This document outlines a contract line item number (CLIN) structure for the Modernizing Instrumentation Solutions for Test and Evaluation (MISTE) solicitation.

The CLIN structure includes line items for an atmospheric conditions parameter study, development of snow and fog generation capabilities, and measurement of generated snow and fog conditions. Delivery of the parameter study is six months after award, while development and delivery of the snow and fog capabilities and measurement systems is twenty-four months after completion of the initial study. The pricing structure is cost-plus-fixed-fee. Additional CLINs cover other direct costs, travel, and contract reporting requirements such as the contract data requirements list and manpower reporting. The solicitation seeks these products and services to enhance the System-of-Systems Controlled Environment Test Infrastructure atmospheric testing capabilities of the Department of the Army Materiel Command Contracting Command Orlando Contracting Center.

ATTACHMENT 19_MISTE DO SCETI-ACE CLIN STRUCTURE_R2_FINAL_REVISED

View the file

Other files

File Type Posted
W900KK-19-R-0006-0002_Conform.pdf PDF
ATTACHMENT_17_MISTE_SOLICITATION-QUESTIONS-COMMENTS_FORM_FINAL_ANSWERS_AMEND_0002_06-03-2019.pdf PDF
W900KK-19-R-0006-0002_Amendment.pdf PDF
ATTACHMENT_07_MISTE_DO_SCETI_ACE_PERFORMANCE_SPEC_FINAL_REV.pdf PDF
Final_RFP_W900KK-19-R-0006-01_Amendment.pdf PDF
ATTACHMENT_18_MISTE_DO_TNM-EPG_CLIN_STRUCTURE_R2_FINAL.pdf PDF
ATTACHMENT_11_MISTE_DO_TNM_EPG_SPEC_FINAL_V1.4.PDF PDF
ATTACHMENT_20_MISTE_DO_TISE_CLIN_STUCTURE_R1_FINAL.pdf PDF
ATTACHMENT_01_MISTE_BASE_STATEMENT_OF_WORK_FINAL_REV.pdf PDF
Final_RFP_W900KK-19-R-0006-0001_Conform.pdf PDF
ATTACHMENT_14_MISTE_VOL_IV_COST_AND_PRICE_BASELINE_XLS_WORKBOOK_FINAL_REV.xlsx XLSX spreadsheet
ATTACHMENT_09_SCETI_ACE_QASP_FINAL.PDF PDF
ATTACHMENT_14_MISTE_VOL_IV_COST_AND_PRICE_BASELINE_XLS_WORKBOOK_FINAL.xlsx XLSX spreadsheet
ATTACHMENT_17_MISTE_SOLICITATION_QUESTIONS-COMMENTS_FORM_FINAL.xlsx XLSX spreadsheet
ATTACHMENT_22_SF1408-14B.pdf PDF
ATTACHMENT_05_MISTE_BASE_CONTRACT_DATA_REQUIREMENTS_LIST_(CDRL)_FINAL.pdf PDF
ATTACHMENT_01_MISTE_BASE_STATEMENT_OF_WORK_FINAL.pdf PDF
ATTACHMENT_10_MISTE_DO_TNM_EPG_SOW_FINAL.pdf PDF
ATTACHMENT_12_MISTE__DO_TNM_EPG_CDRL_REPORT_FINAL.pdf PDF
ATTACHMENT_21_DCAA_REQUIRED_PREAWARD_SURVEY_OF_PROSPECTIVE_CONTRACTOR_ACCOUNTING_SYSTEM_CHECKLIST.pdf PDF
ATTACHMENT_18_MISTE_DO_TNM-EPG_CLIN_STRUCTURE_R1_FINAL.pdf PDF
ATTACHMENT_11_MISTE_DO_TNM_EPG_SPEC_FINAL.pdf PDF
ATTACHMENT_20_MISTE_DO_TISE_CLIN_STUCTURE_FINAL.pdf PDF
ATTACHMENT_06_MISTE_DO_SCETI_ACE_SOW_FINAL.PDF PDF
ATTACHMENT_13_MISTE_DO_TNM_EPG_QASP_FINAL.pdf PDF
ATTACHMENT_04_MISTE_BASE_QUALITY_ASSURANCE_PLAN_R1_FINAL.pdf PDF
ATTACHMENT_02_MISTE_BASE_DD_FORM_254_FINAL.PDF PDF
Final_RFP_W900KK-19-R-0006.pdf PDF
ATTACHMENT_08_MISTE_DO_SCETI_ACE_CDRL_REPORT_FINAL.pdf PDF
ATTACHMENT_07_MISTE_DO_SCETI_ACE_PERFORMANCE_SPEC_FINAL.pdf PDF
ATTACHMENT_19_MISTE_DO_SCETI-ACE_CLIN_STRUCTURE_R1_FINAL.pdf PDF
MISTE_Draft_RFP_Responses_to_Industry_04-04-2019_V2.pdf PDF
ATTACHMENT_11_MISTE__DO_TNM_EPG_CDRL_REPORT.pdf PDF
Draft_MISTE_RFP_2-22-2019.pdf PDF
ATTACHMENT_18_MISTE_DO_SCETI-ACE_CLIN_STRUCTURE.pdf PDF
ATTACHMENT_03_SMALL_BUSINESS_PARTICIPATION_FORM.docx DOCX document
ATTACHMENT_14_TECHNICAL_VOLUME_CROSS_REFERENCE_MATRIX.xlsx XLSX spreadsheet
ATTACHMENT_16_MISTE_SOLICITATION_QUESTIONS-COMMENTS_FORM.xlsx XLSX spreadsheet
ATTACHMENT_04_MISTE_BASE_QUALITY_ASSURANCE_PLAN.pdf PDF
ATTACHMENT_06_MISTE_DO_SCETI_ACE_SOW_DRAFT_RFP.pdf PDF
ATTACHMENT_13_MISTE_VOL_IV_COST_AND_PRICE_BASELINE.02_16_19_1210_XLS_WORKBOOK.XLSX XLSX spreadsheet
ATTACHMENT_05_MISTE_BASE_CONTRACT_DATA_REQUIREMENTS_LIST_(CDRL).pdf PDF
ATTACHMENT_02_MISTE_BASE_DD_FORM_254.pdf PDF
ATTACHMENT_10_MISTE_DO_TNM_EPG_Spec.pdf PDF
ATTACHMENT_08_MISTE_DO_SCETI_ACE_CDRLs_DRAFT_RFP.pdf PDF
ATTACHMENT_15_PAST_PERFORMANCE_QUESTIONAIRE.docx DOCX document
ATTACHMENT_09_MISTE_DO_TNM_EPG_SOW.pdf PDF
ATTACHMENT_12_MISTE_DO_TNM_EPG_QASP.pdf PDF
ATTACHEMENT_17_MISTE_DO_TNM-EPG_CLIN_STRUCTURE.pdf PDF
ATTACHMENT_01_MISTE_BASE_STATEMENT_OF_WORK_V1.3.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 1 Each Atmospheric Conditions Parameter Study

