This is a Questions & Answers document containing 134 industry questions and government responses related to the draft RFP W900KK-25-R-0001 for the Live Training Ranges and Combat Training Centers (LTRaC) Multiple Award Contract (MAC) 1.
The Q&A addresses key aspects of the contract including: the Basic Army Target Lifter (BATL) Technical Data Package (TDP) which will be finalized prior to the first Delivery Order; testing requirements for First Article Testing (FAT), Product Qualification Testing (PQT), and baseline testing; installation requirements for target mechanisms including Stationary Infantry Targets (SIT), Stationary Armor Targets (SAT), Moving Infantry Targets (MIT), and Moving Armor Targets (MAT); radio and RF solutions which will be government-provided; training requirements with no "train the trainer" support; and clarification that there are no warranty requirements beyond transferring manufacturer warranties. The document confirms that each contractor's first Delivery Order will require FAT testing, even if they participated in LRIP. Questions about the draft RFP are due by 2:00 PM EST on November 18, 2024 to the Contract Specialist.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
LTRaC MAC 1 Draft-RFP Q&As Live Training Ranges and Combat Training Centers (LTRaC) Multiple Award Contract (MAC) 1 Industry Questions/Government Answers related to the DRAFT Request For Proposal (RFP) W900KK-25-R-0001
| Question | ||||||
| Number | Topic | Subject | Question / Comment | Question / Comment Reference (SOW, L&M, Page #s, etc.) | Government Responses | |
| 1 | General | BATL | Does the Government anticipate any further design and/or drawing edits prior to release of RFP for MAC 1? | General | Yes. The drawings will be updated on the LT2 portal just prior to release of the final RFP. Then prior to the issuance of the 1st Delivery Orders, minor updates will be made. As the 1st Delivery Orders will only be for ranges with SITs and SATs, there should be no changes that will impact the housing of either device. This should enable offerors to get that long lead item ready for production. Additionally, updates to the TDP are expected to be minor changes. | |
| 2 | 3.1.1. Program Schedule | Program Schedule | Please clarify if this requirement is for individual Delivery Orders | SOW | Each awardee shall provide an IMP/IMS that includes all awarded Delivery Orders that are still active. | |
| 3 | 3.1.4. | Pre-installation Site Visits | Please clarify what is meant by "contracted RF solution". RF solution was assumed to be a Government designed item, not contractor designed. | SOW | The Government intends to provide the RF solution on the wireless ranges. However, as required by the Delivery Order, the LTRaC MAC 1 Contractor will work with the RF vendor to ensure adequate communication devices are installed on/throughout the range for functionality of all target devices. | |
| 4 | 3.1.4. | Pre-installation Site Visits | Is the expectation that complete coverage on the range is possible. Is there consideration for instances where line of sight is not achievable? | SOW | The Government will take line of sight into consideration, but the expectation is to have complete coverage. This RF coverage is intended to be provided bya Contractor through the LTRaC MAC 2 contract, unless otherwise stated in the LTRaC MAC 1 Delivery Order. | |
| 5 | 3.4.4. and Appendix I 5.1.3 | Baseline Testing (BT) and Ancillary range devices | Please define what level of testing is required, and please provide existing test procedures to accomplish the task(s). | Appendix I | Please refer to the draft RFP document titled HW_RF_WiFi Ranges_Baseline_Test_Procedure_Draft. | |
| 6 | 3.4.4. | Baseline Testing (BT) | For the "repeat" of the BT, what/who will determine what may have caused degradation of infrastructure or ancillary devices. | SOW | The Government will access the baseline test(s) performed prior to the final baseline test (or repeat test), and address the situation accordingly. | |
| 7 | 3.2.1 | BATL Target Mechanisms | Are all drawings for target mechanisms provided complete and final? | SOW | No, see answer 1 above. | |
| 8 | 3.2.1.1 | BATL TDP Deviations | Will there be a line item on individual Delivery Orders to provide compensation for changes, testing, and verification? | SOW | Any deviations to the BATL TDP items will be part of the Delivery Order. Any updates that the Government makes to the drawings will be published as part of the Delivery Order and will be explicitly identified. No lines for compensation of changes / testing or verification are planned. The Offeror will need to bid those elements into their overall price. These areas will be addressed by the Government in the Delivery Order and should therefore allow the Offeror to propose accordingly. | |
| 9 | 3.2.2 | Range Control System (RCS) | Will the Government please define "Handheld Computers (HHCs). | SOW | A laptop used to perform direct and/or indirect target mechanism functionality on a range. The details for this device are called out in the FASIT ATO. | |
| 10 | 3.2.3 | Other Equipment | Will requirements for batteries and battery chargers be defined per Delivery Order? | SOW | Yes | |
| 11 | 3.2.3 | Other Equipment | Radios. Please provide clarification around the requirement for contractor provided/defined radios. | SOW | See answer 3 above. Further detail will be forthcoming when available. | |
| 12 | 3.2.7 | Corrosion Resistance | BATL equipment is Government design, and is assumed to be treated with corrosion resistant material when built to Government TDP. | SOW | SOW Section 3.2.7 has been updated. | |
| 13 | 3.2.7 | Corrosion Resistance | Contractor ancillary equipment may not need to be treated with corrosion resistant material, the items may be corrosion resistant just by nature of material chosen to fabricate the items. Will the Government please clarify the statement. | SOW | SOW Section 3.2.7 has been updated. | |
| 14 | 3.3.2 | Equipment Removal | Does the Government intend to accomplish this task as part of the installation, or will this be a separate task on Delivery Orders? | SOW | The requirements will be defined in each delivery order. | |
| 15 | 3.3.3.1 | Power | Please define power generation. | SOW | The requirements will be defined in each delivery order. Added "as specified in DO" at the end of the DC powered requirements section 3.3.3.1. | |
| 16 | 3.3.4.1 | Surge Suppression | Please define "assess" when referencing "any pre-existing surge protectors …." | SOW | Assess = evaluate and report for quality and functionality. | |
| 17 | 3.3.4.2 | Grounding | Will the Government reimburse Contractor's replacement of broken or missing ground cables? | SOW | Grounding requirements will be detailed in the Delivery Order. Any missing/broken ground rods/cables noticed at the awardee site survey that were not in the Delivery Order should be brought to the Government's attention. The PCO will make a determination on reimbursement. | |
| 18 | 3.4.1 | FAT | Please clarify the statement that the FAT shall include: "a. Environmental and functional testing, b. Environmental includes immersion, low temperature, and vibration testing." | |||
| It is assumed that the Government would conduct Environmental tests on the finalized design before release of the base contract, and that contractors issued Delivery Orders would build to the Government owned TDP, which would in turn meet the requirements stated, with no need to repeat testing | SOW | Environmental tests will be conducted to test that requirements were met during manufacturing/production by the LTRaC MAC 1 awardee. |
The Government's intent is to have the awardee ship the devices to a specified location and then the Government will have the environmental tests conducted. The Contractor will be afforded the opportunity to attend these environmental tests to witness the process.
