UFGS 03 01 32 - Concrete Rehabilitation For Civil Works.pdf

PDF 195 KB Posted

Attached to
Masonry Indefinite Delivery Indefinite Quantity (IDIQ) at Watervliet Arsenal, NY
Solicitation number
W911PT20B0002
Issued by

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USACE / NAVFAC / AFCEC / NASA UFGS-03 01 32 (November 2009) Preparing Activity: USACE Superseding UFGS-03 01 32 (April 2006)

UNIFIED FACILITIES GUIDE SPECIFICATION

References are in agreement with UMRL dated January 2016

SECTION TABLE OF CONTENTS

DIVISION 03 - CONCRETE

SECTION 03 01 32

CONCRETE REHABILITATION FOR CIVIL WORKS

11/09

PART 1 GENERAL

1.1 RELATED SECTIONS

1.1.1 Formwork

1.1.2 Reinforcing Steel

1.1.3 Field-Molded Sealants

1.1.4 Compression Seals

1.1.5 Concrete

1.1.6 Shotcrete

1.1.7 Preplaced-Aggregate Concrete

1.1.8 Precast Concrete

1.1.9 Disposal of Waste Materials

1.2 UNIT PRICES

1.2.1 Concrete Removal

1.2.1.1 Payment

1.2.1.2 Measurement

1.2.1.3 Unit of Measure

1.2.2 Concrete Removal (Alternate)

1.2.2.1 Payment

1.2.2.2 Measurement

1.2.2.3 Unit of Measure

1.2.3 Drilling and Grouting Dowels and Anchors

1.2.3.1 Payment

1.2.3.2 Measurement

1.2.3.3 Unit of Measure

1.2.4 Dowels and Anchors

1.2.5 Concrete

1.2.5.1 Payment

1.2.5.2 Measurement

1.2.5.3 Unit of Measure

1.2.6 Mortar

1.2.6.1 Payment

1.2.6.2 Measurement

1.2.6.3 Unit of Measure

1.2.7 Grout

1.2.7.1 Payment

SECTION 03 01 32 Page 1

1.2.7.2 Measurement

1.2.7.3 Unit of Measure

1.2.8 Precast Concrete Units

1.2.8.1 Payment

1.2.8.2 Measurement

1.2.8.3 Unit of Measure

1.2.9 Overlays

1.2.9.1 Payment

1.2.9.2 Measurement

1.2.9.3 Unit of Measure

1.2.10 Crack Injection

1.2.10.1 Payment

1.2.10.2 Measurement

1.2.10.3 Unit of Measure

1.2.11 Crack or Joint Sealing

1.2.12 Notch and Seal Crack Filling

1.2.12.1 Payment

1.2.12.2 Measurement

1.2.12.3 Unit of Measure

1.2.13 Mechanical Anchoring of Cracks

1.2.13.1 Payment

1.2.13.2 Unit of Measure

1.2.14 Crack Stitching

1.2.14.1 Payment

1.2.14.2 Measurement

1.2.14.3 Unit of Measure

1.2.15 Drilling and Plugging Cracks

1.2.15.1 Payment

1.2.15.2 Measurement

1.2.15.3 Unit of Measure

1.2.16 Gravity Crack Filling

1.2.16.1 Payment

1.2.16.2 Measurement

1.2.16.3 Unit of Measure

1.2.17 Measurement Procedures

1.2.17.1 Concrete Removal

1.2.17.2 Measurement of Vertical Concrete Removal

1.2.17.3 Measurement of Horizontal Concrete Removal

1.2.17.4 Measurements of Concrete

1.3 REFERENCES

1.4 DEFINITIONS

1.4.1 Concrete

1.4.2 Mortar

1.4.3 Grout

1.4.4 Cement-Based Material

1.4.5 Polymer-Modifier

1.4.6 Polymer-Modified Material

1.4.7 Epoxy Resin Binder

1.4.8 Epoxy Concrete

1.4.9 Epoxy Mortar

1.4.10 Non-Pressure Epoxy Grout

1.4.11 Epoxy Injection Adhesive

1.4.12 Rapid-Hardening Repair Material

1.4.13 Non-Structural Cracks

1.4.14 Structural Cracks

1.5 SYSTEM DESCRIPTION

1.5.1 Design Requirements

1.5.2 Repair Material Performance Requirements

1.5.3 Sequencing and Scheduling

SECTION 03 01 32 Page 2

1.6 SUBMITTALS

1.7 QUALITY ASSURANCE

1.7.1 Qualifications

1.7.1.1 Contractor Qualifications

1.7.1.2 Worker Qualifications

1.7.1.3 Blasting Personnel Qualifications

1.7.1.4 Quality Control Personnel Qualifications

1.7.2 Regulatory Requirements

1.7.3 Pre-Construction Conference

1.7.4 Repair Material Mixture Proportioning

1.7.5 Test Reports

1.7.5.1 Epoxy Resin Binder

1.7.5.2 Epoxy Resin Grout

1.7.5.3 [Cement-Based Concrete] [and] [Cement-Based Mortar]

1.7.5.4 [Polymer-Modified Concrete] [and] [Polymer-Modified Mortar]

