ATTACHMENT_18_MISTE_DO_SCETI-ACE_CLIN_STRUCTURE.pdf

PDF 77 KB Posted

Attached to
Modernizing Instrumentation Solutions for Test and Evaluation (MISTE)
Solicitation number
W900KK-19-R-0006
Issued by

About this file

This document outlines a line item contract structure for enhancing atmospheric testing capabilities. The contract includes eleven line items for various studies, design and development of snow and fog generation and measurement capabilities, other direct costs, travel costs, and data and reporting requirements. Deliverables are to be provided in accordance with the Statement of Work and attachments for the Modernizing Instrumentation Solutions for Test and Evaluation program managed by the Department of the Army Materiel Command Contracting Command Orlando Contracting Center. Pricing will be fixed price for most items with cost estimates for travel. Response and award dates are not specified.

MISTE DO SCETI-ACE CLIN Structure Draft RFP

View the file

Other files

File Type Posted
ATTACHMENT_17_MISTE_SOLICITATION-QUESTIONS-COMMENTS_FORM_FINAL_ANSWERS_AMEND_0002_06-03-2019.pdf PDF
W900KK-19-R-0006-0002_Amendment.pdf PDF
ATTACHMENT_17_MISTE_SOLICITATION_QUESTIONS-COMMENTS_FORM_FINAL_ANSWERS_5-22-2019.pdf PDF
ATTACHMENT_11_MISTE_DO_TNM_EPG_SPEC_FINAL_V1.4.PDF PDF
ATTACHMENT_20_MISTE_DO_TISE_CLIN_STUCTURE_R1_FINAL.pdf PDF
ATTACHMENT_01_MISTE_BASE_STATEMENT_OF_WORK_FINAL_REV.pdf PDF
Final_RFP_W900KK-19-R-0006-0001_Conform.pdf PDF
ATTACHMENT_14_MISTE_VOL_IV_COST_AND_PRICE_BASELINE_XLS_WORKBOOK_FINAL_REV.xlsx XLSX spreadsheet
ATTACHMENT_22_SF1408-14B.pdf PDF
ATTACHMENT_05_MISTE_BASE_CONTRACT_DATA_REQUIREMENTS_LIST_(CDRL)_FINAL.pdf PDF
ATTACHMENT_01_MISTE_BASE_STATEMENT_OF_WORK_FINAL.pdf PDF
ATTACHMENT_10_MISTE_DO_TNM_EPG_SOW_FINAL.pdf PDF
ATTACHMENT_12_MISTE__DO_TNM_EPG_CDRL_REPORT_FINAL.pdf PDF
ATTACHMENT_21_DCAA_REQUIRED_PREAWARD_SURVEY_OF_PROSPECTIVE_CONTRACTOR_ACCOUNTING_SYSTEM_CHECKLIST.pdf PDF
ATTACHMENT_18_MISTE_DO_TNM-EPG_CLIN_STRUCTURE_R1_FINAL.pdf PDF
ATTACHMENT_11_MISTE_DO_TNM_EPG_SPEC_FINAL.pdf PDF
ATTACHMENT_20_MISTE_DO_TISE_CLIN_STUCTURE_FINAL.pdf PDF
ATTACHMENT_06_MISTE_DO_SCETI_ACE_SOW_FINAL.PDF PDF
ATTACHMENT_13_MISTE_DO_TNM_EPG_QASP_FINAL.pdf PDF
ATTACHMENT_04_MISTE_BASE_QUALITY_ASSURANCE_PLAN_R1_FINAL.pdf PDF
ATTACHMENT_02_MISTE_BASE_DD_FORM_254_FINAL.PDF PDF
Final_RFP_W900KK-19-R-0006.pdf PDF
ATTACHMENT_08_MISTE_DO_SCETI_ACE_CDRL_REPORT_FINAL.pdf PDF
ATTACHMENT_07_MISTE_DO_SCETI_ACE_PERFORMANCE_SPEC_FINAL.pdf PDF
ATTACHMENT_19_MISTE_DO_SCETI-ACE_CLIN_STRUCTURE_R1_FINAL.pdf PDF
ATTACHMENT_15_TECHNICAL_VOLUME_CROSS_REFERENCE_MATRIX.xlsx XLSX spreadsheet
ATTACHMENT_16_PAST_PERFORMANCE_QUESTIONAIRE_FINAL.docx DOCX document
ATTACHMENT_03_SMALL_BUSINESS_PARTICIPATION_FORM_FINAL.docx DOCX document
ATTACHMENT_09_SCETI_ACE_QASP_FINAL.PDF PDF
ATTACHMENT_14_MISTE_VOL_IV_COST_AND_PRICE_BASELINE_XLS_WORKBOOK_FINAL.xlsx XLSX spreadsheet
ATTACHMENT_17_MISTE_SOLICITATION_QUESTIONS-COMMENTS_FORM_FINAL.xlsx XLSX spreadsheet
MISTE_Draft_RFP_Responses_to_Industry_04-04-2019_V2.pdf PDF
ATTACHMENT_14_TECHNICAL_VOLUME_CROSS_REFERENCE_MATRIX.xlsx XLSX spreadsheet
ATTACHMENT_16_MISTE_SOLICITATION_QUESTIONS-COMMENTS_FORM.xlsx XLSX spreadsheet
ATTACHMENT_04_MISTE_BASE_QUALITY_ASSURANCE_PLAN.pdf PDF
ATTACHMENT_06_MISTE_DO_SCETI_ACE_SOW_DRAFT_RFP.pdf PDF
ATTACHMENT_13_MISTE_VOL_IV_COST_AND_PRICE_BASELINE.02_16_19_1210_XLS_WORKBOOK.XLSX XLSX spreadsheet
ATTACHMENT_05_MISTE_BASE_CONTRACT_DATA_REQUIREMENTS_LIST_(CDRL).pdf PDF
ATTACHMENT_02_MISTE_BASE_DD_FORM_254.pdf PDF
ATTACHMENT_10_MISTE_DO_TNM_EPG_Spec.pdf PDF
ATTACHMENT_08_MISTE_DO_SCETI_ACE_CDRLs_DRAFT_RFP.pdf PDF
ATTACHMENT_15_PAST_PERFORMANCE_QUESTIONAIRE.docx DOCX document
ATTACHMENT_09_MISTE_DO_TNM_EPG_SOW.pdf PDF
ATTACHMENT_12_MISTE_DO_TNM_EPG_QASP.pdf PDF
ATTACHEMENT_17_MISTE_DO_TNM-EPG_CLIN_STRUCTURE.pdf PDF
ATTACHMENT_01_MISTE_BASE_STATEMENT_OF_WORK_V1.3.pdf PDF
ATTACHMENT_07_MISTE_DO_SCETI_ACE_SPEC_DRAFT_RFP.pdf PDF
ATTACHMENT_11_MISTE__DO_TNM_EPG_CDRL_REPORT.pdf PDF
Draft_MISTE_RFP_2-22-2019.pdf PDF
ATTACHMENT_03_SMALL_BUSINESS_PARTICIPATION_FORM.docx DOCX document
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 1 Each Atmospheric Conditions Parameter Study

