Schedule of Prices for Evaluation - Masonry IDIQ.xlsx
XLSX spreadsheet 23 KB Posted
- Attached to
- Masonry Indefinite Delivery Indefinite Quantity (IDIQ) at Watervliet Arsenal, NY Federal contract opportunity
- Solicitation number
- W911PT20B0002
View the file
Other files for this federal contract opportunity
Show all 19
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Base Year
| ITEM | DESCRIPTION | EST. | ||
| QTY | U/ | |||
| M | U/ | |||
| P | AMOUNT | Price per Unit | Total Price | |
| 1 | Re-point structure walls, stone up to 8' high, Minimum of 50 LF | |||
| Refer to Statement of Work, Item 3.1.3. | 500 | LF | $ - 0 | |
| 2 | Re-point structure walls, stone from 8' to 16' high, Minimum of 50 LF | |||
| Refer to Statement of Work, Item 3.1.3. | 500 | LF | $ - 0 | |
| 3 | Re-point structure walls, stone from 16' to 24' high, Minimum of 50 LF | |||
| Refer to Statement of Work, Item 3.1.3. | 500 | LF | $ - 0 | |
| 4 | Re-point structure walls, stone above 24' high, Minimum of 50 LF | |||
| Refer to Statement of Work, Item 3.1.3. | 500 | LF | $ - 0 | |
| 5 | Demolish, furnish and install stone, minimum 50 sq ft area. | |||
| Refer to Statement of Work, Item 3.1.3. | 500 | SF | $ - 0 | |
| 6 | Removal of coping stones | |||
| Refer to Statement of Work, Item 3.1.3 C. | 100 | LF | $ - 0 | |
| 7 | Replace coping stone | |||
| Refer to Statement of Work, Item 3.1.3 C. | 100 | LF | $ - 0 | |
| 8 | Capstone pinning | |||
| Refer to Statement of Work, Item 3.1.3 C. | 50 | EA | $ - 0 | |
| 9 | Caulking of capstones, minimum 50 LF | |||
| Refer to Statement of Work, Item 3.1.3 C. | 500 | LF | $ - 0 | |
| 10 | Furnish and install stucco finish over masonry, 3 coats | |||
| Refer to Statement of Work, Item 3.1.3 L. | 1000 | SF | $ - 0 | |
| 11 | Furnish and install stucco finish w/ wire over masonry, 3 coats | |||
| Refer to Statement of Work, Item 3.1.3 M. | 1000 | SF | $ - 0 | |
| Re-point structure walls, CMU up to 8' high | ||||
| Refer to Statement of Work, Item 3.1.3 J. | 150 | SF | $ - 0 | |
| 12 | Re-point structure walls, CMU from 8' to 16' high | |||
| Refer to Statement of Work, Item 3.1.3 J. | 100 | SF | $ - 0 | |
| 13 | Re-point structure walls, CMU from 16' to 24' high | |||
| Refer to Statement of Work, Item 3.1.3 J. | 100 | SF | $ - 0 | |
| 14 | Re-point structure walls, CMU 24' and above | |||
| Refer to Statement of Work, Item 3.1.3 J. | 100 | SF | $ - 0 | |
| 15 | Re-point parapet walls, CMU, roof side | |||
| Refer to Statement of Work, Item 3.1.3 J. | 100 | SF | $ - 0 | |
| 16 | Re-point penthouse walls, CMU, up to 10' | |||
| Refer to Statement of Work, Item 3.1.3 J. | 50 | SF | $ - 0 | |
| 17 | Re-point penthouse walls, CMU, 10' and above | |||
| Refer to Statement of Work, Item 3.1.3 J. | 50 | SF | $ - 0 | |
| 18 | Cleaning CMU after re-pointing. | |||
| Refer to Statement of Work, Item 3.1.3 J. | 150 | SF | $ - 0 | |
| 19 | Demolish, furnish and install CMU, minimum 20 sq ft area. | |||
| Refer to Statement of Work, Item 3.1.3 F. | 100 | SF | $ - 0 | |
