This document is a Government Test Checklist for the Basic Army Target Lifter (BATL) and associated items. It outlines the testing requirements for the First Article Test (FAT) and Acceptance Testing (AT) of various target mechanisms, including Stationary Infantry Targets (SITs), Stationary Armor Targets (SATs), Moving Infantry Targets (MITs), and Moving Armor Targets (MATs). The checklist covers specific requirements such as mechanism adjustability, lifting arm specifications, track and stabilization, and general performance parameters. It also addresses requirements for portable mechanisms, muzzle flash simulators, and non-automated devices like lifter shields. The checklist specifies the verification methods, which include inspection, demonstration, and analysis. Additionally, it outlines general testing requirements related to range startup/shutdown, Battle Effects Simulators, technical manuals, and new equipment training.

This checklist is referenced in the pre-solicitation notice for the Live Training, Ranges, and Combat Training Centers (LTRaC) Multiple Award Contract (MAC) 1, which is a U.S. Army Contracting Command-Orlando (ACC-ORL) requirement to provide and install live-fire training systems using the BATL Technical Data Package (TDP). The LTRaC MAC 1 contract will support military ranges worldwide, with equipment used for both day and night training under all weather conditions.

View the file

Other files

File Type Posted
LTRaC-MAC1_Draft-RFP-Industry-Questions-Govt-Answers_Jan2025.xlsx XLSX spreadsheet
Appendix K - Performance Specifications_17Sep2024.docx DOCX document
Appendix K - Performance Specifications_17Sep2024.docx DOCX document
Appendix B - Example Iron Maiden Target.pdf PDF
RFP_LTRaC-MAC1_SectionJ-Attach-4_DRAFT-RFP-Questions-Comments-Form.xlsx XLSX spreadsheet
Appendix L - TRACR II Software Installation Guide.docx DOCX document
Appendix E - DO_3_Rilea-ARF_JBLM-MRF_Yakima-MPTR.xlsx XLSX spreadsheet
Appendix C - Anticipated FY25 and FY26 Delivery Orders_as-of-23Sep2024.pdf PDF
Appendix K - Performance Specifications_17Sep2024.docx DOCX document
Appendix A - Example of Target Silhouettes_30May2024.pdf PDF
RFP_LTRaC-MAC1_SectionJ-Attach-2_CDRLs_Draft_RFP.pdf PDF
Appendix J - FASIT II ICD_4Mar2024.pdf PDF
RFP_LTRaC-MAC1_SectionJ-Attach-1_SOW_29Oct2024.docx DOCX document
Appendix D - DO_2_Blanding-ARF_Liberty-MPMG.xlsx XLSX spreadsheet
Appendix F - LT2 Distribution Agreement.pdf PDF
Appendix I - PRF-PT-00468_FASIT_v5_9f_15Jan2008.pdf PDF
RFP_LTRaC-MAC1_SectionJ-Attach-6_Preaward Survey of Prospective Contractor Accounting System Checklist.pdf PDF
Draft-RFP_W900KK-25-R-0001_LTRaC-MAC1_31Oct2024.pdf PDF
RFP_LTRaC-MAC1_SectionJ-Attach-3_ Annex-to-Exhibit-A_LPD_23Sep2024.docx DOCX document
RFP_LTRaC-MAC1_SectionJ-Attach-5_Contractor Performance Assessment Questionnaire.docx DOCX document
Appendix H - HW_RF_WiFi Ranges_Baseline_Test_Procedure_draft.docx DOCX document
Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Contractor Guide

BASIC ARMY TARGET LIFTER (BATL) & ASSOCIATED ITEMS TESTING CHECKLIST (V.1)
NOTES:

1. All requirements for FAT must pass prior to the first delivery of establishment or re-establishment of a production line.

2. All FAT items are subject to reverification at AT

3. All requirements for AT must be pass prior to acceptance of the fielded equipment under the DO

4. *- Data sheets/Spec sheets can be used as validation material that will provide enough data to address the requirement.

5. The contractor is responsible for meeting all applicable local, state, and federal laws and regulations.

6. Mechanisms, spare parts and all applicable documents required per the delivery order (DO) will be inventoried and inspected at AT

Government Testing Types
SOW 3.4.1First Article Test (FAT)The FAT units are to be produced from the production line utilizing the contractor’s established production line instructions and QA check points, and not individually fabricated samples. The contractor is to produce five SITs, two SATs, one MIT, and one MAT in support of the FAT requirements.
SOW 3.4.1First Article TestFAT is for the first production of each target type. All FAT events nust pass prior to the resumption of full-rate production.
SOW 3.4.2Physical Configuration Audit (PCA)Performed at FAT. The PCA inspects the system hardware and technical documentation for completeness and accuracy. The PCA verifies that the physical configuration of the system(s) and components correspond to the build-to BATL product baseline documentation, and includes inspection of inventory/equipment lists, documentation, spares, and manuals.
SOW 3.4.5Acceptance Testing (AT)The AT validates that the complete system works properly and can support live fire training missions at the range.
Government Verification Methods
InspectionExamination of product(s) or system(s) using one or more of the five senses. May include simple physical manipulation and measurement.
DemonstrationManipulation of the product(s) or system(s) as it is intended to be used
AnalysisVerification of product(s) or system(s) based on confirmed test restults
3.6Control System
All BATL mechanisms function utilizing TRACR II
PS 3.3.6.1Cross-TiesCross-ties are constructed from new material as specified in part 3 of the in the American Railway Engineering and Maintenance-of-Way Association (AREMA)
PS 3.3.6.1Cross-TiesThe cross-ties are a minimum size of Grade 6 (dimensions of 6” height by 8” width). The cross-tie standard Grade dimension remains consistent along the entire length of the cross-tie holding a tolerance of plus 1” and minus ¼”.
PS 3.3.6.1Cross-TiesContractor provided cross-ties are a length no less than 8’
aCross-TiesIf ballast is required to meet the stabilty requirement, the grading size is a two inch diamter or less

