and Disinfect Rest Room Floors; 1 for | 1/wk | 0 | csf | 4.33 | $0.00 | $0.00 |
| Subtotal | $0.00 | ||||||
| Total Calculated Price Per Month | ERROR:#REF! |
| Notes: |
| 1. Includes Wood Strip Flooring. |
| Frequency/Times Per Month Relationship: | Take Off: | Carpet | V-Tile | Wood | RVSTL | C-Tile | Concrete | Restrooms | Totals |
| 1/wk = 52(1)/12 = 4.33 Times Per Month | Basement: | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 2/wk = 52(2)/12 = 8.66 Times Per Month | 1st Floor: | 463 | 0 | 923 | 0 | 0 | 0 | 0 | 1,386 |
| EOD = 52(2.5)/12 = 10.833 Times Per Month | 2nd Floor: | 243 | 0 | 689 | 0 | 0 | 0 | 0 | 932 |
| 5/wk = 52(5)/12 = 21.66 Times Per Month | 3rd Floor: | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 1/yr = 1/12 = 0.0833 Times Per Month | 4th Floor: | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 2/yr = 2/12 = 0.1666 Times Per Month | Totals: | 706 | 0 | 1,612 | 0 | 0 | 0 | 0 | 2,318 |
&"Courier,Regular"&7 &"Courier New,Regular"
024B
| CUSTODIAL SERVICE JOB ORDER | Page 1 of 1 | ||||||
| Project & Contract Numbers & Title: | |||||||
| Building & Location: 24B, Sheridan Ave., Main Post | Square Feet of Floor Area: 1,625 | ||||||
| Price Calculation | |||||||
| PWS | Custer House Museum | Times | Calculated | ||||
| Para- | Quan- | Per | Unit | Price Per | |||
| graph | Custodial Tasks | Freq | tities | Unit | Month | Price | Month |
| 5.3.1 | Collect and Remove Trash Indoors and Outdoors | 2/mo | 1 | ea | 2.00 | $0.00 | $0.00 |
| 5.3.2 | Sweep and/or Dust Mop Floors and Stairways (Note 1) | 2/mo | 1,190 | csf | 2.00 | $0.00 | $0.00 |
| 5.3.4 | Mop Floors and Stairways (Note 1) | 2/mo | 1,190 | csf | 2.00 | $0.00 | $0.00 |
| 5.3.8 | Strip and Rewax Resilient and Terrazzo Floor Surfaces | AO | 295 | csf | $0.00 | $0.00 | |
| 5.3.9 | Vacuum Carpets, Rugs and Throwrugs | 2/mo | 320 | csf | 2.00 | $0.00 | $0.00 |
| 5.3.11 | Clean Carpets, Rugs and Throwrugs | AO | 320 | csf | $0.00 | $0.00 | |
| 5.3.12 | Clean and Rewax Wood Floor Surfaces | AO | 760 | csf | $0.00 | $0.00 | |
| 5.3.14 | Dust Furnishings/Structural Elements < 7-1/2' AFF | 1,510 | csf | $0.00 | $0.00 | ||
| 5.3.26 | Clean Lavatories, Vanities, Dispensers, Mirrors, and Shelves | 2/mo | 1 | ea | 2.00 | $0.00 | $0.00 |
| 5.3.28 | Clean Toilets and Seats | 2/mo | 1 | ea | 2.00 | $0.00 | $0.00 |
| 5.3.20 | Clean Shower Stalls and/or Bathtubs | 2/mo | 1 | ea | 2.00 | $0.00 | $0.00 |
| 5.3.31 | Scrub and Disinfect Rest Room Floors; 1 for | 2/mo | 115 | csf | 2.00 | $0.00 | $0.00 |
| Subtotal | $0.00 | ||||||
| Total Calculated Price Per Month | ERROR:#REF! |
| Notes: |
| 1. Includes Wood Strip Flooring. |
| Custodial tasks to be completed during the first and |
| third week of each month. |
| Frequency/Times Per Month Relationship: | Take Off: | Carpet | V-Tile | Wood | HP Lam | C-Tile | Concrete | Restrooms | Totals |
| 1/wk = 52(1)/12 = 4.33 Times Per Month | Basement: | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 2/wk = 52(2)/12 = 8.66 Times Per Month | 1st Floor: | 320 | 180 | 602 | 250 | 0 | 0 | 0 | 1,352 |
| EOD = 52(2.5)/12 = 10.833 Times Per Month | 2nd Floor: | 0 | 115 | 158 | 0 | 0 | 0 | 115 | 273 |
| 5/wk = 52(5)/12 = 21.66 Times Per Month | 3rd Floor: | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 1/yr = 1/12 = 0.0833 Times Per Month | 4th Floor: | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 2/yr = 2/12 = 0.1666 Times Per Month | Totals: | 320 | 295 | 760 | 250 | 0 | 0 | 115 | 1,625 |
| CUSTODIAL SERVICE JOB ORDER | Page 1 of 1 | ||||||
| Project & Contract Numbers & Title: | |||||||
| Building & Location: 27, Arnold Ave., Main Post | Square Feet of Floor Area: 8,247 | ||||||
