RFP_LTRaC-MAC1_SectionJ-Attach-2_CDRLs_Draft_RFP.pdf

PDF 1005 KB Posted

Attached to
Live Training, Ranges, and Combat Training Centers (LTRaC) Multiple Award Contract (MAC) 1
Solicitation number
W900KK-25-R-0001
Issued by

About this file

This document is a draft Request for Proposal (RFP) for the Live Training, Ranges, and Combat Training Centers (LTRaC) Multiple Award Contract (MAC) 1 under solicitation number W900KK-25-R-0001. The key details are:

The U.S. Army Contracting Command-Orlando (ACC-ORL) has a requirement to establish the LTRaC MAC 1 to provide and install live-fire training systems to support military ranges worldwide. The systems will utilize the Government-provided Basic Army Target Lifter (BATL) Technical Data Package and allow for minor modifications to meet military needs. The contract will include presentation devices (Stationary/Moving Infantry and Armor Targets), communication devices, commercial targets, ancillary hardware, and IT hardware with range control software. The Government is requesting industry feedback on all aspects of the draft RFP, including requirements, SOW, CLIN structure, schedules, proposal instructions, evaluation criteria, and other programmatic risk issues. Feedback is due by 2:00 PM EST, November 18, 2024. The Government will consider the comments in preparation of the final RFP but will not pay for any information received.

View the file

Other files

File Type Posted
LTRaC-MAC1_Draft-RFP-Industry-Questions-Govt-Answers_Jan2025.xlsx XLSX spreadsheet
Appendix K - Performance Specifications_17Sep2024.docx DOCX document
Appendix K - Performance Specifications_17Sep2024.docx DOCX document
Appendix B - Example Iron Maiden Target.pdf PDF
RFP_LTRaC-MAC1_SectionJ-Attach-4_DRAFT-RFP-Questions-Comments-Form.xlsx XLSX spreadsheet
Appendix L - TRACR II Software Installation Guide.docx DOCX document
Appendix G - Government Test Checklist.xlsx XLSX spreadsheet
Appendix E - DO_3_Rilea-ARF_JBLM-MRF_Yakima-MPTR.xlsx XLSX spreadsheet
Appendix C - Anticipated FY25 and FY26 Delivery Orders_as-of-23Sep2024.pdf PDF
Appendix K - Performance Specifications_17Sep2024.docx DOCX document
Appendix A - Example of Target Silhouettes_30May2024.pdf PDF
Appendix J - FASIT II ICD_4Mar2024.pdf PDF
RFP_LTRaC-MAC1_SectionJ-Attach-1_SOW_29Oct2024.docx DOCX document
Appendix D - DO_2_Blanding-ARF_Liberty-MPMG.xlsx XLSX spreadsheet
Appendix F - LT2 Distribution Agreement.pdf PDF
Appendix I - PRF-PT-00468_FASIT_v5_9f_15Jan2008.pdf PDF
RFP_LTRaC-MAC1_SectionJ-Attach-6_Preaward Survey of Prospective Contractor Accounting System Checklist.pdf PDF
Draft-RFP_W900KK-25-R-0001_LTRaC-MAC1_31Oct2024.pdf PDF
RFP_LTRaC-MAC1_SectionJ-Attach-3_ Annex-to-Exhibit-A_LPD_23Sep2024.docx DOCX document
RFP_LTRaC-MAC1_SectionJ-Attach-5_Contractor Performance Assessment Questionnaire.docx DOCX document
Appendix H - HW_RF_WiFi Ranges_Baseline_Test_Procedure_draft.docx DOCX document
Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SFAE-STRI-TRADE-TTS

6. REQUIRING OFFICE

SOW PARAGRAPH: 3.4.4

5. CONTRACT REFERENCE

DI-NDTI-80809B

4. AUTHORITY (Data Acquisition Document No.)

3. SUBTITLE

N/ATest/Inspection Report

2. TITLE OF THE DATA ITEM

A001

1. DATA ITEM NO.

F. CONTRACTOR

TBD

E. CONTRACT/PR NO.

LTRaC ID/IQ MAC 1

D. SYSTEM/ITEM

TDP

C. CATEGORY

TM OTHER NDTIA

B. EXHIBITA. CONTRACT LINE ITEM NO.

N/A

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

Form Approved OMB No. 0704-0188

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

N/A

8. APP CODE

DD

7. DD 250 REQ

A

9. DIST STATEMENT

REQUIRED

13.DATE OF SUBSEQUENT

SUBMISSION

SEE BLOCK 16

11. AS OF DATE

N/A

SEE BLOCK 16

12.DATE OF FIRST

SUBMISSION

ASREQ

10. FREQUENCY

ReproReg

Final

Draft

b. COPIES

a. ADDRESSEE

14. DISTRIBUTION

J. DATEI. APPROVED BYH. DATEG. PREPARED BY

BLOCK 10: A SEPARATE TEST REPORT SHALL BE COMPLETED FOR EACH

BASELINE TEST WITHIN A DELIVERY ORDER.

BLOCK 12: THE TEST REPORT SHALL BE DUE 7 CALENDAR DAYS AFTER

COMPLETION OF THE BASELINE TEST.

BLOCK 13: SUBSEQUENT SUBMISSIONS DUE FOR EACH BASELINE TEST EVENT.