TM Testing Requirements

Ref #Requirement DescriptionAcceptance Event(s)Verification Method
Stationary Target Mechanisms
Stationarty Infanty Target (SIT)
PS 3.1.3SIT Mechanism Adjustability
SITs that are required to be bolted into emplacements include a system that allows for relocation of the mechanism 8”-12” backwards from its bolted locationFAT/ATDemonstration
PS 3.1.3SIT Mechanism Adjustability
The system accomplishes the relocation without unbolting the mechanism from the emplacement floor in less than 10 seconds by no more than one (1) range person.FATDemonstration
Stationary Armor Target (SAT)
PS 3.1.4SAT Lifting ArmsSAT arms include a minimum of 2 U-bot assemblies for short arms or 4 U-bolt assemblies for long armsFAT/ATInspection
PS 3.1.4SAT Lifting ArmsShort arms measure at 80" with 72" exposed and/or long arms measure at 44" with 36" exposedFATInspection
PS 3.1.4SAT Lifting ArmsThe U-bolt assemblies can be relocated throughout the length of the arms by the userFAT/ATDemonstration
Moving Target Mechanisms
PS 3.1.5Moving Target Mechanisms TrackMIT/MAT track are per the Gov't TDPFATInspection
PS 3.1.5Moving Target Mechanisms TrackAll Moving TM tracks are connected to the provided ground rod in the emplacementATInspection
PS 3.2.6Track BedTrack stanchions line up with existing or replaced railroad cross-tiesATInspection
General RequirementStackingTrack is stable with no visual deficienciesATInspection
General RequirementStakesTrack stakes do not raise from the ground, concrete, or cross-ties during consistent run of mechanismATInspection
Moving Infantry Target (MIT)
General RequirementMIT Silhouette OrientationThe MIT turntable functions as requiredFAT/ATDemonstration
Moving Armor Target (MAT)
General RequirementMAT Stop SafetyMAT safety stop/power cutoff is in working conditionFAT/ATDemonstration
General RequirementMAT Warning IndicatorMove warning indicator (audible) signal is evident during impending movement of the Moving TM.FAT/ATDemonstration
Special Target Mechanism Considerations
Portable Mechanisms
PS 3.1.6Portable SIT and SATPortable stationary TMs and all their components are mounted within the 3-D area of the self-contained unit (SCU). The target arm (when target is in the up position only), the target itself, the SAT target arms, and the radio antenna are the only components that have portions of each that extend beyond the 3-D areaFATInspection
PS 3.1.6Portable SIT and SATEach portable TM and component required for operation have a designated mounting location within the SCUFATInspection
PS 3.1.6Portable SIT and SATThe SCU has a mounting location to hold the SAT arms after they have been removed.FATInspection
PS 3.1.6Portable SIT and SATEach radio fits the designated mounting location for a radio within the SCU.FATInspection
PS 3.1.6Portable SIT and SATFor the TM and the components, the mounting provisions allow each to be removed from the SCU in less than five minutes.FATDemonstration
PS 3.1.6Portable SIT and SATThe design of the SCU includes at least two handles or grasp areas for SIT and four for the SATFATInspection
PS 3.1.6Portable SIT and SATThe SCU is made out of stainless steel or aluminumFAT*Analysis
PS 3.1.6Portable SIT and SATPortable device weights meet Table 1 requirementsFATDemonstration
PS 3.1.6Portable SIT and SATThe SCU stabilizes the TM and its associated components to allow them to meet their operational requirements when placed on unimproved (3% or less slope) ground and in winds up to 35 mph.FATDemonstration
Muzzle Flash Simulator (MFS)
General RequirementThe MFS operates in both a single shot and a multiple shot modeFAT/ATDemonstration
Non Automated Targetry Devices
Lifter shields (LS)
PS 3.3.3Lifter ShieldsThe LS is designed to be free standing.FATDemonstration
PS 3.3.3Lifter ShieldsThe LS is made from ballistic grade materials sufficient to withstand all rounds up to 7.62mm EPR shot at distances ranging from 25 meters and beyondFAT*Analysis
PS 3.3.3Lifter ShieldsThe LS is made from ballistic grade materials sufficient to withstand .50 cal ball ammunition (M2 Heavy Barrel Machine Gun) shot at a minimum distance of 0.25 milesFAT*Analysis
PS 3.3.3Lifter ShieldsThe LS is constructed such that front face or plate facing the shooter is angled. The front face plate angle shall dissipate energy and prevent ricochets, rounds, and splatter from bouncing back in the direction of the shooterFATInspection
PS 3.3.3Lifter ShieldsNo special tools are required for assembly of the LS. The LS has lift eyes and/or handles. The handles/ lift eyes are protected from damage due to normal firingFATInspection
PS 3.3.3Lifter ShieldsThe LS protects the TM and associated equipment from rounds shot from 20 degrees or less to either sideFAT*Analysis
PS 3.3.3Lifter ShieldsThe LS protects the TM from rounds shot from a minimum of 15 degrees aboveFAT*Analysis
PS 3.3.3Lifter ShieldsLS material withstands 500 rounds of 7.62mm and 1000 rounds of 5.56mm shot into a 3” square area with no evidence of penetration such that a subsequent round would result in failure of shield function.FAT*Analysis