| 19 | 3.4.1 | FAT | Please clarify the statement that "Environmental testing will be conducted in Orlando…... The contractor shall ship….. | |||
| Again, it is assumed that Environmental testing was already conducted by the Government, and contractors are building according to the Government owned TDP, which would in turn meet the requirements stated, with no need to repeat testing. | SOW | See answer 18. | ||||
| 20 | 3.4.3 | PQT | Please clarify why an immersion test is required for SIT and SAT on PQT. | |||
| Please provide test procedures and results from Government conduct of test. | SOW | Immersion test is required at PQT For the Government to continuously check the manufacturing processes meet the requirements of the BATL TDP. The immersion test in the PQT is simply to immerse the unit in a tank of water vs the MIL-STD 810 immersion test that is conducted during FAT. | ||||
| 21 | 3.4.5.1 | Cycle / Scenario Testing | Please clarify statement of ". . .failure if there are any reported false "hits" on the target device." | |||
| False hits cannot be attributed solely to contractor actions. | SOW | Contractors will be allowed to make adjustments/corrections as necessary, and the Government will take into consideration other factors that may contribute to false hits. A false hit is defined as the lifter reporting to TRACR that a "hit" occurred when nothing impacted the lifter. | ||||
| 22 | 3.4.5.2 | Scenario Testing | Please clarify statement of "Scenario Testing shall be considered failed if there are any or reported out-of-comms/target failure conditions". | |||
| False hits and out of comms cannot be solely attributed to contractors actions. | SOW | Contractors will be allowed to make adjustments/corrections as necessary, and the Government will take into consideration other factors that may contribute to false hits. A false hit is defined as the lifter reporting to TRACR that a "hit" occurred when nothing impacted the lifter. | ||||
| 23 | 3.4.7 | Test Readiness Review | Please define Handheld Target Controller (HTC) | SOW | HTC = HHC. The SOW Section 3.4.7 has been updated accordingly | |
| 24 | 3.5.1 | LPD/LPDS | Please define non-BATL systems that the Government intends to procure from vendors on MAC 1 | SOW | Refer to Section 3.2.3 of the SOW | |
| 25 | 3.5.5 | Sustainment Partnership | Does the Government intend that this contractor will be a contractor that has been awarded a base contract on MAC 1? | SOW | Undetermined at this time if an awardee in MAC 1 can also be the Contractor described in this section. | |
| 26 | 3.5.5 | Sustainment Partnership | For "…obsolescence of parts in the TDP, testing of new components to be included in the TDP" does this not provide a competitive advantage to the contractor that is awarded the separate contract? | SOW | Undetermined at this time if an awardee in MAC 1 can also be the Contractor described in this section. |
The Government intends to publish all updates to the TDP prior to issuing any new Delivery Orders requiring new components. The MAC 1 awardees will also get to provide input on the new components prior to the Government finalizing the new TDP.
| 27 | 3.5.7.1 | Training Plan | Will the Government be providing a training plan per Delivery Order? | SOW | Yes | |
| 28 | 3.5.7.2 | Training Requirements | Will the Government please clarify what is meant by "… tailor a training course…"? | SOW | LTRaC MAC 1 awardees will receive a training package per SOW Section 3.5.7.1.The Contractor shall tailor the information in that package to meet training to fit the Delivery Order requirements if necessary to clearly convey the training being provided. | |
| 29 | 3.5.7.2 | Training Requirements | Will the Government be providing a training course for MAC 1 contractors? In other words, will there be a "train the trainer" activity provided to contractors? | SOW | No. The Contractor will be provided all the training materials and manuals. It is up to the Contractor to be able to teach these classes at the installations. | |
| 30 | 3.5.7.2.1 | Operator Training | Will the Government be providing a training course for MAC 1 contractors? In other words, will there be a "train the trainer" activity provided to contractors? | SOW | No. The Contractor will be provided all the training materials and manuals. It is up to the Contractor to be able to teach these classes at the installations. | |
| 31 | 3.5.7.2.2 | Deployable Range Package Training | Will the Government be providing a training course for MAC 1 contractors? In other words, will there be a "train the trainer" activity provided to contractors? | SOW | No. The Contractor will be provided all the training materials and manuals. It is up to the Contractor to be able to teach these classes at the installations. | |
| 32 | 3.5.7.2.2 | Deployable Range Package Training | Will the Government please define Deployable Range Package? | SOW | A DRP is a set of systems that are not installed on a fixed range. The systems can be moved from location to location as needed. | |
| 33 | 3.5.7.2.3 | Maintenance Training | Will the Government be providing a training course for MAC 1 contractors? In other words, will there be a "train the trainer" activity provided to contractors? | SOW | No. The Contractor will be provided all the training materials and manuals. It is up to the Contractor to be able to teach these classes at the installations. | |
| 34 | 3.5.7.2.4 | Master Target Data Panels/Target Data Panels (MTDP/TDP) | Will the Government be providing a training course for MAC 1 contractors? In other words, will there be a "train the trainer" activity provided to contractors? | SOW | No. It is up to the Contractor to be able to teach these classes at the installations. | |
| 35 | 3.5.7.2.5 | Moving Target Maintenance | Will the Government be providing a training course for MAC 1 contractors? In other words, will there be a "train the trainer" activity provided to contractors? | SOW | No. The Contractor will be provided all the training materials and manuals. It is up to theContractor to be able to teach these classes at the installations. | |
| 36 | 3.5.7.3 | Training Feedback | Will the Government be providing surveys, sign in rosters, and training denial form? | SOW | No. Contractor can present the data in their format. | |
