H01 Technical Exhibit 11 Daily Contract Inspection Report.doc

DOC document 37 KB Posted

Attached to
PM, Repair and Cleaning Services for AFH at Camp Walker
Solicitation number
W90VN919R0002
Issued by

About this file

Technical Exhibit 11

View the file

Other files

File Type Posted
A21_Amendment_0003.pdf PDF
A21_Amendment_0002.pdf PDF
A21_Amendment_W90VN919R0002.0001.pdf PDF
H01_Technical_Exhibit_54_Tower_4_Bed_Type_Drawing.pdf PDF
H01_Technical_Exhibit_53_Tower_4_Mech_&_Plumbing_Drawing-3.pdf PDF
H01 Technical Exhibit 19 Tower 1 Exterior Window Cleaning Drawing.pdf PDF
H01 Technical Exhibit 4 Monthly Service Order Report.doc DOC document
H01_Technical_Exhibit_22_Tower_1_Elec_Drawing_2.pdf PDF
H01_Technical_Exhibit_51_Tower_4_Mech_&_Plumbing_Drawing-1.pdf PDF
H01_Technical_Exhibit_1_PRS.zip ZIP file
H01 Technical Exhibit 20 Tower 1 Ground Maintenance Map.pdf PDF
H01_Technical_Exhibit_30_Tower_2_Elec_Drawing_3.pdf PDF
H01_Technical_Exhibit_27_Tower_2_Ground_Maintenance_Map.pdf PDF
H01 Technical Exhibit 16 COM Monthly Report.xlsx XLSX spreadsheet
H01_Technical_Exhibit_49_Tower_4_Elec_Drawing-1.pdf PDF
H01_Technical_Exhibit_25_Tower_2_Custodial_Drawing.pdf PDF
H01 Technical Exhibit 10 Record Vacate Qtrs Data.xlsx XLSX spreadsheet
H01_Technical_Exhibit_42_Tower_3_Mech_and_Plumbing_Drawing_3.pdf PDF
H01_Technical_Exhibit_23_Tower_1_Mech_and_Plumbing_Drawing.pdf PDF
H01_Technical_Exhibit_35_Tower_3_Exterior_Window_Cleaning_Drawing_1.pdf PDF
H01_Technical_Exhibit_34_Tower_3_Custodial_Drawing.pdf PDF
H01 Technical Exhibit 3 Scheduled Services.doc DOC document
H01 Technical Exhibit 1 PRS.docx DOCX document
H01 Technical Exhibit 2 Deliverables.docx DOCX document
H01 Technical Exhibit 18 Tower 1 Custodial Drawing.pdf PDF
H01_Technical_Exhibit_26_Tower_2_Exterior_Window_Cleaning_Drawing.pdf PDF
H01_Technical_Exhibit_48_Tower_4_Ground_Maintenance_Map.pdf PDF
H01 Technical Exhibit 12 Sample NCIR.doc DOC document
A21_RFP_W90VN919R0002.pdf PDF
H01 AFH-Maintenance_Exhibit-list.docx DOCX document
H01_Technical_Exhibit_37_Tower_3_Ground_Maintenance_Map.pdf PDF
H01_Technical_Exhibit_45_Tower_4_Custodial_Drawing.pdf PDF
H01_Technical_Exhibit_41_Tower_3_Mech_and_Plumbing_Drawing_2.pdf PDF
H01_Technical_Exhibit-44_Custodial_Working_Schedule.doc DOC document
H01_Technical_Exhibit_33_Tower_2_Bed_Type_Drawing.pdf PDF
H01_Technical_Exhibit_21_Tower_1_Elec_Drawing_1.pdf PDF
H01_Technical_Exhibit_46_Tower_4_Exterior_Window_Cleaning_Drawing.pdf PDF
H01 Technical Exhibit 7 COC Check List.xlsx XLSX spreadsheet
H01_Technical_Exhibit_29_Tower_2_Elec_Drawing_2.pdf PDF
H01 Technical Exhibit 8 COP Check List.docx DOCX document
H01_Technical_Exhibit_31_Tower_2_Elec_Drawing4.pdf PDF
H01 Technical Exhibit 6 Quality and Standards of Work.docx DOCX document
H01 Technical Exhibit 17 Check Lists.docx DOCX document
H01_Technical_Exhibit_24_Tower_1_Bed_Type_Drawing.pdf PDF
H01_Technical_Exhibit_32_Tower_2_Mech_and_Plumbing_Drawing.pdf PDF
H01_Technical_Exhibit_40_Tower_3_Mech_and_Plumbing_Drawing_1.pdf PDF
H01_Technical_Exhibit_28_Tower_2_Elec_Drawing_1.pdf PDF
H01_Technical_Exhibit_36_Tower_3_Exterior_Window_Cleaning_Drawing_2.pdf PDF
H01 Technical Exhibit 9 COM Checklist.docx DOCX document
H01 Technical Exhibit 14 Contract Descepancy Report PDF
Show 40 more

Latest 50 of 58 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DAILY CONTRACT INSPECTION REPORT

(INSTRUCTIONS ON REVERSE SIDE)

1. CONTRACT NUMBER

3. ABBREVIATED CONTRACT NAME
4. NAME OF CONTRACTOR (COMPANY NAME)

2. SPECIFICATION NUMBER

5. NOTICE TO PROCEED DATE
7. WEATHER AND TEMPERATURE
0800 HOURS
1200 HOURS
1500 HOURS

6. ACTUAL DATE STARTED

8a. CONTRACTOR DESCRIBE WORK BEING PERFORMED (INCLUDE LOCATION OF WORK)

8b. NUMBER OF WORKERS ON JOB

8c. NAME OF CONTRACTOR’S REPRESENTATIVE

9b. CONTRACTOR RECORD GOVERNMENT REPRESENTATIVE’S INSTRUCTIONS (IF ANY)

10. CONTRACTOR DESCRIBE DIFFICULTIES ENCOUNTERED (INCLUDE DELAYS, DESCRIBE WORK NOT PERFORMED IN ACCORDANCE WITH SPECIFICATIONS, CORRECTIVE ACTIONS, ETC.)

11. INSPECTOR EVALUATE CONTRACTOR’S INPUT TO ITEMS 8, 9, AND 10

WAS A SITE INSPECTION PERFORMED OF THE WORK IDENTIFIED IN BLOCKS? ____YES ____ NO ____ N/A ________________________

(DATE OF INSPECTION)

12. ESTIMATED COMPLETION

DATE

13. PERCENT COMPLETE
14. CONTRACTOR’S SIGNATURE AND DATE

15. INSPECTOR’S SIGNATURE AND DATE

16. ENGINEERING REVIEW (SIGNATURE AND DATE)

17. CONTRACTING ADMINISTRATOR’S SIGNATURE AND DATE

18. REPORT IS FOR DATE(S)
19. REPORT SERIAL NUMBER

INSTRUCTIONS FOR FILLING OUT DAILY CONTRACT INSPECTION REPORTS

A.

CONTRACTOR’S INSTRUCTIONS.

1.

Fill out a report when you are working, one each day, and not less than one each week when you are not working. Give the report to the inspector or deliver it to the Contrating Officers Representative, HFB. If you are not working for a long period, waiting on materials, or waiting on a modification, fill out the report once a week.

2.

Fill in Blocks 1 through 10, 14, and 19 daily or not less than once a week when no work is proceeding. Fill in Blocks 12 and 13 each Thursday and more often when appropriate. Government representatives will fill in the balance of the blanks.

3.

Block 1 Write in the Contract Number. The last two number groups are sufficient (i.e., 00-P-0000 for W91QVN-00-P-0000). The Inspector will show you this if you have any questions.

4.

Block 2 Write in the Contact Specifications (Spec) Number.

5.

Block 3 Write in the Contract Short Title from the front page of the Specifications.

6.

Block 4 Write in your company’s name.

7.

Block 5 Write in the date you were given the “Notice to Proceed” by the Contracting Officer.

8.

Block 6 Write in the date you started working on the contract.

9.

Block 7 If the weather affects your contract, record it here. If you are working indoors, leave it blank.

10.

Block 8a Write in what you’ve been doing, what you’ve been working on, location of the work, and facility/building number if it applies.

11.

Block 8b Write in the number of workers on the job consistent with the work described in Block 8a.

12.

Block 8c Write in the name of the contractor’s representative on the job at the time the work described in Block 8a was being performed.

13.

Block 9 Write in any instructions given to you by the Inspector, Contracting Officer’s Representative (COR) , or Project Manager.

14.

Block 10 Write in any problems you may have encountered. Read the instructions in this block.

15.

Block 12 Write in the estimated completion date of contract.

16.

Block 13 Fill in on Thursday’s report (see instruction 2); estimate percent of work completed.

17.

Block 14 The employee who makes the report, signs and dates here.

18.

Block 18 Write in the date(s) or period(s) covered by the report. This is NOT the day you turn it in.

19.

Block 19 This is a sequential report number (Example: If it’s the eleventh report you are turning in, write in “11”).

20.

If you have any questions about the Daily Contract Inspection Report, call the HFB 753-6605, 753-7663. He/She is usually at this number Monday through Friday at the following times: 8:00 a.m. - 11:30 a.m. - 12:30 p.m. - 4:30 p.m.

21.

If you want to hand-deliver the inspection reports, give them to the Inspector when he visits the job site or deliver them to Building 309.

B.

INSPECTOR’S INSTRUCTIONS.

1.

Block 11 Inspector evaluate the input given by the contractor. Read the instructions in this block. If you have performed an inspection of the work identified by the contractor in Block 8, indicate this by checking “YES”; record the date of inspection. If no, check “NO”. If the work involved does not require inspection, check “N/A”. Provide any input, comments, etc., which are or may be relevant to the evaluation of the contractor’s work. Coordinate input with the COR, Contract Administrator, and/or Contractor, if required.

2.

Block 15 Sign and date the report. This date must be consistent with the date of your signature; do not backdate.

3.

Forward the report to the COR for review and additional evaluation or instructions.

C.

COR INSTRUCTIONS.

1.

Engineering review report; add and/or attach comments. Coordinate input with Contracting Office, and/or Inspection, if required.

2.

Block 16 Sign and date report.