H01 Technical Exhibit 12 Sample NCIR.doc

DOC document 42 KB Posted

Attached to
PM, Repair and Cleaning Services for AFH at Camp Walker
Solicitation number
W90VN919R0002
Issued by

About this file

Technical Exhibit 12

View the file

Other files

File Type Posted
A21_Amendment_0003.pdf PDF
A21_Amendment_0002.pdf PDF
A21_Amendment_W90VN919R0002.0001.pdf PDF
H01_Technical_Exhibit_54_Tower_4_Bed_Type_Drawing.pdf PDF
H01_Technical_Exhibit_53_Tower_4_Mech_&_Plumbing_Drawing-3.pdf PDF
H01 Technical Exhibit 19 Tower 1 Exterior Window Cleaning Drawing.pdf PDF
H01 Technical Exhibit 4 Monthly Service Order Report.doc DOC document
H01_Technical_Exhibit_22_Tower_1_Elec_Drawing_2.pdf PDF
H01_Technical_Exhibit_51_Tower_4_Mech_&_Plumbing_Drawing-1.pdf PDF
H01_Technical_Exhibit_1_PRS.zip ZIP file
H01 Technical Exhibit 20 Tower 1 Ground Maintenance Map.pdf PDF
H01_Technical_Exhibit_30_Tower_2_Elec_Drawing_3.pdf PDF
H01_Technical_Exhibit_27_Tower_2_Ground_Maintenance_Map.pdf PDF
H01 Technical Exhibit 16 COM Monthly Report.xlsx XLSX spreadsheet
H01_Technical_Exhibit_49_Tower_4_Elec_Drawing-1.pdf PDF
H01_Technical_Exhibit_25_Tower_2_Custodial_Drawing.pdf PDF
H01 Technical Exhibit 10 Record Vacate Qtrs Data.xlsx XLSX spreadsheet
H01_Technical_Exhibit_42_Tower_3_Mech_and_Plumbing_Drawing_3.pdf PDF
H01_Technical_Exhibit_23_Tower_1_Mech_and_Plumbing_Drawing.pdf PDF
H01_Technical_Exhibit_35_Tower_3_Exterior_Window_Cleaning_Drawing_1.pdf PDF
H01_Technical_Exhibit_34_Tower_3_Custodial_Drawing.pdf PDF
H01 Technical Exhibit 3 Scheduled Services.doc DOC document
H01 Technical Exhibit 1 PRS.docx DOCX document
H01 Technical Exhibit 2 Deliverables.docx DOCX document
H01 Technical Exhibit 18 Tower 1 Custodial Drawing.pdf PDF
H01_Technical_Exhibit_26_Tower_2_Exterior_Window_Cleaning_Drawing.pdf PDF
H01_Technical_Exhibit_48_Tower_4_Ground_Maintenance_Map.pdf PDF
A21_RFP_W90VN919R0002.pdf PDF
H01 AFH-Maintenance_Exhibit-list.docx DOCX document
H01_Technical_Exhibit_37_Tower_3_Ground_Maintenance_Map.pdf PDF
H01_Technical_Exhibit_45_Tower_4_Custodial_Drawing.pdf PDF
H01_Technical_Exhibit_41_Tower_3_Mech_and_Plumbing_Drawing_2.pdf PDF
H01_Technical_Exhibit-44_Custodial_Working_Schedule.doc DOC document
H01_Technical_Exhibit_33_Tower_2_Bed_Type_Drawing.pdf PDF
H01_Technical_Exhibit_21_Tower_1_Elec_Drawing_1.pdf PDF
H01_Technical_Exhibit_46_Tower_4_Exterior_Window_Cleaning_Drawing.pdf PDF
H01 Technical Exhibit 7 COC Check List.xlsx XLSX spreadsheet
H01_Technical_Exhibit_29_Tower_2_Elec_Drawing_2.pdf PDF
H01 Technical Exhibit 11 Daily Contract Inspection Report.doc DOC document
H01 Technical Exhibit 8 COP Check List.docx DOCX document
H01_Technical_Exhibit_31_Tower_2_Elec_Drawing4.pdf PDF
H01 Technical Exhibit 6 Quality and Standards of Work.docx DOCX document
H01 Technical Exhibit 17 Check Lists.docx DOCX document
H01_Technical_Exhibit_24_Tower_1_Bed_Type_Drawing.pdf PDF
H01_Technical_Exhibit_32_Tower_2_Mech_and_Plumbing_Drawing.pdf PDF
H01_Technical_Exhibit_40_Tower_3_Mech_and_Plumbing_Drawing_1.pdf PDF
H01_Technical_Exhibit_28_Tower_2_Elec_Drawing_1.pdf PDF
H01_Technical_Exhibit_36_Tower_3_Exterior_Window_Cleaning_Drawing_2.pdf PDF
H01 Technical Exhibit 9 COM Checklist.docx DOCX document
H01 Technical Exhibit 14 Contract Descepancy Report PDF
Show 40 more