1.7.6 Field Samples

1.7.6.1 Concrete Removal

1.7.6.2 Joint and Crack Sealing

1.7.6.3 Precast Unit Assembly Test

1.7.6.4 Sample Repair Panels

1.8 DELIVERY, STORAGE, AND HANDLING

1.8.1 Packing, Shipping, Handling, and Unloading

1.8.2 Epoxy-Resin Materials

1.8.3 Polymer Materials

1.8.4 Chemical Admixtures

1.8.5 Waste Management and Disposal

1.9 PROJECT/SITE CONDITIONS

1.9.1 Environmental Requirements

1.9.2 Existing Conditions

1.9.2.1 Concrete Test Data

1.9.2.2 Concrete Core(s)

1.9.2.3 Embedded Materials

PART 2 PRODUCTS

2.1 MATERIALS

2.1.1 Cement-Based Materials

2.1.1.1 Rapid-Hardening Repair Material

2.1.1.2 Ultra-fine Cement

2.1.2 Admixtures

2.1.3 Aggregate

2.1.4 Water

2.1.5 Fiber Reinforcement

2.1.6 Polymer Materials

2.1.6.1 Polymer Modifier for Concrete or Mortar

2.1.6.2 Polyurethane Injection Adhesive

2.1.6.3 Polyester Resin Grout

2.1.6.4 Latex Bonding Compound

2.1.6.5 High Molecular Weight Methacrylate (HMWM) Sealer

2.1.7 Epoxy Resin Materials

2.1.7.1 Epoxy Resin Binder for Concrete and Mortar

2.1.7.2 Non-Pressure Epoxy Grout

2.1.7.3 Epoxy Injection Adhesive

2.1.7.4 Crack Surface Sealer for Injection Grouting

2.1.7.5 Epoxy Bonding Agent

2.1.8 Bond Breaker

2.1.9 Field-Molded Sealants and Primer

2.1.10 High-Strength Steel Bars

2.1.11 Compression Seals and Lubricant

SECTION 03 01 32 Page 3

2.1.12 Epoxy-Coated Steel Bars

2.1.13 Anchors

2.1.14 Dowels

2.1.15 Anchor Head

2.1.16 Mechanical Anchors

2.2 EQUIPMENT

2.2.1 Cement-Based Concrete Mixing Equipment

2.2.2 Polymer-Modified Concrete Mixing Equipment

2.2.3 Epoxy Mixing Equipment

2.2.4 Grout Mixing Equipment

2.2.5 Joint and Crack [Cleaning] and [Sealing] Equipment

2.2.6 Drilling Equipment

2.2.7 Vehicle-Mounted Breakers

2.2.8 Hand-Held Breaker

2.2.9 Hydromilling Equipment

2.2.10 Rotary Milling Equipment

2.2.10.1 Horizontal Surfaces

2.2.10.2 Vertical Surfaces

2.3 ACCESSORIES

2.3.1 Stitching staples

2.3.2 Neoprene Bearing Pads for Precast Units

2.3.3 Plastic Shims

2.3.4 Expansion Joint Filler Strips, Premolded

2.4 MIXTURE PROPORTIONING

2.4.1 Cement-Based Concrete

2.4.2 Fiber-Reinforced Concrete

2.4.3 Dry-Pack Mortar

2.4.4 Polymer-Modified Mortar

2.4.5 Polymer-Modified Concrete

2.4.6 Precast Concrete Units

2.4.7 Cement-Based Grout

2.4.8 Ultra-fine Cement Grout

PART 3 EXECUTION

3.1 PROTECTION

3.1.1 Protection of Existing Features

3.1.2 Protection of Personnel

3.2 REMOVAL OF EXISTING CONCRETE

3.2.1 General

3.2.1.1 Determination of Removal Limits

3.2.1.2 Perimeter Saw Cut

3.2.1.3 Preliminary Surface Cleaning

3.2.1.4 Reinforcing Steel

3.2.1.5 Shallow Repairs

3.2.2 Cutting

3.2.2.1 General

3.2.2.2 Abrasive-Water-Jet Cutting

3.2.2.3 Diamond-Blade Cutting

3.2.2.4 Diamond-Wire Cutting

3.2.2.5 Stitch Drilling

3.2.3 Impacting

3.2.3.1 Vehicle-Mounted Breaker

3.2.3.2 Hand-Held Breaker

3.2.4 Milling

3.2.4.1 Hydromilling

3.2.4.2 Rotary Head Milling

3.2.5 Presplitting

3.2.5.1 Expansive Agents

SECTION 03 01 32 Page 4

3.2.5.2 Mechanical Presplitting

3.2.6 Controlled Blasting

3.2.6.1 General

3.2.6.2 Safety

3.2.6.3 Procedure

3.2.6.4 Preblasting and Postblasting Inspections

3.2.6.5 Vibration Monitoring

3.3 ANCHORING AND REINFORCING

3.3.1 Drilling and Grouting Dowels and Anchors

3.3.2 Drilling and Installing Mechanical Anchors

3.3.3 Installing Reinforcement

3.4 MIXING MATERIALS

3.5 SURFACE PREPARATION

3.5.1 General

3.5.2 Cleaning

3.5.3 Waste Water Disposal

3.6 SURFACE REPAIRS

3.6.1 Epoxy Mortar

3.6.2 Epoxy Concrete

3.6.3 Polymer-Modified Mortar or Concrete

3.6.3.1 Horizontal Surfaces

3.6.3.2 Vertical Surfaces

3.6.4 Dry-Pack Mortar

3.6.5 Cement-Based Mortar or Concrete

3.6.6 Spalls at Joints and Cracks

3.6.7 Rapid-Hardening Repair Material

3.7 CRACK REPAIR

3.7.1 Routing and Sealing

3.7.1.1 Preparation

3.7.1.2 Rate of Progress

3.7.1.3 Time of Application

3.7.1.4 Sealing

3.7.1.5 Preformed Compression Seals

3.7.2 Filling Cracks with Grout or Mortar

3.7.2.1 Preparation

3.7.2.2 Epoxy Grout

3.7.2.3 Dry-Pack Mortar

3.7.2.4 Curing

3.7.3 Gravity Crack Filling

3.7.3.1 Surface Preparation

3.7.3.2 Applying Sealer

3.7.4 Drilling and Plugging Cracks

3.7.5 Injection Grouting Cracks

3.7.5.1 Preparation

3.7.5.2 Injection

3.7.6 Crack Repair with Additional Reinforcement

3.7.6.1 Stitching

3.7.6.2 Conventional Reinforcement

3.7.6.3 Internal Prestressing Reinforcement

3.7.6.4 External Stressing

3.8 CLEANING AND RESEALING JOINTS

3.8.1 Preparation of Joints

3.8.1.1 Existing Sealant Removal

3.8.1.2 Sandblasting and Waterjetting

3.8.1.3 Rate of Progress of Joint Preparation

3.8.2 Installation of Sealant

3.8.2.1 Time of Application

3.8.2.2 Back-Up Material and Bond Breaker

3.8.2.3 Sealing Joints

SECTION 03 01 32 Page 5

3.8.3 Installation of Preformed Compression Seals

3.9 OVERLAYS

3.9.1 Cement-Based Concrete Overlay

3.9.2 Polymer-Modified Concrete Overlay

3.9.3 Joints

3.10 REFACING VERTICAL SURFACES

3.10.1 Cement-Based Concrete

3.10.2 Preplaced-Aggregate Concrete

3.10.3 Precast Concrete Units

3.10.3.1 Erection of Precast Units

3.10.3.2 Temporary Unit Supports

3.10.3.3 Neoprene Bearing Pads and Joint Filler Material

3.10.3.4 Placement of Infill Concrete

3.10.4 Shotcrete

3.11 TESTS AND INSPECTIONS

3.11.1 General

3.11.2 Preparations for Placing

3.11.3 Grouted Dowels and Anchors

3.11.4 Epoxy Mortar

3.11.4.1 Sampling

3.11.4.2 Testing

3.11.4.3 Inspection

3.11.5 [Cement-Based ] [or] [Polymer-Modified] Concrete and Mortar

3.11.5.1 Air Content

3.11.5.2 Slump

3.11.5.3 Consolidation and Protection

3.11.5.4 Compression Tests

3.11.5.5 Curing

3.11.6 Aggregates

3.11.7 Action Required

3.11.7.1 Placing

3.11.7.2 Grouted Anchors and Dowels

3.11.7.3 Air Content

3.11.7.4 Slump

3.11.7.5 Curing

3.11.8 Final Inspection

3.11.9 Reports

3.11.10 Manufacturer Field Service

3.12 CLEAN UP

3.13 DUST CONTROL

3.14 PROTECTION PRIOR TO ACCEPTANCE

-- End of Section Table of Contents --

SECTION 03 01 32 Page 6

USACE / NAVFAC / AFCEC / NASA UFGS-03 01 32 (November 2009) Preparing Activity: USACE Superseding UFGS-03 01 32 (April 2006)

UNIFIED FACILITIES GUIDE SPECIFICATION

References are in agreement with UMRL dated January 2016

SECTION 03 01 32

CONCRETE REHABILITATION FOR CIVIL WORKS

11/09

NOTE: This guide specification covers the requirements for rehabilitation of concrete for Civil Works type structures.