| 37 | 3.5.8 | Drawings | Will the Government please clarify the expectation of contractors as it relates to updates to any new baselines that may be established for TMs. For example, if a contractor is in the middle of executing a DO, will they be expected to stop work and make equipment adhere to latest baseline published by the Government? | SOW | No. Changes will not be made to ongoing Delivery Orders unless the Government requests a Modification to the Delivery Order. Any updates to the TDP or manuals will be provided either prior to issuance of a Delivery Order or as part of the RFP. | |
| 38 | 3.6.1.3 | Notice of Revisions (NOR) | Will the Government please clarify the expectation of contractors as it relates to updates to any new baselines that may be established for TMs. For example, if a contractor is in the middle of executing a DO, will they be expected to stop work and make equipment adhere to latest baseline published by the Government? | SOW | No. Changes will not be made to ongoing Delivery Orders unless the Government requests a Modification to the Delivery Order. Any updates to the TDP or manuals will be provided either prior to issuance of a Delivery Orders or as part of the RFP. | |
| 39 | 3.6.1.3 | Notice of Revisions (NOR) | Will the Government please clarify what is meant by "The contractor shall be able to produce an field to any approved version of the BATL TDP"? | SOW | Updated SOW Section 3.6.1.3 to the following: "The contractor shall be able to produce and field to any approved version of the BATL TDP as specified in the Delivery Order." | |
| 40 | Warranty | Will the Government please define the warranty expectation for MAC 1? | General | There is no warranty requirement under this contract other than transferring any remaining manufacturers warranties to the Government. Additionally the Government is protected from Latent Defects that appear after acceptance. | ||
| 41 | Appendix I 5.1.4 | Range Infrastructure | Will the Government please clarify why Surface Danger Zones would be listed as an item for contractors to inspect? | Appendix I | If not called out in the Delivery Order,Contractors will need to know if SDZ exists and where on a range so installation can be worked out accordingly based on the Delivery Order timeline requirements. | |
| 42 | reference documents | DoD Pubs | please confirm PEO STRI will provide justification for contractors to access those documents at :https://armypubs.army.mil | Appendix K, Performance Work Statement, Para 2.5 & 2.6 | If necessary PEO STRI will provide justification to access the site. | |
| 43 | BATL devices | SIT Mechanism adjustability | is there a TDP, or any concept design for the desired SIT adjustability? Is this intended to be a framework that anchors into a concrete emplacement allowing the adjustment of the target actuator, or a removable frame for the target actuator (aka roll cage)? or? | Appendix K, Performance Work Statement, Para 3.1.3 | The adjustability feature is a Contractor design. The feature must bolt into the concrete, be able to mount the SIT on top of it, and allow the user to move the SIT forward and backward (toward the emplacement wall/away from the emplacement wall) without having to remove it from the feature. The exposure requirement must also be taken into consideration. | |
| 44 | (new item) emplacements | SCUs | Where can we access a copy of the FASIT SCU TDP? I do not remember seeing it in the previously released BATL/LTRaC TDPs | Appendix K, Performance Work Statement, Para 3.1.6, 3.2.5, 3.3.1 | There is no FASIT SCU TDP. The SCU is a Contractor design that must meet the requirements of the Performance Specification (PS). PS Section 3.1.6 Portable SIT and SAT omitted and moved to Section 3.2.4 Portable Ranges for update to document. | |
| 45 | emplacements | MIT/MAT track bed | Please advise how much moving target track bed is likely to require upgrade/repair - will this be identified in the DO RFPs? Will contractors be able to view the site prior to submitting DO RFP responses? | Appendix K, Performance Work Statement, Para 3.2.6 | This will be described in the Delivery Order request. Visits performed by the Contractor prior to submitting a proposal are at the Contractor's expense, and must be worked out accordingly with the Government. | |
| 46 | data/comms | Fibre terminations | Will LTRaC contractors be required to make fibre terminations during install? Or will all fibre terminations be completed by others (during MILCON phase of project) | Appendix K, Performance Work Statement, Para 3.2.9 | This will be a LTRaC MAC 1 Contrctor responsibility that will be called out in the Delivery Orders when required. | |
| 47 | power interface | grounding | Please confirm if grounding rods are part of emplacement completed at MILCON or if installing contractor must furnish and install them | Appendix K, Performance Work Statement, Para 3.2.10.1.2 | Grounding rods are typically at each emplacement. However, if there is a requirement for the LTRAC MAC 1 Contractor to provide the grounding rods that will be incorporated into the Delivery Orders requirements. | |
| 48 | additional range equipment | Lifter shields | Please confirm requirement is to withstand the required number of impacts without penetration (or imminent penetration) and that surface nicks are not cause for failure | Appendix K, Performance Work Statement, Para 3.3.3 | Confirmed | |
| 49 | additional range equipment | Lifter shields | please confirm if the government will provide the EPR ammo (M855A1 & M80A1) and weapons for the testing - since these items are not readily commercially available | Appendix K, Performance Work Statement, Para 3.3.3 | Ammunition will not be provided by the Government for testing. | |
| 50 | additional range equipment | Lifter shields | Please note, those quantities of 5.56 & 7.62 EPR ammo, concentrated that closely are likely to penetrate the currently fielded ILS & ALS designs - requiring significantly thicker (and order of magnitude heavier) AR steel to survive | Appendix K, Performance Work Statement, Para 3.3.3 | Noted | |
| 51 | additional range equipment | KD target carriages | If an existing KDC design, includes counter balanced carriages that naturally rests at the exposed/concealed position, and targets can be replaced at those positions is an additional locking device still required? We currently furnish an adjustable/selectable counterweight pack to further improve performance - because we are concerned that a 'lock mechanism' will only complicate operation, and be prone to failure over time (due to buildup of range debris. | Appendix K, Performance Work Statement, Para 3.3. 4& 3.3.4.1 | The Government will take designs into consideration pending the requirements necessary and a waiver/ECP provided by the Contractor (if required). | |