BLOCK 14: SHALL BE DELIVERED VIA WIDE AREA WORKFLOW (WAWF). THE

CONTRACTOR SHALL INITIATE A ZERO COST RECEIVING REPORT IN WIDE

AREA WORKFLOW (WAWF) TO THE TECHNICAL OFFICE RESPONSIBLE FOR

THE REVIEW/APPROVAL OF THE DATA ITEM PER BLOCK 6, REQUIRED FOR

EACH DATA ITEM SUBMISSION (INITIAL AND SUBSEQUENT SUBMISSIONS)

TO THE GOVERNMENT. ALL DOCUMENTS AND GRAPHIC PACKAGES USED TO

CREATE FIGURES, TABLES AND CHARTS SHALL READABLE USING MICROSOFT

OFFICE 365. IF UNABLE TO SUBMIT VIA WAWF DUE TO FILE SIZE OR

FORMAT, A COVER PAGE SHALL BE SUBMITTED VIA WAWF AND THE

DELIVERABLE SHALL BE ELECTRONICALLY MAILED OR DELIVERED VIA DOD

SAFE TO THE APM, COR AND LEAD ENGINEER. DOD SAFE CAN BE LOCATED

AT THE FOLLOWING URL: SAFE.APPS.MIL

THE GOVERNMENT WILL HAVE 14 CALENDAR DAYS FOR REVIEW AND

ACCEPTANCE OR REJECTION OF EACH SUBMISSION.

THE CONTRACTOR SHALL INCORPORATE GOVERNMENT COMMENTS WITHIN 10 CALENDAR DAYS.

CONTRACTOR FORMAT IS ACCEPTABLE.

ALL CDRLS SUBMITTED AFTER 4:00PM EST ON FRIDAY AFTERNOON WILL BE

CONSIDERED SUBMITTED ON THE NEXT GOVERNMENT WORKDAY.

16. REMARKS SEE BLOCK 16

000 15. TOTAL

18.ESTIMATED

TOTAL PRICE

17. PRICE GROUP

Page 1 of 1 PagesPREVIOUS EDITION MAY BE USED.DD FORM 1423-1, FEB 2001

SOW PARAGRAPH: 3.5.1

5. CONTRACT REFERENCE

DI-SESS-81758A

4. AUTHORITY (Data Acquisition Document No.)

3. SUBTITLE

N/ALOGISTICS PRODUCT DATA

2. TITLE OF THE DATA ITEM

A002

1. DATA ITEM NO.

F. CONTRACTOR

TBD

E. CONTRACT/PR NO.

LTRaC ID/IQ MAC 1

D. SYSTEM/ITEM

TDP

C. CATEGORY

TM OTHER SESSA

B. EXHIBITA. CONTRACT LINE ITEM NO.

N/A

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

Form Approved OMB No. 0704-0188

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

A

8. APP CODE

DD

7. DD 250 REQ

D

9. DIST STATEMENT

REQUIRED

13.DATE OF SUBSEQUENT

SUBMISSION

SEE BLOCK 16

11. AS OF DATE

N/A

SEE BLOCK 16

12.DATE OF FIRST

SUBMISSION

ASREQ

10. FREQUENCY

ReproReg

Final

Draft

b. COPIES

a. ADDRESSEE

14. DISTRIBUTION

J. DATEI. APPROVED BYH. DATEG. PREPARED BY

BLOCK 3: THIS CDRL SHALL INCLUDE:

-LSA-004 MAINTENANCE ALLOCATION CHART

-LSA-151 PROVISIONING PARTS LIST (PPL)

-LSA-037 INITAIL SPARES/REPAIR PARTS LIST (ISL)

-LSA-074 TOOL AND TEST EQUIPMENT (TTE)

-LSA-080 BILL OF MATERIALS

THE FOLLOWING REPORTS ARE REQUIRED TO BE DELIVERED VIA

ELECTRONIC MAIL USING MICROSOFT OFFICE 365.

-MASS CREATE PROCESS LIST (MANP)

-MATERIEL COMPONENT LIST (MCL)

-LOGISTICS PRODUCT DATA STORE LIST (LPDS)

BLOCK 8: GOVERNMENT APPROVAL IS REQUIRED UPON EACH SUBMITTAL.

BLOCK 9: DISTRIBUTION STATEMENT D: DISTRIBUTION AUTHORIZED TO

THE DEPARTMENT OF DEFENSE AND U.S. DOD CONTRACTORS ONLY. DUE TO

ADMINISTRATIVE USE, THIS DETERMINATION WAS MADE ON 14 DECEMBER

2023. OTHER REQUESTS FOR THIS DOCUMENT MUST BE REFERRED TO U.S.

ARMY PROGRAM EXECUTIVE OFFICE, SIMULATION, TRAINING, AND

INSTRUMENTATION, (PEO STRI), ATTN: SFAE-STRI-TRADE-TTS, 12211

SCIENCE DR., ORLANDO, FL 32826-3224.

BLOCK 10: UPDATES ARE REQUIRED WHEN PARTS/COMPONENTS CHANGE IN

THE BASELINE CONFIGURATION

BLOCK 12: SUBMITTAL SHALL BE 120 CALENDAR DAYS PRIOR TO EQUIPMENT FIELDING.

BLOCK 13: SUBSEQUENT SUBMISSIONS SHALL BE DUE 90 WORKING DAYS

PRIOR TO EQUIPMENT FIELDING, TO SUPPORT CHANGES IN SYSTEMS

CONFIGURATION THROUGHOUT THE LIFE OF THE CONTRACT.

THE GOVERNMENT SHALL HAVE 30 CALENDAR DAYS FOR REVIEW AND

ACCEPTANCE OR REJECTION OF EACH SUBMISSION.

THE CONTRACTOR SHALL HAVE 15 CALENDAR DAYS TO INCORPORATE.

BLOCK 14: SHALL BE DELIVERED VIA WIDE AREA WORKFLOW (WAWF). THE

CONTRACTOR SHALL INITIATE A ZERO COST RECEIVING REPORT IN WIDE

AREA WORKFLOW (WAWF) TO THE TECHNICAL OFFICE RESPONSIBLE FOR

THE REVIEW/APPROVAL OF THE DATA ITEM PER BLOCK 6, REQUIRED FOR

EACH DATA ITEM SUBMISSION (INITIAL AND SUBSEQUENT SUBMISSIONS)

TO THE GOVERNMENT. ALL DOCUMENTS AND GRAPHIC PACKAGES USED TO

CREATE FIGURES, TABLES AND CHARTS SHALL READABLE USING MICROSOFT

OFFICE 365. IF UNABLE TO SUBMIT VIA WAWF DUE TO FILE SIZE OR

FORMAT, A COVER PAGE SHALL BE SUBMITTED VIA WAWF AND THE

DELIVERABLE SHALL BE ELECTRONICALLY MAILED OR DELIVERED VIA DOD

SAFE TO THE APM, COR AND LEAD LOGISTICIAN. DOD SAFE CAN BE

LOCATED AT THE FOLLOWING URL: SAFE.APPS.MIL

16. REMARKS SEE BLOCK 16

000 15. TOTALSee continuation sheet...

18.ESTIMATED

TOTAL PRICE

Page 1 of 2 PagesPREVIOUS EDITION MAY BE USED.DD FORM 1423-1, FEB 2001

16. REMARKS (Continued) ALL CDRLS SUBMITTED AFTER 4:00PM EST ON FRIDAY AFTERNOON WILL BE CONSIDERED SUBMITTED ON THE NEXT GOVERNMENT WORKDAY.

F. CONTRACTOR

TBD

E. CONTRACT/PR NO.

LTRaC ID/IQ MAC 1

D. SYSTEM/ITEM

TDP

C. CATEGORY

TM OTHER SESSA

B. EXHIBITA. CONTRACT LINE ITEM NO.

N/A

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Page 2 of 2 PagesDD FORM 1423-1, FEB 2001

SOW PARAGRAPH: 3.5.3

5. CONTRACT REFERENCE

DI-PSSS-80134B

4. AUTHORITY (Data Acquisition Document No.)

3. SUBTITLE

N/APROPOSED SPARE PARTS LIST

2. TITLE OF THE DATA ITEM

A003

1. DATA ITEM NO.

F. CONTRACTOR

TBD

E. CONTRACT/PR NO.

LTRaC ID/IQ MAC 1

D. SYSTEM/ITEM

TDP

C. CATEGORY

TM OTHER PSSSA

B. EXHIBITA. CONTRACT LINE ITEM NO.

N/A

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

Form Approved OMB No. 0704-0188

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

N/A

8. APP CODE

DD

7. DD 250 REQ

A

9. DIST STATEMENT

REQUIRED

13.DATE OF SUBSEQUENT

SUBMISSION

SEE BLOCK 16

11. AS OF DATE

N/A

SEE BLOCK 16

12.DATE OF FIRST

SUBMISSION

ASREQ

10. FREQUENCY

ReproReg

Final

Draft

b. COPIES

a. ADDRESSEE

14. DISTRIBUTION

J. DATEI. APPROVED BYH. DATEG. PREPARED BY

BLOCK 9: DISTRIBUTION STATEMENT A. APPROVED FOR PUBLIC RELEASE:

DISTRIBUTION UNLIMITED.

BLOCK 12: FIRST SUBMITTAL SHALL BE 90 CALENDAR DAYS AFTER CONTRACT AWARD.

BLOCK 13: REQUIRED SUBMITTAL AS REQUESTED BY THE GOVERNMENT WHEN

THERE ARE CHANGES TO EQUIPMENT OR PARTS IN THE BASELINE AND/OR

WHEN MAINTENANCE OR FAILURE DATA CHANGES FOR EQUIPMENT OR PARTS.

THE GOVERNMENT SHALL HAVE 30 CALENDAR DAYS FOR REVIEW AND

ACCEPTANCE OR REJECTION OF EACH SUBMISSION.

THE CONTRACTOR SHALL HAVE 14 CALENDAR DAYS TO INCORPORATE

GOVERNMENT COMMENTS.

BLOCK 14: SHALL BE DELIVERED VIA WIDE AREA WORKFLOW (WAWF). THE

CONTRACTOR SHALL INITIATE A ZERO COST RECEIVING REPORT IN WIDE

AREA WORKFLOW (WAWF) TO THE TECHNICAL OFFICE RESPONSIBLE FOR

THE REVIEW/APPROVAL OF THE DATA ITEM PER BLOCK 6, REQUIRED FOR

EACH DATA ITEM SUBMISSION (INITIAL AND SUBSEQUENT SUBMISSIONS)

TO THE GOVERNMENT. ALL DOCUMENTS AND GRAPHIC PACKAGES USED TO

CREATE FIGURES, TABLES AND CHARTS SHALL READABLE USING MICROSOFT

OFFICE 365. IF UNABLE TO SUBMIT VIA WAWF DUE TO FILE SIZE OR

FORMAT, A COVER PAGE SHALL BE SUBMITTED VIA WAWF AND THE

DELIVERABLE SHALL BE ELECTRONICALLY MAILED OR DELIVERED VIA DOD

SAFE TO THE APM, COR AND LEAD LOGISTICIAN. DOD SAFE CAN BE

LOCATED AT THE FOLLOWING URL: SAFE.APPS.MIL

ALL CDRLS SUBMITTED AFTER 4:00PM EST ON FRIDAY AFTERNOON WILL BE

CONSIDERED SUBMITTED ON THE NEXT GOVERNMENT WORK DAY.

16. REMARKS SEE BLOCK 16

000 15. TOTAL

18.ESTIMATED

TOTAL PRICE

SOW PARAGRAPH: 3.5.4

5. CONTRACT REFERENCE

DI-MGMT-81858

4. AUTHORITY (Data Acquisition Document No.)

3. SUBTITLE

N/ASee Block 16

2. TITLE OF THE DATA ITEM

A004

1. DATA ITEM NO.

F. CONTRACTOR

TBD

E. CONTRACT/PR NO.

LTRaC ID/IQ MAC 1

D. SYSTEM/ITEM

TDP

C. CATEGORY

TM OTHER MGMTA

B. EXHIBITA. CONTRACT LINE ITEM NO.

N/A

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

Form Approved OMB No. 0704-0188

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

N/A

8. APP CODE

DD

7. DD 250 REQ

D

9. DIST STATEMENT

REQUIRED

13.DATE OF SUBSEQUENT

SUBMISSION

SEE BLOCK 16

11. AS OF DATE

N/A

SEE BLOCK 16

12.DATE OF FIRST

SUBMISSION

ASREQ

10. FREQUENCY

ReproReg

Final

Draft

b. COPIES

a. ADDRESSEE

14. DISTRIBUTION

J. DATEI. APPROVED BYH. DATEG. PREPARED BY

Block 2: Unique Identification (IUID) Marking and Verification Report

BLOCK 4: IUID REPORT IS REQUIRED TO IDENTIFY MANDATED IUID

REQUIREMENTS IN ACCORDANCE WITH MIL-STD 130N AND DID:

DI-MGMT-81804A. EQUIPMENT MARKING SHALL BE APPROVED BY THE GOVERNMENT.

BLOCK 9: DISTRIBUTION STATEMENT D: DISTRIBUTION AUTHORIZED TO

THE DEPARTMENT OF DEFENSE AND U.S. DOD CONTRACTORS ONLY. DUE TO

ADMINISTRATIVE USE, THIS DETERMINATION WAS MADE ON 9 SEPTBEMER

2024. OTHER REQUESTS FOR THIS DOCUMENT MUST BE REFERRED TO U.S.

ARMY PROGRAM EXECUTIVE OFFICE, SIMULATION, TRAINING, AND

INSTRUMENTATION, (PEO STRI), ATTN: PEO-SFAE-STRI-TRADE-TTS, 12211

SCIENCE DR., ORLANDO, FL 32826-3224.

BLOCK 10: UID MARKING AND VERIFICATION REPORT SHALL BE SUBMITTED

FOR EACH DELIVERY ORDER AWARD.

BLOCK 12: FIRST SUBMISSION SHALL BE NLT THE CONTRACTORS FIRST

INSTALLATION COMPLETION DATE AS SPECIFIED IN THE DELIVERY ORDER.

BLOCK 13: SUBSEQUENT SUBMISSIONS SHALL BE FOR EVERY DELIVERY

ORDER AWARD NLT THE INSTALLATION COMPLETION DATE SPECIFIED IN

THE DELIVERY ORDER.

BLOCK 14: SHALL BE DELIVERED VIA WIDE AREA WORKFLOW (WAWF). THE

CONTRACTOR SHALL INITIATE A ZERO COST RECEIVING REPORT IN WIDE

AREA WORKFLOW (WAWF) TO THE TECHNICAL OFFICE RESPONSIBLE FOR

THE REVIEW/APPROVAL OF THE DATA ITEM PER BLOCK 6, REQUIRED FOR

EACH DATA ITEM SUBMISSION (INITIAL AND SUBSEQUENT SUBMISSIONS)

TO THE GOVERNMENT. ALL DOCUMENTS AND GRAPHIC PACKAGES USED TO

CREATE FIGURES, TABLES AND CHARTS SHALL READABLE USING MICROSOFT

OFFICE 365. IF UNABLE TO SUBMIT VIA WAWF DUE TO FILE SIZE OR

FORMAT, A COVER PAGE SHALL BE SUBMITTED VIA WAWF AND THE

DELIVERABLE SHALL BE ELECTRONICALLY MAILED OR DELIVERED VIA DOD

SAFE TO THE APM, COR AND LEAD LOGISTICIAN. DOD SAFE CAN BE

LOCATED AT THE FOLLOWING URL: SAFE.APPS.MIL

CONTRACTOR FORMAT IS ACCEPTABLE.

16. REMARKS SEE BLOCK 16

000 15. TOTAL

18.ESTIMATED

TOTAL PRICE

SOW PARAGRAPH: 3.6.1.1

5. CONTRACT REFERENCE

DI-SESS-80639E

4. AUTHORITY (Data Acquisition Document No.)

3. SUBTITLE

N/AENGINEERING CHANGE PROPOSAL (ECP)

2. TITLE OF THE DATA ITEM

A005

1. DATA ITEM NO.

F. CONTRACTOR

TBD

E. CONTRACT/PR NO.

LTRaC ID/IQ MAC 1

D. SYSTEM/ITEM

TDP

C. CATEGORY

TM OTHER SESSA

B. EXHIBITA. CONTRACT LINE ITEM NO.

N/A

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

Form Approved OMB No. 0704-0188

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

A

8. APP CODE

DD

7. DD 250 REQ

A

9. DIST STATEMENT

REQUIRED

13.DATE OF SUBSEQUENT

SUBMISSION

SEE BLOCK 16

11. AS OF DATE

N/A

SEE BLOCK 16

12.DATE OF FIRST

SUBMISSION

ASREQ

10. FREQUENCY

ReproReg

Final

Draft

b. COPIES

a. ADDRESSEE

14. DISTRIBUTION

J. DATEI. APPROVED BYH. DATEG. PREPARED BY

BLOCK 4: THE FOLLOWING ITEMS ARE TAILORED IN THE DATA ITEM

DESCRIPTION (DID), ONLY THE FORMAT SPECIFIED IN PARAGRAPH 2A

APPLIES. THE GOVERNMENT WILL PROVIDE DD FORM 1692 TEMPLATE UPON

REQUEST AFTER CONTRACT AWARD.

BLOCK 8: APPROVAL REQUIRED BEFORE INCORPORATING CHANGES INTO

PRODUCED SYSTEMS.

BLOCK 10: ONLY REQUIRED IF A CHANGE TO THE APPROVED PRODUCT

BASELINES IS REQUIRED.

BLOCK 12: SHALL BE DUE WITHIN 7 CALENDAR DAYS AFTER IDENTIFYING A

CHANGE TO ANY ESTABLISHED BASELINE.

BLOCK 13: SUBSEQUENT SUBMISSION SHALL BE AS NOTED IN BLOCK 10 AND BLOCK 12.

BLOCK 14: SHALL BE DELIVERED VIA WIDE AREA WORKFLOW (WAWF). THE

CONTRACTOR SHALL INITIATE A ZERO COST RECEIVING REPORT IN WIDE

AREA WORKFLOW (WAWF) TO THE TECHNICAL OFFICE RESPONSIBLE FOR

THE REVIEW/APPROVAL OF THE DATA ITEM PER BLOCK 6, REQUIRED FOR

EACH DATA ITEM SUBMISSION (INITIAL AND SUBSEQUENT SUBMISSIONS)

TO THE GOVERNMENT. ALL DOCUMENTS AND GRAPHIC PACKAGES USED TO

CREATE FIGURES, TABLES AND CHARTS SHALL READABLE USING MICROSOFT

OFFICE 365. IF UNABLE TO SUBMIT VIA WAWF DUE TO FILE SIZE OR

FORMAT, A COVER PAGE SHALL BE SUBMITTED VIA WAWF AND THE

DELIVERABLE SHALL BE ELECTRONICALLY MAILED OR DELIVERED VIA DOD

SAFE TO THE APM, COR AND LEAD ENGINEER. DOD SAFE CAN BE LOCATED

AT THE FOLLOWING URL: SAFE.APPS.MIL

THE GOVERNMENT WILL HAVE 14 CALENDAR DAYS FOR REVIEW AND

ACCEPTANCE OR REJECTION OF EACH SUBMISSION.

THE CONTRACTOR SHALL HAVE 10 CALENDAR DAYS TO INCORPORATE

GOVERNMENT COMMENTS.

16. REMARKS SEE BLOCK 16

000 15. TOTAL

18.ESTIMATED

TOTAL PRICE

SOW PARAGRAPH: 3.6.1.2

5. CONTRACT REFERENCE

DI-SESS-81732

4. AUTHORITY (Data Acquisition Document No.)

3. SUBTITLE

N/AREQUEST FOR WAIVERS

2. TITLE OF THE DATA ITEM

A006

1. DATA ITEM NO.

F. CONTRACTOR

TBD

E. CONTRACT/PR NO.

LTRaC ID/IQ MAC 1

D. SYSTEM/ITEM

TDP

C. CATEGORY

TM OTHERA

B. EXHIBITA. CONTRACT LINE ITEM NO.

N/A

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

Form Approved OMB No. 0704-0188

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

A

8. APP CODE

DD

7. DD 250 REQ

A

9. DIST STATEMENT

REQUIRED

13.DATE OF SUBSEQUENT

SUBMISSION

SEE BLOCK 16

11. AS OF DATE

N/A

SEE BLOCK 16

12.DATE OF FIRST

SUBMISSION

ASREQ

10. FREQUENCY

ReproReg

Final

Draft

b. COPIES

a. ADDRESSEE

14. DISTRIBUTION

J. DATEI. APPROVED BYH. DATEG. PREPARED BY

BLOCK 8: APPROVAL IS REQUIRED PRIOR TO DEVIATING FROM THE APPROVED BASELINE.

BLOCK 10: A REQUEST FOR WAIVERS IS REQUIRED WITHIN 7 CALENDAR

DAYS AFTER IDENTIFICATION OF REQUIREMENTS THAT NEED TO BE WAIVED.

BLOCK 12: SHALL BE SUBMITTED WHEN A REQUIREMENT OF A BASELINE

NEEDS TO BE WAIVED.

BLOCK 13: SHALL BE DUE WHEN SUBSEQUENT REQUEST FOR WAIVERS ARE REQUIRED.

BLOCK 14: SHALL BE DELIVERED VIA WIDE AREA WORKFLOW (WAWF). THE

CONTRACTOR SHALL INITIATE A ZERO COST RECEIVING REPORT IN WIDE

AREA WORKFLOW (WAWF) TO THE TECHNICAL OFFICE RESPONSIBLE FOR

THE REVIEW/APPROVAL OF THE DATA ITEM PER BLOCK 6, REQUIRED FOR

EACH DATA ITEM SUBMISSION (INITIAL AND SUBSEQUENT SUBMISSIONS)

TO THE GOVERNMENT. ALL DOCUMENTS AND GRAPHIC PACKAGES USED TO

CREATE FIGURES, TABLES AND CHARTS SHALL READABLE USING MICROSOFT

OFFICE 365. IF UNABLE TO SUBMIT VIA WAWF DUE TO FILE SIZE OR

FORMAT, A COVER PAGE SHALL BE SUBMITTED VIA WAWF AND THE

DELIVERABLE SHALL BE ELECTRONICALLY MAILED OR DELIVERED VIA DOD

SAFE TO THE APM, COR AND LEAD ENGINEER. DOD SAFE CAN BE LOCATED

AT THE FOLLOWING URL: SAFE.APPS.MIL

THE GOVERNMENT WILL HAVE 14 CALENDAR DAYS FOR REVIEW AND

ACCEPTANCE OR REJECTION OF EACH SUBMISSION.

THE CONTRACTOR SHALL HAVE 10 CALENDAR DAYS TO INCORPORATE

GOVERNMENT COMMENTS.

16. REMARKS SEE BLOCK 16

000 15. TOTAL

18.ESTIMATED

TOTAL PRICE

SOW PARAGRAPH: 3.6.1.3

5. CONTRACT REFERENCE

DI-SESS-80642E

4. AUTHORITY (Data Acquisition Document No.)

3. SUBTITLE

N/ANOTICE OF REVISION (NOR)

2. TITLE OF THE DATA ITEM

A007

1. DATA ITEM NO.

F. CONTRACTOR

TBD

E. CONTRACT/PR NO.

LTRaC ID/IQ MAC 1

D. SYSTEM/ITEM

TDP

C. CATEGORY

TM OTHER SESSA

B. EXHIBITA. CONTRACT LINE ITEM NO.

N/A

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

Form Approved OMB No. 0704-0188

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

A

8. APP CODE

DD

7. DD 250 REQ

A

9. DIST STATEMENT

REQUIRED

13.DATE OF SUBSEQUENT

SUBMISSION

SEE BLOCK 16

11. AS OF DATE

N/A

SEE BLOCK 16

12.DATE OF FIRST

SUBMISSION

ASREQ

10. FREQUENCY

ReproReg

Final

Draft

b. COPIES

a. ADDRESSEE

14. DISTRIBUTION

J. DATEI. APPROVED BYH. DATEG. PREPARED BY

BLOCK 4: THE FOLLOWING ITEMS ARE TAILORED IN THE DATA ITEM

DESCRIPTION (DID), ONLY THE FORMAT SPECIFIED IN PARAGRAPH 2A

APPLIES. THE GOVERNMENT WILL PROVIDE DD FORM 1695 TEMPLATE UPON

REQUEST AFTER CONTRACT AWARD.

BLOCK 8: APPROVAL REQUIRED BEFORE INCORPORATING CHANGES INTO DOCUMENTATION.

BLOCK 10: NOTICE OF REVISIONS WILL BE PUBLISHED UPON ANY APPROVED

CHANGES TO THE BASELINE.

BLOCK 12: FIRST SUBMISSION CONSISTS OF CONTRACTOR

ACKNOWLEDGEMENT TO THE NOR WHICH SHALL BE NLT FIVE BUSINESS

DAYS POST THE GOVERNMENT PUBLISHED NOR.

BLOCK 13: SUBSEQUENT SUBMISSION SHALL BE AS NOTED IN BLOCK 10 AND BLOCK 12.

BLOCK 14: SHALL BE DELIVERED VIA WIDE AREA WORKFLOW (WAWF). THE

CONTRACTOR SHALL INITIATE A ZERO COST RECEIVING REPORT IN WIDE

AREA WORKFLOW (WAWF) TO THE TECHNICAL OFFICE RESPONSIBLE FOR

THE REVIEW/APPROVAL OF THE DATA ITEM PER BLOCK 6, REQUIRED FOR

EACH DATA ITEM SUBMISSION (INITIAL AND SUBSEQUENT SUBMISSIONS)

TO THE GOVERNMENT. ALL DOCUMENTS AND GRAPHIC PACKAGES USED TO

CREATE FIGURES, TABLES AND CHARTS SHALL READABLE USING MICROSOFT

OFFICE 365. IF UNABLE TO SUBMIT VIA WAWF DUE TO FILE SIZE OR

FORMAT, A COVER PAGE SHALL BE SUBMITTED VIA WAWF AND THE

DELIVERABLE SHALL BE ELECTRONICALLY MAILED OR DELIVERED VIA DOD

SAFE TO THE APM, COR AND LEAD ENGINEER. DOD SAFE CAN BE LOCATED

AT THE FOLLOWING URL: SAFE.APPS.MIL

THE GOVERNMENT WILL HAVE 14 CALENDAR DAYS FOR REVIEW AND

ACCEPTANCE OR REJECTION OF EACH SUBMISSION.

THE CONTRACTOR SHALL HAVE 10 CALENDAR DAYS TO INCORPORATE

GOVERNMENT COMMENTS.

16. REMARKS SEE BLOCK 16

000 15. TOTAL

18.ESTIMATED

TOTAL PRICE

SFAE-STRI-PMST-LTS

SOW PARAGRAPH: 3.5.6

5. CONTRACT REFERENCE

DI-TMSS-80527D

4. AUTHORITY (Data Acquisition Document No.)

3. SUBTITLE

N/ASee Block 16

2. TITLE OF THE DATA ITEM

C001

1. DATA ITEM NO.

F. CONTRACTOR

TBD

E. CONTRACT/PR NO.

LTRaC ID/IQ MAC 1

D. SYSTEM/ITEM

TDP

C. CATEGORY

TM X OTHERC

B. EXHIBITA. CONTRACT LINE ITEM NO.

N/A

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

Form Approved OMB No. 0704-0188

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

A

8. APP CODE

DD

7. DD 250 REQ

A

9. DIST STATEMENT

REQUIRED

13.DATE OF SUBSEQUENT

SUBMISSION

SEE BLOCK 16

11. AS OF DATE

N/A

SEE BLOCK 16

12.DATE OF FIRST

SUBMISSION

Block 16

10. FREQUENCY

ReproReg

Final

Draft

b. COPIES

a. ADDRESSEE

14. DISTRIBUTION

J. DATEI. APPROVED BYH. DATEG. PREPARED BY

Block 2: COMMERCIAL OFF-THE-SHELF (COTS) MANUALS AND ASSOCIATED

SUPPLEMENTAL DATA

BLOCK 4: CONTRACTOR FORMAT ACCEPTABLE. DID REQUIREMENTS AMENDED

BY PARAGRAPH AS FOLLOWS:

FORMAT: THE MANUAL SHALL BE PRESENTED IN THE FORMAT SPECIFIED BY

THE ACQUIRING ACTIVITY. ASSOCIATED SUPPLEMENTAL DATA SHALL BE

IN CONTRACTOR FORMAT.

BLOCK 8: GOVERNMENT VERIFICATION AND APPROVAL SHALL BE REQUIRED

PRIOR TO CONDUCTING NEW EQUIPMENT TRAINING (NET).

BLOCK 10: COTS MANUALS AND ASSOCIATED SUPPLEMENTAL DATA SHALL BE

DELIVERED FOR EACH DELIVERY ORDER.

BLOCK 12: INITIAL SUBMISSION SHALL BE NLT FIRST TEST EVENT FOR

SYSTEMS THAT INCLUDE THE ASSOCIATED COTS COMPONENTS

BLOCK 13: SUBSEQUENT SUBMISSIONS SHALL BE UPON CHANGES TO THE COTS MANUALS.

BLOCK 14: SHALL BE DELIVERED VIA WIDE AREA WORKFLOW (WAWF). THE

CONTRACTOR SHALL INITIATE A ZERO COST RECEIVING REPORT IN WIDE

AREA WORKFLOW (WAWF) TO THE TECHNICAL OFFICE RESPONSIBLE FOR

THE REVIEW/APPROVAL OF THE DATA ITEM PER BLOCK 6, REQUIRED FOR

EACH DATA ITEM SUBMISSION (INITIAL AND SUBSEQUENT SUBMISSIONS)

TO THE GOVERNMENT. ALL DOCUMENTS AND GRAPHIC PACKAGES USED TO

CREATE FIGURES, TABLES AND CHARTS SHALL READABLE USING MICROSOFT

OFFICE 365. IF UNABLE TO SUBMIT VIA WAWF DUE TO FILE SIZE OR

FORMAT, A COVER PAGE SHALL BE SUBMITTED VIA WAWF AND THE

DELIVERABLE SHALL BE ELECTRONICALLY MAILED OR DELIVERED VIA DOD

SAFE TO THE APM, COR AND LEAD LOGISTICIAN. DOD SAFE CAN BE

LOCATED AT THE FOLLOWING URL: SAFE.APPS.MIL

ALL COTS DOCUMENTATION SHALL BE REVIEWED AND VALIDATED BY THE

CONTRACTOR FOR ACCURACY/COMPLETENESS PRIOR TO THE SYSTEM VERIFICATION TEST.

SUPPLEMENTAL DATA (IF REQUIRED) SHALL BE INCORPORATED BY THE

CONTRACTOR INTO THE SYSTEM OPERATION/USERS AND MAINTENANCE

MANUALS AS APPLICABLE AND VERIFIED DURING MANUAL

VALIDATION/VERIFICATION EVENTS.

THE GOVERNMENT WILL HAVE 30 CALENDAR DAYS TO REVIEW AND ACCEPT OR

REJECT EACH SUBMISSION.

THE CONTRACTOR SHALL HAVE 10 CALENDAR DAYS TO INCORPORATE COMMENTS.

AFTER GOVERNMENT ACCEPTANCE, ALL COTS OEM DOCUMENTATION SHALL BE

INDEXED, TABBED, PLACED IN A BINDER, AND DELIVERED TO THE

FIELDED SITE. THE INDEXED BINDER SHALL INCLUDE A TABLE OF

CONTENTS AND TECHNICAL DOCUMENTATION NUMBER PROVIDED BY THE GOVERNMENT.

16. REMARKS SEE BLOCK 16

000 15. TOTAL

18.ESTIMATED

TOTAL PRICE

SOW PARAGRAPH: 3.5.6

5. CONTRACT REFERENCE

DI-ADMN-80925A

4. AUTHORITY (Data Acquisition Document No.)

3. SUBTITLE

UPDATES TO EXISTING MANUALSREVISIONS TO EXISTING GOVERNMENT DOCUMENTS

2. TITLE OF THE DATA ITEM

C002

1. DATA ITEM NO.

F. CONTRACTOR

TBD

E. CONTRACT/PR NO.

LTRaC ID/IQ MAC 1

D. SYSTEM/ITEM

TDP

C. CATEGORY

TM OTHER ADMNA

B. EXHIBITA. CONTRACT LINE ITEM NO.

N/A

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

Form Approved OMB No. 0704-0188

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

N/A

8. APP CODE

DD

7. DD 250 REQ

A

9. DIST STATEMENT

REQUIRED

13.DATE OF SUBSEQUENT

SUBMISSION

SEE BLOCK 16

11. AS OF DATE

N/A

SEE BLOCK 16

12.DATE OF FIRST

SUBMISSION

ASREQ

10. FREQUENCY

ReproReg

Final

Draft

b. COPIES

a. ADDRESSEE

14. DISTRIBUTION

J. DATEI. APPROVED BYH. DATEG. PREPARED BY

BLOCK 12: INITIAL UPDATES TO IMPACTED DOCUMENTS SHALL BE DUE 14

CALENDAR DAYS AFTER A REQUEST BY THE GOVERNMENT OR THE

GOVERNMENT APPROVAL OF A CHANGE IMPACTING APPROVED BASELINES.

FINAL SUBMISSION SHALL BE DUE 30 CALENDAR DAYS PRIOR TO THE END

OF THE DELIVERY ORDER.

BLOCK 13: REVISIONS SHALL BE SUBMITTED WITHIN 14 CALENDAR DAYS

AFTER A CHANGE AS REQUIRED THROUGH LIFE OF THE CONTRACT.

BLOCK 14: SHALL BE DELIVERED VIA WIDE AREA WORKFLOW (WAWF). THE

CONTRACTOR SHALL INITIATE A ZERO COST RECEIVING REPORT IN WIDE

AREA WORKFLOW (WAWF) TO THE TECHNICAL OFFICE RESPONSIBLE FOR

THE REVIEW/APPROVAL OF THE DATA ITEM PER BLOCK 6, REQUIRED FOR

EACH DATA ITEM SUBMISSION (INITIAL AND SUBSEQUENT SUBMISSIONS)

TO THE GOVERNMENT. ALL DOCUMENTS AND GRAPHIC PACKAGES USED TO

CREATE FIGURES, TABLES AND CHARTS SHALL READABLE USING MICROSOFT

OFFICE 365. IF UNABLE TO SUBMIT VIA WAWF DUE TO FILE SIZE OR

FORMAT, A COVER PAGE SHALL BE SUBMITTED VIA WAWF AND THE

DELIVERABLE SHALL BE ELECTRONICALLY MAILED OR DELIVERED VIA DOD

SAFE TO THE APM, COR, LEAD ENGINEER, AND LEAD LOGISTICIAN. DOD

SAFE CAN BE LOCATED AT THE FOLLOWING URL: SAFE.APPS.MIL

THE GOVERNMENT SHALL HAVE 10 CALENDAR DAYS FOR REVIEW AND

ACCEPTANCE OR REJECTION OF SUBMISSIONS.

THE CONTRACTOR SHALL HAVE 10 CALENDAR DAYS TO INCORPORATE

GOVERNMENT COMMENTS.

THE CONTRACTOR SHALL UTILIZE THE PREVIOUSLY GOVERNMENT APPROVED

FORMAT FOR EACH DOCUMENT.

16. REMARKS SEE BLOCK 16

000 15. TOTAL

18.ESTIMATED

TOTAL PRICE

File details come from the government source that posted it. Updated .