| 20 | Re-point structure walls, red brick up to 8' high | |||
| Refer to Statement of Work, Item 3.1.3 J. | 3,000 | SF | $ - 0 | |
| 21 | Re-point structure walls, red brick from 8' to 16' high | |||
| Refer to Statement of Work, Item 3.1.3 J. | 1,500 | SF | $ - 0 | |
| 22 | Re-point structure walls, red brick from 16' to 24' high | |||
| Refer to Statement of Work, Item 3.1.3 J. | 1,500 | SF | $ - 0 | |
| 23 | Re-point structure walls, red brick 24' and above | |||
| Refer to Statement of Work, Item 3.1.3 J. | 1,000 | SF | $ - 0 | |
| 24 | Re-point parapet walls, red brick, roof side | |||
| Refer to Statement of Work, Item 3.1.3 J. | 500 | SF | $ - 0 | |
| 25 | Re-point penthouse walls, red brick, up to 10' | |||
| Refer to Statement of Work, Item 3.1.3 J. | 100 | SF | $ - 0 | |
| 26 | Re-point penthouse walls, red brick, 10' and above | |||
| Refer to Statement of Work, Item 3.1.3 J. | 100 | SF | $ - 0 | |
| 27 | Cleaning red brick after re-pointing. | |||
| Refer to Statement of Work, Item 3.1.3 J. | 5,000 | SF | $ - 0 | |
| 28 | Demolish, furnish and install red brick, minimum 100 sq ft area. | |||
| Refer to Statement of Work, Item 3.1.3 E. | 2500 | SF | $ - 0 | |
| 29 | Re-point structure walls, yellow brick up to 8' high | |||
| Refer to Statement of Work, Item 3.1.3 J. | 150 | SF | $ - 0 | |
| 30 | Re-point structure walls, yellow brick from 8' to 16' high | |||
| Refer to Statement of Work, Item 3.1.3 J. | 100 | SF | $ - 0 | |
| 31 | Re-point structure walls, yellow brick from 16' to 24' high | |||
| Refer to Statement of Work, Item 3.1.3 J. | 100 | SF | $ - 0 | |
| 32 | Re-point structure walls, yellow brick 24' and above | |||
| Refer to Statement of Work, Item 3.1.3 J.. | 100 | SF | $ - 0 | |
| 33 | Re-point parapet walls, yellow brick, roof side | |||
| Refer to Statement of Work, Item 3.1.3 J. | 100 | SF | $ - 0 | |
| 34 | Re-point penthouse walls, yellow brick, up to 10' | |||
| Refer to Statement of Work, Item 3.1.3 J. | 50 | SF | $ - 0 | |
| 35 | Re-point penthouse walls, yellow brick, 10' and above | |||
| Refer to Statement of Work, Item 3.1.3 J. | 50 | SF | $ - 0 | |
| 36 | Cleaning yellow brick after re-pointing. | |||
| Refer to Statement of Work, Item 3.1.3 J. | 200 | SF | $ - 0 | |
| 37 | Demolish, furnish and install yellow brick, minimum 100 sq ft area. | |||
| Refer to Statement of Work, Item 3.1.3 J. | 100 | SF | $ - 0 | |
| 38 | Cleaning of Structure 8'-1" - 16' high - Cleaning of façade. |
Refer to Statement of Work, Item 3.1.3 K.
| Cleaning is with medium/high pressure water to include the use of light brushing or mild detergent. Pressure is not to exceed 1,000 psi. | 2,000 | SF | $ - 0 |
| 39 | Cleaning of Structure 16'-1" - 24' high - Cleaning of façade. |
Refer to Statement of Work, Item 3.1.3 K.
| Cleaning is with medium/high pressure water to include the use of light brushing or mild detergent. Pressure is not to exceed 1,000 psi. | 2,000 | SF | $ - 0 |
| 40 | Cleaning of Structure above 24' high - Cleaning of façade. |
Refer to Statement of Work, Item 3.1.3 K.
