ATTACHMENT_19_MISTE_DO_SCETI-ACE_CLIN_STRUCTURE_R1_FINAL.pdf
PDF 82 KB Posted
- Solicitation number
- W900KK-19-R-0006
About this file
This document outlines a contract line item structure for the Modernizing Instrumentation Solutions for Test and Evaluation (MISTE) solicitation. The contract calls for the design, development, delivery, installation and integration of Snow Development Capability and Fog Development Capability to generate measurable atmospheric conditions. It also requires an Atmospheric Measurement capability to characterize conditions and a study to determine realistic snow and fog operational parameters. Delivery of the snow capabilities is due twenty-four months after award, while the fog and measurement capabilities and study are due six to twenty-four months post-award. Pricing is cost-plus-fixed-fee for the various contract line items, with additional items for other direct costs, travel and reporting requirements. The solicitation was issued by the Department of the Army Materiel Command Contracting Command Orlando Contracting Center.
MISTE DO SCETI-ACE CLIN Structure_Final
View the file
Other files
Show 40 more
Latest 50 of 55 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Each Atmospheric Conditions Parameter Study
The contractor shall develop and deliver a study to determine the realistic operational conditions for snow and fog DVE. The contractor shall identify the characteristics to be generated by the Snow Development Capability (SDC) and Fog Development Capability (FDC) which shall be measurable by the Atmospheric Measurement (AM) capability in accordance with the attached System-of-Systems Controlled Environment Test Infrastructure (SCETI) Atmospheric Conditions Enhancement (ACE) Statement of Work and Performance Specification.
Delivery date six (6) months after delivery order (DO) award.
CPFF
ESTIMATED COST
FIXED FEE
TOTAL EST COST + FEE
0002 1 Each Snow Development Capability (SDC)
Design, development, delivery, installation, and integration of Snow Development Capability (SDC) in accordance with the attached System-of-Systems Controlled Environment Test Infrastructure (SCETI) Atmospheric Conditions Enhancement (ACE) Statement of Work and Performance Specification.
Delivery date twenty-four (24) months after delivery order (DO) award.
0003 1 Each Snow Atmospheric Measurement Capability
Deliver Atmospheric Measurement (AM) capability to measure and characterize the snow environmental conditions in accordance with the attached System-of- Systems Controlled Environment Test Infrastructure (SCETI) Atmospheric Conditions Enhancement (ACE) Statement of Work and Performance Specification.
0004 1 Each Fog Development Capability (FDC)
Design, development, delivery, installation, and integration of Fog Development Capability (FDC) in accordance with the attached System-of-Systems Controlled Environment Test Infrastructure (SCETI) Atmospheric Conditions Enhancement (ACE) Statement of Work and Performance Specification.
0005 1 Each Fog Atmospheric Measurement Capability
Deliver Atmospheric Measurement (AM) capability to measure and characterize the fog environmental conditions in accordance with the attached System-of- Systems Controlled Environment Test Infrastructure (SCETI) Atmospheric Conditions Enhancement (ACE) Statement of Work and Performance Specification.
0006 1 Lot
ODC
COST
TEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0007 1 Lot Travel
COST
0008 1 Lot Contract Data Requirement List
NSP
NET AMT NSP
0009 1 Lot Manpower Reporting
NSP
NET AMT NSP
0010 1 Lot Reserved
0011 1 Lot Reserved
File details come from the government source that posted it. Updated .