| 52 | additional range equipment | Iron Maiden with Kill Zone | Would the government have any interest in an Iron Maiden target mechanism designed for, and proven in use with .50cal and belt fed ammunition | Appendix K, Performance Work Statement, complete 3.3.5 | A possibility of interest may exist, however this would be dependent on the requirements of such ranges anticipated to be installed. | |
| 53 | specifications | precedence of specs and design packages | which takes precedence the FASIT Performance Specification, or the BATL actuator TDPs. | Appendix I, PRF-PT 00468, para 2.2.1, 2.2.2, 2.3 | The FASIT Perf Spec is no longer part of this requirement as the BATL systems are government designed. | |
| 54 | applicable documents | specifications, standards, and handbooks | Will PEO STRI assist with getting access to the noted documents (where/when government sponsorship is required)? | Appendix I, PRF-PT 00468, para 2.2.1 | Yes | |
| 55 | presentation devices | target signatures | will the government recommend/specify COTs solutions for thermal and multi-spectral signatures, similar to BATL TDPs | Appendix I, PRF-PT 00468, para 3.4.1 - 3.4.2.1 | If/When necessary, the Government will provide the data. At this time it is not a requirement of the LTRaC MAC 1 Contractors. | |
| 56 | Range Effects | Range Effects Devices | will the government recommend/specify COTs solutions for the range effects devices - similar to BATL TDPs | Appendix I, PRF-PT 00468, para 3.5, 3.5.2, 3.5.3 | LTRaC MAC 1 Contractors will not be supplying range effect devices. However, installation provided range effect device(s) may be a Contractor requirement to have tested with the BATL devices during acceptance tests. | |
| 57 | NIACS code | NAICS | will the government consider soliciting under the NAICS code for ATS/ATSII/ATSIII 33299 instead of 333310 | Draft RFP W900KK25R0001 | No | |
| 58 | SOW | preinstall survey and baseline testing | Will contractors be paid for the efforts involved in preinstallation site visits? These did not show up in the CLIN structure, would they be a Delivery Order item? | Section J Attachment 1 paragraph 3.1.4 | Under CLIN 0001 there is a Site Survey Line for proposal purposes. See the Sample Delivery Orders that are included as part of the RFP. The pre-installation site visits includes running the Baseline Test procedures. | |
| 59 | SOW | GFE | does this paragraph only refer to FATs for production equipment, or will government furnished computers be used for TRACRF (UTC) system on every delivery Order? | Section J Attachment 1 paragraph 3.2.2 | Government Furnished TRACR computers will be used for testing installed equipment on the ranges for each delivery order. TRACR will also be used during FATs utilizing the computers referenced in Section 3.1.3 | |
| 60 | SOW | BATL target installation | who will be responsible for diagnosing and repairing any issues with existing range infrastructure discovered during preinstallation survey, or actual installation? If contractor how will they be paid for this? | Section J Attachment 1 paragraph 3.3 | This is the responsibility of the Installation. | |
| 61 | SOW | removal of legacy equipment | will removal, survey, catalogue, and removal to storage of existing equipment be paid as a separate CLIN on specific delivery orders, or just be considered part of installation services | Section J Attachment 1 paragraph 3.3.2 | If required, a separate line item under CLIN 0001 will be available. The Delivery Order will call out any need for removal of equipment and/or accessories | |
| 62 | SOW | First Article Testing | Will FAT be awarded as a specific delivery order to each contractor? If not how will contractors be paid for these efforts | Section J Attachment 1 paragraph 3.4.1 | No, Contractors should consider the price of the FAT on the Delivery Orders for items that have not gone through this particular test and/or will need to be retested due to a significant change as detailed in the SOW. | |
| 63 | SOW | Baseline testing | Will Baseline testing be awarded as a CLIN in specific delivery orders? If not how will contractors be paid for these efforts | Section J Attachment 1 paragraph 3.4.4 | No. Baseline tests will be considered part of the Site Survey unless otherwise noted in the Delivery Order requirements. | |
| 64 | SOW | MTDPs | Does the government expect fiber connections (during installation) to be made by certified professional (subcontractors) or will contractor personnel be required to do this work? | Section J Attachment 1 paragraph 3.5.7.2.4 | That is at the discretion of the Contractor. However, the Contractor is assuming all risks related to this requirement. | |
| 65 | SOW | Credentialing | Will PEO STRI be sponsoring contractor personnel for CAC credentialing? | Section J Attachment 1 paragraph 3.7.9 | Yes | |
| 66 | Immersion testing | "The contractor shall conduct immersion testing on each SIT and SAT undergoing PQT" | The SOW does not provide a time requirement. Appendix I lists 4 hrs. @ 2 ft - written instructions, and the MIL SPEC lists 2 hrs. @ 1 meter. | |||
| What is the immersion test time for each unit? | SOW 3.4.3 | The contractor shall keep the SIT / SAT immersed for 1 hour, then remove the unit from the tank, open the unit, and assist the Government inspecting the unit for water intrusion. | ||||
| 67 | Baseline Test | 3.1.4 During the site survey, the contractor shall conduct the Baseline Test”. | Suggest that the Baseline Test is changed to occur immediately before fielding. A lot can change between site survey and the installation. Perhaps have two tests, one at site survey to give time for range corrections, and one just prior to installation to record current range issues. | SOW 3.1.4 | The SOW shows multiple BT being conducted. One as part of the site survey (sec 3.1.4) and another "after the contractor testing and acceptance testing event (sec 3.4.4). | |
| 68 | System Support Package | “The contractor shall synchronize with the PEO STRI LCCS contractor and provide the applicable System Support Package (SSP), transitional training, and transition support to the LCCS contractor.” | Where is the SSP defined? | |||