| Cleaning is with medium/high pressure water to include the use of light brushing or mild detergent. Pressure is not to exceed 1,000 psi. | 1,000 | SF | $ - 0 | |
| 41 | Furnish and install masonry weather seal coating, clear. | |||
| Refer to Statement of Work, Item 3.1.3. | 10,000 | SF | $ - 0 | |
| 42 | Cast-in place concrete walkway, up to 5" thick. | |||
| Refer to Statement of Work, Item 3.1.4. | 3,000 | SF | $ - 0 | |
| 43 | Demo existing concrete walkway, up to 7" thick. | |||
| Refer to Statement of Work, Item 3.1.4. | 3,000 | SF | $ - 0 | |
| 44 | Demolish, furnish, and install concrete curb | |||
| Refer to Statement of Work, Item 3.1.5. | 500 | LF | $ - 0 | |
| 45 | Reset pre-cast concrete curb | |||
| Refer to Statement of Work, Item 3.1.5. | 100 | LF | $ - 0 | |
| 46 | Demolish, furnish and install granite curb | |||
| Refer to Statement of Work, Item 3.1.5. | 200 | LF | $ - 0 | |
| 47 | Reset granite curb | |||
| Refer to Statement of Work, Item 3.1.5. | 100 | LF | $ - 0 | |
| 48 | Demolish, furnish, and install concrete window sill. | |||
| Refer to Statement of Work, Item 3.05. | 500 | LF | $ - 0 | |
| 49 | Demolish, furnish, and install pre-cast concrete window sill. | |||
| Refer to Statement of Work, Item 3.05. | 100 | LF | $ - 0 | |
| 50 | Demolish, furnish, and install bluestone window sill. | |||
| Refer to Statement of Work, Item 3.05. | 100 | LF | $ - 0 | |
| 51 | Demolish, furnish, and install brownstone window sill. | |||
| Refer to Statement of Work, Item 3.05. | 100 | LF | $ - 0 | |
| 52 | Demolish, furnish, and install limestone window sill. | |||
| Refer to Statement of Work, Item 3.05. | 100 | LF | $ - 0 | |
| 53 | Concrete Repair, 0"-2" thick. | |||
| Refer to Statement of Work, Item 3.06. | 500 | SF | $ - 0 | |
| 54 | Concrete Repair, >2"-10" thick. | |||
| Refer to Statement of Work, Item 3.06. | 1,000 | SF | $ - 0 | |
| 55 | Demolish, furnish and install cast-in place concrete stair tread, 0"-3" thick. | |||
| Refer to Statement of Work, Item 3.06, H. | 200 | SF | $ - 0 | |
| 56 | Demolish, furnish and install cast-in place concrete stair tread, >3"-10" thick. | |||
| Refer to Statement of Work, Item 3.06, H. | 200 | SF | $ - 0 | |
| 57 | Furnish and install cast iron abrasive stair nosing 3" wide. | |||
| Refer to Statement of Work, Item 3.06, H. | 150 | LF | $ - 0 | |
| $ - 0 |
Ordering Year 1
| ITEM | DESCRIPTION | EST. | ||
| QTY | U/ | |||
| M | U/ | |||
| P | AMOUNT | Price per Unit | Total Price | |
| 1 | Re-point structure walls, stone up to 8' high | |||
| Refer to Statement of Work, Item 3.1.3. | 500 | LF | $ - 0 | |
| 2 | Re-point structure walls, stone from 8' to 16' high | |||
| Refer to Statement of Work, Item 3.1.3. | 500 | LF | $ - 0 | |
| 3 | Re-point structure walls, stone from 16' to 24' high | |||
| Refer to Statement of Work, Item 3.1.3. | 500 | LF | $ - 0 | |
| 4 | Re-point structure walls, stone above 24' high | |||
| Refer to Statement of Work, Item 3.1.3. | 500 | LF | $ - 0 | |
| 5 | Demolish, furnish and install stone, minimum 50 sq ft area. | |||
