This document is a Quality Assurance Surveillance Plan (QASP) for the Modernizing Instrumentation Solutions for Test and Evaluation (MISTE) Delivery Order: 0002 Electronic Proving Ground (EPG) Test Network Modernization contract. The QASP outlines performance standards and monitoring methods for tasks such as program management, financial management, and ensuring completion of anti-terrorism and security training. Performance will be evaluated on criteria including technical, budget and schedule performance. Monitoring methods include direct observation, analysis of progress reports, and performance reporting against defined metrics. Unacceptable performance will be documented through Contract Discrepancy Reports requiring corrective action plans from the contractor. The Procuring Contracting Officer and Contracting Officer's Representative from the U.S. Army are responsible for contract oversight.

MISTE DO TNM EPG QASP Draft RFP

View the file

Other files

File Type Posted
ATTACHMENT_17_MISTE_SOLICITATION-QUESTIONS-COMMENTS_FORM_FINAL_ANSWERS_AMEND_0002_06-03-2019.pdf PDF
W900KK-19-R-0006-0002_Conform.pdf PDF
W900KK-19-R-0006-0002_Amendment.pdf PDF
ATTACHMENT_17_MISTE_SOLICITATION_QUESTIONS-COMMENTS_FORM_FINAL_ANSWERS_5-22-2019.pdf PDF
Final_RFP_W900KK-19-R-0006-01_Amendment.pdf PDF
ATTACHMENT_19_MISTE_DO_SCETI-ACE_CLIN_STRUCTURE_R2_FINAL.pdf PDF
ATTACHMENT_18_MISTE_DO_TNM-EPG_CLIN_STRUCTURE_R2_FINAL.pdf PDF
ATTACHMENT_07_MISTE_DO_SCETI_ACE_PERFORMANCE_SPEC_FINAL_REV.pdf PDF
ATTACHMENT_11_MISTE_DO_TNM_EPG_SPEC_FINAL_V1.4.PDF PDF
ATTACHMENT_14_MISTE_VOL_IV_COST_AND_PRICE_BASELINE_XLS_WORKBOOK_FINAL_REV.xlsx XLSX spreadsheet
ATTACHMENT_20_MISTE_DO_TISE_CLIN_STUCTURE_R1_FINAL.pdf PDF
ATTACHMENT_01_MISTE_BASE_STATEMENT_OF_WORK_FINAL_REV.pdf PDF
Final_RFP_W900KK-19-R-0006-0001_Conform.pdf PDF
ATTACHMENT_04_MISTE_BASE_QUALITY_ASSURANCE_PLAN_R1_FINAL.pdf PDF
ATTACHMENT_16_PAST_PERFORMANCE_QUESTIONAIRE_FINAL.docx DOCX document
ATTACHMENT_03_SMALL_BUSINESS_PARTICIPATION_FORM_FINAL.docx DOCX document
ATTACHMENT_15_TECHNICAL_VOLUME_CROSS_REFERENCE_MATRIX.xlsx XLSX spreadsheet
ATTACHMENT_09_SCETI_ACE_QASP_FINAL.PDF PDF
ATTACHMENT_05_MISTE_BASE_CONTRACT_DATA_REQUIREMENTS_LIST_(CDRL)_FINAL.pdf PDF
ATTACHMENT_07_MISTE_DO_SCETI_ACE_PERFORMANCE_SPEC_FINAL.pdf PDF
ATTACHMENT_19_MISTE_DO_SCETI-ACE_CLIN_STRUCTURE_R1_FINAL.pdf PDF
ATTACHMENT_17_MISTE_SOLICITATION_QUESTIONS-COMMENTS_FORM_FINAL.xlsx XLSX spreadsheet
ATTACHMENT_18_MISTE_DO_TNM-EPG_CLIN_STRUCTURE_R1_FINAL.pdf PDF
ATTACHMENT_22_SF1408-14B.pdf PDF
ATTACHMENT_02_MISTE_BASE_DD_FORM_254_FINAL.PDF PDF
ATTACHMENT_21_DCAA_REQUIRED_PREAWARD_SURVEY_OF_PROSPECTIVE_CONTRACTOR_ACCOUNTING_SYSTEM_CHECKLIST.pdf PDF
ATTACHMENT_10_MISTE_DO_TNM_EPG_SOW_FINAL.pdf PDF
ATTACHMENT_01_MISTE_BASE_STATEMENT_OF_WORK_FINAL.pdf PDF
Final_RFP_W900KK-19-R-0006.pdf PDF
ATTACHMENT_12_MISTE__DO_TNM_EPG_CDRL_REPORT_FINAL.pdf PDF
ATTACHMENT_08_MISTE_DO_SCETI_ACE_CDRL_REPORT_FINAL.pdf PDF
ATTACHMENT_14_MISTE_VOL_IV_COST_AND_PRICE_BASELINE_XLS_WORKBOOK_FINAL.xlsx XLSX spreadsheet
ATTACHMENT_13_MISTE_DO_TNM_EPG_QASP_FINAL.pdf PDF
ATTACHMENT_06_MISTE_DO_SCETI_ACE_SOW_FINAL.PDF PDF
ATTACHMENT_20_MISTE_DO_TISE_CLIN_STUCTURE_FINAL.pdf PDF
ATTACHMENT_11_MISTE_DO_TNM_EPG_SPEC_FINAL.pdf PDF
MISTE_Draft_RFP_Responses_to_Industry_04-04-2019_V2.pdf PDF
ATTACHMENT_15_PAST_PERFORMANCE_QUESTIONAIRE.docx DOCX document
ATTACHMENT_09_MISTE_DO_TNM_EPG_SOW.pdf PDF
ATTACHMENT_03_SMALL_BUSINESS_PARTICIPATION_FORM.docx DOCX document
ATTACHMENT_18_MISTE_DO_SCETI-ACE_CLIN_STRUCTURE.pdf PDF
Draft_MISTE_RFP_2-22-2019.pdf PDF
ATTACHMENT_14_TECHNICAL_VOLUME_CROSS_REFERENCE_MATRIX.xlsx XLSX spreadsheet
ATTACHEMENT_17_MISTE_DO_TNM-EPG_CLIN_STRUCTURE.pdf PDF
ATTACHMENT_16_MISTE_SOLICITATION_QUESTIONS-COMMENTS_FORM.xlsx XLSX spreadsheet
ATTACHMENT_04_MISTE_BASE_QUALITY_ASSURANCE_PLAN.pdf PDF
ATTACHMENT_06_MISTE_DO_SCETI_ACE_SOW_DRAFT_RFP.pdf PDF
ATTACHMENT_11_MISTE__DO_TNM_EPG_CDRL_REPORT.pdf PDF
ATTACHMENT_01_MISTE_BASE_STATEMENT_OF_WORK_V1.3.pdf PDF
ATTACHMENT_07_MISTE_DO_SCETI_ACE_SPEC_DRAFT_RFP.pdf PDF
Show 40 more