| SOW 3.1.10 | The SSP will be defined in each Delivery Order. | |||||
| 69 | System Support Package | “The contractor shall synchronize with the PEO STRI LCCS contractor and provide the applicable System Support Package (SSP), transitional training, and transition support to the LCCS contractor.” | What are the requirements of the transitional training? | SOW 3.1.11 | See the SOW Section 3.5.7 and its subsections regarding New Equipment Training | |
| 70 | Silhouettes | “The contractor shall coordinate with range personnel to have them install the SAT and MAT silhouettes prior to the Acceptance Test (AT).” |
and above it states:
| “The contractor shall procure / produce, deliver, install, and integrate ancillary range devices…”. | Who is responsible for installing silhouettes? | SOW 3.2.3.2 | The MAC 1Contractor is responsible for providing and installing the infantry silhouettes. The armor silhouettes will be provided by the range personnel. The Contractor may elect to install the armor silhouettes themselves, or oversee installation of the armor silhouettes performed by range personnel. | ||
| 71 | FASIT ICD Appendix I | Portable Maintenance Actuator | Per ICD 3.2.22 - Operability Test - refers to a Portable Maintenance Actuator. I find no reference to a PMA in the SOW or PD. Are contractors required to provide a PMA, or will the government provide one? | Any requirements for a PMA will be detailed in the Delivery Orders and/or pushed out to the Contractors when available. | |
| 72 | FASIT ICD Appendix I | Variants of requirements | Per ICD 3.3 - Presentation Devices. PD's are required to have 1 primary power input of 120/240VAC and 1 Secondary power input of 12VDC via an MS3102E22-8P connector. The BATL PD's do not show a 120/240VAC input. Will they be equipped with one? | The FASIT ICD can be disregarded. | |
| 73 | FASIT ICD Appendix I | Variants of requirements | Per ICD 3.3 - Presentation Devices. PD's are required to have 1 primary power output of 120/240VAC 15A via an L5-15 receptacle and 1 auxiliary power output of 12VDC via an MS3102E22-8S receptacle. The BATL PD's do not show a 120/240VAC output. Will they be equipped with one? | The FASIT ICD can be disregarded. | |
| 74 | FASIT ICD Appendix I | Variants of requirements | Per ICD 3.3 - Presentation Devices - PD primary power shall come from GFE L14-20 Receptacle in the target position. Current BATL devices only appear to be 12VDC input. Are contractors required to provide an external power supply for each device? Where will it mount? | The FASIT ICD can be disregarded. | |
| 75 | FASIT ICD Appendix I | Target Actuation variants | Per ICD 3.3.1.2 - Target Actuation for a SAT is seven (7) seconds against any wind up to 35 mph. Table 1 of Appendix K Performance Specifications indicates 12 seconds for a SAT. Does the PS spec override the FASIT spec? | Yes. Refer to the Appendix K - Performance Specification requirements. | |
| 76 | Appendix K Performance Specifications | 3.1.6 Portable SIT/SAT | Self-Contained Units - are SCU's part of the BATL target design, or will individual contractors be required to design a SCU to meet the 3.1.6 requirements for the government's BATL SIT/SAT? | The SCU is a Contractor design that must meet the requirements of the Performance Specifications. | |
| 77 | General | Warranty | We find no reference to hardware warranty. Please clarify | There is no warranty requirement under this contract other than transferring any remaining manufacturers warranties to the Government. Additionally the Government is protected from Latent Defects that appear after acceptance. | |
| 78 | General | Pricing | Will all pricing be determined per Delivery Order, including spare parts line items? | Yes | |
| 79 | Section J Attachment 1 SOW | 3.1.2 - Integrated Product Team | Contractor shall host a 1-hour in-person or virtual meeting….. Is this only after Delivery Order award? If multiple Delivery Orders are ongoing, does each require a weekly meeting? Weekly progress emails seem to be a better solution than teams meetings that will require de-briefing emails. | 1 hour weekly IPTs shall be set up to include information about all Delivery Orders the Contractor has been awarded. | |
| 80 | Section J Attachment 1 SOW | 3.1.4 Site Visit and 3.4.4 Baseline Test | Are the pre-installation site visit and the baseline testing the same? Each must be done prior to equipment install, but they call out different functions/responsibilities. Please clarify. | Unless otherwise stated in the Delivery Order, the Baseline Test must be performed during the site survey prior to uninstall of the existing range equipment. The Baseline Test must be performed again after installation of the BATL equipment during contractor testing. | |
| 81 | Section J Attachment 1 SOW | 3.2.1 - BATL Target Mechanisms | This paragraph indicates BATL TDP's and drawing packages will be provided. Will more information be provided than what is currently on the LT2portal - BATL collaboration site? Are the current TDP's and drawings the final released versions? Latest folder was dated 17-JUN-2024 | The BATL TDP's/Drawings on LT2 are not finalized. The Government will place finalized data onto the LT2 Portal as they become available | |
| 82 | Section J Attachment 1 SOW | 3.2.2 Range Control System (RCS) | It appears RCS will not be part of the MAC1 Delivery Order, and will be installed in the range tower by other contractors. Will that contractor be present during GAT to ensure no RCS issues arise? Will installations of RCS be coordinated with BATL installation? | The installation of the RCS will be coordinated by the Government with the installation of the BATL equipment. The Government will take into consideration having an onsite RCS representative and/or a hotline available for questions/concerns. | |
| 83 | Section J Attachment 1 SOW | 3.4.1 - First Article Testing | SOW indicates 5 SITs, 2 SATs, 1 MIT and 1 MAT shall be produced for FAT. Devices are not required until a Delivery Orders is awarded that requires them. Are these devices allowed to be integrated into the Delivery Orders, or will they be separate devices that will not be integrated into the range? If not, will they have a separate price for production? | Those quantities indicate the total number that must undergo FAT, but can be completed as a Delivery Order is awarded to include those target mechanisms. The target mechanisms that go through FAT are to be those from the Delivery Order production line that will be installed on a range. | |