| Price Calculation | |||||||
| PWS | Arnold Hall, Bachelor Housing | Times | Calculated | ||||
| Para- | Quan- | Per | Unit | Price Per | |||
| graph | Custodial Tasks | Freq | tities | Unit | Month | Price | Month |
| 5.3.1 | Collect and Remove Trash (Rest Room and Laundry Rooms Only) | 1/wk | 5 | ea | 4.33 | $0.00 | $0.00 |
| 5.3.2 | Sweep and/or Dust Mop Floors and Stairways (Quarry Tile Entries) | 1/wk | 128 | csf | 4.33 | $0.00 | $0.00 |
| 5.3.2 | Sweep and/or Dust Mop Floors and Stairways (Laundry Rooms) | 1/wk | 280 | csf | 4.33 | $0.00 | $0.00 |
| 5.3.2 | Sweep and/or Dust Mop Floors and Stairways (Back Wood and VCT Stairs) | 1/wk | 588 | csf | 4.33 | $0.00 | $0.00 |
| 5.3.2 | Sweep and/or Dust Mop Floors and Stairways (Basement Floors and Front Wood Stairs) | 1/mo | 4,579 | csf | 1.00 | $0.00 | $0.00 |
| 5.3.4 | Mop Floors and Stairways (Quarry Tile Entries) | 1/wk | 128 | csf | 4.33 | $0.00 | $0.00 |
| 5.3.4 | Mop Floors and Stairways (Laundry Rooms) | 1/wk | 280 | csf | 4.33 | $0.00 | $0.00 |
| 5.3.4 | Mop Floors and Stairways (Back Wood and VCT Stairs) | 1/wk | 588 | csf | 4.33 | $0.00 | $0.00 |
| 5.3.4 | Mop Floors and Stairways (Basement Floors and Front Wood Stairs) | 1/mo | 4,579 | csf | 1.00 | $0.00 | $0.00 |
| 5.3.8 | Strip and Rewax Resilient and Terrazzo Floor Surfaces | AO | 84 | csf | $0.00 | $0.00 | |
| 5.3.9 | Vacuum Carpets, Rugs and Throwrugs | 1/wk | 2,632 | csf | 4.33 | $0.00 | $0.00 |
| 5.3.11 | Clean Carpets, Rugs and Throwrugs | AO | 2,632 | csf | $0.00 | $0.00 | |
| 5.3.14 | Dust Furnishings/Structural Elements < 7-1/2' AFF | 3,952 | csf | $0.00 | $0.00 | ||
| 5.3.32 | Clean Clothes Washer and Clothes Dryer | 1/wk | 8 | ea | 4.33 | $0.00 | $0.00 |
| 5.3.26 | Clean Lavatories, Vanities, Dispensers, Mirrors, and Shelves | 1/wk | 1 | ea | 4.33 | $0.00 | $0.00 |
| 5.3.28 | Clean Toilets and Seats | 1/wk | 1 | ea | 4.33 | $0.00 | $0.00 |
| 5.3.31 | Scrub and Disinfect Rest Room Floors; 1 for | 1/wk | 40 | csf | 4.33 | $0.00 | $0.00 |
| Subtotal | $0.00 | ||||||
| Total Calculated Price Per Month | ERROR:#REF! |
| Frequency/Times Per Month Relationship: | Take Off: | Carpet | V-Tile | Wood | Rubber | Q-Tile | Concrete | Restrooms | Totals |
| 1/wk = 52(1)/12 = 4.33 Times Per Month | Basement: | 0 | 40 | 0 | 280 | 0 | 4,503 | 40 | 4,823 |
| 2/wk = 52(2)/12 = 8.66 Times Per Month | 1st Floor: | 680 | 44 | 372 | 0 | 128 | 0 | 0 | 1,224 |
| EOD = 52(2.5)/12 = 10.833 Times Per Month | 2nd Floor: | 976 | 0 | 248 | 0 | 0 | 0 | 0 | 1,224 |
| 5/wk = 52(5)/12 = 21.66 Times Per Month | 3rd Floor: | 976 | 0 | 0 | 0 | 0 | 0 | 0 | 976 |
| 1/yr = 1/12 = 0.0833 Times Per Month | 4th Floor: | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 2/yr = 2/12 = 0.1666 Times Per Month | Totals: | 2,632 | 84 | 620 | 280 | 128 | 4,503 | 40 | 8,247 |
| CUSTODIAL SERVICE JOB ORDER | Page 1 of 1 | ||||||
| Project & Contract Numbers & Title: | |||||||
| Building & Location: 29, Arnold Ave., Main Post | Square Feet of Floor Area: 2,519 | ||||||
| Price Calculation | |||||||
| PWS | SWCPOC Administrative | Times | Calculated | ||||
| Para- | Quan- | Per | Unit | Price Per | |||
| graph | Custodial Tasks | Freq | tities | Unit | Month | Price | Month |
| 5.3.1 | Collect and Remove Trash Indoors and Outdoors | 2/wk | 2 | ea | 8.66 | $0.00 | $0.00 |
| 5.3.2 | Sweep and/or Dust Mop Floors and Stairways | 1/wk | 120 | csf | 4.33 | $0.00 | $0.00 |
| 5.3.4 | Mop Floors and Stairways | 1/wk | 120 | csf | 4.33 | $0.00 | $0.00 |
| 5.3.9 | Vacuum Carpets, Rugs and Throwrugs | 1/wk | 2,239 | csf | 4.33 | $0.00 | $0.00 |
| 5.3.11 | Clean Carpets, Rugs and Throwrugs | AO | 2,239 | csf | $0.00 | $0.00 | |