Latest 50 of 55 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

QUALITY ASSURANCE SURVEILLANCE PLAN

Version 1.0, 9 December 2019

For

MODERNIZING INSTRUMENTATION SOLUTIONS FOR TEST AND EVALUATION

(MISTE)

Delivery Order: 0002

ELECTRONIC PROVING GROUND (EPG) TEST NETWORK MODERNIZATION

1. PURPOSE.

This Quality Assurance Surveillance Plan (QASP) provides a systematic method to evaluate performance for the stated contract. This QASP explains the following:

• What will be monitored

• How monitoring will take place

• Who will conduct the monitoring

• How monitoring efforts and results will be documented

This QASP does not detail how the contractor accomplishes the work. Rather, the QASP is created with the premise that the contractor is responsible for management and quality control actions to meet the terms of the contract. It is the Government’s responsibility to be objective, fair, and consistent in evaluating performance. In addition, the QASP should recognize that unforeseen and uncontrollable situations may occur.

This QASP is a “living document” and the Government may review and revise it on a regular basis. However, the Government shall coordinate changes with the contractor.

Updates shall ensure that the QASP remains a valid, useful, and enforceable document.

Copies of the original QASP and revisions shall be provided to the contractor and Government officials implementing surveillance activities.

The following FAR clause applies based on contract type:

52.246-4 Inspection of Services – Fixed Price 52.246-5 Inspection of Services – Cost Reimbursement 52.246-6 Inspection – Time and Material and Labor Hour

2. GOVERNMENT ROLES AND RESPONSIBILITIES.

The following personnel shall oversee and coordinate surveillance activities.

a. Procuring Contracting Officer (PCO) - The PCO shall ensure performance of all necessary actions for effective contracting, ensure compliance with the contract terms, and shall safeguard the interests of the United States in the contractual relationship.

The PCO shall also assure that the contractor receives impartial, fair, and equitable treatment under this contract. The PCO is ultimately responsible for the final determination of the adequacy of the contractor’s performance.

Assigned PCO: Daniel Veenstra Organization or Agency: U.S. Army Contracting Command-Orlando Telephone: (407) 208-3308 Email: daniel.l.veenstra.civ@mail.mil

b. Contract Specialist (CS) - The CS acts as an acquisition consultant and serves as liaison between the requesting program office, the contractor, and the supporting contracting office.

