AMD 04 - C4S Attachment 8 - Price Elements.xlsx
XLSX spreadsheet 21 KB Posted
- Attached to
- Call for Solutions - Flight School Next (FSN)
- Solicitation number
- W9113M-25-S-C006-0001
About this file
This is a pricing template attachment for the Flight School Next (FSN) Call for Solutions solicitation. The document outlines the required price elements that offerors must submit across a 26-year contract period for training 900-1,500 rotary wing pilots annually at Fort Rucker, Alabama.
The pricing template is structured in multiple phases: Year 1 consists of a build-up period with zero student load, Years 2-4 are transition years with offeror-specified student loads and percentage of full operational capacity (FOC), and Years 5-10 reflect 1,250 annual student load with full pricing details. Years 11-15, 16-20, and 21-26 continue at the 1,250 annual student load with not-to-exceed (NTE) pricing caps for overhead, G&A, and profit. For each year or period, offerors must provide line-item pricing, overhead percentages, G&A percentages, and profit percentages. Additionally, the template includes separate pricing rows for Non-Core Initial Entry Rotary Wing (IERW) Training Opportunities, allowing offerors to propose pricing for supplemental training options. The template directs offerors to review Instruction 5 in the C4S document for specific submission directions and completion requirements.
View the file
Other files
Show all 38
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1 Attachment 8 - Basic Price Elements
* Review C4S Instruction 5 for Directions
| YEAR | Description | % | Per Student Price | Price ($) | |
| Year 1 - Build-Up | |||||
| (0 Student Load) | Price | ||||
| Overhead | |||||
| G&A | |||||
| Profit |
| Year 2 - Transition | ||
| (Offeror specified Student Load # and % of FOC ) | Price | |
| Overhead | ||
| G&A | ||
| Profit |
Year 3 - Transition (Offeror specified Student Load # and % of FOC )
| Price | |
| Overhead | |
| G&A | |
| Profit |
| Year 4 - Transition | ||
| (Offeror specified Student Load # and % of FOC ) | Price | |
| Overhead | ||
| G&A | ||
| Profit |
| Year 5 | ||
| 1250 Annual Student Load | Price | |
| Overhead | ||
| G&A | ||
| Profit |
| Year 6 | ||
| 1250 Annual Student Load | Price | |
| Overhead | ||
| G&A | ||
| Profit |
| Year 7 | ||
| 1250 Annual Student Load | Price | |
| Overhead | ||
| G&A | ||
| Profit |
| Year 8 | ||
| 1250 Annual Student Load | Price | |
| Overhead | ||
| G&A | ||
| Profit |
| Year 9 | ||
| 1250 Annual Student Load | Price | |
| Overhead | ||
| G&A | ||
| Profit |
| Year 10 | ||
| 1250 Annual Student Load | Price | |
| Overhead | ||
| G&A | ||
| Profit |
| Years 11-15 | ||
| 1250 Annual Student Load | Overhead (NTE) | |
| G&A (NTE) | ||
| Profit (NTE) |
| Years 16-20 | ||
| 1250 Annual Student Load | Overhead (NTE) | |
| G&A (NTE) | ||
| Profit (NTE) |
| Years 21-26 | ||
| 1250 Annual Student Load | Overhead (NTE) | |
| G&A (NTE) | ||
| Profit (NTE) |
| Non-Core IERW Training | ||
| Opportunity #1 | Price | |
| Overhead | ||
| G&A | ||
| Profit |
| Non-Core IERW Training | ||
| Opportunity #2 | Price | |
| Overhead | ||
| G&A | ||
| Profit |
| Non-Core IERW Training | ||
| Opportunity #3 | Price | |
| Overhead | ||
| G&A | ||
| Profit |
| Non-Core IERW Training | ||
| Opportunity #Etc. | Price | |
| Overhead | ||
| G&A | ||
| Profit |
File details come from the government source that posted it. Updated .