General Testing Requirements

Ref #Requirement DescriptionAcceptance Event(s)Verification Method
General RequirementRange Start Up/ShutdownIt takes no more than 30 minutes to start up the range at the beginning of the training session and 30 min to shut down the range at the end of the training sessionATDemonstration
General RequirementBattle Effects Simulator (BES)BES fires as required, when applicableFAT/ATDemonstration
SOW 3.5.6Technical ManualsAll BATL and supplemental manuals are provided per SOW/DOATInspection
SOW 3.5.7New Equipment TrainingNew Equipment Training has been completedATInspection
BATL Target Mechanisms
PS 3.1.1BATL PerformanceTime to raise/lower the mechanisms meet the Table 1 requirementsFAT/ATDemonstration
PS 3.1.1BATL PerformanceTime to raise/lower the mechanisms in <=35 MPH wind meet the Table 1 requirementsFATDemonstration
PS 3.1.1BATL PerformanceMechanisms are <= max weight listed in Table 1FATDemonstration
PS 3.1.1BATL PerformanceMechanisms meet the minimum target visibility requirement listed in Table 1ATInspection
PS 3.1.1BATL PerformanceEach mechanisms cycle test meets the cycles per hour requirement listed in Table 1ATDemonstration
PS 3.1.1BATL PerformanceEach mechanisms cycle test meets half the cycles per 24 hour requirement listed in Table 1FATDemonstration
PS 3.1.1BATL PerformanceMoving mechanisms meet the speed and distance requirements listed in Table 1FATDemonstration
General RequirementMechanism PortsMechanisms contain no loose connections/portsFAT/ATInspection
PS 3.1.2Stability
Equipment necessary to maintain the position of the stationary TMs and the rail of the moving TMs in the emplacement are providedATInspection
PS 3.1.2StabilityThe stability method used allows for removal of the TM without damage to the TMFATInspection
PS 3.1.2StabilityThe TMs hold their respective targets upright and remain stable in winds up to 35 mphFATDemonstration
PS 3.1.2StabilityThe TMs perform all required functions without the system recording false hits, tipping over, or other malfunctions.FAT/ATInspection
PS 3.1.7
SOW 3.2.3.2SilhouetteAll silhouettes installed are per DO requirement and as defined in Appendix AATInspection
PS 3.1.7SilhouettesAll silhouettes are securely installedATInspection
PS 3.2.8ProtectionDownrange targetry devices and other support devices (except for the Solar panels, ILS, ALS, IMS, antennae, and IMKZT) are sized to fit inside the emplacement and are not subject to damage from rounds fired from the designated firing positionATInspection
SOW 3.3.3Range DataTMs provide initial status and operational status feedback on/within TRACRFAT/ATInspection
General RequirementHit Detection (All TM's)Mechanisms interface with Targetry Range Automated Control and Recording (TRACR) software hit sensitivity adjustment levels.FATDemonstration
General RequirementHit Detection (All TM's)RCS detects and scores a hit when the TM begins to raise the target and through each TMs full exposure timeFATDemonstration
General RequirementHit Detection (All TM's)Mechanisms stop reporting hits to the RCS when the TM starts to lower the targetFATDemonstration
SOW 3.3.4Lightening ProtectionThe equipment includes protection against lightning that passes over the range or strikes near the rangeFAT*Analysis
SOW 3.3.4.2GroundingAll installed hardware is connected to a ground rod in each emplacementATInspection
SOW 3.4.5.2Scenario TestingScenarios ran as required without any false hits on the target mechanisms and/or did not report out of communication/target failures.ATDemonstration
SOW 3.5.4Item Unique Identification (IUID)IUID labels are present on all required mechanisms/devicesFAT/ATInspection
Range Work
PS 3.2Range WorkAll emplacement/range work required is per the delivery order and environmental requirementsATInspection
PS 3.2
SOW 3.3Range WorkAll mechanisms are integrated with the range computer station using the power and data supplied, or as specified in the delivery orderATInspection
PS 3.2.7Target positionZinc coated hardware is used to anchor contractor provided equipmentFAT*Analysis
PS 3.2.7.1Existing Target Position EquipmentBolts are level with the floor and/or anchor bolts are removed w/o damaging the emplacement further than the holes already made by the bolt. Holes are cappedATInspection
SOW 3.3.4Lightening ProtectionAll lightning protection systems are developed in accordance with NFPA 780, 2023 Edition (Except Chapters 9-11).FAT*Analysis
SOW 3.3.4Lightening ProtectionTransient and surge protection devices are provided for all power linesFAT*Analysis
SOW 3.3.4Lightening ProtectionThe lightning protection system for the power lines include an indicator status light, be modular, and support ease of maintenance and replacement.FATInspection
SOW 3.3.4.2GroundingReplaced ground cables are 6 AWG copper conductors and are mechanically bonded to the existing ground rodATInspection
Power
General RequirementCentral Power SwitchAll downrange targetry devices are not negatively affected by turning on/shutting down the range by way of the central power switch.ATDemonstration
PS 3.2.10.1.1Power SourceTarget mechanisms are powered by DC onlyFATInspection
PS 3.2.10.1.1Power SourceCommercially available outlet adapters and power converters accommodating range outlet(s) is providedAT*Analysis
PS 3.2.10.1.1Power SourcePower converters use 240V AC only for input power (unless otherwise specified in the DO)FAT/GATInspection
PS 3.2.10.1.2Power InterfacesAll electrical circuitry are installed and grounded IAW applicable local, state, and federal electrical codes and regulations (i.e., NFPA 70)AT*Analysis
PS 3.2.10.1.2Power InterfacesAll hardware installed in emplacements are electrically grounded to the grounding rods.ATInspection
PS 3.2.10.1.4OCONUS PowerThe hardware installed on the ranges are altered as necessary to operate with the local voltage and frequency requirementsAT*Analysis
PS 3.2.10.1.4OCONUS PowerThe hardware is equipped with the electrical connectors required to receive the local voltage and frequency.AT*Analysis
PS 3.2.10.1.5Loss of PowerAll devices, including battery chargers and power supplies, are protected from damage in the event of loss of AC power.FAT*Analysis
PS 3.2.10.2.1GeneratorsDiesel fuel powered generators and/or gasoline powered generators are usedFATInspection
PS 3.2.10.2.1GeneratorsFuel tanks are labeled with the type of fuel used.FATInspection
PS 3.2.10.2.1GeneratorsGenerators have fuel tank capacity sized to support 20 hrs of training at the required cycle rates between refuelingFAT*Analysis
PS 3.2.10.2.1GeneratorsGenerators meet local, state, and federal laws and regulations (this includes fuel containers)FAT*Analysis
PS 3.2.10.2.1GeneratorsGenerators are equipped with a Ground Fault Circuit Interrupt (GFCI) outletFATInspection
PS 3.2.10.2.1GeneratorsGenerators include a protective frame (Excluding MIT/MATs on board generators)FATInspection
PS 3.2.10.2.1GeneratorsGenerators are equipped with a fuel gaugeFATInspection
PS 3.2.10.2.1GeneratorsGenerators include a wheel kit (Excluding MIT/MATs on board generators)FATInspection
PS 3.2.10.2.1GeneratorsGenerators include a fuel spill containment pan (Excluding MIT/MATs on board generators)FATInspection
PS 3.2.10.2.1GeneratorsGenerators provide a L14-30 receptacle ®FATInspection
PS 3.2.10.2.1Regeneration DevicesThe regeneration devices provide power to operate the range for 24/7 on a continuous basis without loss of training to regenerate the power.FAT*Analysis
PS 3.2.10.2.1Regeneration DevicesRegeneration units have features that protect against overcharging and overheating the battery
FAT*Analysis
PS 3.2.10.2.2Battery Powered DevicesBatteries are sealed Lithium Iron or Absorbent Glass Mat (AGM)FATInspection
PS 3.2.10.2.2Battery Powered DevicesEach battery is equipped with carrying handles. All batteries are commercially available from multiple sources.FATInspection
PS 3.2.10.2.2Battery Powered DevicesOn board batteries meet the specifications defined in the BATL TDPFATInspection
PS 3.2.10.2.3Battery SizingBatteries supplying power within an emplacement are sized to support the operational capability (see Table 1) of all devices in that emplacement.AT*Analysis
PS 3.2.10.2.3Battery SizingBatteries on a moving TM are sized to support the operational capacity of all installed lifters, and all other devices the moving TM is required to carry and power.AT*Analysis
PS 3.2.10.2.4Battery ChargingBattery chargers are approved for use with the chemical composition of the batteries provided under the DOFAT*Analysis
PS 3.2.10.2.4Battery ChargingThe battery charger limits float charge to between 2.25 and 2.3 volts per cell at 68 degrees Fahrenheit (F).FAT*Analysis
PS 3.2.10.2.4Battery ChargingThe battery charger is spark proof such that leads must be connected before an output voltage is developed by the battery chargerFAT*Analysis
PS 3.2.10.2.4Battery ChargingThe battery charger is short circuit protected such that the charger can sustain an indefinite short circuit connection directly across the output terminals without risk of electric shock or excessive heat.FAT*Analysis
PS 3.2.10.2.4Battery ChargingThe battery charger is reverse polarity protected such that leads being connected to the opposite polarity post will not cause damage to either the battery or the chargerFAT*Analysis
PS 3.2.10.2.4Battery ChargingThe battery charger is UL tested and approvedFAT*Analysis
PS 3.2.10.2.5Battery Charging Station (BCS)Battery Charging Stations charges all battery types used on downrange devicesFAT*Analysis
PS 3.2.10.2.6Solar PanelsSolar panels are UL1703 ratedATInspection
PS 3.2.10.2.6Solar PanelsA charge controller is provided with each solar panel assembly connected to a batteryFATInspection
PS 3.2.10.2.6Solar PanelsThe charge controller regulates the voltageFAT*Analysis
PS 3.2.10.2.6Solar PanelsThe charge controller prevents overcharging of the batteryFAT*Analysis
PS 3.2.10.2.6Solar PanelsThe battery controller provides protection for reverse polarityFAT*Analysis
PS 3.2.10.2.6Solar PanelsThe battery controller provides protection for transient voltageFAT*Analysis
PS 3.2.10.2.6Solar PanelsThe battery controller provides protection for over currentFAT*Analysis
PS 3.2.10.2.6Solar PanelsThe battery controller provides protection for over temperatureFAT*Analysis
Communication
PS 3.2.11.2
PS 3.2.11.3HW/RF CommunicationAll required communication interfaces are in the NEMA enclosuresATInspection
PS 3.2.11.2
PS 3.2.11.3HW/RF CommunicationAll NEMA rated enclosures maintain the NEMA rating at the conclusion of installationATInspection
PS 3.2.11.2
PS 3.2.11.3HW CommunicationAll holes not used in the NEMA enclosures are plugged with NEMA 4 rated enclosure plugs to maintain the NEMA ratingATInspection
PS 3.2.11.2.3Network DevicesNetwork equipment not installed in a climate control environment operates at temp between -20 and 120 degreesFAT*Analysis
PS 3.2.11.2.4VDSL ModemsMeet all requirments of 3.2.11.2.4 in the Performance SpecificationsFAT*Anaylsis
PS 3.2.11.3.1RF CommunicationRadio used meets BATL specifications and frequency specifications in the DOFAT/AT*Analysis
PS 3.2.11.3.1Frequency BandTransmitters and receivers operate using either the 138 to 160 Megahertz (MHz) Very High Frequency (VHF), 380-400 MHz Ultra High Frequency (UHF), the 406 to 420 MHz (UHF), the 900 MHz (802.11ah), the 2.4 Gigahertz (GHz) (802.11b/g/n/ax/be), or 5 GHz (802.11a/h/j/n/ac/ax/be) bandsFAT*Anaylsis
PS 3.2.11.3.1Frequency BandThe HHC, RCC, and all RF down range receivers/transmitters are tunable through each band by range support personnel without changing internal componentsFATDemonstration
PS 3.2.11.3.1Frequency BandRF transmitters/receivers meet all Federal Communications Commission (FCC) requirements.FAT*Analysis
PS 3.2.11.3.1Frequency Band (Portable)Portable targetry devices include the VHF, UHF and/or WiFi bandsFATInspection
PS 3.2.11.3.2Radio ApprovalThe radio(s) have a JF/12 number or is in the process of being approvedFAT/AT*Analysis
PS 3.2.11.3.2Radio ApprovalRadios are in a NEMA 4 rated enclosure (unless otherwise specified in the DO)ATInspection
PS 3.2.11.3.3Transceiver BandwidthAll UHF and VHF radio transmitters and receivers utilize narrow bandwidth technology (12.5 kilohertz (kHz) or less) IAW the National Telecommunications and Information Administration (NTIA).FAT*Analysis
PS 3.2.11.3.4Tuning DevicesAll equipment required to tune the transmitters/receivers are provided with the installation of the range.ATInspection
PS 3.2.11.3.6Transmitter Power AdjustmentPower output of the transmitters are adjustable in at least 5 stepsFAT*Analysis
PS 3.2.11.3.6Transmitter Power AdjustmentThe adjustment in power communicates with targetry devices at distances up to 5 miles (up to 3 miles for ranges where the HHC is the only RCS controller)FAT*Analysis
PS 3.2.11.3.7Radio AntennasAntennas are within emplacements and protected from rounds fired from firing line and/or placed outside the emplacement (off to the side) if proper LOS cannot be establishedATInspection
PS 3.2.11.3.8Antenna SafetyAntenna tips or other sharp rods have tip caps or other suitable design fixture to prevent puncture hazards where personnel are likely to be exposed to such hazards.FATInspection
PS 3.2.11.3.8Antenna SafetyWhere design considerations permit, antennas are coated with a dielectric material to insulate against at least 10,000 volts Root Mean Squared (RMS).FAT*Analysis
PS 3.2.11.3.8Antenna SafetyAntenna masts incorporate a ground stud with the necessary hardware to permit secure attachment of a ground strap/rod.ATInspection
PS 3.2.11.3.8Antenna SafetyLead-in wires have discharge units (lightning arrestors) on each conductor or enclosure in a continuous metallic shield that is effectively grounded; coaxial cable lead-in may be used as is if the outer shields are grounded at both endsATInspection
PS 3.2.11.3.8Antenna SafetyAntennas and other devices that carry sufficient RF voltage to burn or injure personnel are protected from accidental contact in the same manner as for AC voltages.ATInspection
PS 3.2.11.3.8Antenna SafetyMicrowave or RF radiation signs are permanently affixed to warn personnel of danger zones.ATInspection
Thermals
PS 3.3.2.1AC ThermalsAll AC powered stationary mechanisms have a thermal interface cable/set up with an interface box that mates with the mechanism auxillary thermal receptacle and provides a Locking (L) 5-20 Receptacle on the thermal sideFAT/ATInspection
PS 3.3.2.1AC ThermalsAll AC powered mechanisms Interface box is rated Ingress Protection (IP) 67FAT*Analysis
PS 3.3.2.1AC ThermalsThe AC powered MATs have a thermal interface cable/set up with an interface box that mates with the mechanism auxillary thermal receptacle and provides a Locking (L) 5-20 Receptacle on the thermal sidepending decision in PS
PS 3.3.2.1AC ThermalsA 36" long cable with a L5-20 plug on one side and a two pin SAE connector on the other is provided for all AC thermal interfacesFAT/ATInspection
PS 3.3.2.1
PS 3.3.2.2AC/DC ThermalsAll thermals turn on/off from RCSFAT/ATDemonstration
PS 3.3.2.2DC ThermalsAll stationary mechanisms that are not HW for power have a thermal interface cable/setup with an interface box mating to the target auxillary thermal receptacle on one side and provides a two pin SAE connector on the target sideFAT/ATInspection
PS 3.3.2.2DC ThermalsAll MATs not in HW emplacements have a thermal interface cable/setup with an interface box that mates with the target mechanism auxilary thermal receptacle on one side and a two pin SAE connector on the target sideFAT/ATInspection
PS 3.3.2.2
PS 3.3.2.3DC/MIT ThermalsThe cable with the two pin SAE connector is a minimum of 36" longFAT/ATInspection
PS 3.3.2.3MIT ThermalsAll MITs have a thermal interface cable/setup that mates with the mechanisms auxillary thermal receptacle on one side and provides a two pin SAE connector on the target sideFAT/ATInspection
PS 3.3.2.3MIT ThermalsDC power draws directly from the target mechanism auxillary thermal receptacleFAT/ATDemonstration
Cables, Wires & Surge Protection
PS 3.1.9.1Interface CablingCables are mechanically and electrically insulated. Holes are large enough to allow the cable to be freely drawn through the opening. Cables are protected with conduit or PVC sleeving.AT*Analysis
PS 3.2.11.2.2Cable InterfacesAll downrange devices include enclosure mounted twist lock or threaded connectors for all external connectionsATInspection
PS 3.2.11.2.2Cable InterfacesAll external connections, including TDP/MTDPs and Ferrous Deep (FD) boxes, include a mating twist lock or threaded cap, tethered to the device.ATInspection
PS 3.2.11.2.2Cable InterfacesAll MTDP/TDPs, CJBs and/or FD Boxes have the M12 Speedcon connector installedATInspection
PS 3.2.11.2.2Cable InterfacesIf an FD box is present on the range, the blank face plate is removed and a face plate that includes one (1) M12 Speedcon connector is installed onto the FD boxATInspection
PS 3.2.11.2.2Cable InterfacesThe face plate shall maintain a NEMA 3R rating for the FD BoxATInspection
PS 3.2.11.2.2Cable InterfacesIf an FD box is not present on the range these connectors are mounted to the side wall of the TDP/MTDP enclosure facing the emplacement power receptaclesATInspection
PS 3.2.11.2.5Surge ProtectionThe surge protectors are grounded IAW manufacturer specificationsATInspection
PS 3.2.11.2.5Surge ProtectionSurge protectors are lightning ratedAT*Analysis
PS 3.2.11.2.5Surge ProtectionSurge protector response time is 1 - 5 NanosecondsAT*Analysis
PS 3.2.11.2.5Surge ProtectionThe surge protectors are Underwriter’s Laboratory (UL) listedAT*Analysis
PS 3.2.11.2.5Surge ProtectionSurge protection devices in the TDP/MTDP fit in a 5 inch (”) wide by 6” long by 6” deep space.FATInspection
PS 3.2.11.2.5.1Surge protection for Ethernet.Surge protectors meet or exceed TIA-568-C.2 Standards for CAT5e performance.AT*Analysis
PS 3.2.11.2.5.1Surge protection for Ethernet.Surge protectors shall utilize RJ-45 connectors for input/outputAT*Analysis
PS 3.2.11.2.5.1Surge protection for Ethernet.Surge protection devices in target emplacements can be auto-resettableATDemonstration
PS 3.2.11.2.5.1Surge protection for Ethernet.The surge protection device have a clipping voltage between 12-20 Volts (V)AT*Analysis
PS 3.2.11.2.5.1Surge protection for Ethernet.Surge protectors protect the equipment on the targetry side from lightning and other surgesAT*Analysis
PS 3.2.11.2.5.2Surge protection for VDSLThe surge protection device have a peak clamping voltage Between 48 and 300 Volts (V)AT*Analysis
PS 3.2.11.2.5.2Surge protection for VDSLThe surge protection device have a maximum shunt capacitance of 95 picofarads.AT*Analysis
PS 3.2.11.2.6Cables and Patch CordsThe vendor provided and installed patch cords and adapters between the surge protectors, the modem, and the existing range data cablesATInspection
PS 3.2.11.2.6Cables and Patch CordsVendors did not terminate RJ-45 connectors into RJ-11 ports and vice versa.ATInspection
PS 3.2.9Power and data wires/cablesAll cables necessary to interface with the range infrastructure and to operate the targetry devices are providedATInspection
PS 3.2.9Power and data wires/cablesCables are IAW applicable local and national electrical codes. Cable are not lengthened by splicing if discovered to be too short within an emplacementATInspection
PS 3.2.9Power and data wires/cablesShort cables are replaced with cables of the proper length. CAT 5E, 6, or 7 data cabling are color coded IAW TIA-568-C2.ATInspection
PS 3.2.9Power and data wires/cablesExterior wires and cables are armored and sealed to prevent damage by non-human living organisms found on rangesFAT*Analysis
PS 3.2.9Power and data wires/cablesInterior wires and cables are positioned or protected to avoid pinching, contact with rough or irregular surfaces and sharp edges to avoid damage to conductorsFAT/ATInspection
SOW 3.3.4Lightening ProtectionData/communication cables are shielded. The individual data lines are electrically isolated from the electronic control circuitry in the equipment and have appropriate transient and surge protectionFAT*Analysis
Production
SOW 3.2.4QA/QCQA/QC plan and processes for vendor supplies per SOW 3.2.4FATInspection
SOW 3.2.5WorkmanshipAll surfaces, including threads, are free of burrs and sharp edges and in compliance to the BATL TDP assembly instructionsFAT/ATInspection
TDP/Drawings/TMWorkmanshipBATL mechanisms are made according to the BATL TDP/drawing packagesFATInspection
General RequirementWorkmanshipAll interior parts and surfaces of the devices are thoroughly cleaned and dried, and are free of dust, burrs, chips, grinding compound, mold release agents, or other debrisATInspection
TDP/Drawings/TMMaterial Safety ConsiderationsLiquids are IAW BATL TDP/Drawing/TM requirementsFATInspection
TDP/Drawings/TMAdhesivesApplied Adhesives meet the requirements of the TDP/Drawing/TMFATInspection
SOW 3.2.6Materials/Commercial ComponentsAll materials are of uniform quality and condition, and free from seams, cracks, and other defects that may adversely affect the strength, endurance, wear, and corrosion resistance of the partFAT/ATInspection
SOW 3.2.7Corrosion ResistanceAll exposed surfaces are constructed of or treated with a corrosion resistant materialFAT*Analysis
Materials/Commercial ComponentsMaterial defects are not concealedATInspection
SOW 3.4.1Water SubmersionMechanisms (not including carriers) can be totally submerged in water for 4 hrs.FATDemonstration
PS 3.3.1.1Materials/Commercial ComponentsMaterials are not subject to damage by non-human living organisms on exposed portions of downrange equipmentFAT/ATInspection
PS 3.3.1.1Materials/Commercial ComponentsMaterials of construction use commercial or military standard components, parts, and assemblies of reliable constructionFAT*Analysis
Labeling
PS 3.3.1.2SafetyWarning labels for equipment and moving parts that describe potential hazards are providedFAT/ATInspection
SOW 3.5.9Identification Plates/Contractor PlateA plate is located in the tower near the computer.ATInspection
SOW 3.5.9Identification Plates/Contractor PlateIf there isn’t a tower on the range, then the contract data plate is attached to the HHC in a location that does not interfere with battery replacementATInspection
SOW 3.5.9Identification Plates/Contractor PlateContract data plates installed on the HHC withstand the installation location's environmental conditionsAT*Analysis
SOW 3.5.9Identification Plates/Contractor PlateThe contract data plates identify the requirements in this sectionATInspection
SOW 3.5.10.1Mechanism LabelsTargetry device ports and cables are labeledFAT/ATInspection
SOW 3.5.10.2Cable LabelsAll cables installed are labeled at each cable termination and are legibleATInspection
SOW 3.5.10.3Server Room LabelsAll lines in the range tower, server room or other area associated with the equipment installation are clearly labeled and legibleATInspection
Additional Range Equipment and Requirements
PS 3.3.1.3Transportation of HardwareEquipment to be carried or lifted by personnel have handles and/or grasp areas that meet MIL-STD-1472G paragraph 5.8.6.5.3FAT*Analysis/Inspection
PS 3.3.1.4Service LifeVendor provided equipment is constructed to achieve a minimum service life of 20 years, except for batteries.FAT*Analysis
PS 3.3.1.5Environmental RequirementsAll contractor provided equipment and materials not installed in a climate controlled enclosure or structure on the range operate under the specified environmental conditions without damage or loss of performance (Unless otherwise noted in the applicable RFDOP)FAT*Analysis

KD_IM_Testing Requirements

Ref #Requirement DescriptionAcceptance Event(s)Verification Method
Iron Maiden Targets
PS 3.3.5Iron Maiden TargetsIron Maidens consist of three pieces: the IMKZT, the base, and the IMSFATInspection
PS 3.3.5Iron Maiden TargetsThe material(s) used for the IMS and IMKZT do not present ricochet hazards to the shooters when fired upon at distances between 100m and 1,000m (.50 Cal will be fired upon at a minimum of 400m).FAT*Analysis
PS 3.3.5.1Target BaseThe Iron Maiden base holds the IMS and the IMKZT at their established positions described in paragraphs 3.3.5.2 & 3.3.5.3.FATDemonstration
PS 3.3.5.1Target BaseAll stabilization components are provided with the baseFAT/ATInspection
PS 3.3.5.1Target BaseStabilization methods of anchoring into the ground are not used.FAT/ATInspection
PS 3.3.5.1Target BaseAll components of the target base fit behind and are fully protected by the IMSFAT/ATInspection
PS 3.3.5.1Target BaseThe target base includes carrying handles for portability purposes.FATInspection
PS 3.3.5.1Target BaseThe target base is considered part of the IMKZT.FATInspection
PS 3.3.5.2Iron Maiden Silhouettes (IMS)IMSs have an E-type target shape and are within the parameters of Appendix BFATInspection
PS 3.3.5.2Iron Maiden Silhouettes (IMS)The IMS are made out of through hardened 3/8”, AR500 steel.FAT*Analysis
PS 3.3.5.2Iron Maiden Silhouettes (IMS)The Kill Zone area are cut out of the target to the dimensions of APPENDIX BFAT*Analysis
PS 3.3.5.2Iron Maiden Silhouettes (IMS)The Kill Zone area provides an open space for rounds to pass through to the IMKZTFATInspection
PS 3.3.5.2Iron Maiden Silhouettes (IMS)IMSs withstand 500 rounds of 7.62mm and 1000 rounds of 5.56mm shot into a 3” square area with no evidence of penetration such that a subsequent round would result in failure of shield functionFAT*Analysis
PS 3.3.5.2Iron Maiden Silhouettes (IMS)The IMS are angled forward 80 degrees to 85 degrees from horizontal.FAT*Analysis
PS 3.3.5.2Iron Maiden Silhouettes (IMS)When angled, the IMS and the Kill Zone cut-out area dimensions are sized to present to the shooter a target with the dimensions shown in APPENDIX BFAT*Analysis
PS 3.3.5.2Iron Maiden Silhouettes (IMS)Four (4) carrying handles are attached to the silhouetteFATInspection
PS 3.3.5.2Iron Maiden Silhouettes (IMS)Two handles are at the base and two shall be at the shoulder, on each side of the IMSFATInspection
PS 3.3.5.2Iron Maiden Silhouettes (IMS)The method of attaching the handles to the IMS do not alter the ballistic properties of the IMS.FATDemonstration
PS 3.3.5.3Iron Maiden Kill Zone Target (IMKZT)IMKZTs is made out of through hardened, 3/8”, AR500 steelFAT*Analysis
PS 3.3.5.3Iron Maiden Kill Zone Target (IMKZT)IMKZTs is positioned behind the kill zone area of the silhouetteFATInspection
PS 3.3.5.3Iron Maiden Kill Zone Target (IMKZT)IMKZTs dimensions are at least 2” larger than the kill zone area dimensions of the IMS.FATInspection
PS 3.3.5.3Iron Maiden Kill Zone Target (IMKZT)IMKZTs provide a visual queue to the shooter and spotter when it receives a hitFATDemonstration
PS 3.3.5.3Iron Maiden Kill Zone Target (IMKZT)The visual feedback is more than a round impact disrupting a painted surfaceFATInspection
PS 3.3.5.3Iron Maiden Kill Zone Target (IMKZT)If the determined visual queue requires the IMKZTs to be moved by the round to show it has been hit, then the IMKZTs include an auto reset mechanism (without user intervention) to bring the target back to its original positionFATDemonstration
PS 3.3.5.3Iron Maiden Kill Zone Target (IMKZT)The visual feedback method is moveable by a minimum of a fired 7.62mm round throughout the 100-1000m rangeFAT*Analysis
Known Distance Lifters
PS 3.3.4Known Distance (KD) LiftersKD lifters raise and lower 72” by 72” framed targets IAW training requirements stated in FM 3-22.9FATInspection
PS 3.3.4Known Distance (KD) LiftersKD lifters are anchored to the emplacement.ATInspection
PS 3.3.4Known Distance (KD) LiftersThe anchoring method withstands constant winds up to and including 35 mph.FATDemonstration
PS 3.3.4.1KD Lifting CapabilitiesAll target lifting features are fully protected by the emplacement.ATInspection
PS 3.3.4.1KD Lifting CapabilitiesThe KD lifter fully exposes and fully conceas a 72” by 72” target above and behind, respectively the emplacement wallATInspection
PS 3.3.4.1KD Lifting CapabilitiesIf a roller chain and sprocket solution is utilized, bearings are lifetime lubricated or greaseless, and roller chains and sprockets require lubrication no less than every 1,000 liftsFAT*Analysis
PS 3.3.4.1KD Lifting CapabilitiesChains meet ANSI B 29.1M requirementsFAT*Analysis
PS 3.3.4.1KD Lifting CapabilitiesChains can be repaired by replacing individual linksFATDemonstration
PS 3.3.4.1KD Lifting CapabilitiesThe total lift weight of the KD lifter components and target to be raised is no more than 40 lbs to the operator.FATDemonstration
PS 3.3.4.1KD Lifting CapabilitiesThe target locks into position at the target mounting position, the fully exposed position, and the fully concealed.ATDemonstration
PS 3.3.4.1KD Lifting CapabilitiesThe lifter requires the operator to manually release the locking method to move to the desired positionATDemonstration
PS 3.3.4.1KD Lifting CapabilitiesThe locking setup is releasable by one hand in less than 1 second.FATDemonstration
PS 3.3.4.2KD PlatformKD platforms are free standing and moveable. Platforms shall be a minimum of 20" by 20" (L” x W”).FATInspection
PS 3.3.4.2KD PlatformThe design working load of the movable platform is calculated on the basis of one or more 200 lb persons with 50 lbs of equipment each.FAT*Analysis
PS 3.3.4.2KD PlatformThe moveable platform is constructed to carry a working load of 75 lbs per square foot.FAT*Analysis
PS 3.3.4.2KD PlatformThe platformis slip resistantFATInspection