| Refer to Statement of Work, Item 3.1.3. | 500 | SF | $ - 0 | |
| 6 | Removal of coping stones | |||
| Refer to Statement of Work, Item 3.1.3 C. | 100 | LF | $ - 0 | |
| 7 | Replace coping stone | |||
| Refer to Statement of Work, Item 3.1.3 C. | 100 | LF | $ - 0 | |
| 8 | Capstone pinning | |||
| Refer to Statement of Work, Item 3.1.3 C. | 50 | EA | $ - 0 | |
| 9 | Caulking of capstones, minimum 50 LF | |||
| Refer to Statement of Work, Item 3.1.3 C. | 500 | LF | $ - 0 | |
| 10 | Furnish and install stucco finish over masonry, 3 coats | |||
| Refer to Statement of Work, Item 3.1.3 L. | 1000 | SF | $ - 0 | |
| 11 | Furnish and install stucco finish w/ wire over masonry, 3 coats | |||
| Refer to Statement of Work, Item 3.1.3 M. | 1000 | SF | $ - 0 | |
| Re-point structure walls, CMU up to 8' high | ||||
| Refer to Statement of Work, Item 3.1.3 J. | 150 | SF | $ - 0 | |
| 12 | Re-point structure walls, CMU from 8' to 16' high | |||
| Refer to Statement of Work, Item 3.1.3 J. | 100 | SF | $ - 0 | |
| 13 | Re-point structure walls, CMU from 16' to 24' high | |||
| Refer to Statement of Work, Item 3.1.3 J. | 100 | SF | $ - 0 | |
| 14 | Re-point structure walls, CMU 24' and above | |||
| Refer to Statement of Work, Item 3.1.3 J. | 100 | SF | $ - 0 | |
| 15 | Re-point parapet walls, CMU, roof side | |||
| Refer to Statement of Work, Item 3.1.3 J. | 100 | SF | $ - 0 | |
| 16 | Re-point penthouse walls, CMU, up to 10' | |||
| Refer to Statement of Work, Item 3.1.3 J. | 50 | SF | $ - 0 | |
| 17 | Re-point penthouse walls, CMU, 10' and above | |||
| Refer to Statement of Work, Item 3.1.3 J. | 50 | SF | $ - 0 | |
| 18 | Cleaning CMU after re-pointing. | |||
| Refer to Statement of Work, Item 3.1.3 J. | 150 | SF | $ - 0 | |
| 19 | Demolish, furnish and install CMU, minimum 20 sq ft area. | |||
| Refer to Statement of Work, Item 3.1.3 F. | 100 | SF | $ - 0 | |
| 20 | Re-point structure walls, red brick up to 8' high | |||
| Refer to Statement of Work, Item 3.1.3 J. | 3,000 | SF | $ - 0 | |
| 21 | Re-point structure walls, red brick from 8' to 16' high | |||
| Refer to Statement of Work, Item 3.1.3 J. | 1,500 | SF | $ - 0 | |
| 22 | Re-point structure walls, red brick from 16' to 24' high | |||
| Refer to Statement of Work, Item 3.1.3 J. | 1,500 | SF | $ - 0 | |
| 23 | Re-point structure walls, red brick 24' and above | |||
| Refer to Statement of Work, Item 3.1.3 J. | 1,000 | SF | $ - 0 | |
| 24 | Re-point parapet walls, red brick, roof side | |||
| Refer to Statement of Work, Item 3.1.3 J. | 500 | SF | $ - 0 | |
| 25 | Re-point penthouse walls, red brick, up to 10' | |||
| Refer to Statement of Work, Item 3.1.3 J. | 100 | SF | $ - 0 | |
| 26 | Re-point penthouse walls, red brick, 10' and above | |||
| Refer to Statement of Work, Item 3.1.3 J. | 100 | SF | $ - 0 | |
| 27 | Cleaning red brick after re-pointing. | |||
| Refer to Statement of Work, Item 3.1.3 J. | 5,000 | SF | $ - 0 | |
| 28 | Demolish, furnish and install red brick, minimum 100 sq ft area. | |||
| Refer to Statement of Work, Item 3.1.3 E. | 2500 | SF | $ - 0 | |
| 29 | Re-point structure walls, yellow brick up to 8' high | |||
