This document outlines a contract line item structure for the modernization of a test network at Fort Huachuca, Arizona. The contract includes line items for design, hardware/material procurement and installation, network testing, and network training and maintenance. Line items 0001 through 0004 cover design, procurement, testing, and training/maintenance phases. Line items 0005 through 0007 cover other direct costs, travel costs, and data and manpower reporting requirements. Line items 0008 through 0010 are reserved. The related federal contract opportunity is solicitation number W900KK-19-R-0006 from the Department of the Army Materiel Command Contracting Command Orlando Contracting Center to provide instrumentation solutions for test and evaluation. The purpose of the amendment is to provide additional questions and answers, revise sections L and M, remove a duplicate clause, incorporate a clause by full text, and extend the response deadline.
MISTE DO TNM-EPG CLIN Structure_Final
View the file
Other files
Show 40 more
Latest 50 of 55 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Each Design Phase
Includes Start of Work Meeting, Site Surveys, Analysis and all Preliminary and Critical Design Activities leading up through successful completion of Critical Design Review (CDR) for the Test Network at Electronic Proving Grounds (EPG) in Fort Huachuca, AZ in support of Testing Instrumentation for the US Army Test and Evaluation Command (A TEC) in accordance with the Electronic Proving Ground (EPG) Test Network Modernizations Statement of Work and attachments.
Delivery date twelve (12) months after award.
CPFF
ESTIMATED COST
FIXED FEE
TOTAL EST COST + FEE
0002 1 Each Hardware/Material
Procurement, installation, configuration and integration phase for the Test Network at Electronic Proving Grounds (EPG) in Fort Huachuca, AZ in support of Testing Instrumentation for the US Army Test and Evaluation Command (A TEC) in accordance with the Electronic Proving Ground (EPG) Test Network Modernizations Statement of Work and attachments.
Delivery date twelve (12) months after award.
0003 1 Each Network Testing Phase
Network Testing Phase and Government Acceptance for the Test Network at Electronic Proving Grounds (EPG) in Fort Huachuca, AZ in support of Testing Instrumentation for the US Army Test and Evaluation Command (ATEC) in accordance with the Electronic Proving Ground (EPG) Test Network Modernizations Statement of Work and attachments.
Delivery date four (4) months after award.
0004 1 Each Network Training
Network Training, On-Site Monitoring and Maintenance for 12 months for the Test Network at Electronic Proving Grounds (EPG) in Fort Huachuca, AZ in support of Testing Instrumentation for the US Army Test and Evaluation Command (ATEC) in accordance with the Electronic Proving Ground (EPG) Test Network Modernizations Statement of Work and attachments. On-Site monitoring and maintenance for 12 months shall commence after Government approval of the TISN-EN Network. On-Site monitoring and maintenance shall include network optimization, troubleshooting, assistance during live customer testing events, and additional over the shoulder training of the new modernized TISN-EN network.
Period of Performance of twelve months (12) after Government approval of the TISN-EN Network.
0005 1 Lot
ODC
COST
0006 1 Month Travel
COST
0007 1 Month Contract Data Requirement List
NSP
NET AMT NSP
0008 1 Lot Manpower Reporting
NSP
NET AMT NSP
0009 1 Lot Reserved
0010 1 Lot Reserved