AMD 04 - C4S Attachment 8 - Price Elements.xlsx

XLSX spreadsheet 21 KB Posted

Attached to
Call for Solutions - Flight School Next (FSN)
Solicitation number
W9113M-25-S-C006-0001
Issued by

About this file

This is a pricing template attachment for the Flight School Next (FSN) Call for Solutions solicitation. The document outlines the required price elements that offerors must submit across a 26-year contract period for training 900-1,500 rotary wing pilots annually at Fort Rucker, Alabama.

The pricing template is structured in multiple phases: Year 1 consists of a build-up period with zero student load, Years 2-4 are transition years with offeror-specified student loads and percentage of full operational capacity (FOC), and Years 5-10 reflect 1,250 annual student load with full pricing details. Years 11-15, 16-20, and 21-26 continue at the 1,250 annual student load with not-to-exceed (NTE) pricing caps for overhead, G&A, and profit. For each year or period, offerors must provide line-item pricing, overhead percentages, G&A percentages, and profit percentages. Additionally, the template includes separate pricing rows for Non-Core Initial Entry Rotary Wing (IERW) Training Opportunities, allowing offerors to propose pricing for supplemental training options. The template directs offerors to review Instruction 5 in the C4S document for specific submission directions and completion requirements.

View the file

Other files

File Type Posted
FSN Questions and Answers 20 Feb 2026.pdf PDF
AMD 04 - FSN C4S_FINAL_19FEB2026.pdf PDF
AMD 04 - SOO FSN Revision 2 02.19.2026.pdf PDF
AMD 03_FSN C4S_FINAL_06FEB2026 .pdf PDF
QNA_FSN_06 Feb 2026.pdf PDF
AMD 03_SOO FSN Revision 1 02.06.2026.pdf PDF
AMD 03_C4S Attachment 8 - Price Elements.xlsx XLSX spreadsheet
AMD 02_FSN C4S_FINAL_03FEB2026.pdf PDF
FSN C4S_FINAL_9DEC2025 AMD 01.pdf PDF
SOO Attachment 1 - Academic Topics and Flight Task List.pdf PDF
SOO Attachment 3 - Example AVCOE FY26 Holiday and DONSA Memo.pdf PDF
FSN W9113M25SC0060 C4S 0001 (FINAL).pdf PDF
SOO FSN 11.21.2025 - Final.pdf PDF
SOO Attachment 4 - Supplemental Operating Procedures and Guidance.PDF PDF
SOO Attachment 2 - Facility Guide and Transition Plan.pdf PDF
QNA_ FSN 11.19.2025_REVISED.pdf PDF
Attachment 1 - Academic Topics and Flight Task List.PDF PDF
Attachment 3 - Holiday and DONSA schedule.PDF PDF
C4S Attachment 7 FSN Government Clauses.pdf PDF
Attachment 4 - Supplemental Operating Procedures and Guidance.PDF PDF
C4S Attachment 8 FSN Basic Price Elements.pdf PDF
SOO FSN 11.10.2025 - Final DRAFT version.pdf PDF
Special Procurement Notice_6_FSN_11.10.2025.pdf PDF
C4S FSN 11.10.2025 - Final DRAFT version with 7 and 8.pdf PDF
Attachment 2 - Facilities and Transition Guide.PDF PDF
Special Procurement Notice_5_FSN_11.8.2025_FINAL.pdf PDF
QNA_ FSN 11.07.2025_REVISED_with map.pdf PDF
Special Procurement Notice_FSN_10.31.2025_Amendment 4.REV 1.pdf PDF
Special Procurement Notice_FSN_10.31.2025_Amendment 4.pdf PDF
QNA_ FSN 9.8.2025_REVISED.pdf PDF
QNA_ FSN_9.05.2025_REVISED.pdf PDF
Special Procurement Notice_FSN_9.07.2025.pdf PDF
DRAFT_C4S_FSN_22 Aug 2025 Master_Change 1_mm.pdf PDF
QNA_ FSN 8.15.2025_REVISED.pdf PDF
Flight School Next CSO Brief_DISTROA_ACCRSA2025-014.pdf PDF
QNA_ FSN 7.11.2025_REVISED.pdf PDF
DRAFT_C4S_FSN_7.10.2025 Master _Uncontrolled.pdf PDF
DRAFT_C4S_FSN_7.10.2025 Master .pdf PDF
Show all 38

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1 Attachment 8 - Basic Price Elements

* Review C4S Instruction 5 for Directions

YEARDescription%Per Student PricePrice ($)
Year 1 - Build-Up
(0 Student Load)Price
Overhead
G&A
Profit
Year 2 - Transition
(Offeror specified Student Load # and % of FOC )Price
Overhead
G&A
Profit

Year 3 - Transition (Offeror specified Student Load # and % of FOC )

Price
Overhead
G&A
Profit
Year 4 - Transition
(Offeror specified Student Load # and % of FOC )Price
Overhead
G&A
Profit
Year 5
1250 Annual Student LoadPrice
Overhead
G&A
Profit
Year 6
1250 Annual Student LoadPrice
Overhead
G&A
Profit
Year 7
1250 Annual Student LoadPrice
Overhead
G&A
Profit
Year 8
1250 Annual Student LoadPrice
Overhead
G&A
Profit
Year 9
1250 Annual Student LoadPrice
Overhead
G&A
Profit
Year 10
1250 Annual Student LoadPrice
Overhead
G&A
Profit
Years 11-15
1250 Annual Student LoadOverhead (NTE)
G&A (NTE)
Profit (NTE)
Years 16-20
1250 Annual Student LoadOverhead (NTE)
G&A (NTE)
Profit (NTE)
Years 21-26
1250 Annual Student LoadOverhead (NTE)
G&A (NTE)
Profit (NTE)
Non-Core IERW Training
Opportunity #1Price
Overhead
G&A
Profit
Non-Core IERW Training
Opportunity #2Price
Overhead
G&A
Profit
Non-Core IERW Training
Opportunity #3Price
Overhead
G&A
Profit
Non-Core IERW Training
Opportunity #Etc.Price
Overhead
G&A
Profit

File details come from the government source that posted it. Updated .