Adhere to UFC 1-300-02 Unified Facilities Guide Specifications (UFGS) Format Standard when editing this guide specification or preparing new project specification sections. Edit this guide specification for project specific requirements by adding, deleting, or revising text. For bracketed items, choose applicable items(s) or insert appropriate information.

Remove information and requirements not required in respective project, whether or not brackets are present.

Comments, suggestions and recommended changes for this guide specification are welcome and should be submitted as a Criteria Change Request (CCR) .

PART 1 GENERAL

NOTE: This guide specification was prepared to be compatible with the guidance given in EM

1110-2-2000, EM 1110-2-2002, ACI 224.1R, UFC

3-270-03 and UFC 3-270-04.

The following information should be shown on the project drawings:

1. Location and extent of spalled, cracked or damaged concrete to be repaired with epoxy;

2. Location and extent of cracked concrete or saw kerfs to be filled with epoxy mortar;

3. Location of dowels to be installed and cracks to

SECTION 03 01 32 Page 7 be repaired with non-pressure grout; and

4. Location and sizes of cracks to be filled by pressure grouting.

1.1 RELATED SECTIONS

1.1.1 Formwork

Formwork shall conform to the requirements of Section 03 11 13.00 10 STRUCTURAL CAST-IN-PLACE CONCRETE FORMING. Do not use form oil with epoxy or polymer-modified repair materials.

1.1.2 Reinforcing Steel

Reinforcing Steel shall conform to the requirements of Section

03 20 00.00 10 CONCRETE REINFORCING.

1.1.3 Field-Molded Sealants

Field-molded sealants shall conform to the requirements of Section

03 15 00.00 10 CONCRETE ACCESSORIES.

1.1.4 Compression Seals

Compression seals shall conform to the requirements of Section

03 15 00.00 10 CONCRETE ACCESSORIES.

1.1.5 Concrete

Unless otherwise specified, concrete shall conform to the requirements of Section [03 30 00.00 10 CAST-IN-PLACE CONCRETE] [03 31 01.00 10 CAST-IN-PLACE STRUCTURAL CONCRETE FOR CIVIL WORKS] [Section 03 30 53

MISCELLANEOUS CAST-IN-PLACE CONCRETE].

1.1.6 Shotcrete

Shotcrete shall conform to the requirements of Section 03 37 13 SHOTCRETE.

1.1.7 Preplaced-Aggregate Concrete

Preplaced-aggregate concrete shall conform to the requirements of Section

03 37 00 PREPLACED-AGGREGATE CONCRETE.

1.1.8 Precast Concrete

Precast concrete shall conform to the requirements of Section 03 45 33

PRECAST [PRESTRESSED] STRUCTURAL CONCRETE.

1.1.9 Disposal of Waste Materials

Dispose waste materials in accordance with the requirements of Section 01 74 19 CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT. Dispose of waste water in accordance with 01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS.

1.2 UNIT PRICES

SECTION 03 01 32 Page 8

NOTE: If Section 01 22 00.00 10 PRICE AND PAYMENT PROCEDURES is included in the project specifications, this paragraph title (UNIT PRICES) should be deleted from this section and the remaining appropriately edited subparagraphs below should be inserted into Section 01 22 00.00 10. For additional guidance on payment items, see International Concrete Repair Institute Guidelines No. 03735 "Guide for Methods of Measurement and Contract Types for Concrete Repair Work".

For small projects where other relevant guide specifications are not included in the project specification, insert applicable measurement and payment paragraphs either here or in Section 01 22 00.00 10.

1.2.1 Concrete Removal

NOTE: Repeat this bid item and its respective subparagraphs for each bid item of concrete removal, renumbering the bid items appropriately. Unit price bid items should be inserted in paragraph UNIT PRICE BID ITEMS of Section 01 22 00.00 10 PRICE AND PAYMENT PROCEDURES. Where concrete removal depth is uniform across an area, measurement and payment may be made on an area basis, in which case the "ALTERNATE" paragraph may be used.

1.2.1.1 Payment

Payment will be made for costs associated with concrete removal, which includes preparatory work, removal of concrete and embedded items, and disposal of debris. Payment will be made at the contract price per cubic meter yard of concrete removed. No payment will be made for concrete removal, as such, that is in connection with items for which payment is made as a lump sum.

1.2.1.2 Measurement

Concrete removal will be measured for payment based upon the actual volume of concrete removed within the pay lines as indicated on the drawings.

Measurement will be made in accordance with paragraph MEASUREMENT PROCEDURES. No measurement will be made of concrete removal outside the pay lines shown which is incidental to the indicated removal unless such removal is specifically authorized by the Contracting Officer. No deductions will be made for rounded or beveled edges or for voids or embedded items that are either less than 0.15 cubic meters five cubic feet in volume or 0.10 square meter one square foot in cross section.

1.2.1.3 Unit of Measure

Unit of measure: cubic meters yards.

SECTION 03 01 32 Page 9

1.2.2 Concrete Removal (Alternate)

NOTE: Repeat this bid item and its respective subparagraphs for each bid item of concrete removal, renumbering the bid items appropriately. Unit price bid items should be inserted in paragraph UNIT PRICE BID ITEMS of Section 01 22 00.00 10 PRICE AND PAYMENT PROCEDURES. Where concrete removal depth is not uniform across an area, measurement and payment should be made on a volume basis basis, in which case the previous paragraph should be used.

1.2.2.1 Payment

Payment will be made for costs associated with concrete removal, which includes preparatory work, removal of concrete and embedded items, and disposal of debris. Payment will be made at the contract price per square meter yard of concrete removed. No payment will be made for concrete removal, as such, that is in connection with items for which payment is made as a lump sum.

1.2.2.2 Measurement

Concrete removal will be measured for payment based upon the actual area of concrete removed within the pay lines as indicated on the drawings. No measurement will be made of concrete removal outside the pay lines shown which is incidental to the indicated removal.

1.2.2.3 Unit of Measure

Unit of measure: square meters yards.