The contractor shall complete and deliver a study to determine the appropriate operationally relevant characteristics of snow and fog DVE conditions. The contractor shall identify the characteristics to be generated by the Snow Development Capability (SDC) and Fog Development Capability (FDC) which shall be measurable by the enhanced Atmospheric Measurement (AM) capability in accordance with the attached System-of-Systems Controlled Environment Test Infrastructure (SCETI) Atmospheric Conditions Enhancement (ACE) Statement of Work, and attachments A-Z.

FFP

NET AMT

0002 1 Each Snow Development Capability (SDC)

Design, development, integration, and delivery of Snow Development Capability (SDC) in accordance with the attached System-of-Systems Controlled Environment Test Infrastructure (SCETI) Atmospheric Conditions Enhancement (ACE) Statement of Work, and attachments A-Z.

0003 1 Each Snow Atmospheric Measurement Capability

Deliver enhancements to the existing Atmospheric Measurement (AM) capability to measure the snow environmental conditions in accordance with the attached System-of-Systems Controlled Environment Test Infrastructure (SCETI) Atmospheric Conditions Enhancement (ACE) Statement of Work, and attachments A-Z.

0004 1 Each Fog Development Capability (FDC)

Design, development, integration, and delivery of Fog Development Capability (FDC), and enhancements to the existing Atmospheric Measurement (AM) capability to measure the new environmental conditions in accordance with the attached System-of-Systems Controlled Environment Test Infrastructure (SCETI) Atmospheric Conditions Enhancement (ACE) Statement of Work, and attachments

0005 1 Each Fog Atmospheric Measurement Capability

Deliver enhancements to the existing Atmospheric Measurement (AM) capability to measure the fog environmental conditions in accordance with the attached System-of-Systems Controlled Environment Test Infrastructure (SCETI) Atmospheric Conditions Enhancement (ACE) Statement of Work, and attachments

0006 1 Lot

ODC

TEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0007 1 Lot Travel

COST

ESTIMATED COST

0008 1 Lot Contract Data Requirement List

NSP

NET AMT NSP

0009 1 Lot Manpower Reporting

NSP

NET AMT NSP

0010 1 Lot Reserved

0011 1 Lot Reserved