| 5.3.14 | Dust Furnishings/Structural Elements < 7-1/2' AFF | 2,359 | csf | $0.00 | $0.00 | ||
| 5.3.21 | Clean Exterior Door Glass | 45 | ea | $0.00 | $0.00 | ||
| 5.3.24 | Clean Kitchen/Kitchenette Sink | 1/wk | 1 | ea | 4.33 | $0.00 | $0.00 |
| 5.3.25 | Clean Countertop | 1/wk | 16 | lf | 4.33 | $0.00 | $0.00 |
| 5.3.26 | Clean Lavatories, Vanities, Dispensers, Mirrors, and Shelves | 2/wk | 2 | ea | 8.66 | $0.00 | $0.00 |
| 5.3.28 | Clean Toilets and Seats | 2/wk | 2 | ea | 8.66 | $0.00 | $0.00 |
| 5.3.20 | Clean Shower Stalls and/or Bathtubs | 2 | ea | $0.00 | $0.00 | ||
| 5.3.31 | Scrub and Disinfect Rest Room Floors; 2 for | 1/wk | 160 | csf | 4.33 | $0.00 | $0.00 |
| Subtotal | $0.00 | ||||||
| Total Calculated Price Per Month | ERROR:#REF! |
| Frequency/Times Per Month Relationship: | Take Off: | Carpet | V-Tile | RVSTL | Epoxy | C-Tile | Concrete | Restrooms | Totals |
| 1/wk = 52(1)/12 = 4.33 Times Per Month | Basement: | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 2/wk = 52(2)/12 = 8.66 Times Per Month | 1st Floor: | 2,239 | 0 | 0 | 0 | 280 | 0 | 160 | 2,519 |
| EOD = 52(2.5)/12 = 10.833 Times Per Month | 2nd Floor: | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 5/wk = 52(5)/12 = 21.66 Times Per Month | 3rd Floor: | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 1/yr = 1/12 = 0.0833 Times Per Month | 4th Floor: | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 2/yr = 2/12 = 0.1666 Times Per Month | Totals: | 2,239 | 0 | 0 | 0 | 280 | 0 | 160 | 2,519 |
| CUSTODIAL SERVICE JOB ORDER | Page 1 of 1 | ||||||
| Project & Contract Numbers & Title: | |||||||
| Building & Location: 200, Henry Ave., Main Post | Square Feet of Floor Area: 36,442 | ||||||
| Price Calculation | |||||||
| PWS | Patton Hall - NEC Administrative | Times | Calculated | ||||
| Para- | Quan- | Per | Unit | Price Per | |||
| graph | Custodial Tasks | Freq | tities | Unit | Month | Price | Month |
| 5.3.1 | Collect and Remove Trash Indoors and Outdoors | 2/wk | 7 | ea | 8.66 | $0.00 | $0.00 |
| 5.3.2 | Sweep and/or Dust Mop Floors and Stairways (All Except Auditorium) | 1/wk | 13,017 | csf | 4.33 | $0.00 | $0.00 |
| 5.3.2 | Sweep and/or Dust Mop Floors and Stairways (Auditorium Only) | AO | 1,618 | csf | $0.00 | $0.00 | |
| 5.3.4 | Mop Floors and Stairways (All Except Auditorium) | 1/wk | 13,017 | csf | 4.33 | $0.00 | $0.00 |
| 5.3.4 | Mop Floors and Stairways (Auditorium Only) | AO | 1,618 | csf | $0.00 | $0.00 | |
| 5.3.6 | Spray and Buff Resilient and Terrazzo Floor Surfaces (Note 1) | 1/yr | 3,465 | csf | 0.42 | $0.00 | $0.00 |
| 5.3.8 | Strip and Rewax Resilient and Terrazzo Floor Surfaces (All Except Auditorium) | 1/yr | 1,104 | csf | 0.08 | $0.00 | $0.00 |
| 5.3.8 | Strip and Rewax Resilient and Terrazzo Floor Surfaces (Auditorium Only) | AO | 1,618 | csf | $0.00 | $0.00 | |
| 5.3.9 | Vacuum Carpets, Rugs and Throwrugs (All Except Auditorium) | 1/wk | 19,548 | csf | 4.33 | $0.00 | $0.00 |
| 5.3.9 | Vacuum Carpets, Rugs and Throwrugs (Auditorium Only) | AO | 1,230 | csf | $0.00 | $0.00 | |
| 5.3.11 | Clean Carpets, Rugs and Throwrugs | AO | 20,778 | csf | $0.00 | $0.00 | |
| 5.3.14 | Dust Furnishings/Structural Elements < 7-1/2' AFF | 35,030 | csf | $0.00 | $0.00 | ||
| 5.3.17 | Polish Metal Work (In All Public Spaces) | 2 | ea | $0.00 | $0.00 | ||
| 5.3.21 | Clean Exterior Door Glass | 24 | sf | $0.00 | $0.00 | ||
| 5.3.23 | Clean Drinking Fountains | 2/wk | 5 | ea | 8.66 | $0.00 | $0.00 |
| 5.3.26 | Clean Lavatories, Vanities, Dispensers, Mirrors, and Shelves | 2/wk | 16 | ea | 8.66 | $0.00 | $0.00 |
| 5.3.28 | Clean Toilets and Seats | 2/wk | 17 | ea | 8.66 | $0.00 | $0.00 |