1.2.3 Drilling and Grouting Dowels and Anchors

1.2.3.1 Payment

Payment will be made for costs associated with drilling holes and grouting dowels and anchors for anchoring new concrete and for repairs to existing concrete. The price shall include the cost of furnishing all equipment, labor, and materials, except dowels and anchors, and all other incidental costs in connection with completing the item of work as shown and as specified. Payment for dowels and anchors will be made as specified for dowels, anchors, and reinforcing steel bars.

1.2.3.2 Measurement

Measurement of drilling holes and grouting dowels and anchors will be made by the linear meter foot of hole actually drilled and grouted to the depth indicated. Measurement will be made from the surface of the concrete after removal or surface preparation and will be made to the nearest 25 mm inch.

No payment will be made for holes improperly drilled or grouted nor for repairs required due to damage caused by the drilling and grouting operations.

1.2.3.3 Unit of Measure

Unit of measure: linear meter feet.

SECTION 03 01 32 Page 10

1.2.4 Dowels and Anchors

Measurement and payment for furnishing and placing dowels, anchors and reinforcing steel bars for anchorage will be made as specified in Section

03 20 00.00 10 CONCRETE REINFORCING.

1.2.5 Concrete

Measurement and payment for cement-based concrete will be made as specified in Section [03 30 00.00 10 CAST-IN-PLACE CONCRETE] [03 31 01.00 10

CAST-IN-PLACE STRUCTURAL CONCRETE FOR CIVIL WORKS] [03 30 53 MISCELLANEOUS

CAST-IN-PLACE CONCRETE].

1.2.5.1 Payment

Payment for [epoxy] [polymer-modified] [fiber-reinforced] concrete will be made at the respective contract unit prices per cubic meter yard. These payments shall constitute full compensation for performing the work and shall include the cost of all labor, equipment and tools, materials and supplies required to complete the concrete work under this contract; except steel reinforcement, and embedded parts which are specified to be paid for separately. No measurement and payment will be made for concrete, as such, which is placed in structures for which payment is made as a lump sum. No separate payment will be made for bonding coats or agents.

1.2.5.2 Measurement

Measurement of concrete will be made on the basis of the actual volume of concrete placed, within the limits of work, as indicated on the contract drawings. Measurement of concrete placed against the sides of any excavation without the use of intervening forms will be made only within the pay lines of the structure shown on the contract drawings. Measurement will be made in accordance with paragraph MEASUREMENT PROCEDURES. No deductions will be made for rounded or beveled edges or space occupied by metal work, electrical conduits or other materials, nor for individual voids or embedded items which are either less than 0.15 cubic meters five cubic feet in volume or 0.10 square meter one square foot in cross section.

1.2.5.3 Unit of Measure

Unit of measure: cubic meter yard.

1.2.6 Mortar

1.2.6.1 Payment

Payment for [cement-based mortar] [epoxy mortar] [polymer-modified mortar] [Rapid-Hardening Repair Mortar] will be made at the respective contract unit prices per cubic meter foot. These payments shall constitute full compensation for performing the work and shall include the cost of all labor, equipment and tools, materials and supplies required to complete the mortar work under this contract; except steel reinforcement, and embedded parts which are specified to be paid for separately. No measurement and payment will be made for mortar, as such, which is placed in structures for which payment is made as a lump sum. No separate payment will be made for bonding coats or agents.

SECTION 03 01 32 Page 11

1.2.6.2 Measurement

Measurement of mortar will be made on the basis of the actual volume of mortar placed, within the limits of work, as indicated on the contract drawings. Measurement will be made in accordance with paragraph MEASUREMENT PROCEDURES. No deductions will be made for rounded or beveled edges or space occupied by metal work, electrical conduits or other materials, nor for voids or embedded items.

1.2.6.3 Unit of Measure

Unit of measure: cubic meter foot.

1.2.7 Grout

1.2.7.1 Payment

Payment for [cement-based] [epoxy] [polymer-modified] grout will be made at the respective contract unit prices per cubic meter foot. These payments shall constitute full compensation for performing the work and shall include the cost of all labor, equipment and tools, materials and supplies required to complete the grout work under this contract. No measurement and payment will be made for grout, as such, which is placed in structures for which payment is made as a lump sum. No separate payment will be made for bonding coats or agents.

1.2.7.2 Measurement

Measurement of grout will be made on the basis of the actual volume of grout placed, within the limits of work, as indicated on the contract drawings. Measurement will be made in accordance with paragraph MEASUREMENT PROCEDURES. No deductions will be made for rounded or beveled edges or space occupied by metal work, electrical conduits or other materials, nor for individual voids or embedded items.

1.2.7.3 Unit of Measure

Unit of measure: cubic meter foot.

1.2.8 Precast Concrete Units

NOTE: Repeat this bid item and its respective subparagraphs for each bid item of precast concrete units, renumbering the bid items appropriately.

Unit price bid items should be inserted in paragraph UNIT PRICE BID ITEMS of Section 01 22 00.00 10 PRICE AND PAYMENT PROCEDURES. When uniform thickness and construction precast units are used, area measurement is appropriate. If the units are not uniform, either separate area measurements of volume measurements should be specified.

1.2.8.1 Payment

Payment will be made for costs associated with fabricating, transporting and erecting precast concrete units. The payment will include bearing pads, shims, and all temporary supports required for erection. Payment for

SECTION 03 01 32 Page 12 precast units will be made at the contract price per square meter foot for:

1.2.8.2 Measurement

Construction tolerances for erection of precast concrete units shall meet the requirements of PCI MNL-116 . Measurement of precast concrete units will be made on the basis of the actual surface area of precast units placed, and accepted, within the limits of work as indicated on the contract drawings. No deductions will be made for beveled edges or space occupied by metal work, or for embedded items.

1.2.8.3 Unit of Measure

Unit of measure: square meter feet.

1.2.9 Overlays

1.2.9.1 Payment

Payment for [cement-based] [polymer-modified] concrete overlay will be made at the respective contract unit prices per square meter yard. These payments shall constitute full compensation for performing the work and shall include the cost of all labor, equipment and tools, materials and supplies required to complete the overlay work under this contract, including surface preparation. No separate payment will be made for bonding agents or primers, when required.

1.2.9.2 Measurement

Measurement of [cement-based] [polymer-modified] concrete overlay will be made on the basis of the actual area of overlay placed, within the limits of work, as indicated on the contract drawings. No deductions will be made for voids or embedded items which are less than 0.09 square meter one square foot in area.

1.2.9.3 Unit of Measure

Unit of measure: square meter yard.

1.2.10 Crack Injection

1.2.10.1 Payment

NOTE: If there is considerable uncertainty concerning the quantity to be used, consideration should be given to using subdivided payment items, with the first amount being the minimum anticipated and subitems to cover unknown quantities above the minimum.