| 84 | Section J Attachment 1 SOW | 3.4.1 - First Article Testing | SOW indicates further in the paragraph that FAT testing will require shipment of 2 SITs, 1 SAT to Orlando for environmental testing. Are these devices on top of the devices listed in the first part of the paragraph (See question 13). Will they be allowed to be integrated into the range after testing? If not, will they be separately priced? | Those quantities required are from the required quantity of 5 SITs and 2 SATs for FAT and will be from the production line of a Delivery Order that will be installed on a range | |
| 85 | Section J Attachment 1 SOW | 3.4.1 First Article Testing | Will LRIP vendors be required to re-submit FAT on devices? If not, how will the government ensure they do not have a competitive advantage on initial task orders? LRIP vendors were allowed to include pricing to perform environmental testing, will LTRAC MAC1 vendors be given the same opportunity? | All LTRaC MAC 1 awardees will go through FAT. | |
| 86 | General | Non-Recurring Costs | Will the Government allow for Non-recurring costs for vendors that were not part of LRIP to cover initial tooling, testing, fixtures and other ramp-up related costs? How will the government ensure that LRIP vendors do not have a competitive advantage over other vendors awarded MAC 1 contracts? | This will be addressed on each individual Delivery Order. | |
| 87 | General | Final TDP | Will the final TDP include suppliers of custom high initial cost items? i.e. SIT/SAT housing castings, printed circuit boards? | No, the suppliers for these custom items will not be provided. | |
| 88 | Section J Attachment 1 SOW | 3.4.3 Product Qualification Testing | Please clarify the SIT and SAT immersion test. SOW indicates contractor provided test tank, 6 inch depth of submersion and unit 10 Deg C above water temp. How long to immerse? Does the water temp./product temp have to remain 10 Deg delta? The device will immediately begin to approach the water temp, how are we to maintain the temp delta? | The contractor shall keep the SIT / SAT immersed for 1 hour, then remove the unit from the tank, open the unit, and assist the Government inspecting the unit for water intrusion. The submerging temperature is to be 10 degrees C higher than the water temperature. | |
| 89 | Section J Attachment 1 SOW | 3.4.3 Product Qualification Testing | SOW indicates the contractor shall conduct PQT based on government randomly selected units. Will a government rep be present for all production runs during the course of MAC1? | The Contractor shall coordinate PQT with the local DCMA office. | |
| 92 | Section J Attachment 1 SOW | 3.5.5 Sustainment Partnership | Will the separate contract awarded outside MAC1 be awarded to a contractor on MAC1? Will it be competitively bid? Will this contractor be responsible for warranty issues? It also states this contractor will be providing test chambers for FAT systems? Is this a conflict of interest or a competitive advantage to a particular vendor? | Undetermined at this time if an awardee in LTRaC MAC 1 can also be the Contractor described in this section. | |
| 91 | Section J Attachment 1 SOW | 3.5.5 Sustainment Partnership | If a separate vendor will be providing sustainment, will contractors be required to maintain an inventory of spare parts for Delivery Orders installed as required under previous contracts? | That is at the discretion of the Contractor. However, there will be requirements on Delivery Order for LTRaC MAC 1 Contractors to provide spare parts to the range(s). | |
| 92 | Appendix K Performance Specifications | 3.2.10.2.1 - Generators | Will the BATL TDP include generator specifications(i.e. model and size ) that will meet requirements of the Performance Specs? | No, the BATL TDP will not provide detail on the generator specifications. Any requirement for a generator will be provided on the Delivery Order | |
| 93 | Appendix K Performance Specifications | 3.3.3 Lifter Shields | Please confirm the requirement is to withstand the required number of impacts without penetration and that surface nicks are not cause for failure. | Confirmed. Surface nicks are not a cause of failure | |
| 94 | Appendix K Performance Specifications | 3.3.3 Lifter Shields | Will the government provide EPR ammo (M855A1 & M80A1) and weapons for testing - since these items are not readily commercially available. | If required, the Government will clarify those requirements in the specific Delivery Order | |
| 95 | Appendix K Performance Specifications | 3.3.3 Lifter Shields | Please note, the quantities listed for 5.56 and 7.62 in an EPR round, concentrated in a 3 x 3 inch square are likely to penetrate the currently fielded ILS and ALS products. New products will require significantly thicker and heavier AR steel to survive EPR rounds. Is this the governments intent? | Noted. The Government will updates a necessary as requirements for the Lifter Shields surface. | |
| 96 | Appendix K Performance Specifications | 3.3.4 Known Distance (KD) lifters | If an existing KDC design includes counter balanced carriages that naturally rests at the exposed/concealed position, and targets can be replaced at those positions is an additional locking device still required? We currently furnish an adjustable/selectable counterweight pack to further improve performance - because we are concerned that a 'lock mechanism' will only complicate operation, and be prone to failure over time (due to buildup of range debris. | The Government will take designs into consideration pending the requirements necessary and a waiver/ECP provided by the Contractor (if required). | |
| 97 | Section J Attachment 1 SOW | Supply Chain | How will the government ensure supply chain availability on BATL TDP products? If government specified products have long lead times that exceed the given Delivery Order dates, will contractors be penalized? | The Government cannot ensure the supply chain availability of BATL parts. To forego being penalized, Contractors should notify the Government immediately upon any indication of supply chain issues. | |
| 98 | Appendix K Performance Specifications | 3.2.3 RF Ranges | 3.2.3 indicates defined FASIT radios in the TDP - we do not find any specified radios in the TDP package. Please identify TDP approved radios | Radio TDP is unavailable at the moment. Contractors will be provided detail as it becomes available. Any requirement for radios will be specified in the Delivery Order. | |