| 5.3.29 | Clean Urinals | 2/wk | 8 | ea | 8.66 | $0.00 | $0.00 |
| 5.3.31 | Scrub and Disinfect Rest Room Floors | 1/wk | 1,309 | csf | 4.33 | $0.00 | $0.00 |
| Subtotal | $0.00 | ||||||
| Total Calculated Price Per Month | ERROR:#REF! |
| Frequency/Times Per Month Relationship: | Take Off: | Carpet | V-Tile | Terraz | Linol | C-Tile | Concrete | Restrooms | Totals |
| 1/wk = 52(1)/12 = 4.33 Times Per Month | Basement: | 1,238 | 0 | 6,024 | 0 | 236 | 30 | 236 | 7,528 |
| 2/wk = 52(2)/12 = 8.66 Times Per Month | Base Corr: | 0 | 0 | 1,156 | 0 | 0 | 0 | 0 | 1,156 |
| EOD = 52(2.5)/12 = 10.833 Times Per Month | 1st Floor: | 9,490 | 801 | 0 | 0 | 279 | 24 | 473 | 10,594 |
| 5/wk = 52(5)/12 = 21.66 Times Per Month | 1st Corr: | 0 | 303 | 2,172 | 0 | 0 | 0 | 0 | 2,475 |
| 1/yr = 1/12 = 0.0833 Times Per Month | 2nd Floor: | 10,050 | 0 | 1,618 | 140 | 460 | 49 | 600 | 12,317 |
| 2/yr = 2/12 = 0.1666 Times Per Month | 2nd Corr: | 0 | 0 | 2,372 | 0 | 0 | 0 | 0 | 2,372 |
| Totals: | 20,778 | 1,104 | 13,342 | 140 | 975 | 103 | 1,309 | 36,442 |
| CUSTODIAL SERVICE JOB ORDER | Page 1 of 1 | ||||||
| Project & Contract Numbers & Title: | |||||||
| Building & Location: 203, Henry Ave., Main Post | Square Feet of Floor Area: 475 | ||||||
| Price Calculation | |||||||
| PWS | U1S. Cavalry Museum | Times | Calculated | ||||
| Para- | Quan- | Per | Unit | Price Per | |||
| graph | Custodial Tasks | Freq | tities | Unit | Month | Price | Month |
| 5.3.1 | Collect and Remove Trash Indoors and Outdoors | 1/wk | 1 | ea | 4.33 | $0.00 | $0.00 |
| 5.3.2 | Sweep and/or Dust Mop Floors and Stairways | csf | 4.33 | $0.00 | $0.00 | ||
| 5.3.4 | Mop Floors and Stairways | csf | 4.33 | $0.00 | $0.00 | ||
| 5.3.9 | Vacuum Carpets, Rugs and Throwrugs | 1/wk | 388 | csf | 4.33 | $0.00 | $0.00 |
| 5.3.11 | Clean Carpets, Rugs and Throwrugs | csf | $0.00 | $0.00 | |||
| 5.3.12 | Clean and Rewax Wood Floor Surfaces | csf | $0.00 | $0.00 | |||
| 5.3.14 | Dust Furnishings/Structural Elements < 7-1/2' AFF | 388 | csf | $0.00 | $0.00 | ||
| 5.3.23 | Clean Drinking Fountains | 1/wk | 2 | ea | 4.33 | $0.00 | $0.00 |
| 5.3.24 | Clean Kitchen/Kitchenette Sink | ea | $0.00 | $0.00 | |||
| 5.3.25 | Clean Countertop | lf | $0.00 | $0.00 | |||
| 5.3.26 | Clean Lavatories, Vanities, Dispensers, Mirrors, and Shelves | 1/wk | 1 | ea | 4.33 | $0.00 | $0.00 |
| 5.3.28 | Clean Toilets and Seats | 1/wk | 1 | ea | 4.33 | $0.00 | $0.00 |
| 5.3.29 | Clean Urinals | 1/wk | 1 | ea | 4.33 | $0.00 | $0.00 |
| 5.3.31 | Scrub and Disinfect Rest Room Floors; 3 for | 1/wk | 87 | csf | 4.33 | $0.00 | $0.00 |
| Subtotal | $0.00 | ||||||
| Total Calculated Price Per Month | ERROR:#REF! |
Notes:
| Frequency/Times Per Month Relationship: | Take Off: | Carpet | V-Tile | Wood | RVSTL | C-Tile | Concrete | Restrooms | Totals |
| 1/wk = 52(1)/12 = 4.33 Times Per Month | Basement: | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 2/wk = 52(2)/12 = 8.66 Times Per Month | 1st Floor: | 388 | 0 | 0 | 0 | 87 | 0 | 87 | 475 |
| EOD = 52(2.5)/12 = 10.833 Times Per Month | 2nd Floor: | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 5/wk = 52(5)/12 = 21.66 Times Per Month | 3rd Floor: | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 1/yr = 1/12 = 0.0833 Times Per Month | 4th Floor: | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 2/yr = 2/12 = 0.1666 Times Per Month | Totals: | 388 | 0 | 0 | 0 | 87 | 0 | 87 | 475 |
| CUSTODIAL SERVICE JOB ORDER | Page 1 of 1 | ||||||
| Project & Contract Numbers & Title: F1-00009-0J / W911RX-21-D-0001 / Custodial Service for Fort Riley, Kansas | |||||||
