A21_Amendment_0003.pdf

PDF 134 KB Posted

Attached to
PM, Repair and Cleaning Services for AFH at Camp Walker
Solicitation number
W90VN919R0002
Issued by

About this file

Please see the attached Amendment No. 0003.

View the file

Other files

File Type Posted
A21_Amendment_0002.pdf PDF
A21_Amendment_W90VN919R0002.0001.pdf PDF
H01_Technical_Exhibit_54_Tower_4_Bed_Type_Drawing.pdf PDF
H01_Technical_Exhibit_53_Tower_4_Mech_&_Plumbing_Drawing-3.pdf PDF
H01 Technical Exhibit 19 Tower 1 Exterior Window Cleaning Drawing.pdf PDF
H01 Technical Exhibit 4 Monthly Service Order Report.doc DOC document
H01_Technical_Exhibit_22_Tower_1_Elec_Drawing_2.pdf PDF
H01_Technical_Exhibit_51_Tower_4_Mech_&_Plumbing_Drawing-1.pdf PDF
H01_Technical_Exhibit_1_PRS.zip ZIP file
H01 Technical Exhibit 20 Tower 1 Ground Maintenance Map.pdf PDF
H01_Technical_Exhibit_30_Tower_2_Elec_Drawing_3.pdf PDF
H01_Technical_Exhibit_27_Tower_2_Ground_Maintenance_Map.pdf PDF
H01 Technical Exhibit 16 COM Monthly Report.xlsx XLSX spreadsheet
H01_Technical_Exhibit_49_Tower_4_Elec_Drawing-1.pdf PDF
H01_Technical_Exhibit_25_Tower_2_Custodial_Drawing.pdf PDF
H01 Technical Exhibit 10 Record Vacate Qtrs Data.xlsx XLSX spreadsheet
H01_Technical_Exhibit_42_Tower_3_Mech_and_Plumbing_Drawing_3.pdf PDF
H01_Technical_Exhibit_23_Tower_1_Mech_and_Plumbing_Drawing.pdf PDF
H01_Technical_Exhibit_35_Tower_3_Exterior_Window_Cleaning_Drawing_1.pdf PDF
H01_Technical_Exhibit_34_Tower_3_Custodial_Drawing.pdf PDF
H01 Technical Exhibit 3 Scheduled Services.doc DOC document
H01 Technical Exhibit 1 PRS.docx DOCX document
H01 Technical Exhibit 2 Deliverables.docx DOCX document
H01 Technical Exhibit 18 Tower 1 Custodial Drawing.pdf PDF
H01_Technical_Exhibit_26_Tower_2_Exterior_Window_Cleaning_Drawing.pdf PDF
H01_Technical_Exhibit_48_Tower_4_Ground_Maintenance_Map.pdf PDF
H01 Technical Exhibit 12 Sample NCIR.doc DOC document
A21_RFP_W90VN919R0002.pdf PDF
H01 AFH-Maintenance_Exhibit-list.docx DOCX document
H01_Technical_Exhibit_37_Tower_3_Ground_Maintenance_Map.pdf PDF
H01_Technical_Exhibit_45_Tower_4_Custodial_Drawing.pdf PDF
H01_Technical_Exhibit_41_Tower_3_Mech_and_Plumbing_Drawing_2.pdf PDF
H01_Technical_Exhibit-44_Custodial_Working_Schedule.doc DOC document
H01_Technical_Exhibit_33_Tower_2_Bed_Type_Drawing.pdf PDF
H01_Technical_Exhibit_21_Tower_1_Elec_Drawing_1.pdf PDF
H01_Technical_Exhibit_46_Tower_4_Exterior_Window_Cleaning_Drawing.pdf PDF
H01 Technical Exhibit 7 COC Check List.xlsx XLSX spreadsheet
H01_Technical_Exhibit_29_Tower_2_Elec_Drawing_2.pdf PDF
H01 Technical Exhibit 11 Daily Contract Inspection Report.doc DOC document
H01 Technical Exhibit 8 COP Check List.docx DOCX document
H01_Technical_Exhibit_31_Tower_2_Elec_Drawing4.pdf PDF
H01 Technical Exhibit 6 Quality and Standards of Work.docx DOCX document
H01 Technical Exhibit 17 Check Lists.docx DOCX document
H01_Technical_Exhibit_24_Tower_1_Bed_Type_Drawing.pdf PDF
H01_Technical_Exhibit_32_Tower_2_Mech_and_Plumbing_Drawing.pdf PDF
H01_Technical_Exhibit_40_Tower_3_Mech_and_Plumbing_Drawing_1.pdf PDF
H01_Technical_Exhibit_28_Tower_2_Elec_Drawing_1.pdf PDF
H01_Technical_Exhibit_36_Tower_3_Exterior_Window_Cleaning_Drawing_2.pdf PDF
H01 Technical Exhibit 9 COM Checklist.docx DOCX document
H01 Technical Exhibit 14 Contract Descepancy Report PDF
Show 40 more

