Attachment 0002 - Mission Performance Calculation.xlsx
XLSX spreadsheet 26 KB Posted
- Solicitation number
- W58RGZ-26-R-0026
About this file
This file is a Performance Measurement Calculation template used to evaluate mission performance metrics for aircraft fleet operations under the Fort Rucker Aviation Maintenance (FRAM II) contract. The template establishes two primary performance measurement standards: Daily Mission Performance (DMP) and Monthly Sustained Mission Performance (MSMP).
DMP is a binary daily metric determined separately for each fleet that compares the number of adjusted initial issue aircraft available against contracted aircraft requirements. The calculation accounts for initial issue aircraft totals, rejects, and approved In-Service Repair Action Permits (IRAPs), with DMP rated as "YES" when adjusted aircraft meet or exceed contracted aircraft and "NO" when they fall short. MSMP is a cumulative monthly performance measure that incorporates both initial issue aircraft and additional surge aircraft issued, calculated as a percentage where the total available aircraft (accounting for rejects and approved IRAPs) are divided by the adjusted initial issue aircraft and multiplied by 100. The template provides example calculations showing DMP results and MSMP percentages (100.00% and 107.10% in the examples provided), establishing the baseline measurement framework for evaluating contractor performance in maintaining adequate aircraft availability for Army Aviator training operations at Fort Rucker, Alabama.
View the file
Other files
Show all 36
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
ATTACHMENT 0002 Mission Performance Calculation (v1.9 22JUN26)
DMP
| DMP is determined seperately for each fleet using total information for all 3 sorties, each measured day. DMP is YES or NO | |||
| C1 | 28 | Contracted Aircraft (The lower of Total Aircraft Requested or Attachment 0003 Fleet Calculations) | |
| C2 | 30 | Initial Issue Aircraft Total (The total number of Initial Issue aircraft including spares). This does not include Surge aircraft | |
| C3 | 2 | Initial Issue Aircraft Rejects (The total number of Initial Issue aircraft rejects for all launch periods for the day) | |
| C4 | 1 | Approved IRAPs (The total number approved IRAPs for rejected Initial Issue aircraft) | |
| C5 | 29 | Adjusted Initial Issue Aircraft (=Initial Issue Aircraft Total - (Initial Issue Aircraft Rejects-Approved IRAPs)) | |
| DMP | YES | DMP (DMP is Yes for the fleet for the day if C5-Adjusted Initial Issue Aircraft is >= C1 Contracted Aircraft. DMP is NO for the day for a fleet if C5-Adjusted Initial Issue Aircraft is < C1 Contracted Aircraft |
| C2 | C3 | C4 | C5 | ||||||||||||||||||||||
| 30 | - | ( | 2 | - | 1 | ) | X | 100 | = | 30 | - | 1 | X | 100 | = | 29 | X | 100 | = | 1.036 | X | 100 | = | 103.50 | |
| 28 | 28 | 28 | |||||||||||||||||||||||
| C1 | C1 |
MSMP
| MSMP is a cumulative monthly measure for each fleet | |||
| C1 | 28 | Contracted Aircraft (The lower of Total Aircraft Requested or Attachment 0003 Fleet Calculations) | |
| C2 | 30 | Initial Issue Aircraft Total (The total number of Initial Issue aircraft including spares). This does not include Surge aircraft | |
| C3 | 2 | Initial Issue Aircraft Rejects (The total number of Initial Issue aircraft rejects for all launch periods for the day) | |
| C4 | 0 | Approved IRAPs (The total number approved IRAPs for rejected Initial Issue aircraft) | |
| C5 | 28 | Adjusted Initial Issue Aircraft (=Initial Issue Aircraft Total - (Initial Issue Aircraft Rejects-Approved IRAPs)) |
| C2 | C3 | C4 | C5 | ||||||||||||||||||||||
| 30 | - | ( | 2 | - | 0 | ) | X | 100 | = | 30 | - | 2 | X | 100 | = | 28 | X | 100 | = | 1.000 | X | 100 | = | 100.00 | |
| 28 | 28 | 28 | |||||||||||||||||||||||
| C1 |
| C6 | 28 | Adjusted Initial Issue Aircraft (not to exceed Contracted Aircraft; capped at 100% prior to surge) | |||||||||||||||||||||||||||||
| C7 | 2 | Additional Issue/Surge Aircraft Issued (The total number of Additional Issue/surge aircraft issued, including spares) | |||||||||||||||||||||||||||||
| C8 | 1 | Additional Issue/Surge Aircraft Rejects (The total number of Additional Issue/Surge aircraft rejects for all launch periods for the day) | |||||||||||||||||||||||||||||
| C9 | 1 | Approved Additional Issue/Surge IRAPs (The total number approved IRAPs for rejected Additional Issue/Surge aircraft) | |||||||||||||||||||||||||||||
| C10 | 30 | Additional Issue/Surge Aicraft Total (=(Adjusted Initial Issue Aircraft + Additional Issue/Surge Aircraft Issued)- (Additional Issue/Surge Aircraft Rejects-Approved Additional Issue/Surge IRAPs)) | |||||||||||||||||||||||||||||
| MSMP | 107.1 | MSMP (=(Additional Issue/Surge Aircraft Total divided by (/) Adjusted Initial Issue Aircraft) x 100) | |||||||||||||||||||||||||||||
| C6 | C7 | C8 | C9 | C10 | MSMP | ||||||||||||||||||||||||||
| ( | 28 | + | 2 | ) | - | ( | 1 | - | 1 | ) | X | 100 | = | 30 | - | 0 | X | 100 | = | 30 | X | 100 | = | 1.071 | X | 100 | = | 107.10 | |||
| 28 | 28 | 28 | |||||||||||||||||||||||||||||
| C1 |