| 99 | Draft RFP | Section I Contract Clauses | The Buy American Act and clauses are referenced. Can the government elaborate on the definition/interpretation of this clause as it relates to key components of the BATL product line that have components identified that are made in China. Example- Autotex G138 SIT motor | For each Delivery Order, the Contractor shall identify the foreign end products, as directed in the Buy American Act FAR provisions 52.225-2 and 52.225-4, and follow the guidance of DFARS clauses 252.225-7001 and 252.225-7036. | |
| 100 | Section J Attachment 1 SOW | 3.4 Testing | Clarify the difference between site visit and baseline test. If a baseline test is done before a new RCS with TRACR II is installed, how can a contractor be ensured that the new range (running on TRACR II) will work as it did with a legacy product? Should the BT be done after the new RCS is installed to ensure the range is operable with TRACR II? | At a site visit the Contractor will be looking at/testing the location to ensure the range suffices for installation of the BATL equipment and any/all ancillary items as described in the Delivery Order. At this site visit, the Contractor will not only perform a site inspection, but will go in-depth to perform the baseline tests on the existing equipment and ancillary items to determine the current functionality of the entirety of the range and equipment in order to provide a comparison for BATL acceptance testing. A TRACR II test will be performed after the installation of the system to ensure existing range/equipment functionality, and the Government will perform an additional baseline test prior to equipment removal from the range. | |
| 101 | Section J Attachment 1 SOW | 3.1.3 - Start of Work/Post award meetings | Is this requirement after the first Delivery Order per contractor, or does it apply to any Delivery Order during the duration of LTRAC? This meeting seems a bit redundant per Delivery Order as indicated. | This requirement is after the first Delivery Order only (per Contractor). Weekly IPTs will be held thereafter. | |
| 102 | Section J Attachment 1 SOW | 3.1.3 Start of Work/Post Award | Indicates within 30 days of award, we are to send a compute to the government to install TRACR II. What is this for? Is it a laptop or Desktop PC? Will this just be for training, or to be used to set up Delivery Order Ranges? If so, can we provide more than one computer? | This is a laptop computer that the Contractor will keep to not only learn TRACR II, but to use during installation of ranges for Contractor testing, as necessary. Contractors may chose to send in more than 1 computer. | |
| 103 | Section J Attachment 1 SOW | 3.1.6 Risk Management | If a Delivery Orders is FFP, will the contractor be required to submit risk management data to the government? | For FFP Orders: The Contractor shall conduct risk management to systematically control the uncertainty in the project’s ability to meet schedule and performance objectives. The contractor shall cover risk management to product requirement objectives at the IPT meetings. The contractor shall use their internal risk management tools to perform risk management. |
For Cost Type Orders: The Contractor shall conduct risk management to systematically control the uncertainty in the project’s ability to meet cost, schedule, and performance objectives. The contractor shall cover risk management to product requirement objectives at the IPT meetings. The contractor shall use their internal risk management tools to perform risk management.
| 104 | Section J Attachment 1 SOW | 3.1.8 Data Rights | Please elaborate on what contractor data rights will be required. The BATL TDP will be the basis of design, contractors will have little to no major designs to withhold data rights on. | The Government requires Government Purpose Data Rights on any other systems that are procured under a Delivery Order to allow it to operate, maintain, and sustain the systems. | |
| 105 | Section J Attachment 1 SOW | 3.2.2 - 3.2.3 RCS | Section 3.2.2 RCS indicates the Government will provide RCC's and HHC's. The next section 3.2.3 Other equipment lists computer tablets and accessories to be provided by the contractor. What are these in reference to? | Section 3.2.3 lists other equipment the LTRaC MAC 1 Contractor may be responsible for providing during the course of the contract. Requirements will be established in the Delivery Order. | |
| 106 | Section J Attachment 1 SOW | 3.3.2 Equipment removal | Will the government remove old lifter devices and just leave cables and anchor bolts? Please clarify if contractors will be required to remove target lifters and inventory/stack them for range personnel? | The requirements will be defined in each Delivery Order. | |
| 107 | Section J Attachment 1 SOW | 3.4.1 First Article Testing | Environmental testing to be conducted in Orlando, FL. Can contractors be present for environmental testing? Will this be done at a certified test facility? What is the estimated timeline of this testing and will it be factored into the initial Delivery Order for each contractor? | The Contractor will be afforded the opportunity to attend these environmental tests to witness the process. The estimated timeline is unknown at this time. | |
| 108 | Section J Attachment 1 SOW | 3.4.1 First Article Testing | Will all vendors awarded a MAC 1 award be required to submit First articles on production devices, even if they were part of LRIP? | Yes | |
| 109 | Section J Attachment 1 SOW | 3.4.3 PQT | Will monthly PQT's be required for all Delivery Orders during the life of LTRAC or will this only apply to the first Delivery Orders during initial production, or after major design changes to BATL products? | At this time, yes. Notice will be given if/when the requirement changes. | |
| 110 | Section J Attachment 1 SOW | 3.4.5.1 Cycle/Scenario testing | Will GAT's require 50 cycles on all BATL targets? MAT devices will take hours to conduct 50 cycles per device. Is that the governments intent? | No, GATs will require 1 hour of cycles per the Table in the Performance Specifications Document. | |
| 111 | Section J Attachment 1 SOW | 3.4.5.1 Cycle/Scenario testing | "Cycle testing shall be considered a fail if there are reported false hits" Will contractors be allowed to make adjustments/corrections during the GAT, or is a "Fail" mean a failed GAT and it will have to be re-scheduled? Please clarify "Failed" and "corrective actions" | Contractors will be allowed to make adjustments/corrections. The SOW Section 3/4/5/1 and its subsections have been updated accordingly. | |
| 112 | Section J Attachment 1 SOW | 3.5.9 ID Plate | If the range doesn't have a tower, the data plate is to be applied to the HHC. The HHC will be provided by others - it may already have a ID plate by whomever provided it. I suggest finding an alternative location besides the HHC. | The SOW Section 3.5.9 has been updated accordingly. | |
| 113 | Section J Attachment 1 SOW | 3.6.1.4 TRACR Updates | Contractor shall immediately comply… If a Delivery Order is ongoing, or being installed and devices firmware are not updated to TRACR updates, who will be responsible for testing | The Government will only push out updates that have been tested. Changes will not be made to ongoing Delivery Orders unless the Government requests a Modification to the Delivery Order. Any updates will be provided either prior to issuance of a Delivery Order or as part of the RFP. | |
| 114 | Section J Attachment 1 SOW | 3.1.2 Supply Chain | If BATL device components have long lead times that exceed the Delivery Order timeline, will contractors be penalized for late deliveries for hardware not designed/specified by the contractor? | During the Delivery Order proposal stage, any device component that the Contractor(s) knowingly exceeds the Delivery Order timeline should be relayed to the Government prior to the proposal deadline. The Contractor should also notify the Government immediately upon any indication of supply chain issues that occur after a Delivery Order award. Failure to communicate supply chain issues and missing obligation dates may result in penalties. | |
| 115 | CLIN Structure | Revising CLIN Structure for Billing and Testing | The current CLIN Structure of the example Delivery Orders (one for the whole range, one for travel, one for spares) could potentially cause difficulties for billing at the completion of the Site visit/Baseline Test and NET, which is separate from GAT, as well as the potential acceptance of some target types requiring separate test events. Is the Government considering revising the CLIN Structure (MAC and/or Delivery Orders) to address these issues? | Appendix D, Appendix E | The Government will take this into consideration. |
| 116 | Past Performance Evaluation | Multiple Delivery Orders in One Reference | Can a single past performance contract reference include multiple Delivery Orders, or must each delivery order be listed as a separate reference? | RFP Section L.3.2.1 e, RFP Section M 3.2, Attachment 5 | A single past performance contract reference include multiple Delivery Orders with similar scope. |
| 117 | Baseline Test | Support for Non-Targetry Ancillary Equipment | What level of Government/O&M support can be expected for the baseline test, particularly concerning non-targetry ancillary equipment? | SOW 3.4.4 | Government representatives will be on site during the baseline tests to provide assistance as needed. |
| 118 | PQT Requirements | 5% Submersion per Lot | The PQT requirements drive a 5% submersion for each lot, which seems excessive. Is the Government considering revisiting this requirement to reduce the burden on contractors? | SOW 3.4.3 | The Government will take this into consideration. |
| 119 | PQT Requirements | PQT | Is the PQT a Government-witnessed Test event, or a contractor test? | SOW 3.4.3 | The PQT is a Government witnessed Test event performed by both Government and contractor. |
| 120 | Automated Test Tool | Interface Compliance Verification Tool Availability | The Government mentions a Government-provided automated test tool for interface compliance verification. Is this tool, and/or associated documentation, available for review by the contractors? | SOW 3.4.3 | Yes. See SOW Section 3.1.3. The tool will be provided on the computer that the awardees of the MAC are to provide to the Government. |
| 121 | Submission | Workflow diagram Expectation | Can Government describe the specific expectations for the Workflow diagram, and/or can the Government provide a sample. | Draft RFP - L3.1.1 | The expectations are available in Section L.3.1.1 and M.3.1.1. |
A workflow diagram shows pictorially how the work happens.
| 122 | Submission | Technical Volume Page Count | Does the requested workflow diagram covering all four ranges specified in Table L.2 count towards the 10-page limit of the technical proposal, listed in Table L.1? | Draft RFP - L3, L3.1.1 | Yes. |
| 123 | Submission | Workflow diagram Expectation | Is an Integrated Master Schedule (IMS) acceptable to fulfill the requirements of the workflow diagram? | Draft RFP - L3.1.1, SOW 3.1.1 | The Offeror shall describe their approach for producing and fielding live-fire range instrumentation based on the Army’s BATL TDP for the locations, types, quantities, and delivery requirements listed in Table L.2 |
| 124 | Submission | Workflow diagram Expectation | If an Integrated Master Schedule (IMS) is acceptable, does a Microsoft Project file format fulfill the requirements for Office 365 file compatibility, and/or would it need to be submitted as a flat PDF output? | Draft RFP - L3.1.1, SOW 3.1.1 | A Microsoft Project file format is not acceptable. The technical volume has a 10 page limitation to include the Workflow diagram and must be readable by MS Office 365 products (Word, Excel or PowerPoint). |
| 125 | Submission | Workflow diagram Expectation | Is the "single competitive Delivery Order encompassing the four ranges" represented by "Table L.2 - Sample Ranges, Schedule, and Equipment for Proposal" assumed to be the first Delivery Order, requiring FAT for each target type? Or is it assumed to be a Delivery Order later in the contract? | Draft RFP - L3.1.1, SOW 3.4.1 | Awarded Day 1 listed in the table is referencing the potential first Delivery Order of the contract. |
FAT requirements are defined in the SOW as to when they are conducted. Every Contractor's first awarded Delivery Order will go through FAT.
126 Submission Workflow diagram Expectation Will the Government specify the radio solution required for the RF ranges in Table L.2, since this will impact workflow.