| Building & Location: 205, Henry Ave., Main Post | Square Feet of Floor Area: 8,972 | ||||||
| Price Calculation | |||||||
| PWS | U1S. Cavalry Museum | Times | Calculated | ||||
| Para- | Quan- | Per | Unit | Price Per | |||
| graph | Custodial Tasks | Freq | tities | Unit | Month | Price | Month |
| 5.3.1 | Collect and Remove Trash Indoors and Outdoors | 1/wk | 2 | ea | 4.33 | $0.00 | $0.00 |
| 5.3.2 | Sweep and/or Dust Mop Floors and Stairways | 1/wk | 2,817 | csf | 4.33 | $0.00 | $0.00 |
| 5.3.4 | Mop Floors and Stairways | 1/wk | 2,817 | csf | 4.33 | $0.00 | $0.00 |
| 5.3.9 | Vacuum Carpets, Rugs and Throwrugs | 1/wk | 4,578 | csf | 4.33 | $0.00 | $0.00 |
| 5.3.11 | Clean Carpets, Rugs and Throwrugs | AO | 46 | csf | $0.00 | $0.00 | |
| 5.3.12 | Clean and Rewax Wood Floor Surfaces | 1/wk | 1,160 | csf | 4.33 | $0.00 | $0.00 |
| 5.3.14 | Dust Furnishings/Structural Elements < 7-1/2' AFF | 343 | csf | $0.00 | $0.00 | ||
| 5.3.23 | Clean Drinking Fountains | 1/wk | 1 | ea | 4.33 | $0.00 | $0.00 |
| 5.3.24 | Clean Kitchen/Kitchenette Sink | ea | $0.00 | $0.00 | |||
| 5.3.25 | Clean Countertop | lf | $0.00 | $0.00 | |||
| 5.3.26 | Clean Lavatories, Vanities, Dispensers, Mirrors, and Shelves | 1/wk | 5 | ea | 4.33 | $0.00 | $0.00 |
| 5.3.28 | Clean Toilets and Seats | 1/wk | 6 | ea | 4.33 | $0.00 | $0.00 |
| 5.3.29 | Clean Urinals | 1/wk | 2 | ea | 4.33 | $0.00 | $0.00 |
| 5.3.31 | Scrub and Disinfect Rest Room Floors; 3 for | 1/wk | 417 | csf | 4.33 | $0.00 | $0.00 |
| Subtotal | $0.00 | ||||||
| Total Calculated Price Per Month | ERROR:#REF! |
Notes:
| Restrooms | Totals | ||||||||
| 0 | 0 | ||||||||
| 368 | 549 | ||||||||
| 49 | 1,066 | ||||||||
| 0 | 0 | ||||||||
| Frequency/Times Per Month Relationship: | Take Off: | Carpet | V-Tile | Wood | RVSTL | C-Tile | Concrete | 0 | 0 |
| 1/wk = 52(1)/12 = 4.33 Times Per Month | Basement: | 0 | 0 | 0 | 0 | 0 | 0 | 417 | 1,615 |
| 2/wk = 52(2)/12 = 8.66 Times Per Month | 1st Floor: | 0 | 0 | 0 | 0 | 549 | 0 | ||
| EOD = 52(2.5)/12 = 10.833 Times Per Month | 2nd Floor: | 0 | 0 | 801 | 0 | 265 | 0 | ||
| 5/wk = 52(5)/12 = 21.66 Times Per Month | 3rd Floor: | 0 | 0 | 0 | 0 | 0 | 0 | ||
| 1/yr = 1/12 = 0.0833 Times Per Month | 4th Floor: | 0 | 0 | 0 | 0 | 0 | 0 | ||
| 2/yr = 2/12 = 0.1666 Times Per Month | Totals: | 0 | 0 | 801 | 0 | 814 | 0 |
| CUSTODIAL SERVICE JOB ORDER | Page 1 of 1 | ||||||
| Project & Contract Numbers & Title: | |||||||
| Building & Location: 206, Custer Ave., Main Post | Square Feet of Floor Area: 5,949 | ||||||
| Price Calculation | |||||||
| PWS | Times | Calculated | |||||
| Para- | Quan- | Per | Unit | Price Per | |||
| graph | Custodial Tasks | Freq | tities | Unit | Month | Price | Month |
| 5.3.1 | Collect and Remove Trash (Rest Rooms, Break Room and Student/Teacher Lounge Only) | 2/wk | 6 | ea | 8.66 | $0.00 | $0.00 |
| 5.3.2 | Sweep and/or Dust Mop Floors and Stairways (All Including Stairway) | 1/wk | 5,234 | csf | 4.33 | $0.00 | $0.00 |
| 5.3.4 | Mop Floors and Stairways (All Except Stairway) | 1/wk | 5,219 | csf | 4.33 | $0.00 | $0.00 |
| 5.3.4 | Mop Floors and Stairways (Stairway Only) | AO | 15 | csf | $0.00 | $0.00 | |
| 5.3.9 | Vacuum Carpets, Rugs and Throwrugs (Carpet and Entrance Mat) | 1/wk | 253 | csf | 4.33 | $0.00 | $0.00 |
| 5.3.11 | Clean Carpets, Rugs and Throwrugs (Entrance Mat) | AO | 147 | csf | $0.00 | $0.00 | |
| 5.3.11 | Clean Carpets, Rugs and Throwrugs (All Except Entrance Mat) | AO | 106 | csf | $0.00 | $0.00 | |
| 5.3.14 | Dust Furnishings/Structural Elements < 7-1/2' AFF | 5,447 | csf | $0.00 | $0.00 | ||
| 5.3.23 | Clean Drinking Fountains | 2/wk | 2 | ea | 8.66 | $0.00 | $0.00 |