Latest 50 of 58 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NONCONFORMANCE INSPECTION REPORT (SEE INSTRUCTIONS ON REVERSE)

PAGE____1____OF___1__PAGES

1. REPORT NUMBER

00001

2. CONTRACT NUMBER
3. DELIVERY ORDER NUMBER
4. BUILDING/FACILITY NUMBER
5. CONTRACT NAME
6. CONTRACTOR
W91QVN-00-P-0000
0001
UNIT#

Tower#1

Change of Occupancy Cleaning and Painting of (AFH), USAG Daegu
Korean Construction Co. Ltd
7. SPECIFICATION NUMBER
8. SERVICE ORDER NUMBER
9. LOCATION
COP/COC
N/A
USAG Daegu

DPW, Housing Div

10. DESCRIPTION OF NONCONFORMANCE CONDITION(S) OR ITEM(S)

(Reference the specifications, page, para, drawing number, as applicable)

14. CONTRACTOR CORRECTIVE ACTION

(Identify date/time of completion; initial each item)

This nonconformance report is issued to you on ________13 Sep 19_________. Contractor to repair

Non-conformance items identified in “10”. Return this form to Family Housing, Facilities Management

15. CONTRACTOR REPRESENTATIVE (QC) SIGN AND DATE

Branch, DPW Housing, Building 309.

18/19. INSPECTOR’S SIGNATURE
DATE
by ____14 Sep 19_____________per contract specifications, page no.__234____, para no.____2b(1)_____.
Follow up Inspection

20. COR COMMENTS

12. INSPECTED BY

DATE/TIME
13. TYPE OF INSPECTION

17. REVIEWED BY

DATE
16. DATE/TIME RETURNED
21. COR’S SIGNATURE
DATE

INSTRUCTIONS FOR COMPLETING NONCONFORMANCE INSPECTION REPORT

INSPECTOR’S INSTRUCTIONS (when issuing Nonconformance Report to contractor).

BLOCK 1-9

Fill out all information in these blocks. Mark N/A in blocks which do not apply.

BLOCK 10

Identify and list all nonconformance conditions of inspection. If additional sheets are needed use another Nonconformance Inspection Report and identify as next page. Reference the paragraph (para), page, and drawing number to the nonconformance condition, if applicable. Record any additional remarks pertinent to your inspection.

BLOCK 11

Fill in the date and time you issued the Nonconformance Report to the contractor. Indicate the date and time the contractor has to repair the nonconformance conditions and to return the report to the Housing, Facilities Management Branch. Reference the contact specifications page and paragraph number as it applies to time limit for repairing and/or re-performing service.

BLOCK 12

Sign and date the report.

BLOCK 13

Identify the type of inspection (i.e., Final, Re-Inspection, Change of Occupancy Cleaning (COC), Flooring, Change of Occupancy Painting (COP) etc.

CONTRACTOR’S INSTRUCTIONS (when correcting nonconformance items).

BLOCK 14

Correct nonconformance items. Indicate the date and time that each item/condition listed in Block 10 was corrected. Remark on any condition related to the repair such as extenuating circumstances which may prevent you from performing the corrective action.

BLOCK 15

Contractor Q.C. representative sign and date after the repairs are made. Return the completed report to the Housing, Facilities Management Branch, within the time frame identified in the referenced contract specifications. The Housing, Facilities Management Branch is located at USAG Humphreys, Building 309, telephone (DSN) 753-5798.

INSPECTOR’S INSTRUCTIONS (when receiving Nonconformance Report from contractor).

BLOCK 16

Identify the date and time the contractor returned the form or when the form was received at DPW Housing, Facilities Management Branch.

BLOCK 17

This block is for supervisory review after the form is returned from contractor.

INSPECTOR’S INSTRUCTIONS

BLOCK 18

Perform follow up inspection on rejected items. Indicate date and time of re-inspection (if applicable). Comment on any circumstances. If no follow up inspection is made, indicate not re-inspected.

BLOCK 19

Sign and date. Forward to the COR.

COR’S INSTRUCTIONS

BLOCK 20

Review this report. Add or attach comments. Coordinate input with Contracting Office if required.

BLOCK 21

Sign and date the report. Forward this copy to 411th, CSB, Humphrey’s office, Contract Administrator if required.

Retain this copy in the COR, Facilities Management Branch files.