Payment will be made for costs associated with injecting cracks with [ultra-fine cement grout] [epoxy injection adhesive] [polyurethane injection adhesive], including cleaning the cracks, preparing the surface for crack surface sealer, placing crack surface sealer, installing injection ports, and cleanup upon completion of injection. Payment for

SECTION 03 01 32 Page 13 will be made at the contract price per liter gallon of material injected.

1.2.10.2 Measurement

Measurement of crack injection will be made on the basis of the actual volume of [ultra-fine cement] [epoxy] [polyurethane] material injected, and accepted, within the limits of work as indicated on the contract drawings.

No measurement will be made of grout that is released through ports or otherwise wasted.

1.2.10.3 Unit of Measure

Unit of measure: cubic meter foot.

1.2.11 Crack or Joint Sealing

Measurement and payment for crack or joint sealing, including sawing or routing cracks or joints, removing existing deteriorated sealants and joint materials, surface preparation, installing sealant and backup materials, and cleanup upon completion of sealing will be made as specified in Section

32 01 19 FIELD MOLDED SEALANTS FOR SEALING JOINTS IN RIGID PAVEMENTS.

1.2.12 Notch and Seal Crack Filling

1.2.12.1 Payment

Payment will be made for costs associated with filling cracks with [dry-pack mortar] [polymer-modified mortar], including preparing the cracks. Payment for will be made at the contract price per cubic meter foot of material placed.

1.2.12.2 Measurement

Measurement of crack filling will be made on the basis of the actual volume of mortar placed, and accepted, within the limits of work as indicated on the contract drawings.

1.2.12.3 Unit of Measure

Unit of measure: cubic meter foot.

1.2.13 Mechanical Anchoring of Cracks

NOTE: When a substantial amount of work involves mechanical anchoring of cracks, consideration may be given to using separate unit prices for drilling, reinforcing or prestressing steel, and miscellaneous metals for anchorages.

1.2.13.1 Payment

Payment will be for costs associated with preparation and installation of mechanical anchorage systems for crack repair.

1.2.13.2 Unit of Measure

Unit of measure: [each] [lump sum].

SECTION 03 01 32 Page 14

1.2.14 Crack Stitching

NOTE: When the area of stitching is small and/or well defined, payment may be lump sum.

1.2.14.1 Payment

Payment will be made for costs associated with stitching cracks, including drilling, grouting, and furnishing and installing stitching staples.

Payment for will be made at the contract price per stitching staple installed. Payment for sealing cracks will be made as specified for the specific type of crack treatment.

[ 1.2.14.2 Measurement

Measurement of crack stitching will be made on the basis of the actual number of stitching staples installed and accepted, within the limits of work as indicated on the contract drawings.

] 1.2.14.3 Unit of Measure

Unit of measure: [each] [lump sum].

1.2.15 Drilling and Plugging Cracks

1.2.15.1 Payment

Payment will be made for costs associated with drilling and plugging cracks with [portland cement grout] [polymer-modified mortar], including drilling the cracks and furnishing and placing the [grout] [mortar]. Payment for will be made at the contract price per cubic meter foot of material placed.

1.2.15.2 Measurement

Measurement of drilling and plugging cracks will be made on the basis of the actual volume of [portland cement grout] [polymer-modified mortar]placed, and accepted, within the limits of work as indicated on the contract drawings.

1.2.15.3 Unit of Measure

Unit of measure: cubic meter foot.

1.2.16 Gravity Crack Filling

1.2.16.1 Payment

Payment for gravity filling of cracks will be made at the contract unit price per square meter yard. This payments shall constitute full compensation for performing the work and shall include the cost of all labor, equipment and tools, materials and supplies required to complete the gravity filling work under this contract, including surface preparation.

1.2.16.2 Measurement

Measurement of gravity crack filling will be made on the basis of the

SECTION 03 01 32 Page 15 actual area of concrete surface treated, within the limits of work, as indicated on the contract drawings.

1.2.16.3 Unit of Measure

Unit of measure: square meter yard.

1.2.17 Measurement Procedures

1.2.17.1 Concrete Removal

NOTE: 25 mm 1 inch tolerance is suitable for concrete removal over150 mm 6 inches deep. For thinner repairs, a tighter tolerance would be more appropriate. The methods of removal should also be considered. The relative costs of achieving closer tolerance should be weighed against the anticipated benefits.

Remove concrete to the lines of removal indicated on the contract drawings. A tolerance of plus or minus [25 mm 1 inch] [13 mm 1/2 inch] will be allowed about the lines indicated [except in the thin wall areas where no removal beyond that indicated will be permitted]. Concrete removals that vary by more than the indicated tolerance will be acceptable, unless evidence indicates that deteriorated concrete is still present or the variation in tolerance results in a violation of the requirements for material placement, in which case removal shall continue to the lines indicated. Additional concrete removal beyond the allowable tolerance will be acceptable when deteriorated concrete is found as determined in accordance with paragraph Determination of Removal Limits, and the limits of such removal are set and approved by the Contracting Officer.

Unauthorized concrete removals in excess of 25 mm 1 inch beyond the lines shown will not be acceptable, and repair of such excess area shall be performed by the Contractor to the satisfaction of the Contracting Officer and at no additional cost to the Government.

1.2.17.2 Measurement of Vertical Concrete Removal

Determine the volume of vertical concrete removal from cross sections made prior to and after removal. Make cross sections from surveyed measurements [on a 1.5 by 1.5 meter 5 by 5 foot grid system] [at a minimum of 20 points], unless otherwise specified by the Contracting Officer. Take initial survey of the existing surface prior to removal, and take final surveys on the same control stations. Calculate volumes by the average-end-area method using the cross sections surveyed, unless otherwise specified. For areas of vertical concrete removal which are not readily accessible for survey, determine the volume of concrete from the neat lines of concrete removal as shown on the contract drawings, with the approval of the Contracting Officer,. Do not include any volume of concrete removal made beyond the allowable tolerances specified.

1.2.17.3 Measurement of Horizontal Concrete Removal

Determine volumes of horizontal concrete removal from cross sections made prior to and after removal. Make cross sections from surveyed measurements [on a 3 by 3 meter 10 by 10 foot grid system] [at a minimum of 20 points], unless otherwise specified by the Contracting Officer. Take initial survey

SECTION 03 01 32 Page 16 of the existing surface prior to removal, and take final cross sections at the same control stations. Calculate volumes by the average-end-area method using the cross sections surveyed, unless otherwise specified. Do not include any volume of concrete removal made beyond the allowable tolerances specified.

1.2.17.4 Measurements of Concrete

For areas that are readily accessible by a survey crew, determine volumes by cross sections of the areas prior to and after concrete placement. Take the initial and final cross sections at the same control stations used for concrete removal where possible. Calculate volumes by the average-end-area method using the cross sections surveyed, unless otherwise specified. For areas of concrete placement which are not readily accessible for survey, determine the volume of concrete from the neat lines of concrete placement as shown on the contract drawings. Do not include any volume of concrete placed to compensate for removal made beyond the allowable tolerances specified.

1.3 REFERENCES

NOTE: This paragraph is used to list the publications cited in the text of the guide specification. The publications are referred to in the text by basic designation only and listed in this paragraph by organization, designation, date, and title.

Use the Reference Wizard's Check Reference feature when you add a RID outside of the Section's Reference Article to automatically place the reference in the Reference Article. Also use the Reference Wizard's Check Reference feature to update the issue dates.

References not used in the text will automatically be deleted from this section of the project specification when you choose to reconcile references in the publish print process.

The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by basic designation only.

AMERICAN ASSOCIATION OF STATE HIGHWAY AND TRANSPORTATION OFFICIALS

(AASHTO)

AASHTO M 288 (2015) Standard Specification for Geotextile Specification for Highway Applications

AASHTO T 334 (2008; R 2012) Standard Method of Test for Estimating the Cracking Tendency of Concrete

SECTION 03 01 32 Page 17

AMERICAN CONCRETE INSTITUTE INTERNATIONAL (ACI)

ACI 117 (2010; Errata 2011) Specifications for Tolerances for Concrete Construction and Materials and Commentary

ACI 211.1 (1991; R 2009) Standard Practice for Selecting Proportions for Normal, Heavyweight and Mass Concrete

ACI 318 (2014; Errata 1-2 2014; Errata 3-4 2015) Building Code Requirements for Structural Concrete and Commentary

ACI 318M (2014) Building Code Requirements for Structural Concrete & Commentary

ACI 548.4 (2011) Standard Specification for Latex-Modified Concrete (LMC) Overlays

ACI SP-66 (2004) ACI Detailing Manual

ASTM INTERNATIONAL (ASTM)

ASTM A36/A36M (2014) Standard Specification for Carbon Structural Steel

ASTM A615/A615M (2015a; E 2015) Standard Specification for Deformed and Plain Carbon-Steel Bars for Concrete Reinforcement

ASTM A722/A722M (2015) Standard Specification for Uncoated High-Strength Steel Bar for Prestressing Concrete

ASTM A775/A775M (2007b; R2014) Standard Specification for Epoxy-Coated Steel Reinforcing Bars

ASTM A820/A820M (2011) Standard Specification for Steel Fibers for Fiber-Reinforced Concrete

ASTM A996/A996M (2015) Standard Specification for Rail-Steel and Axle-Steel Deformed Bars for Concrete Reinforcement

ASTM C1012/C1012M (2013) Standard Test Method for Length Change of Hydraulic-Cement Mortars Exposed to a Sulfate Solution

ASTM C1017/C1017M (2013; E 2015) Standard Specification for Chemical Admixtures for Use in Producing Flowing Concrete

ASTM C1059/C1059M (2013) Standard Specification for Latex Agents for Bonding Fresh to Hardened Concrete

ASTM C1077 (2015) Standard Practice for Laboratories Testing Concrete and Concrete Aggregates

SECTION 03 01 32 Page 18 for Use in Construction and Criteria for Laboratory Evaluation

ASTM C109/C109M (2013; E 2015) Standard Test Method for Compressive Strength of Hydraulic Cement Mortars (Using 2-in. or (50-mm) Cube Specimens)

ASTM C1116/C1116M (2010a; R 2015) Standard Specification for Fiber-Reinforced Concrete

ASTM C117 (2013) Standard Test Method for Materials Finer than 75-um (No. 200) Sieve in Mineral Aggregates by Washing

ASTM C136/C136M (2014) Standard Test Method for Sieve Analysis of Fine and Coarse Aggregates

ASTM C143/C143M (2012) Standard Test Method for Slump of Hydraulic-Cement Concrete

ASTM C1438 (2013) Standard Specification for Latex and Powder Polymer Modifiers for Hydraulic Cement Concrete and Mortar

ASTM C144 (2011) Standard Specification for Aggregate for Masonry Mortar

ASTM C150/C150M (2015) Standard Specification for Portland Cement

ASTM C157/C157M (2008; R 2014; E 2014) Standard Test Method for Length Change of Hardened Hydraulic-Cement Mortar and Concrete

ASTM C172/C172M (2014a) Standard Practice for Sampling Freshly Mixed Concrete

ASTM C192/C192M (2015) Standard Practice for Making and Curing Concrete Test Specimens in the Laboratory

ASTM C231/C231M (2014) Standard Test Method for Air Content of Freshly Mixed Concrete by the Pressure Method

ASTM C273/C273M (2011) Shear Properties of Sandwich Core Materials

ASTM C31/C31M (2012) Standard Practice for Making and Curing Concrete Test Specimens in the Field

ASTM C33/C33M (2013) Standard Specification for Concrete Aggregates

ASTM C39/C39M (2015a) Standard Test Method for Compressive Strength of Cylindrical Concrete Specimens

SECTION 03 01 32 Page 19

ASTM C469/C469M (2014) Static Modulus of Elasticity and Poisson's Ratio of Concrete in Compression

ASTM C494/C494M (2015a) Standard Specification for Chemical Admixtures for Concrete

ASTM C596 (2009; E 2015) Drying Shrinkage of Mortar Containing Hydraulic Cement

ASTM C666/C666M (2015) Resistance of Concrete to Rapid Freezing and Thawing

ASTM C881/C881M (2014) Standard Specification for Epoxy-Resin-Base Bonding Systems for Concrete

ASTM C882/C882M (2013a) Bond Strength of Epoxy-Resin Systems Used with Concrete by Slant Shear

ASTM C928/C928M (2013) Packaged, Dry, Rapid-Hardening Cementitious Materials for Concrete Repairs

ASTM C937 (2010) Grout Fluidifier for Preplaced-Aggregate Concrete

ASTM C940 (2010a) Expansion and Bleeding of Freshly Mixed Grouts for Preplaced-Aggregate Concrete in the Laboratory

ASTM D1623 (2009) Tensile and Tensile Adhesion Properties of Rigid Cellular Plastics

ASTM D2103 (2015) Standard Specification for Polyethylene Film and Sheeting

ASTM D2240 (2005; R 2010) Standard Test Method for Rubber Property - Durometer Hardness

ASTM D226/D226M (2009) Standard Specification for Asphalt-Saturated Organic Felt Used in Roofing and Waterproofing

ASTM D2822/D2822M (2005; E 2011; R 2011) Asphalt Roof Cement

ASTM D323 (2015a) Vapor Pressure of Petroleum Products (Reid Method)

ASTM D3418 (2015) Transition Temperatures of Polymers by Differential Scanning Calorimetry

ASTM D395 (2014) Standard Test Methods for Rubber Property - Compression Set

ASTM D4016 (2014) Viscosity of Chemical Grouts by Brook field Viscometer (Laboratory Method)

ASTM D4101 (2014) Standard Specification for Polypropylene Injection and Extrusion Materials

SECTION 03 01 32 Page 20

ASTM D412 (2006a; R 2013) Standard Test Methods for Vulcanized Rubber and Thermoplastic Elastomers - Tension

ASTM D450/D450M (2007; E 2013; R 2013) Coal-Tar Pitch Used in Roofing, Dampproofing, and Waterproofing

ASTM D471 (2015a) Standard Test Method for Rubber Property - Effect of Liquids

ASTM D4869/D4869M (2015) Standard Specification for Asphalt-Saturated Organic Felt Underlayment Used in Steep Slope Roofing

ASTM D572 (2004; R 2010) Rubber Deterioration by Heat and Oxygen

ASTM D75/D75M (2014) Standard Practice for Sampling Aggregates

ASTM E488/E488M (2015) Standard Test Methods for Strength of Anchors in Concrete and Masonry Elements

CONCRETE SAWING AND DRILLING ASSOCIATION (CSDA)

CSDA-W-104 (June 1, 1998; R 2007) Track Mounted Wall Sawing

POST-TENSIONING INSTITUTE (PTI)

PTI TAB.1 (2006) Post-Tensioning Manual

PRECAST/PRESTRESSED CONCRETE INSTITUTE (PCI)

PCI MNL-116 (1999) Manual for Quality Control for Plants and Production of Structural Precast Concrete Products, 4th Edition

U.S. ARMY CORPS OF ENGINEERS (USACE)

COE CRD-C 164 (1992) Standard Test Method for Direct Tensile Strength of Cylindrical Concrete or Mortar Specimens

COE CRD-C 39 (1981) Test Method for Coefficient of Linear Thermal Expansion of Concrete

COE CRD-C 400 (1963) Requirements for Water for Use in Mixing or Curing Concrete

EM 385-1-1 (2014) Safety and Health Requirements Manual

U.S. GENERAL SERVICES ADMINISTRATION (GSA)

CID A-A-1922 (Rev A; Notice 2) Shield, Expansion (Caulking Anchors, Single Lead)

SECTION 03 01 32 Page 21

CID A-A-1923 (Rev A; Notice 2) Shield, Expansion (Lag, Machine and Externally Threaded Wedge Bolt Anchors)

CID A-A-55614 (Basic; Notice 2) Shield, Expansion (Non-Drilling Expansion Anchors)

1.4 DEFINITIONS

NOTE: See ACI 201.1 for definitions of various types of concrete deterioration.

1.4.1 Concrete

A mixture of binder material, water, and fine and coarse aggregate, with or without admixtures.

1.4.2 Mortar

A mixture of binder material, water, and fine aggregate, with or without admixtures.

1.4.3 Grout

A mixture of binder material and water, with or without a filler.

1.4.4 Cement-Based Material

A material consisting of portland cement and/or other cementitious materials as a binder and aggregate. As used in this specification, cement-based materials do not include materials with polymer modifiers.

1.4.5 Polymer-Modifier

A polymer used to modify the properties of a cement-based concrete or mortar. The polymers commonly associated with concrete rehabilitation are styrene-butadiene and acrylic latex.

1.4.6 Polymer-Modified Material

A combination of polymer, portland cement and/or other cementitious materials, and fine and/or coarse aggregate. Polymer-modified concrete is normally placed to a thickness of 25 mm 1 inch or greater.

Polymer-modified mortar is normally placed to a thickness of less than 25 mm 1 inch.

1.4.7 Epoxy Resin Binder

A two-component epoxy resin binder system in low and medium viscosities used by itself as a primer or for producing epoxy concrete or mortars when mixed with aggregate.

1.4.8 Epoxy Concrete

A combination of epoxy resin and fine and coarse aggregate.

SECTION 03 01 32 Page 22

1.4.9 Epoxy Mortar

A combination of epoxy resin, a mineral filler, and fine aggregate.

1.4.10 Non-Pressure Epoxy Grout

A combination of epoxy resin binder, a mineral filler and a thixotropic agent.

1.4.11 Epoxy Injection Adhesive

A low viscosity epoxy resin system pumped under pressure into cracks.

1.4.12 Rapid-Hardening Repair Material

A combination of rapid-setting cement and aggregate(s) that can develop sufficient compressive strength at an early age to permit intended use.

1.4.13 Non-Structural Cracks

Cracks that do not affect the load-carrying capacity of the structure.

1.4.14 Structural Cracks

Cracks that affect the load-carrying capacity of the structure.

1.5 SYSTEM DESCRIPTION

1.5.1 Design Requirements

NOTE: If higher earlier strength is needed for repairs, revise this paragraph to provide appropriate criteria. The mixture design should maximize aggregate size and minimize the water-cementitious material ratio to reduce shrinkage. Material properties should be coordinated with EM 1110-2-2002 Evaluation and Repair of Concrete Structures. Where other guide specifications are included in the project specification, ensure that appropriate parameters are inserted in the applicable specification.

Consideration should be given to including and alternative age other than 28 days such as 90 days when pozzolan is used to provide more cost effective use of materials. If flowability of the grout is important, use ASTM C1017/C1017M for admixture and specify where it is to be used; otherwise use ASTM C494/C494M.

Submit manufacturer's literature from suppliers that demonstrates compliance with applicable specifications for the above materials. For proportioned materials, submit three copies of the proposed mix design prior to placement. The mix design shall indicate the weight of each ingredient of the mixture. No concrete shall be placed prior to approval of the proposed mix design. No deviation from the approved job-mix formula will be permitted without prior approval.

SECTION 03 01 32 Page 23

a. Concrete. Design the concrete mixtures in accordance with Section [

03 30 00.00 10 CAST-IN-PLACE CONCRETE] [03 31 01.00 10 CAST-IN-PLACE

STRUCTURAL CONCRETE FOR CIVIL WORKS] [03 30 53 MISCELLANEOUS

CAST-IN-PLACE CONCRETE].

b. Mortar. Design the mortar mixtures to produce material having an average compressive strength of [_____] kPa psi at 28 days of age, determined in conformance with ASTM C109/C109M. Design the mixtures to secure an air content by volume of [5] [_____] percent, plus or minus 1-1/2 percent, based on measurements made on concrete at the point of placement in conformance with ASTM C231/C231M. The range of slump shall be 13 to 50 mm 1/2 to 2 inches when tested in accordance with ASTM C143/C143M except that maximum slump may be increased to 100 mm 4 inches when the Contractor has included an approved water-reducing, high range, admixture conforming to ASTM C494/C494M in the mix design.