The contractor shall develop and deliver a study to determine the realistic operational conditions for snow and fog DVE. The contractor shall identify the characteristics to be generated by the Snow Development Capability (SDC) and Fog Development Capability (FDC) which shall be measurable by the Atmospheric Measurement (AM) capability in accordance with the attached System-of-Systems Controlled Environment Test Infrastructure (SCETI) Atmospheric Conditions Enhancement (ACE) Statement of Work and Performance Specification.

Delivery date six (6) months after delivery order (DO) award.

CPFF

ESTIMATED COST

FIXED FEE

TOTAL EST COST + FEE

0002 1 Each Snow Development Capability (SDC)

Design, development, delivery, installation, and integration of Snow Development Capability (SDC) in accordance with the attached System-of-Systems Controlled Environment Test Infrastructure (SCETI) Atmospheric Conditions Enhancement (ACE) Statement of Work and Performance Specification.

Delivery date twenty-four (24) months after completion of CLIN 0001.

0003 1 Each Snow Atmospheric Measurement Capability

Deliver Atmospheric Measurement (AM) capability to measure and characterize the snow environmental conditions in accordance with the attached System-of- Systems Controlled Environment Test Infrastructure (SCETI) Atmospheric Conditions Enhancement (ACE) Statement of Work and Performance Specification.

0004 1 Each Fog Development Capability (FDC)

Design, development, delivery, installation, and integration of Fog Development Capability (FDC) in accordance with the attached System-of-Systems Controlled Environment Test Infrastructure (SCETI) Atmospheric Conditions Enhancement (ACE) Statement of Work and Performance Specification.

0005 1 Each Fog Atmospheric Measurement Capability

Deliver Atmospheric Measurement (AM) capability to measure and characterize the fog environmental conditions in accordance with the attached System-of- Systems Controlled Environment Test Infrastructure (SCETI) Atmospheric Conditions Enhancement (ACE) Statement of Work and Performance Specification.

0006 1 Lot

ODC

COST

TEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0007 1 Lot Travel

COST

0008 1 Lot Contract Data Requirement List

NSP

NET AMT NSP

0009 1 Lot Manpower Reporting

NSP

NET AMT NSP

0010 1 Lot Reserved

0011 1 Lot Reserved