Assigned CS: Joe Candelaria Organization or Agency: U.S. Army Contracting Command-Orlando Telephone: 407-208-3220 Email: joseph.candelaria5.civ@mail.mil

c. Contracting Officer’s Representative (COR) - The COR is responsible for technical administration of the contract and shall assure proper Government surveillance of the contractor’s performance. The COR shall keep a quality assurance file. At the conclusion of the contract or when requested by the PCO, the COR shall provide documentation to the PCO. The COR is not empowered to make any contractual commitments or to authorize any contractual changes on the Government’s behalf. The contractor shall refer any changes they deem may affect contract price, terms, or conditions to the PCO for action.

Assigned COR: Juan Orozco Organization or Agency: PEO STRI, PM ITTS-IMO Telephone: 407-384-5370 Email: juan.b.orozco.civ@mail.mil

3. CONTRACTOR REPRESENTATIVES.

To be determined.

4. PERFORMANCE STANDARDS.

Performance standards define desired services. The Government performs surveillance to determine if the contractor exceeds, meets or does not meet these standards.

The Statement of Work (SOW) (SOW-2018-055), V1.1 dated 21 December 2018 delineates the tasks required by the Government. These tasks shall be subject to the following performance standards listed in the table below.

Table 4-1 Performance Standards Summary Matrix

Task Performance Standard Method of Surveillance Frequency

Program Management

(SOW 3.2)

Manage project to achieve technical, budget, and schedule performance.

A, C, D, E Monthly

Financial Management (SOW 3.2.2) Manage project within cost. D, E, F Monthly

Reports

Management Reviews

(SOW 3.2.4)

Maintains and provides continuous interchange of ideas, issues, and resolves potential problem areas.

A, B, D, E Every 4 Months

Anti-Terrorism (AT) Level 1 Awareness

Training

(SOW 3.4.7)

Ensure all Anti-Terrorism Training is complete A, D, F Reporting as required

Access and General

Protection/Security Policy and Procedures

(SOW 3.4.8)

Manage project to ensure all Antiterrorism Operations Security and Information Assurance/Information Technology (IT) training is completed.

A, D, F Reporting as required

Threat Awareness and Reporting

Program (TARP)

(SOW 3.4.9)

Ensure all TARP Training is completed. A, D, F Reporting as required iWatch Training

(SOW 3.4.10)

Ensure all iWatch Training is complete. A, D, F Reporting as required

Notes:

a. Frequency can be adjusted to bi-weekly dependent on contractor performance to ensure risk is adequately managed and mitigated.

b. The Government technical team consists of subject matter expertise from Electronic Proving Grounds (EPG) from Ft. Huachuca, AZ and PM ITTS Instrumentation Management Office (IMO).

c. Methods of Surveillance are explained in Section 5 below.

5. METHODS OF QUALITY ASSURANCE SURVEILLANCE.

Various methods exist to monitor performance. The COR shall use the surveillance methods listed below in the administration of this QASP.

Regardless of the surveillance method, the COR shall always contact the contractor's task manager or on-site representative when a defect is identified and inform the manager of the specifics of the problem. The COR, with assistance from the Contract Specialist, shall be responsible for monitoring the contractor’s performance in meeting a specific performance standard.

A. Direct Observation. (Can be performed periodically or through 100% surveillance.)

B. Management Information Systems (MIS). (Evaluates outputs through the use of management information reports. Best used for general surveillance and may need to be supplemented by periodic inspections.)

C. Periodic Inspection.

D. Progress or status meetings.

E. Analysis of contractor's progress reports. (Evaluate cost, schedule, etc.)

F. Performance reporting. (Evaluate metrics for a specific time period. Develop metrics or use metrics found in MIS.)

6. RATINGS.

Metrics and methods are designed to determine if performance exceeds, meets, or does not meet a given standard and acceptable quality level. A rating scale shall be used to determine a positive, neutral, or negative outcome.

Surveillance results may be used as the basis for actions (to include payment deductions) against the contractor. In such cases, the Inspection of Services clause in the Contract becomes the basis for the PCO’s actions. Additionally, surveillance results may be used to prepare Performance Assessment Reports through the Contract Performance Assessment Reporting System (CPARS). Performance will be documented using the Department of Defense standards for Performance Assessments. The standards, with their definitions, are as follows:

Table 6-1 Overall Performance Ratings

Overall Performance

Rating

Standard

Exceptional Performance meets contractual requirements and exceeds many to the Government’s benefit. The contractual performance of the element or sub-element being evaluated was accomplished with few minor problems for which corrective actions taken by the contractor were highly effective.

Very Good Performance meets contractual requirements and exceeds some to the Government’s benefit. The contractual performance of the element or sub-element being evaluated was accomplished with some minor problems for which corrective actions taken by the contractor were effective.

Satisfactory Performance meets contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.

Marginal Performance does not meet some contractual requirements.

The contractual performance of the element or sub-element being evaluated reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor’s proposed actions appear only marginally effective or were not fully implemented.

Unsatisfactory Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains a serious problem(s) for which the contractor’s corrective actions appear or were ineffective.

7. DOCUMENTING PERFORMANCE.

a. Acceptable Performance.

The Government shall document positive performance. Any report may become a part of the supporting documentation for contract fee payments or other actions.

Additionally, surveillance results may be used to prepare Performance Assessment Reports in CPARS.

b. Unacceptable Performance.

When unacceptable performance occurs, the COR shall inform the contractor and PCO.

This will normally be in writing unless circumstances necessitate verbal communication.

In any case the COR shall document the discussion and place it in the COR file.

When the COR determines formal written communication is required, the COR shall prepare a Contract Discrepancy Report (CDR), and present it to the contractor’s task manager or on-site representative. A CDR template is attached to this QASP.

The contractor shall acknowledge receipt of the CDR in writing. The CDR will specify if the contractor is required to prepare a corrective action plan to document how the contractor shall correct the unacceptable performance and avoid a recurrence. The CDR will also state how long after receipt the contractor has to present his corrective action plan to the COR. The Government shall review the contractor’s corrective action plan to determine acceptability.

Any CDRs may become a part of supporting documentation for contract payment deductions, fee deductions, award fee nonpayment, or other actions deemed necessary by the PCO and as documented in the contract.

8. FREQUENCY OF MEASUREMENT.

a. Frequency of Measurement.

During contract/order performance, the COR shall take periodic measurements as specified in the Frequency column of the Performance Standards Summary Matrix, and shall analyze whether the negotiated frequency of measurement is appropriate for the work being performed.

b. Frequency of Performance Assessment Meetings.

At a minimum, the COR shall meet with the contractor on a bi-weekly basis via teleconference sessions and quarterly at the contractor’s facility to assess performance and shall provide a written assessment. Appendix B and C provide sample report formats.

Prepared by:

Juan Orozco Contracting Officer’s Representative

Appendix A Acronyms and Definitions

Acronyms/Terms Definition AT Anti-Terrorism CDR Contract Discrepancy Report COR Contracting Officer’s Representative CPARS Contract Performance Assessment Reporting System IMO Instrumentation Management Office IT Information Technology PCO Procuring Contracting Officer MIS Management Information System SOW Statement of Work QASP Quality Assurance Surveillance Plan

Appendix B Performance Report

1) CONTRACT NUMBER:

2) Prepared by: (Name of COR) [Insert Name]

3) Date and time of observation:

4) Description of Observation:

Examples of items to include in a report are:

− Method of surveillance:

− How frequently you conducted surveillance:

− Surveillance Results:

− Number of Observations:

Prepared by: [Enter COR’s name]

Signature of Contracting Officer’s Representative Date

Appendix C Contract Discrepancy Report (CDR)

1) CONTRACT NUMBER:

2) TO: (Contractor Task Manger or on-site representative) [Insert Name]

3) FROM: Prepared by: [Enter COR’s name]

4) Date and time of observation:

5) Description of discrepancy or problem: [Describe in detail Identify any attachments, engineering reports or contractor provided specification sheets]

6) Corrective action plan:

[COR’s and Government team’s assessment if a written corrective action plan< is / is not> required]

[If a written corrective action plan is required include the following. > The written Corrective Action Plan will be provided to the undersigned not later than <# of days after receipt of COR notification]

Prepared by: [Enter COR’s name]

Signature Contracting Officer’s Representative Date

Received by:

Signature Contractor Task Manger or on-site representative Date

The COR may initiate a CDR at any time contractor performance is determined to be impacting cost, schedule or performance standards.

1. PURPOSE.
2. GOVERNMENT ROLES AND RESPONSIBILITIES.
3. CONTRACTOR REPRESENTATIVES.
4. PERFORMANCE STANDARDS.
5. METHODS OF QUALITY ASSURANCE SURVEILLANCE.
Regardless of the surveillance method, the COR shall always contact the contractor's task manager or on-site representative when a defect is identified and inform the manager of the specifics of the problem. The COR, with assistance from the Contract...
6. RATINGS.
7. DOCUMENTING PERFORMANCE.
8. FREQUENCY OF MEASUREMENT.