Latest 50 of 58 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

SEE NEXT PAGE.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 4

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 10-Jan-2019

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W90VN919R0002

X 9B. DATED (SEE ITEM 11)

20-Dec-2018

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

09-Jan-2019

CODE

411TH CONTRACTING SUPPORT BRIGADE, KOREA

RCO DAEGU, UNIT #15682

APO AP 96218-5682

UNITED STATES

W90VN9 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W90VN919R0002

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

AMENDMENT NO. 0003

A. The purpose of this amendment is to:

(i) Revise quantity of CLIN 4016 from “5,000” to “500” under the 4th option period.

(ii) Revise PWS, Para as shown below:

FROM TO

1.3.3.2 First Option year 1 Mar 2020 to 28 Feb 2021:

BOD Jun 2020 – Tower-3 consists of fifty six 3-bedrooms, twenty four 4-bedrooms, and four 5-bedrooms and will be added to the first option year contract. Building number is to be determined (TBD).

1.3.3.2 First Option year 1 Mar 2020 to 28 Feb

2021: BOD July 2020 – Tower-3 consists of fifty six 3-bedrooms, twenty four 4-bedrooms, and four

5-bedrooms and will be added to the first option year contract. Building number is to be determined

(TBD).

1.3.3.3. Third Option year 1 Mar 2022 to 28 Feb 2023:

BOD Jul 2022 – Tower-4 consists of fifty six 3-bedrooms, twenty four 4-bedrooms, and four 5-bedrooms and will be added to the first option year contract. Building number is to be determined (TBD).

1.3.3.3. Third Option year 1 Mar 2022 to 28 Feb

2023: BOD June 2022 – Tower-4 consists of fifty six 3-bedrooms, twenty four 4-bedrooms, and four

5-bedrooms and will be added to the 3rd option year contract. Building number is to be determined

(TBD).

5.7.2. Interior Painting (2 COATS). Interior

painting of 200 square feet and less is part of the firm fixed priced CLIN. Interior painting above 200 square feet shall be accomplished by this CLIN. Interior painting includes patching, painting all interior surfaces to include common areas, walls, ceilings, parking lines, doors, window frames, sills, wood and metal trim, thresholds and baseboards. Contractor shall prepare all surfaces to receive paint. Paint colors shall match existing color schemes. If there are changes in colors of paint the Contractor shall provide to the COR for acceptance, paint color code number, trade name and MSDS cut sheet prior to use. The

Contractor shall ensure adherence to all finished surfaces, these surfaces shall be smooth and free of defects. All coats shall produce a film of uniform thickness with no bleed through when viewed from five (5) feet away. The Contractor shall ensure the paint color matches existing paint. The Contractor shall remove paint from all interior items and accessories that are not intended to be painted, or replace them. The Contractor shall be responsible for disconnecting and moving all appliances and furniture, and relocating the items after painting is completed.

Interior painting of 20 square meter and less is part of the firm fixed priced CLIN. Interior painting above 20 square meter shall be accomplished by this CLIN. Interior painting includes patching, painting all interior surfaces to include common areas, walls, ceilings, parking lines, doors, window frames, sills, wood and metal trim, thresholds and baseboards. Contractor shall prepare all surfaces to receive paint. Paint colors shall match existing color schemes. If there are changes in colors of paint the

Contractor shall provide to the COR for acceptance, paint color code number, trade name and MSDS cut sheet prior to use. The Contractor shall ensure adherence to all finished surfaces, these surfaces shall be smooth and free of defects. All coats shall produce a film of uniform thickness with no bleed through when viewed from five (5) feet away. The

Contractor shall ensure the paint color matches existing paint. The Contractor shall remove paint from all interior items and accessories that are not intended to be painted, or replace them. The

Contractor shall be responsible for disconnecting and moving all appliances and furniture, and relocating the items after painting is completed.

5.7.3. Exterior Painting (2 COATS). Exterior

painting of 200 square feet and less is part of the firm fixed priced CLIN. Exterior painting above 200 square feet shall be accomplished by this CLIN. Work shall be recurring preventive/exterior facilities maintenance. Damaged or deteriorated surfaces shall be restored and in weather tight condition. Repaired areas shall be water sealed, primed, and painted.

Repairs shall completely match the undamaged portion of the facility. Finished surfaces shall have no defects, whether pre-existing, created at any time by another Contractor, or created by this contract. Each coat shall produce a film of uniform thickness, with no bleed-through. Paint colors shall match existing color schemes. If there are changes in colors of paint the

Contractor shall provide to the COR for acceptance, paint color code number, trade name and MSDS cut sheet prior to use. When one unit of a duplex is given to the Contractor for COM and an exterior area requires painting, the Contractor shall paint the entire area on that facility in order to keep it uniform. Major and Minor paintings are not limited to only one coat of paint. The Contractor shall paint the area until the interior or exterior painted surface is uniform thickness with no bleed-through when viewed from five (5) feet away.

5.7.3. Exterior Painting (2 COATS). Exterior

painting of 20 square meter and less is part of the firm fixed priced CLIN. Exterior painting above 20 square meter shall be accomplished by this CLIN.

Work shall be recurring preventive/exterior facilities maintenance. Damaged or deteriorated surfaces shall be restored and in weather tight condition. Repaired areas shall be water sealed, primed, and painted. Repairs shall completely match the undamaged portion of the facility.

Finished surfaces shall have no defects, whether pre-existing, created at any time by another

Contractor, or created by this contract. Each coat shall produce a film of uniform thickness, with no bleed-through. Paint colors shall match existing color schemes. If there are changes in colors of paint the Contractor shall provide to the COR for acceptance, paint color code number, trade name and MSDS cut sheet prior to use. When one unit of a duplex is given to the Contractor for COM and an exterior area requires painting, the Contractor shall paint the entire area on that facility in order to keep it uniform. Major and Minor paintings are not limited to only one coat of paint. The Contractor shall paint the area until the interior or exterior painted surface is uniform thickness with no bleed-through when viewed from five (5) feet away.

B. All other terms and conditions of the solicitation remain unchanged.

SECTION SF 1449 - CONTINUATION SHEET

SUPPLIES OR SERVICES AND PRICES

CLIN 4016

The pricing detail quantity has decreased by 4,500.00 from 5,000.00 to 500.00.

DELIVERIES AND PERFORMANCE

The following Delivery Schedule item for CLIN 4016 has been changed from:

DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /

CAGE

POP 01-MAR-2023 TO

29-FEB-2024

N/A DPW, USAG DAEGU

CHU, TAEPONG

ATTN: IMKO-ADP, UNIT #15746

APO AP 96218-5746

UNITED STATES

768-7554

FOB: Destination

WT4KB6

To:

DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /

CAGE

POP 01-MAR-2023 TO

29-FEB-2024

N/A DPW, USAG DAEGU

CHU, TAEPONG

ATTN: IMKO-ADP, UNIT #15746

APO AP 96218-5746

UNITED STATES

768-7554

FOB: Destination

WT4KB6

(End of Summary of Changes)

File details come from the government source that posted it.