| 5.3.24 | Clean Kitchen/Kitchenette Sink | 1/wk | 3 | ea | 4.33 | $0.00 | $0.00 |
| 5.3.25 | Clean Countertop | 1/wk | 55 | lf | 4.33 | $0.00 | $0.00 |
| 5.3.26 | Clean Lavatories, Vanities, Dispensers, Mirrors, and Shelves | 2/wk | 8 | ea | 8.66 | $0.00 | $0.00 |
| 5.3.28 | Clean Toilets and Seats | 2/wk | 8 | ea | 8.66 | $0.00 | $0.00 |
| 5.3.29 | Clean Urinals | 2/wk | 3 | ea | 8.66 | $0.00 | $0.00 |
| 5.3.31 | Scrub and Disinfect Rest Room Floors; 4 for | 1/wk | 462 | csf | 4.33 | $0.00 | $0.00 |
| Subtotal | $0.00 | ||||||
| Total Calculated Price Per Month | ERROR:#REF! |
| Notes: |
| 1. Coffee Shop Is Not Included In This Task. |
| 2. The Second Floor Is Not Included In This Task. |
| Frequency/Times Per Month Relationship: | Take Off: | Carpet | C-Tile | LV-Tile | Wood | Epoxy | RVSTL | Restrooms | Totals |
| 1/wk = 52(1)/12 = 4.33 Times Per Month | Basement: | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 2/wk = 52(2)/12 = 8.66 Times Per Month | 1st Floor: | 253 | 999 | 4,682 | 15 | 0 | 0 | 462 | 5,949 |
| EOD = 52(2.5)/12 = 10.833 Times Per Month | 2nd Floor: | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 5/wk = 52(5)/12 = 21.66 Times Per Month | Corridors | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 1/yr = 1/12 = 0.0833 Times Per Month | 4th Floor: | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 2/yr = 2/12 = 0.1666 Times Per Month | Totals: | 253 | 999 | 4,682 | 15 | 0 | 0 | 462 | 5,949 |
| CUSTODIAL SERVICE JOB ORDER | Page 1 of 1 | ||||||
| Project & Contract Numbers & Title: | |||||||
| Building & Location: 210, Custer Ave., Main Post | Square Feet of Floor Area: 37,271 | ||||||
| Price Calculation | |||||||
| PWS | Wainwright Hall - Administrative | Times | Calculated | ||||
| Para- | Quan- | Per | Unit | Price Per | |||
| graph | Custodial Tasks | Freq | tities | Unit | Month | Price | Month |
| 5.3.1 | Collect and Remove Trash Indoors and Outdoors | 4/wk | 4 | ea | 17.33 | $0.00 | $0.00 |
| 5.3.2 | Sweep and/or Dust Mop Floors and Stairways (Note 1) | 3/wk | 6,812 | csf | 13.00 | $0.00 | $0.00 |
| 5.3.2 | Sweep and/or Dust Mop Floors and Stairways (Note 2) | 1/wk | 25,622 | csf | 4.33 | $0.00 | $0.00 |
| 5.3.4 | Mop Floors and Stairways (Note 1) | 3/wk | 6,812 | csf | 13.00 | $0.00 | $0.00 |
| 5.3.4 | Mop Floors and Stairways (Note 2) | 1/wk | 25,622 | csf | 4.33 | $0.00 | $0.00 |
| 5.3.5 | Machine Grout Scrub | AO | 22,811 | csf | $0.00 | $0.00 | |
| 5.3.9 | Vacuum Carpets, Rugs and Throwrugs (Note 1) | 3/wk | 217 | csf | 13.00 | $0.00 | $0.00 |
| 5.3.9 | Vacuum Carpets, Rugs and Throwrugs (Note 2) | 1/wk | 3,638 | csf | 4.33 | $0.00 | $0.00 |
| 5.3.11 | Clean Carpets, Rugs and Throwrugs | AO | 3,855 | csf | $0.00 | $0.00 | |
| 5.3.14 | Dust Furnishings/Structural Elements < 7-1/2' AFF | 36,219 | csf | $0.00 | $0.00 | ||
| 5.3.23 | Clean Drinking Fountains | 4/wk | 4 | ea | 17.33 | $0.00 | $0.00 |
| 5.3.26 | Clean Lavatories, Vanities, Dispensers, Mirrors, and Shelves | 4/wk | 16 | ea | 17.33 | $0.00 | $0.00 |
| 5.3.28 | Clean Toilets and Seats | 4/wk | 17 | ea | 17.33 | $0.00 | $0.00 |
| 5.3.29 | Clean Urinals | 4/wk | 6 | ea | 17.33 | $0.00 | $0.00 |
| 5.3.31 | Scrub and Disinfect Rest Room Floors; 4 for | 3/wk | 982 | csf | 13.00 | $0.00 | $0.00 |
| Subtotal | $0.00 | ||||||
| Total Calculated Price Per Month | ERROR:#REF! |
Note:
| 1. Corridors, Stairways, and Entrance Only |
| 2. All Except Corridors, Stairways, and Entrance |
| Frequency/Times Per Month Relationship: | Take Off: | Carpet | LV-Tile | RVSTL | Epoxy | C-Tile | Concrete | Restrooms | Totals |
| 1/wk = 52(1)/12 = 4.33 Times Per Month | Lower Level | 2,267 | 477 | 60 | 7,222 | 542 | 34 | 542 | 10,602 |