To minimize drying shrinkage, the maximum water-cementitious materials ratio by weight shall be 0.45 and the maximum cement content shall be kept to a minimum to limit water volume. Make mix design studies and tests in accordance with ASTM C39/C39M and ASTM C192/C192M, and submit the test results for approval.

c. Grout. Design the grout mixtures to produce material having an average compressive strength of [_____] kPapsi at 28 days of age, determined in conformance with ASTM C109/C109M. Design the mixtures to secure an air content by volume of [5] [_____] percent, plus or minus 1-1/2 percent, based on measurements made on concrete at the point of placement in conformance with ASTM C231/C231M. The range of slump shall be 13 to 50 mm 1/2 to 2 inches when tested in accordance with ASTM C143/C143M except that maximum slump may be increased to 100 mm 4 inches when the Contractor has included an approved water-reducing, high range, admixture conforming to [ ASTM C494/C494M] [ ASTM C1017/C1017M ] in the mix design. To minimize drying shrinkage, the maximum water-cementitious materials ratio by weight shall be 0.45 and the maximum cement content shall be kept to a minimum to limit water volume. Make mix design studies and tests in accordance with ASTM C39/C39M and ASTM C192/C192M, and submit the test results for approval.

d. Repair Materials. [Provide the services of a technical specialist experienced in using the polymer for repair materials.]

1.5.2 Repair Material Performance Requirements

Place repair materials to the lines indicated on the drawings.

Construction tolerances for concrete and mortar repair materials shall meet the requirements of ACI 117 . Design repair materials to conform to the following requirements at 28 days unless otherwise indicated:

Physical Properties of Cement-Based Repair materials

Property Test method Criteria

Tensile Strength (28 days) COE CRD-C 164 2.8 MPa (minimum)400 psi (minimum)

Modulus of Elasticity ASTM C469/C469M 24 GPa (maximum)3,500,000 psi (maximum)

SECTION 03 01 32 Page 24

Physical Properties of Cement-Based Repair materials

Coefficient of Thermal Expansion

COE CRD-C 39 12 millionths/degree C (maximum)

6.7 millionths/degree F (maximum)

Drying Shrinkage ASTM C157/C157M (modified)

(28 days) 400 millionths (maximum)

(1 year) 1,000 millionths (maximum)

Restrained Shrinkage Cracking Implied strain at 1 year

AASHTO T 334 No cracks within 14 days, 1,000 millionths (maximum)

Notes on Table:

a. ASTM C157/C157M (modified). The modifications to the test method for this requirement are as follows:

(1) Standard specimen size is 76x76x275 mm 3x3x11-1/4 inch for concrete mortar expanded with aggregate and mortar.

(2) Remove sample from mold at 23 plus or minus 1/2 hours and make initial comparator reading immediately. (For rapid hardening materials, remove sample from mold at 3 hours and make initial comparator reading.)

(3) The specimens are then stored under the standard conditions at

23.0 + 2 degree C 73.4 plus or minus 3 degrees F and 50 plus or minus 4 percent RH.

Subsequent comparator readings are to be taken at ages of 3 days, 7 days, 14 days, 1 month, 2 months; measurements shall continue until 90 percent of ultimate drying shrinkage is reached. Ultimate shrinkage is to be determined as described in ASTM C596.

1.5.3 Sequencing and Scheduling

Unless otherwise specified, perform the work in such sequence that new work does not damage previously completed work. Do not perform concrete removal and other operations which cause vibrations within [15] [_____] m [50] [_____] feet of repair materials that have cured less than 24 hours.

Perform the work as shown in the following SCHEDULE.

SCHEDULE

Concrete Removal Methods

Removal Method

Feature A B C D E F G H I J K

Horizontal Surface X X X X X X X X

Vertical Surface X X X X X X X X X X

Slab-On-Grade X X X X X

SECTION 03 01 32 Page 25

Concrete Removal Methods

Removal Method

Feature A B C D E F G H I J K

A Controlled Blasting

B Abrasive Water Jet Cutting

C Diamond Blade Cutting

D Diamond Wire Cutting

E Stitch Cutting

F Boom Mounted Breaker

G Hand Held Breaker

H Hydromilling

I Rotary Head Milling

J Presplitting (Expansive Agent)

K Mechanical Presplitting

Repair Material

Repair Material

Feature A B C D E F G H I

Horizontal Surfaces (repair)

X X X X X

Horizontal Surfaces (Overlay)

X X X X

Vertical Surfaces (repair) X X X X X X X X

Vertical Surfaces (Refacing)

X X X X X X

SECTION 03 01 32 Page 26

Repair Material

Repair Material

Feature A B C D E F G H I

A Cement-Based Concrete

B Cement-Based Mortar

C Precast Portland Cement Concrete

D Polymer-Modified Mortar

E Polymer-Modified Concrete

F Epoxy Mortar

G Epoxy Concrete

H Preplaced-Aggregate Concrete

I Shotcrete

Crack Repair

Repair Method

Type of Crack A B C D E F

Open Crack on Surface X X

Structural Crack (Inactive) X X X X

Structural Crack (Active) X X

A Clean and Seal

B Clean and Fill

C Drill and Plug

D Injection

E Stitching

F Mechanical Anchoring

1.6 SUBMITTALS

NOTE: Review submittal description (SD) definitions in Section 01 33 00 SUBMITTAL PROCEDURES and edit the following list to reflect only the submittals

SECTION 03 01 32 Page 27 required for the project.

The Guide Specification technical editors have designated those items that require Government approval, due to their complexity or criticality, with a "G." Generally, other submittal items can be reviewed by the Contractor's Quality Control System. Only add a “G” to an item, if the submittal is sufficiently important or complex in context of the project.

For submittals requiring Government approval on Army projects, a code of up to three characters within the submittal tags may be used following the "G" designation to indicate the approving authority.

Codes for Army projects using the Resident Management System (RMS) are: "AE" for Architect-Engineer; "DO" for District Office (Engineering Division or other organization in the District Office); "AO" for Area Office; "RO" for Resident Office; and "PO" for Project Office. Codes following the "G" typically are not used for Navy, Air Force, and NASA projects.

An "S" following a submittal item indicates that the submittal is required for the Sustainability Notebook to fulfill federally mandated sustainable requirements in accordance with Section 01 33 29

SUSTAINABILITY REPORTING.

Choose the first bracketed item for Navy, Air Force and NASA projects, or choose the second bracketed item for Army projects.

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for [Contractor Quality Control approval.] [information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government.] Submittals with an "S" are for inclusion in the Sustainability Notebook, in conformance to Section 01 33 29 SUSTAINABILITY REPORTING. Submit the following in accordance with Section 01 33 00

SUBMITTAL PROCEDURES:

SD-01 Preconstruction Submittals

Work Plan; G [, [_____]] Demolition Plan; G [, [_____]]…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .