H01 Technical Exhibit 1 PRS.docx

DOCX document 16 KB Posted

Attached to
PM, Repair and Cleaning Services for AFH at Camp Walker
Solicitation number
W90VN919R0002
Issued by

About this file

Technical Exhibit 1

View the file

Other files

File Type Posted
A21_Amendment_0003.pdf PDF
A21_Amendment_0002.pdf PDF
A21_Amendment_W90VN919R0002.0001.pdf PDF
H01_Technical_Exhibit_54_Tower_4_Bed_Type_Drawing.pdf PDF
H01_Technical_Exhibit_53_Tower_4_Mech_&_Plumbing_Drawing-3.pdf PDF
H01 Technical Exhibit 19 Tower 1 Exterior Window Cleaning Drawing.pdf PDF
H01 Technical Exhibit 4 Monthly Service Order Report.doc DOC document
H01_Technical_Exhibit_22_Tower_1_Elec_Drawing_2.pdf PDF
H01_Technical_Exhibit_51_Tower_4_Mech_&_Plumbing_Drawing-1.pdf PDF
H01_Technical_Exhibit_1_PRS.zip ZIP file
H01 Technical Exhibit 20 Tower 1 Ground Maintenance Map.pdf PDF
H01_Technical_Exhibit_30_Tower_2_Elec_Drawing_3.pdf PDF
H01_Technical_Exhibit_27_Tower_2_Ground_Maintenance_Map.pdf PDF
H01 Technical Exhibit 16 COM Monthly Report.xlsx XLSX spreadsheet
H01_Technical_Exhibit_49_Tower_4_Elec_Drawing-1.pdf PDF
H01_Technical_Exhibit_25_Tower_2_Custodial_Drawing.pdf PDF
H01 Technical Exhibit 10 Record Vacate Qtrs Data.xlsx XLSX spreadsheet
H01_Technical_Exhibit_42_Tower_3_Mech_and_Plumbing_Drawing_3.pdf PDF
H01_Technical_Exhibit_23_Tower_1_Mech_and_Plumbing_Drawing.pdf PDF
H01_Technical_Exhibit_35_Tower_3_Exterior_Window_Cleaning_Drawing_1.pdf PDF
H01_Technical_Exhibit_34_Tower_3_Custodial_Drawing.pdf PDF
H01 Technical Exhibit 3 Scheduled Services.doc DOC document
H01 Technical Exhibit 2 Deliverables.docx DOCX document
H01 Technical Exhibit 18 Tower 1 Custodial Drawing.pdf PDF
H01_Technical_Exhibit_26_Tower_2_Exterior_Window_Cleaning_Drawing.pdf PDF
H01_Technical_Exhibit_48_Tower_4_Ground_Maintenance_Map.pdf PDF
H01 Technical Exhibit 12 Sample NCIR.doc DOC document
A21_RFP_W90VN919R0002.pdf PDF
H01 AFH-Maintenance_Exhibit-list.docx DOCX document
H01_Technical_Exhibit_37_Tower_3_Ground_Maintenance_Map.pdf PDF
H01_Technical_Exhibit_45_Tower_4_Custodial_Drawing.pdf PDF
H01_Technical_Exhibit_41_Tower_3_Mech_and_Plumbing_Drawing_2.pdf PDF
H01_Technical_Exhibit-44_Custodial_Working_Schedule.doc DOC document
H01_Technical_Exhibit_33_Tower_2_Bed_Type_Drawing.pdf PDF
H01_Technical_Exhibit_21_Tower_1_Elec_Drawing_1.pdf PDF
H01_Technical_Exhibit_46_Tower_4_Exterior_Window_Cleaning_Drawing.pdf PDF
H01 Technical Exhibit 7 COC Check List.xlsx XLSX spreadsheet
H01_Technical_Exhibit_29_Tower_2_Elec_Drawing_2.pdf PDF
H01 Technical Exhibit 11 Daily Contract Inspection Report.doc DOC document
H01 Technical Exhibit 8 COP Check List.docx DOCX document
H01_Technical_Exhibit_31_Tower_2_Elec_Drawing4.pdf PDF
H01 Technical Exhibit 6 Quality and Standards of Work.docx DOCX document
H01 Technical Exhibit 17 Check Lists.docx DOCX document
H01_Technical_Exhibit_24_Tower_1_Bed_Type_Drawing.pdf PDF
H01_Technical_Exhibit_32_Tower_2_Mech_and_Plumbing_Drawing.pdf PDF
H01_Technical_Exhibit_40_Tower_3_Mech_and_Plumbing_Drawing_1.pdf PDF
H01_Technical_Exhibit_28_Tower_2_Elec_Drawing_1.pdf PDF
H01_Technical_Exhibit_36_Tower_3_Exterior_Window_Cleaning_Drawing_2.pdf PDF
H01 Technical Exhibit 9 COM Checklist.docx DOCX document
H01 Technical Exhibit 14 Contract Descepancy Report PDF
Show 40 more

Latest 50 of 58 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EXHIBIT-1

4.0 Performance Requirements Summary (PRS) Matrix.

Performance standards define desired services. The Government performs surveillance to determine if the contractor exceeds, meets or does not meet these standards. Government will use these standards to determine contractor performance and will compare contractor performance to the Acceptable Quality Level (AQL).

PERFORMANCE REQUIREMENT SUMMARY TABLE

PERFORMANCE OBJECTIVE
STANDARD
ACCEPTABLE QUALITY LEVEL
METHOD OF SURVEILLANCE
REMEDY OF FAILURE/INCENTIVE
1. Common Area Cleaning Services, Para. 5.2 in PWS
Common areas clean
1.1. Quality
Floors, Windows, Walls Clean, Trash Removed
95%
100% Inspection.

Validated user/customer complaints.

Re-accomplished within one (1) day/Good Ratings on CORT Monthly Report

1.2. Timeliness
Completed within one working day
97%
100% Inspection.

Validated user/customer complaints.

Re-accomplished within one (1) day/Good Ratings on CORT Monthly Report

2. Grounds Cleanup and Maintenance of Common Area Areas, Para. 5.3 in PWS
Seasonal work evaluated
2.1. Quality
Grass Mowing Grounds Cleanup with Trash removed
95%
100% Inspection.

Validated user/customer complaints.

Re-accomplished within one (1) day/Good Ratings on CORT Monthly Report

2.2. Timeliness
Completed within one working day
97%
100% Inspection.

Validated user/customer complaints.

Re-accomplished within one (1) day/Good Ratings on CORT Monthly Report

3. Service Calls Task Orders, Para. 5.4 in PWS
Responsive routine repair and maintenance call system
3.1 Quality
Receipt of service calls and customer coordination
96%
Periodic inspection. Validated user/customer complaints. Random sampling.
Re-accomplished within one (1) day/Good Ratings on CORT Monthly Report
3.2 Timeliness
Response times in emergency repair service calls
97%
Periodic inspection. Validated user/customer complaints. Random sampling.
Re-accomplished within one (1) day/Good Ratings on CORT Monthly Report
0. 3.3 Records
Contractors management and documentation of close out work orders
95%
Periodic inspection. Validated user/customer complaints. Random sampling.
Re-accomplished within one (1) day/Good Ratings on CORT Monthly Report
4. Preventive Maintenance and Minor Repair, Para. 5.5 in PWS
Response to work orders and work completed
4.1. Quality
Maintenance and repairs equivalent to initial construction or manufacturer’s standards
95%
Periodic inspection. Validated user/customer complaints. Random sampling.
Re-accomplished within one (1) day/Good Ratings on CORT Monthly Report

5. COC

Para. 5.6.

All work required during COC

5.1. Quality
Complete cleaning of quarters as ordered
95%
100% Inspection.

Validated user/customer complaints.

Re-accomplished within one (1) day/Good Ratings on CORT Monthly Report

5.2. Timeliness
Quarters turned back to the Government on time
97%
Re-accomplished within one (1) day/Good Ratings on CORT Monthly Report
Re-accomplished within one (1) day/Good Ratings on CORT Monthly Report

6. COM

Para. 5.6 All works required during COM

6.1. Quality
Repair and maintenance equivalent to initial construction or manufacturer’s standards
95%
100% Inspection.

Validated user/customer complaints.

Re-accomplished within one (1) day/Good Ratings on CORT Monthly Report

6.2. Timeliness
Quarters turned back to the Government on time
97%
100% Inspection.

Validated user/customer complaints.

Re-accomplished within one (1) day/Good Ratings on CORT Monthly Report

7. COP

Para. 7.6 All work required during COC

7.1. Quality
Complete painting of quarters as ordered
95%
100% Inspection.

Validated user/customer complaints.

Re-accomplished within one (1) day/Good Ratings on CORT Monthly Report

7.2. Timeliness
Quarters turned back to the Government on time
97%
100% Inspection.

Validated user/customer complaints.

Re-accomplished within one (1) day/Good Ratings on CORT Monthly Report

8. Project Works including Major Repair Works Para 7.7.

Complete project works as ordered
95%
100% Inspection.

Validated user/customer complaints.

Re-accomplished within one (1) day/Good Ratings on CORT Monthly Report

File details come from the government source that posted it.