| 2/wk = 52(2)/12 = 8.66 Times Per Month | Upper Level | 1,371 | 17,491 | 271 | 0 | 471 | 36 | 440 | 19,640 |
| EOD = 52(2.5)/12 = 10.833 Times Per Month | Lower (Note 1) | 0 | 284 | 282 | 2,218 | 0 | 0 | 0 | 2,784 |
| 5/wk = 52(5)/12 = 21.66 Times Per Month | Upper (Note 2) | 217 | 3,546 | 482 | 0 | 0 | 0 | 0 | 4,245 |
| 1/yr = 1/12 = 0.0833 Times Per Month | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | |
| 2/yr = 2/12 = 0.1666 Times Per Month | Totals: | 3,855 | 21,798 | 1,095 | 9,440 | 1,013 | 70 | 982 | 37,271 |
| CUSTODIAL SERVICE JOB ORDER | Page 1 of 1 | ||||||
| Project & Contract Numbers & Title: | |||||||
| Building & Location: 211, Custer Ave., Main Post | Square Feet of Floor Area: 25,152 | ||||||
| Price Calculation | |||||||
| PWS | Wainwright Hall - Administrative | Times | Calculated | ||||
| Para- | Quan- | Per | Unit | Price Per | |||
| graph | Custodial Tasks | Freq | tities | Unit | Month | Price | Month |
| 5.3.1 | Collect and Remove Trash (Rest Rooms and Breakrooms Only) | 2/wk | 8 | ea | 8.66 | $0.00 | $0.00 |
| 5.3.2 | Sweep and/or Dust Mop Floors and Stairways | 1/wk | 15,294 | csf | 4.33 | $0.00 | $0.00 |
| 5.3.4 | Mop Floors and Stairways | 1/wk | 14,822 | csf | 4.33 | $0.00 | $0.00 |
| 5.3.8 | Strip and Rewax Resilient and Terrazzo Floor Surfaces (Note 1) | 1/yr | 13,588 | csf | 0.08 | $0.00 | $0.00 |
| 5.3.9 | Vacuum Carpets, Rugs and Throwrugs | 1/wk | 8,394 | csf | 4.33 | $0.00 | $0.00 |
| 5.3.11 | Clean Carpets, Rugs and Throwrugs | AO | 8,394 | csf | $0.00 | $0.00 | |
| 5.3.14 | Dust Furnishings/Structural Elements < 7-1/2' AFF | 23,658 | csf | $0.00 | $0.00 | ||
| 5.3.23 | Clean Drinking Fountains | 2/wk | 6 | ea | 8.66 | $0.00 | $0.00 |
| 5.3.24 | Clean Kitchen/Kitchenette Sink | 1/wk | 2 | ea | 4.33 | $0.00 | $0.00 |
| 5.3.25 | Clean Countertop | 1/wk | 12 | lf | 4.33 | $0.00 | $0.00 |
| 5.3.26 | Clean Lavatories, Vanities, Dispensers, Mirrors, and Shelves | 2/wk | 12 | ea | 8.66 | $0.00 | $0.00 |
| 5.3.28 | Clean Toilets and Seats | 2/wk | 15 | ea | 8.66 | $0.00 | $0.00 |
| 5.3.29 | Clean Urinals | 2/wk | 3 | ea | 8.66 | $0.00 | $0.00 |
| 5.3.31 | Scrub and Disinfect Rest Room Floors; 6 for | 1/wk | 1,404 | csf | 4.33 | $0.00 | $0.00 |
| Subtotal | $0.00 | ||||||
| Total Calculated Price Per Month | ERROR:#REF! |
| Note: |
| 1. Strip and Rewax Resilient Tile Floor Surfaces Only. Do Not Strip and Rewax Terrazzo Floor Surfaces or Rubber Stair Treads. Strip and Reseal Terrazzo Floor Surfaces. |
| Frequency/Times Per Month Relationship: | Take Off: | Carpet | V-Tile | Terraz | RVSTL | C-Tile | Epoxy | Wood | Restrooms | Totals |
| 1/wk = 52(1)/12 = 4.33 Times Per Month | Basement: | 2,136 | 2,549 | 1,550 | 0 | 498 | 140 | 0 | 468 | 6,873 |
| 2/wk = 52(2)/12 = 8.66 Times Per Month | 1st Floor: | 4,274 | 3,416 | 2,137 | 160 | 602 | 280 | 472 | 468 | 11,341 |
| EOD = 52(2.5)/12 = 10.833 Times Per Month | 2nd Floor: | 1,984 | 2,428 | 1,508 | 160 | 602 | 256 | 0 | 468 | 6,938 |
| 5/wk = 52(5)/12 = 21.66 Times Per Month | 3rd Floor: | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 1/yr = 1/12 = 0.0833 Times Per Month | 4th Floor: | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 2/yr = 2/12 = 0.1666 Times Per Month | Totals: | 8,394 | 8,393 | 5,195 | 320 | 1,702 | 676 | 472 | 1,404 | 25,152 |
| CUSTODIAL SERVICE JOB ORDER | Page 1 of 1 | ||||||
| Project & Contract Numbers & Title: | |||||||
| Building & Location: 212, Custer Ave., Main Post | Square Feet of Floor Area: 24,953 | ||||||
| Price Calculation | |||||||
| PWS | DHR - Administrative | Times | Calculated | ||||
| Para- | Quan- | Per | Unit | Price Per | |||
| graph | Custodial Tasks | Freq | tities | Unit | Month | Price | Month |
| 5.3.1 | Collect and Remove Trash Indoors and Outdoors | 2/wk | 8 | ea | 8.66 | $0.00 | $0.00 |
| 5.3.2 | Sweep and/or Dust Mop Floors and Stairways | 1/wk | 9,728 | csf | 4.33 | $0.00 | $0.00 |
| 5.3.4 | Mop Floors and Stairways | 1/wk | 9,728 | csf | 4.33 | $0.00 | $0.00 |
| 5.3.8 | Strip and Rewax Resilient and Terrazzo Floor Surfaces | 1/yr | 9,594 | csf | 0.08 | $0.00 | $0.00 |
| 5.3.9 | Vacuum Carpets, Rugs and Throwrugs | 1/wk | 14,303 | csf | 4.33 | $0.00 | $0.00 |
| 5.3.11 | Clean Carpets, Rugs and Throwrugs | AO | 14,303 | csf | $0.00 | $0.00 | |
| 5.3.14 | Dust Furnishings/Structural Elements < 7-1/2' AFF | 24,031 | csf | $0.00 | $0.00 | ||
| 5.3.23 | Clean Drinking Fountains | 2/wk | 6 | ea | 8.66 | $0.00 | $0.00 |
| 5.3.24 | Clean Kitchen/Kitchenette Sink | 6 | ea | $0.00 | $0.00 | ||
| 5.3.25 | Clean Countertop | 30 | lf | $0.00 | $0.00 | ||
| 5.3.26 | Clean Lavatories, Vanities, Dispensers, Mirrors, and Shelves | 2/wk | 15 | ea | 8.66 | $0.00 | $0.00 |
| 5.3.28 | Clean Toilets and Seats | 2/wk | 13 | ea | 8.66 | $0.00 | $0.00 |
| 5.3.29 | Clean Urinals | 2/wk | 5 | ea | 8.66 | $0.00 | $0.00 |
| 5.3.20 | Clean Shower Stalls and/or Bathtubs | 4 | ea | $0.00 | $0.00 | ||
| 5.3.31 | Scrub and Disinfect Rest Room Floors; 8 for | 1/wk | 922 | csf | 4.33 | $0.00 | $0.00 |
| Subtotal | $0.00 | ||||||
| Total Calculated Price Per Month | ERROR:#REF! |
| Frequency/Times Per Month Relationship: | Take Off: | Carpet | V-Tile | Terraz | RVSTL | C-Tile | Concrete | Restrooms | Totals |
| 1/wk = 52(1)/12 = 4.33 Times Per Month | Basement: | 5,116 | 1,227 | 0 | 0 | 266 | 0 | 266 | 6,609 |
| 2/wk = 52(2)/12 = 8.66 Times Per Month | 1st Floor: | 7,448 | 1,251 | 134 | 0 | 328 | 0 | 328 | 9,161 |
| EOD = 52(2.5)/12 = 10.833 Times Per Month | 2nd Floor: | 1,739 | 7,116 | 0 | 0 | 328 | 0 | 328 | 9,183 |
| 5/wk = 52(5)/12 = 21.66 Times Per Month | 3rd Floor: | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 1/yr = 1/12 = 0.0833 Times Per Month | 4th Floor: | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| 2/yr = 2/12 = 0.1666 Times Per Month | Totals: | 14,303 | 9,594 | 134 | 0 | 922 | 0 | 922 | 24,953 |
| CUSTODIAL SERVICE JOB ORDER | Page 1 of 1 | ||||||
| Project & Contract Numbers & Title: | |||||||
| Building & Location: 214, Custer Ave., Main Post | Square Feet of Floor Area: 4,839 | ||||||
| Price Calculation | |||||||
| PWS | Enlisted Barracks and Administrative | Times | Calculated | ||||
| Para- | Quan- | Per | Unit | Price Per | |||
| graph | Custodial Tasks | Freq | tities | Unit | Month | Price | Month |
| 5.3.1 | Collect and Remove Trash Indoors and Outdoors | 2/wk | 2 | ea | 8.66 | $0.00 | $0.00 |
| 5.3.2 | Sweep and/or Dust Mop Floors and Stairways | 1/wk | 4,594 | csf | 4.33 | $0.00 | $0.00 |
| 5.3.4 | Mop Floors and Stairways | 1/wk | 4,594 | csf | 4.33 | $0.00 | $0.00 |
| 5.3.8 | Strip and Rewax Resilient and Terrazzo Floor Surfaces | 1/yr | 4,594 | csf | 0.08 | $0.00 | $0.00 |
| 5.3.14 | Dust Furnishings/Structural Elements < 7-1/2' AFF | 4,594 | csf | $0.00 | $0.00 | ||
| 5.3.23 | Clean Drinking Fountains | 2/wk | 1 | ea | 8.66 | $0.00 | $0.00 |
| 5.3.24 | Clean Kitchen/Kitchenette Sink | 1/wk | 1 | ea | 4.33 | $0.00 | $0.00 |
| 5.3.25 | Clean Countertop | 1/wk | 19 | lf | 4.33 | $0.00 | $0.00 |
| 5.3.26 | Clean Lavatories, Vanities, Dispensers, Mirrors, and Shelves | 2/wk | 5 | ea | 8.66 | $0.00 | $0.00 |
| 5.3.28 | Clean Toilets and Seats | 2/wk | 4 | ea | 8.66 | $0.00 | $0.00 |
| 5.3.29 | Clean Urinals | 2/wk | 2 | ea | 8.66 | $0.00 | $0.00 |
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .