Final_RFP_W900KK-19-R-0006-01_Amendment.pdf

PDF 151 KB Posted

Attached to
Modernizing Instrumentation Solutions for Test and Evaluation (MISTE)
Solicitation number
W900KK-19-R-0006
Issued by

About this file

This amendment modifies an existing solicitation for the Modernizing Instrumentation Solutions for Test and Evaluation program. The amendment provides additional answers to industry questions, revises sections L and M of the solicitation, deletes a duplicate clause, incorporates another clause by full text, and extends the deadline for receipt of proposals. Key details include that the solicitation is seeking proposals to provide instrumentation, test, and evaluation services and solutions for the Department of the Army Materiel Command at multiple test ranges. The extended deadline for receipt of initial proposals is [DATE]. Information on historical documentation related to past efforts at specified Army test sites is also provided.

Final RFP_W900KK-19-R-0006-01_Amendment

View the file

Other files

File Type Posted
ATTACHMENT_17_MISTE_SOLICITATION-QUESTIONS-COMMENTS_FORM_FINAL_ANSWERS_AMEND_0002_06-03-2019.pdf PDF
W900KK-19-R-0006-0002_Conform.pdf PDF
W900KK-19-R-0006-0002_Amendment.pdf PDF
ATTACHMENT_17_MISTE_SOLICITATION_QUESTIONS-COMMENTS_FORM_FINAL_ANSWERS_5-22-2019.pdf PDF
ATTACHMENT_19_MISTE_DO_SCETI-ACE_CLIN_STRUCTURE_R2_FINAL.pdf PDF
ATTACHMENT_18_MISTE_DO_TNM-EPG_CLIN_STRUCTURE_R2_FINAL.pdf PDF
ATTACHMENT_07_MISTE_DO_SCETI_ACE_PERFORMANCE_SPEC_FINAL_REV.pdf PDF
ATTACHMENT_11_MISTE_DO_TNM_EPG_SPEC_FINAL_V1.4.PDF PDF
ATTACHMENT_14_MISTE_VOL_IV_COST_AND_PRICE_BASELINE_XLS_WORKBOOK_FINAL_REV.xlsx XLSX spreadsheet
ATTACHMENT_20_MISTE_DO_TISE_CLIN_STUCTURE_R1_FINAL.pdf PDF
ATTACHMENT_01_MISTE_BASE_STATEMENT_OF_WORK_FINAL_REV.pdf PDF
Final_RFP_W900KK-19-R-0006-0001_Conform.pdf PDF
ATTACHMENT_04_MISTE_BASE_QUALITY_ASSURANCE_PLAN_R1_FINAL.pdf PDF
ATTACHMENT_16_PAST_PERFORMANCE_QUESTIONAIRE_FINAL.docx DOCX document
ATTACHMENT_03_SMALL_BUSINESS_PARTICIPATION_FORM_FINAL.docx DOCX document
ATTACHMENT_15_TECHNICAL_VOLUME_CROSS_REFERENCE_MATRIX.xlsx XLSX spreadsheet
ATTACHMENT_09_SCETI_ACE_QASP_FINAL.PDF PDF
ATTACHMENT_05_MISTE_BASE_CONTRACT_DATA_REQUIREMENTS_LIST_(CDRL)_FINAL.pdf PDF
ATTACHMENT_07_MISTE_DO_SCETI_ACE_PERFORMANCE_SPEC_FINAL.pdf PDF
ATTACHMENT_19_MISTE_DO_SCETI-ACE_CLIN_STRUCTURE_R1_FINAL.pdf PDF
ATTACHMENT_17_MISTE_SOLICITATION_QUESTIONS-COMMENTS_FORM_FINAL.xlsx XLSX spreadsheet
ATTACHMENT_18_MISTE_DO_TNM-EPG_CLIN_STRUCTURE_R1_FINAL.pdf PDF
ATTACHMENT_22_SF1408-14B.pdf PDF
ATTACHMENT_02_MISTE_BASE_DD_FORM_254_FINAL.PDF PDF
ATTACHMENT_21_DCAA_REQUIRED_PREAWARD_SURVEY_OF_PROSPECTIVE_CONTRACTOR_ACCOUNTING_SYSTEM_CHECKLIST.pdf PDF
ATTACHMENT_10_MISTE_DO_TNM_EPG_SOW_FINAL.pdf PDF
ATTACHMENT_01_MISTE_BASE_STATEMENT_OF_WORK_FINAL.pdf PDF
Final_RFP_W900KK-19-R-0006.pdf PDF
ATTACHMENT_12_MISTE__DO_TNM_EPG_CDRL_REPORT_FINAL.pdf PDF
ATTACHMENT_08_MISTE_DO_SCETI_ACE_CDRL_REPORT_FINAL.pdf PDF
ATTACHMENT_14_MISTE_VOL_IV_COST_AND_PRICE_BASELINE_XLS_WORKBOOK_FINAL.xlsx XLSX spreadsheet
ATTACHMENT_13_MISTE_DO_TNM_EPG_QASP_FINAL.pdf PDF
ATTACHMENT_06_MISTE_DO_SCETI_ACE_SOW_FINAL.PDF PDF
ATTACHMENT_20_MISTE_DO_TISE_CLIN_STUCTURE_FINAL.pdf PDF
ATTACHMENT_11_MISTE_DO_TNM_EPG_SPEC_FINAL.pdf PDF
MISTE_Draft_RFP_Responses_to_Industry_04-04-2019_V2.pdf PDF
ATTACHMENT_15_PAST_PERFORMANCE_QUESTIONAIRE.docx DOCX document
ATTACHMENT_12_MISTE_DO_TNM_EPG_QASP.pdf PDF
ATTACHMENT_09_MISTE_DO_TNM_EPG_SOW.pdf PDF
ATTACHMENT_03_SMALL_BUSINESS_PARTICIPATION_FORM.docx DOCX document
ATTACHMENT_18_MISTE_DO_SCETI-ACE_CLIN_STRUCTURE.pdf PDF
Draft_MISTE_RFP_2-22-2019.pdf PDF
ATTACHMENT_14_TECHNICAL_VOLUME_CROSS_REFERENCE_MATRIX.xlsx XLSX spreadsheet
ATTACHEMENT_17_MISTE_DO_TNM-EPG_CLIN_STRUCTURE.pdf PDF
ATTACHMENT_16_MISTE_SOLICITATION_QUESTIONS-COMMENTS_FORM.xlsx XLSX spreadsheet
ATTACHMENT_04_MISTE_BASE_QUALITY_ASSURANCE_PLAN.pdf PDF
ATTACHMENT_06_MISTE_DO_SCETI_ACE_SOW_DRAFT_RFP.pdf PDF
ATTACHMENT_11_MISTE__DO_TNM_EPG_CDRL_REPORT.pdf PDF
ATTACHMENT_01_MISTE_BASE_STATEMENT_OF_WORK_V1.3.pdf PDF
ATTACHMENT_07_MISTE_DO_SCETI_ACE_SPEC_DRAFT_RFP.pdf PDF
Show 40 more

Latest 50 of 55 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to incorporate attachment 17, questions and answ ers, one (1) through sixty-three (63), and associated revised attachments. All other terms and conditions remain unchanged.

1. CONTRACT ID CODE PAGE OF PAGES

1 4

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 22-May-2019

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W900KK-19-R-0006

X 9B. DATED (SEE ITEM 11)

25-Apr-2019

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 2 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

22-May-2019

CODE

ARMY CONTRACTING COMMAND - ORLANDO

ATTN: BRAVO DIVISION

12211 SCIENCE DRIVE

ORLANDO FL 32826-3224

W900KK 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W900KK-19-R-0006

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

The following have been modified:

ATTACHMENTS AND EXHIBITS

TYPE NAME # of

PAGES

Attachment 1 ATTACHMENT 01_MISTE BASE STATEMENT OF WORK_FINAL 41

Attachment 2 ATTACHMENT 02_MISTE BASE DD FORM 254_FINAL 3

Attachment 3 ATTACHMENT 03_SMALL BUSINESS PARTICIPATION FORM_FINAL 4

Attachment 4 ATTACHMENT 04_MISTE BASE QUALITY ASSURANCE PLAN_R1_FINAL 16

Attachment 5 ATTACHMENT 05_MISTE BASE CONTRACT DATA REQUIREMENTS LIST

(CDRL)_FINAL_A001 & A002

Attachment 6 ATTACHMENT 06_MISTE DO SCETI ACE SOW_FINAL 33

Attachment 7 ATTACHMENT 07_MISTE DO SCETI ACE PERFORMANCE SPEC_FINAL 19

Attachment 8 ATTACHMENT 08_MISTE DO SCETI ACE CDRL REPORT_FINALA001 - A009; A00A - A00G;

B001 - B005 and C001

Attachment 9 ATTACHMENT 09_SCETI ACE QASP_FINAL 12

Attachment 10 ATTACHMENT 10_MISTE DO TNM EPG SOW_FINAL 30

Attachment 11 ATTACHMENT 11_MISTE DO TNM EPG SPEC_FINAL 33

Attachment 12 ATTACHMENT 12_MISTE DO TNM EPG CDRL REPORT_FINAL_A001 - A0022 23

Attachment 13 ATTACHMENT 13_MISTE DO TNM EPG QASP_FINAL 9

Attachment 14 ATTACHMENT 14_MISTE VOL IV COST AND PRICE BASELINE.03.28.19 XLS

WORKBOOK_FINAL

Attachment 15 ATTACHMENT 15_TECHNICAL VOLUME CROSS REFERENCE MATRIX (Solicitation Only)

Attachment 16 ATTACHMENT 16_PAST PERFORMANCE QUESTIONAIRE_FINAL (Solicitation Only) 5

Attachment 17 ATTACHMENT 17_MISTE SOLICITATION QUESTIONS-COMMENTS FORM_FINAL (Solicitation Only)

Attachment 18 ATTACHMENT 18_MISTE DO TNM-EPG CLIN STRUCTURE_R1_FINAL 4

Attachment 19 ATTACHMENT 19_MISTE DO SCETI-ACE CLIN STRUCTURE_FINAL 4

Attachment 20 ATTACHMENT 20_MISTE DO TISE CLIN STUCTURE_FINAL 10

Attachment 21 ATTACHMENT 21_DCAA REQUIRED PREAWARD_SURVEY OF PROSPECTIVE CONTRACTOR

ACCOUNTING SYSTEM CHECKLIST

Attachment 22 ATTACHMENT 22_SF1408-14B 2

Attachment 23* ATTACHMENT 23_DO TNM EPG-APPENDIX_A-DEC 2018 1

Attachment 24* ATTACHMENT 24_A002_EPG_EOL_APPENDIX_C-DEC 2018

Attachment 25* ATTACHMENT 25_A002_EPG_EQUIPMENT_DATASHEETS-APPENDIX_E

Attachment 26* ATTACHMENT 26_A002_EPG_EQUIPMENT LIST_APPENDIX_B-ADD JUNIPER

Attachment 27* ATTACHMENT 27_A002_EPG_INSTALLATION_INTEGRATION_PLAN_APPENDIX_G 2

Attachment 28* ATTACHMENT 28_A002_REQUIREMENT_TRACEABILITY_MATRIX_APPENDIX_F

Attachment 29* ATTACHMENT 29_A002_EPG_SITEMAP_APPENDIX_D 1

Attachment 30* ATTACHMENT 30_A002_EPG_TNM_SITE_SURVEY_REPORT 35

Attachment 31* ATTACHMENT 31_MISTE DO SCETI ACE RATH SYSTEM DESCRIPTION & INTERFACES R26 123

Attachment 32* ATTACHMENT 32_MISTE DO SCETI_DVE_FOGTAXONOMY_FINAL REPORT_AQRSC 44

Attachment 33* ATTACHMENT 33_MISTE DO SCETI_GAN-00001_TEST SITE 5

* Note: Each individual attachment (23 through 33) are for information only, will not be incorporated into the final contract, and will be available upon request as follows:

Procedures for interested parties to request historical records pertaining to past efforts performed under the Test Network Modernization Program (TNM) at Electronic Proving Grounds (EPG) Fort Huachuca, AZ and the System of Systems Controlled Environment Test Infrastructure (SCETI) at Redstone Test Center, AL are provided as follows:

a. Parties interested in responding to the MODERNIZING INSTRUMENTATION SOLUTIONS FOR TEST AND EVALUATION (MISTE) Request for Proposal (RFP) may request the historical documents referenced under items 1) and 2) below.

b. Interested parties must contact, in writing, the assigned MISTE Contract Specialist. Written email requests are acceptable. The contact information is provided as follows:

Joseph Candelaria joseph.candelaria5.civ@mail.mil 407-208-3220 Address: 12211 Science Drive, Orlando, FL 32826 USA

Interested parties may include in the email a “cc” for the Contracting Officer, Daniel Veenstra, daniel.l.veenstra.civ@mail.mil, and the MIST Program Manager, Ron Miller, Ronald.e.miller40.civ@mail.mil .

c. In order to process any request for this information, the prospective offeror, MUST possess a valid CAGE Code that allows them to receive For Official Use Only (FOUO) information and MUST provide all the following information in a timely fashion (within 7 business days from of the release of this DRAFT RFP) to the Contract Specialist:

i. Company Name:

ii. Company Address:

iii. POC Name:

iv. POC Email:

v. POC Phone Number:

vi. Company DUNS Number:

vii. Company CAGE Code:

viii. Current Facility Clearance Level:

ix. FSO Name:

x. FSO Contact Information:

xi. Defense Security Service Office Contact Information:

xii. Specific Identification of which Documents are being requested:

1) For the purpose of the historical data that will be provided related to the MISTE TNM EPG DO, this includes eight (8) documents (CDRLS). These documents were used to procure end of life (EoL) equipment for EPG’s Test Network in the summer of 2017. These documents provide a summary of the EPG Test Network as it existed as-of 2017 (DISCLAIMER - but is not considered to fully and accurately representative of the current Network configuration today).

-a. DO TNM EPG-Appendix_A_Dec 2018.pdf" -b. A002_EPG_EOL_Appendix_C-Dec2018.xlsx"

-c. A002_EPG_Equipment_Datasheets_Appendix_E.XLSX" -d. A002_EPG_EquipmentList_Appendix_B-add Juniper.xlsx" -e. A002_EPG_Installation_Integration_Plan_Appendix_G.docx" -f. A002_EPG_Requirement_Traceability_Matrix_Appendix_F.XLS" -g. A002_EPG_SiteMap_Appendix_D.JPG" -h. A002_EPG_TNM_SITE_SURVEY_REPORT.PDF"

2) For the purpose of historical information in support of the MISTE SCETI ACE DO. The attached will include 1 document, which may be used to understand the RTC/ASE Architecture for T&E of Hostile-Fire (RATH) System Description and Interfaces.

-a. MISTE DO SCETI ACE RATH System Description and Interfaces.pdf -b. MISTE DO SCETI_DVE_FOGTAXONOMY_FINAL REPORT_AQRSC -c. MISTE DO SCETI_GAN-00001_TEST SITE

(End of Summary of Changes)