| Refer to Statement of Work, Item 3.1.3 J. | 150 | SF | $ - 0 | |
| 30 | Re-point structure walls, yellow brick from 8' to 16' high | |||
| Refer to Statement of Work, Item 3.1.3 J. | 100 | SF | $ - 0 | |
| 31 | Re-point structure walls, yellow brick from 16' to 24' high | |||
| Refer to Statement of Work, Item 3.1.3 J. | 100 | SF | $ - 0 | |
| 32 | Re-point structure walls, yellow brick 24' and above | |||
| Refer to Statement of Work, Item 3.1.3 J.. | 100 | SF | $ - 0 | |
| 33 | Re-point parapet walls, yellow brick, roof side | |||
| Refer to Statement of Work, Item 3.1.3 J. | 100 | SF | $ - 0 | |
| 34 | Re-point penthouse walls, yellow brick, up to 10' | |||
| Refer to Statement of Work, Item 3.1.3 J. | 50 | SF | $ - 0 | |
| 35 | Re-point penthouse walls, yellow brick, 10' and above | |||
| Refer to Statement of Work, Item 3.1.3 J. | 50 | SF | $ - 0 | |
| 36 | Cleaning yellow brick after re-pointing. | |||
| Refer to Statement of Work, Item 3.1.3 J. | 200 | SF | $ - 0 | |
| 37 | Demolish, furnish and install yellow brick, minimum 100 sq ft area. | |||
| Refer to Statement of Work, Item 3.1.3 J. | 100 | SF | $ - 0 | |
| 38 | Cleaning of Structure 8'-1" - 16' high - Cleaning of façade. |
Refer to Statement of Work, Item 3.1.3 K.
| Cleaning is with medium/high pressure water to include the use of light brushing or mild detergent. Pressure is not to exceed 1,000 psi. | 2,000 | SF | $ - 0 |
| 39 | Cleaning of Structure 16'-1" - 24' high - Cleaning of façade. |
Refer to Statement of Work, Item 3.1.3 K.
| Cleaning is with medium/high pressure water to include the use of light brushing or mild detergent. Pressure is not to exceed 1,000 psi. | 2,000 | SF | $ - 0 |
| 40 | Cleaning of Structure above 24' high - Cleaning of façade. |
Refer to Statement of Work, Item 3.1.3 K.
| Cleaning is with medium/high pressure water to include the use of light brushing or mild detergent. Pressure is not to exceed 1,000 psi. | 1,000 | SF | $ - 0 | |
| 41 | Furnish and install masonry weather seal coating, clear. | |||
| Refer to Statement of Work, Item 3.1.3. | 10,000 | SF | $ - 0 | |
| 42 | Cast-in place concrete walkway, up to 5" thick. | |||
| Refer to Statement of Work, Item 3.1.4. | 3,000 | SF | $ - 0 | |
| 43 | Demo existing concrete walkway, up to 7" thick. | |||
| Refer to Statement of Work, Item 3.1.4. | 3,000 | SF | $ - 0 | |
| 44 | Demolish, furnish, and install concrete curb | |||
| Refer to Statement of Work, Item 3.1.5. | 500 | LF | $ - 0 | |
| 45 | Reset pre-cast concrete curb | |||
| Refer to Statement of Work, Item 3.1.5. | 100 | LF | $ - 0 | |
| 46 | Demolish, furnish and install granite curb | |||
| Refer to Statement of Work, Item 3.1.5. | 200 | LF | $ - 0 | |
| 47 | Reset granite curb | |||
| Refer to Statement of Work, Item 3.1.5. | 100 | LF | $ - 0 | |
| 48 | Demolish, furnish, and install concrete window sill. | |||
| Refer to Statement of Work, Item 3.05. | 500 | LF | $ - 0 | |
| 49 | Demolish, furnish, and install pre-cast concrete window sill. | |||
| Refer to Statement of Work, Item 3.05. | 100 | LF | $ - 0 | |
| 50 | Demolish, furnish, and install bluestone window sill. | |||
| Refer to Statement of Work, Item 3.05. | 100 | LF | $ - 0 | |
| 51 | Demolish, furnish, and install brownstone window sill. | |||
| Refer to Statement of Work, Item 3.05. | 100 | LF | $ - 0 | |
| 52 | Demolish, furnish, and install limestone window sill. | |||
| Refer to Statement of Work, Item 3.05. | 100 | LF | $ - 0 | |
| 53 | Concrete Repair, 0"-2" thick. | |||
| Refer to Statement of Work, Item 3.06. | 500 | SF | $ - 0 | |
| 54 | Concrete Repair, >2"-10" thick. | |||
| Refer to Statement of Work, Item 3.06. | 1,000 | SF | $ - 0 | |
| 55 | Demolish, furnish and install cast-in place concrete stair tread, 0"-3" thick. | |||
| Refer to Statement of Work, Item 3.06, H. | 200 | SF | $ - 0 | |
| 56 | Demolish, furnish and install cast-in place concrete stair tread, >3"-10" thick. | |||
| Refer to Statement of Work, Item 3.06, H. | 200 | SF | $ - 0 | |
| 57 | Furnish and install cast iron abrasive stair nosing 3" wide. | |||
| Refer to Statement of Work, Item 3.06, H. | 150 | LF | $ - 0 | |
| $ - 0 |
Ordering Year 2
| ITEM | DESCRIPTION | EST. | ||
| QTY | U/ | |||
| M | U/ | |||
| P | AMOUNT | Price per Unit | Total Price | |
| 1 | Re-point structure walls, stone up to 8' high | |||
| Refer to Statement of Work, Item 3.1.3. | 500 | LF | $ - 0 | |
| 2 | Re-point structure walls, stone from 8' to 16' high | |||
| Refer to Statement of Work, Item 3.1.3. | 500 | LF | $ - 0 | |
| 3 | Re-point structure walls, stone from 16' to 24' high | |||
| Refer to Statement of Work, Item 3.1.3. | 500 | LF | $ - 0 | |
| 4 | Re-point structure walls, stone above 24' high | |||
| Refer to Statement of Work, Item 3.1.3. | 500 | LF | $ - 0 | |
| 5 | Demolish, furnish and install stone, minimum 50 sq ft area. | |||
| Refer to Statement of Work, Item 3.1.3. | 500 | SF | $ - 0 | |
| 6 | Removal of coping stones | |||
| Refer to Statement of Work, Item 3.1.3 C. | 100 | LF | $ - 0 | |
| 7 | Replace coping stone | |||
| Refer to Statement of Work, Item 3.1.3 C. | 100 | LF | $ - 0 | |
| 8 | Capstone pinning | |||
| Refer to Statement of Work, Item 3.1.3 C. | 50 | EA | $ - 0 | |
| 9 | Caulking of capstones, minimum 50 LF | |||
| Refer to Statement of Work, Item 3.1.3 C. | 500 | LF | $ - 0 | |
| 10 | Furnish and install stucco finish over masonry, 3 coats | |||
| Refer to Statement of Work, Item 3.1.3 L. | 1000 | SF | $ - 0 | |
| 11 | Furnish and install stucco finish w/ wire over masonry, 3 coats | |||
| Refer to Statement of Work, Item 3.1.3 M. | 1000 | SF | $ - 0 | |
| Re-point structure walls, CMU up to 8' high | ||||
| Refer to Statement of Work, Item 3.1.3 J. | 150 | SF | $ - 0 | |
| 12 | Re-point structure walls, CMU from 8' to 16' high | |||
| Refer to Statement of Work, Item 3.1.3 J. | 100 | SF | $ - 0 | |
| 13 | Re-point structure walls, CMU from 16' to 24' high | |||
| Refer to Statement of Work, Item 3.1.3 J. | 100 | SF | $ - 0 | |
| 14 | Re-point structure walls, CMU 24' and above | |||
| Refer to Statement of Work, Item 3.1.3 J. | 100 | SF | $ - 0 | |
| 15 | Re-point parapet walls, CMU, roof side | |||
| Refer to Statement of Work, Item 3.1.3 J. | 100 | SF | $ - 0 | |
| 16 | Re-point penthouse walls, CMU, up to 10' | |||
| Refer to Statement of Work, Item 3.1.3 J. | 50 | SF | $ - 0 | |
| 17 | Re-point penthouse walls, CMU, 10' and above | |||
| Refer to Statement of Work, Item 3.1.3 J. | 50 | SF | $ - 0 | |
| 18 | Cleaning CMU after re-pointing. | |||
| Refer to Statement of Work, Item 3.1.3 J. | 150 | SF | $ - 0 | |
| 19 | Demolish, furnish and install CMU, minimum 20 sq ft area. | |||
| Refer to Statement of Work, Item 3.1.3 F. | 100 | SF | $ - 0 | |
| 20 | Re-point structure walls, red brick up to 8' high | |||
| Refer to Statement of Work, Item 3.1.3 J. | 3,000 | SF | $ - 0 | |
| 21 | Re-point structure walls, red brick from 8' to 16' high | |||
| Refer to Statement of Work, Item 3.1.3 J. | 1,500 | SF | $ - 0 | |
| 22 | Re-point structure walls, red brick from 16' to 24' high | |||
| Refer to Statement of Work, Item 3.1.3 J. | 1,500 | SF | $ - 0 | |
| 23 | Re-point structure walls, red brick 24' and above | |||
| Refer to Statement of Work, Item 3.1.3 J. | 1,000 | SF | $ - 0 | |
| 24 | Re-point parapet walls, red brick, roof side | |||
| Refer to Statement of Work, Item 3.1.3 J. | 500 | SF | $ - 0 | |
| 25 | Re-point penthouse walls, red brick, up to 10' | |||
| Refer to Statement of Work, Item 3.1.3 J. | 100 | SF | $ - 0 | |
| 26 | Re-point penthouse walls, red brick, 10' and above | |||
| Refer to Statement of Work, Item 3.1.3 J. | 100 | SF | $ - 0 | |
| 27 | Cleaning red brick after re-pointing. | |||
| Refer to Statement of Work, Item 3.1.3 J. | 5,000 | SF | $ - 0 | |
| 28 | Demolish, furnish and install red brick, minimum 100 sq ft area. | |||
| Refer to Statement of Work, Item 3.1.3 E. | 2500 | SF | $ - 0 | |
| 29 | Re-point structure walls, yellow brick up to 8' high | |||
| Refer to Statement of Work, Item 3.1.3 J. | 150 | SF | $ - 0 | |
| 30 | Re-point structure walls, yellow brick from 8' to 16' high | |||
| Refer to Statement of Work, Item 3.1.3 J. | 100 | SF | $ - 0 | |
| 31 | Re-point structure walls, yellow brick from 16' to 24' high | |||
| Refer to Statement of Work, Item 3.1.3 J. | 100 | SF | $ - 0 | |
| 32 | Re-point structure walls, yellow brick 24' and above | |||
| Refer to Statement of Work, Item 3.1.3 J.. | 100 | SF | $ - 0 | |
| 33 | Re-point parapet walls, yellow brick, roof side | |||
| Refer to Statement of Work, Item 3.1.3 J. | 100 | SF | $ - 0 | |
| 34 | Re-point penthouse walls, yellow brick, up to 10' | |||
| Refer to Statement of Work, Item 3.1.3 J. | 50 | SF | $ - 0 | |
| 35 | Re-point penthouse walls, yellow brick, 10' and above | |||
| Refer to Statement of Work, Item 3.1.3 J. | 50 | SF | $ - 0 | |
| 36 | Cleaning yellow brick after re-pointing. | |||
| Refer to Statement of Work, Item 3.1.3 J. | 200 | SF | $ - 0 | |
| 37 | Demolish, furnish and install yellow brick, minimum 100 sq ft area. | |||
| Refer to Statement of Work, Item 3.1.3 J. | 100 | SF | $ - 0 | |
| 38 | Cleaning of Structure 8'-1" - 16' high - Cleaning of façade. |
Refer to Statement of Work, Item 3.1.3 K.
| Cleaning is with medium/high pressure water to include the use of light brushing or mild detergent. Pressure is not to exceed 1,000 psi. | 2,000 | SF | $ - 0 |
| 39 | Cleaning of Structure 16'-1" - 24' high - Cleaning of façade. |
Refer to Statement of Work, Item 3.1.3 K.
| Cleaning is with medium/high pressure water to include the use of light brushing or mild detergent. Pressure is not to exceed 1,000 psi. | 2,000 | SF | $ - 0 |
| 40 | Cleaning of Structure above 24' high - Cleaning of façade. |
Refer to Statement of Work, Item 3.1.3 K.
| Cleaning is with medium/high pressure water to include the use of light brushing or mild detergent. Pressure is not to exceed 1,000 psi. | 1,000 | SF | $ - 0 | |
| 41 | Furnish and install masonry weather seal coating, clear. | |||
| Refer to Statement of Work, Item 3.1.3. | 10,000 | SF | $ - 0 | |
| 42 | Cast-in place concrete walkway, up to 5" thick. | |||
| Refer to Statement of Work, Item 3.1.4. | 3,000 | SF | $ - 0 | |
| 43 | Demo existing concrete walkway, up to 7" thick. | |||
| Refer to Statement of Work, Item 3.1.4. | 3,000 | SF | $ - 0 | |
| 44 | Demolish, furnish, and install concrete curb | |||
| Refer to Statement of Work, Item 3.1.5. | 500 | LF | $ - 0 | |
| 45 | Reset pre-cast concrete curb | |||
| Refer to Statement of Work, Item 3.1.5. | 100 | LF | $ - 0 | |
| 46 | Demolish, furnish and install granite curb | |||
| Refer to Statement of Work, Item 3.1.5. | 200 | LF | $ - 0 | |
| 47 | Reset granite curb | |||
| Refer to Statement of Work, Item 3.1.5. | 100 | LF | $ - 0 | |
| 48 | Demolish, furnish, and install concrete window sill. | |||
| Refer to Statement of Work, Item 3.05. | 500 | LF | $ - 0 | |
| 49 | Demolish, furnish, and install pre-cast concrete window sill. | |||
| Refer to Statement of Work, Item 3.05. | 100 | LF | $ - 0 | |
| 50 | Demolish, furnish, and install bluestone window sill. | |||
| Refer to Statement of Work, Item 3.05. | 100 | LF | $ - 0 | |
| 51 | Demolish, furnish, and install brownstone window sill. | |||
| Refer to Statement of Work, Item 3.05. | 100 | LF | $ - 0 | |
| 52 | Demolish, furnish, and install limestone window sill. | |||
| Refer to Statement of Work, Item 3.05. | 100 | LF | $ - 0 | |
| 53 | Concrete Repair, 0"-2" thick. | |||
| Refer to Statement of Work, Item 3.06. | 500 | SF | $ - 0 | |
| 54 | Concrete Repair, >2"-10" thick. | |||
| Refer to Statement of Work, Item 3.06. | 1,000 | SF | $ - 0 | |
| 55 | Demolish, furnish and install cast-in place concrete stair tread, 0"-3" thick. | |||
| Refer to Statement of Work, Item 3.06, H. | 200 | SF | $ - 0 | |
| 56 | Demolish, furnish and install cast-in place concrete stair tread, >3"-10" thick. | |||
| Refer to Statement of Work, Item 3.06, H. | 200 | SF | $ - 0 | |
| 57 | Furnish and install cast iron abrasive stair nosing 3" wide. | |||
| Refer to Statement of Work, Item 3.06, H. | 150 | LF | $ - 0 | |
| $ - 0 |