Attachment 2A_AA1 00150 2P_BLDG 2022_FINAL_TECHNICAL SPECIFICATIONS.pdf

PDF 655 KB Posted

Attached to
Darby Military Community Construction Multiple Award Task Order (MATOC) Recompete
Solicitation number
W58D2M24R0003
Issued by

About this file

This is a solicitation for a multiple award task order contract (MATOC) recompete to provide construction services at Darby Military Community. The solicitation seeks to award an indefinite delivery/indefinite quantity contract with a five-year ordering period and $500 million ceiling to an unspecified number of awardees. Services will include new construction, repair, alteration, and maintenance of facilities, utilities and infrastructure. The Department of the Army Materiel Command Army Contracting Command is the issuing agency. The response deadline is not provided. Pricing will be fixed unit prices or labor rates. There are no set-asides or socioeconomic requirements specified.

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEPARTMENT OF THE ARMY

UNITED STATES ARMY GARRISON ITALY - DARBY MILITARY COMMUNITY

PUBLIC WORKS OFFICE

APO AE 09613

Project

AA1-00150-2P

DECONSTRUCT AND RECONSTRUCT FACILITY IN ASA

BUILDING 2022

AMMUNITION STORAGE AREA, LIVORNO, ITALIA

TECHNICAL SPECIFICATIONS

Consisting of 94 pages + 1 attachment of 2 pages

Date: March 2023

User Timbro TVG

AA1-00150-2P – BLDG. 2022 2

INDEX

SECTION Ia - GENERAL REQUIREMENTS

SECTION Ib - QUALITY CONTROL BY CONTRACTOR

SECTION IIa - DESCRIPTION OF WORK

SECTION IIIa - DEMOLITION AND REMOVAL

SECTION IIIb - EXCAVATION AND BACKFILLING

SECTION IVa - REINFORCED CONCRETE WORK

SECTION IVb - REINFORCED CONCRETE

SECTION IVc - STEEL WORK

SECTION Va – PREFINISHED PREFORMED INSULATED METAL ROOFING AND

WALL PANELS

SECTION Ve - MISCELLANEOUS METALWORK

SECTION VIIf - RUST-INHIBITIVE TREATMENT FOR METAL SURFACES

SECTION VIIIb – OVERHEAD MOTORIZED ROLLING DOOR

SECTION IXc – STEEL DOORS AND FRAMES

SECTION IXe - DOOR HARDWARE

SECTION XIa - ROAD PAVEMENTS

SECTION XId - REPAIR OF BITUMINOUS PAVINGS

SECTION XIIa - GENERAL REQUIREMENTS MECHANICAL SYSTEMS

SECTION XIIi - VENTILATION SYSTEM

SECTION XIIIa - ELECTRICAL SYSTEMS

SECTION XIIIb - TELECOMMUNICATION SYSTEM

AA1-00150-2P – BLDG. 2022 3

SECTION XIIIc - FIRE DETECTION AND ALARM SYSTEMS

ATTACHMENT 1 - MINIMUM SAFETY/SECURITY REQUIREMENTS AMMUNITION

STORAGE AREA

AA1-00150-2P – BLDG. 2022 4

PREFACE

NATURALISTIC RESTRAINS

Since the work area is subject to particular naturalistic constraints, construction works shall not be authorized between 15 March and 15 July due to the fauna reproduction period, as prescribed by the Natural Park. In case construction works are still ongoing during that timeframe, works will be stopped without additional expenses for the Government.

AA1-00150-2P – BLDG. 2022 5

SECTION Ia - GENERAL REQUIREMENTS

1a-01 WORK PHASING.

a. Work Schedule. Whenever the nature of the contract and the work location are such that the work is to be performed in an area assigned to activities and services that cannot be interrupted, work shall be scheduled with concurrence of COR in such a manner as to cause the least possible inconvenience to the normal operations of mentioned activities and services.

Contractor shall submit his proposed work schedule to the COR at the time of the pre-construction conference. Work start shall be contingent upon schedule approval.

b. Utilities Cut-Offs. As a rule, cut-off of power and other utilities (water, sewage, heating system, etc.) is not allowed. All temporary connections necessary to insure continuous power distribution shall be provided. If cut-offs are necessary, they shall not exceed the period of time strictly needed to make the temporary connections. Cut-off shall be scheduled with the COR not less than 15 days ahead of time.

c. Alarm, Telephone and Televisions Systems. Deenergizing of alarm, telephone and television systems is strictly prohibited. Should these systems, which may not appear on the drawing interfere with the contract work, they shall be temporarily diverted and fed by means of temporary connections to be adequately protected. Written approval must be obtained from COR prior to doing any temporary work.

d. System Reactivating. At the completion of the work, all existing systems, including water, electrical and heating systems, shall be reactivated and placed in their original locations.

e. Temporary Protections. Floors, carpets, and equipment that cannot be removed shall be adequately protected by temporary tarpaulins to be furnished and installed at no cost to the US Government. In addition, temporary protections shall be furnished and installed in some particular areas so as to allow performance of activities that cannot be interrupted or transferred. Also, the Contractor shall be responsible for removing, protecting, and reinstalling all furniture, shelves and furnishings that may interfere with the work course.

A wrong or no evaluation of all requirements specified above does not constitute grounds for a request for additional compensation.

1a-02 JOBSITE CLEAN UP AND DUST CONTROL. The contractor shall have sufficient trash/waste bins on site, and shall clean the worksite so that all discarded materials, debris and trash are placed in these bins at the end of each workday, and not left or allowed to accumulate anywhere else on the jobsite. These waste bins shall not be allowed to overflow with debris, and shall be emptied as soon as they become full. Haul roads shall be watered sufficiently to prevent excessive dust. The work area shall be swept regularly to prevent accumulation of debris. Equipment, construction materials and excavated soil shall be stored in a safe and orderly manner on the jobsite, in accordance with the contractor's approved area use plan.

AA1-00150-2P – BLDG. 2022 6

1a-03 CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT. The contractor is considered the waste generator of all salvage, re-usable, re-cyclable and disposable materials derived from the demolition and removal works included in this contract and shall handle these materials as hereinafter indicated.

a. Salvage Material. All salvage end items that the COR will have considered in good operating conditions shall be disassembled without damage, cleared of all dirt and scaling and then transported to the DPW Warehouse, Building 5156, Depot, where they shall be handled over undamaged.

b. Re-usable Material. End items removed during contract accomplishment which cannot be re-utilized in future construction but which still have a commercial value shall be delivered to the DRMO, through DD Form 1348-1a. This material includes, but it is not limited to, canvas, textile consisting of scrap clothing, scrap aluminum including doors, windows and frames, copper, brass, bronze, and stainless steel, cables, electric motors, light and heavy metals in different sizes and thicknesses that the DRMO contractor can handle (3-4 m long), electrical and electronic equipment, and kitchen appliances. All the above material must be free of hazardous property and need to be segregated. The scraps generated in the Supply & Maintenance Area shall be transported to the DRMO yard only on Monday and Tuesday from 08:00 am to 15:00 pm by appointment through the COR. The scraps generated from other installations must be kept in place. DRMO will arrange the removal. However, the contractor shall request a pre-inspection of the material by DRMO through the COR.

c. Recyclable Material. All construction and demolition recyclable waste material shall be delivered to authorized treatment facilities by the contractor.

d. Special Waste. All special waste, either hazardous or not hazardous, shall be delivered by the contractor to authorized disposal facilities.

e. Waste Storage. Construction and demolition waste shall be stored in waste specific containers provided by the contractor. Containers will be in good conditions, free from severe rusting, bulging, or structural defects. Containers shall be placed in area identified by COR. Containers shall be removed once full or on COR’s decision.

f. Certificates and Authorizations.

(1) Recyclable Materials. As regards to recyclable materials, the Contractor shall submit copy of the authorization of the treatment facility which they are delivered to and will certify that waste have been removed in compliance with applicable law requirements.

(2) Disposable Materials. As regards to material delivery to disposal facilities, the contractor will provide the COR and DPW Environmental Office with copies of the following documents:

Authorization to transport construction and demolition waste;

AA1-00150-2P – BLDG. 2022 7

Authorization of the landfill;

4th copy of Formulario di Identificazione del Rifiuto.

(3) Waste Manifest. All transported waste will be accompanied by the Formulario di Identificazione del Rifiuto (waste manifest) to ensure a complete audit trail from point of origin to ultimate disposal. The waste manifest must be completed in quadruplet, all dated and signed by the waste generator and countersigned by the transporter. The first copy of the manifest will remain with the waste generator; of the remaining three copies, (countersigned and dated by the receiver), the second copy will remain with the transporter, the third copy will remain with the receiver, and the fourth copy must be returned by the transporter to the waste generator within 3 months of delivery of the waste to the disposal/treatment facility.

g. Costs. All operations included in this paragraph shall be carried out by the contractor with no additional cost to the US Government.

1a-04 AUTHORIZATION FOR INSTALLATION OF MATERIAL AND EQUIPMENT. Before installing any material or equipment mentioned in the specifications, approval shall be obtained from the COR. Contractor shall submit material samples, shop drawings, manufacturer's literature, etc., to the COR 10 days prior to installation and shall proceed with installation only after receiving written approval from the COR. All material installed without COR's approval shall be removed. The COR approval of submittals shall not be construed as a complete check, but will indicate that the general method of construction, materials, detailing and other information are satisfactory. Approval will not relieve the Contractor of the responsibility for any error which may exist.

1a-05 CONTRACTING OFFICER'S REPRESENTATIVE TITLE ABBREVIATION.

The terms COR and "Direzione dei Lavori" used in the Italian version of these specifications are equivalent to the American term "Contracting Officer's Representative," which in the English version is indicated by the letters COR.

1a-06 DIGGING PERMIT. The Contractor shall obtain a digging permit for all work areas affected by this contract (to insure that all the as-built information for underground services is received). This permit and related drawings must be received by the Contractor prior to starting any work. After receipt of the digging permit, the Contractor shall immediately notify, in writing the Contracting Officer of the permit receipt. The Contractor will be held responsible for any damages caused to existing services, as indicated on the digging permit and related drawings, and will repair such damages at his own expense. In any case before excavating, Contractor shall always perform a survey with an Underground Cables and Pipes Locator.

1a-07 PARTICULAR REQUIREMENT FOR WORK IN HEATING PLANTS. When the contract requires the work to be performed inside heating plants, the contractor shall provide a new cylinder in the door lock and shall deliver two keys of the new cylinder and the removed cylinder to the personnel in charge of the maintenance. At the work end the contractor shall restore the lock to the original conditions and the temporary cylinder will remain his own property.

AA1-00150-2P – BLDG. 2022 8

1a-08 ANTI-TERRORISM TRAININGS AND SECURITY POLICY. The Contractor shall comply with the following security requirements:

a. AT Level I Training. All contractor employees, to include subcontractor employees, requiring access Army installations, facilities and controlled access areas must complete AT Level I awareness training prior to issuance of Installation Access Passes. The contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee to the COR or to the contracting officer,if a COR is not assigned, within 10 calendar days after completion of training by all employees and subcontractor personnel. Certificate is valid for 1 year and training must be redone before the expiration date.

AT Level I awareness training is available at the following website:

http://jko.jten.mil/courses/atl1/launch.html

b. OPSEC Training. All contractor employees, to include subcontractor employees, requiring access Army installations, facilities and controlled access areas must complete OPSEC training prior to issuance of Installation Access Passes. The contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee to the COR or to the contracting officer if a COR is not assigned, within 10 calendar days after completion of training by all employees and subcontractor personnel. Certificate is valid for 1 year and training must be redone before the expiration date. OPSEC training is available at the following website: https://securityawareness.usalearning.gov/opsec/index.htm.

c. iWATCH Training. The contractor and all associated sub-contractors must brief all employees requiring access Army installations, facilities and controlled access areas on the local iWATCH program prior to issuance of Installation Access Passes. This local developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR. The contractor shall submit a declaration of training completion for each affected contractor employee and subcontractor employee to the COR or to the contracting officer if a COR is not assigned, within 10 calendar days after completion of training by all employees and subcontractor personnel. Training must be annually renovated.

d. Access And General Protection/Security Policy And Procedures. The Contractor shall obtain entry passes for each employee. The Contractor shall inform his personnel that they may be subjected to search when entering or leaving the installation at the discretion of the Installation Commander. Upon completion of the contract work or upon employee termination the Contractor shall return all passes to the Contracting Officer or the COR. Contractor and all associated sub-contractors' employees shall comply with applicable access and security policies and procedures (provided by government representative). The contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshall Office, Director of Emergency Services, or Security Office. Contractor workforce must comply with all personal identity verification requirements as directed by DOD, HQDA, and/or local policy.

AA1-00150-2P – BLDG. 2022 9

In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security processes.

1a-09 ENVIRONMENTAL POLICY. The USAG Italy implements an EMS in accordance with EO13693, ISO 14001:2004(E), DoD, and IMCOM requirements. An EMS is an overall management system that includes organizational structure, planning activities, responsibilities, practices, procedures, processes and resources for developing, implementing, achieving, reviewing and maintaining the environmental policy of an organization. The USAG Italy EMS is designed to ensure that all personnel, including contract personnel, whose work activities can cause real or potential significant environmental impact, are aware of how their work supports the EMS and are competent to perform their roles, responsibilities and authorities while supporting the USAG Italy mission. Contractors and their personnel are required to be aware of, and comply with, the USAG Italy Environmental policy and legal and other requirements when performing work at an installation. The contractor will provide the following information semi-annually to be used by the Government to address environmental performance relative to the goals of the USAG Italy Environmental Management System. Please note that the amounts reported are those used/generated by the contractor regardless of source (private purchase or government furnished). Reports for January – June will be submitted by 15 July and reports for July- December will be submitted by 15 January each year.

Media Report Element #1 Report Element #2 Non-Hazardous Solid Waste Total Waste Generated (Kg) Amount of Waste Diverted from Landfill (Kg) Construction Debris/Demolition Materials

Total Waste Generated (Kg) Amount of Waste Diverted from Landfill (Kg)

Compostable/Organic Material

Total Waste Generated (Kg) Amount of Waste Diverted from Landfill (Kg)

Hazardous Materials Total Used (Kg) Hazardous Waste Total Generated (Kg) Total Recycled (Kg) Energy Consumption - Electricity

Total Energy Consumed (MBtu)

Energy Consumption - Fuel Total Fuel Consumed (L) Renewable/Alternative Energy

Total Consumed (MW)

Facility Construction/Renovation

Number of Buildings LEED Certified Silver or Higher

SqFt of buildings LEED Certified

1a-10 COMPLIANCE WITH LAWS, REGULATIONS, CRITERIA. All construction works shall be performed in full accordance with applicable Italian and United States laws, regulations, codes, whichever is more restrictive at contract award date.

AA1-00150-2P – BLDG. 2022 10

SECTION Ib - QUALITY CONTROL BY CONTRACTOR

1b-01 GENERAL. The Contractor shall establish and maintain an effective quality control system to implement the requirements of contract clause entitled "Inspection of Construction (July 1986)". The quality control system shall comprise plans, schedules, and organization necessary to provide materials, equipment, workmanship, manufacture, construction, and operations which comply with contract requirements and shall identify personnel and forms to be used. The system shall cover construction operations, both indoors and outdoors, and shall be in accordance with the proposed construction sequence.

1b-02 COORDINATION MEETING. As soon as practicable after receipt of Notice to Proceed and before start of construction, the Contractor shall meet with the Contracting Officer's Representative (COR) and discuss the Contractor's quality control (CQC) system.

During the meeting a mutual understanding of the system details shall be developed including the forms for recording the CQC operations, control activities, testing, administration of the system for both indoors and outdoors construction, and the interrelationship of Contractor's inspection and control with the Government's inspection. Minutes of the meeting will be prepared by the COR and forwarded to the Contracting Officer who will make them a part of the contract file. There may also be other subsequent meetings will be called to reconfirm understandings. Minutes of these meetings will also be forwarded to the Contracting Officer.

1b-03 QUALITY CONTROL PLAN.

a. Prior to starting the construction, the Contractor shall furnish his CQC plan through the COR to the Contracting Officer for acceptance. Construction will be permitted to begin only after acceptance of the CQC plan or approval of that portion of the plan applicable to the particular feature of the work to be started. The QC plan proposed by the Contractor shall identify personnel, procedures, instructions, records and forms, and, as a minimum, shall include:

- A description of the quality management organization.

- The names, qualifications, duties, responsibilities, and authorities of each person assigned a quality control (QC) function.

- A copy of the letter to the QC manager, signed by an authorized official of the firm, which describes the responsibilities and delegates the authorities of the QC manager.

- Procedures to perform QC over other activities including subcontractors, manufacturers, and suppliers.

- Control testing procedures for each specific test.

- Reporting procedures for QC including proposed reporting formats.

b. After approval of the QC plan the Contractor shall notify the Contracting

Officer in writing of any proposed change to his QC plan. Proposed changes are subject to acceptance by Contracting Officer.

AA1-00150-2P – BLDG. 2022 11

c. The acceptance of the QC plan is conditional and will be predicated on a satisfactory performance during the construction. If it is determined that the QC plan, personnel, instructions, controls, tests or records are not providing a construction conforming to contract requirements, the Government will reserve the right to require the Contractor to make changes in his QC plan and operations, as deemed necessary to obtain the specified quality. Any changes required to the plan will be made at no cost to the Government.

1b-04 QUALITY CONTROL ORGANIZATION.

a. The Contractor shall identify an individual within his organization at the site of the work who shall be responsible for overall management of CQC and have the authority to act in all CQC matters for the Contractor.

b. A staff shall be maintained under the direction of the system manager to perform all QC activities. The actual strength of the staff during any specific work period may vary to cover work phase needs, shifts and rates of placement. The personnel of his staff shall be fully qualified by experience and technical training to perform their assigned tasks, and shall be directly hired by and work for the prime Contractor.

1b-05 SUBMITTALS.

a. The Contractor shall develop procedures for purchasing materials and equipment, subcontracting, and processing shop drawings, samples, certificates, and other submittals. This procedure shall include the establishment of responsibilities to assure, at each level, adequate review and approval, timely delivery including verification procedures, and proper storage. Submittals of the shop drawings and/or manufacturer's data shall be, as specified, in accordance with contract clauses entitled "Materials and Workmanship" and "Shop Drawings."

b. Actions shall be taken to ensure that only materials and equipment which comply with contract requirements are purchased and delivered to the job site or used in off site fabrication, unless specific deviations are approved, as specified hereinafter. The COR may request a copy of the document of transportation of the provided material.

c. The Contractor shall review the contract requirements and verify that submittals are confirming to contract compliance. Within 10 days after receipt of notice to proceed, the Contractor shall submit a submittal control document listing and scheduling all submittal items required in the contract. This document shall be in duplicate and shall be addressed through the COR to the Contracting Officer. The control document shall include such items as construction schedules, monthly progress reports, shop drawings, manufacturer's literature, certificates of compliance, material samples, and guarantees. The document shall schedule for each item the dates of submittals. The scheduling of submittals shall be coordinated with the approved progress schedule; the information contained therein shall be reviewed and updated at each schedule update.

AA1-00150-2P – BLDG. 2022 12

Adequate time shall be allowed to the US Government for approval of submittals. The Contractor shall review the listing at each progress schedule update and copies of updated documents shall be submitted through the COR to the Contracting Officer in the specified quantity. Payments to the Contractor will not be made for material or equipment which does not comply with the Contract requirements.

d. The CQC organization shall be responsible for certifying that all submittals are in compliance with the contract requirements. Submittals to the Contracting Officer without evidence of the certification will be returned for resubmission.

e. The Contractor shall submit copies of all submittals through the COR to the Contracting Officer.

f. Delays in the approval process shall not be the basis for consideration of a time extension when such delay is the result of the Contractor's failure to make proper and timely submittal, or make corrections in accordance with the specifications or the Contracting Officer's comments, or is a result of a resubmittal which is required because of an unsatisfactory original submittal. Approval action by the Contracting Officer will not relieve the Contractor of his responsibility for compliance with the contract but will indicate only that the general method of construction and detailing is satisfactory.

g. All proposed deviations from contract requirements shall be submitted in writing for approval by the Contracting Officer.

1b-06 CONTROL. Quality control is the means by which the Contractor assures himself that his construction complies with the requirements of the contract plans and specifications. The QC system shall include at least the following three phases of control and management for all definitive features of work:

a. Preparatory. This control phase shall be performed before beginning work on each definable feature of work. It shall include a review of contract requirements to assure that materials, sample, and equipment conform to contract requirements and that control testing procedures are finalized. The control shall also include examination of the work area to verify that structures over which new work is to be placed conform to contract requirements;

Contractor shall also verify that the required materials be on hand and properly stored. The COR shall be notified at least 24 hours in advance of each preparatory activity.

b. Initial. This phase of control must be accomplished as soon as a representative portion of the particular feature of work has been accomplished and shall include examination of the quality of workmanship and a review of control testing for compliance with contract requirements, identification of defective or damaged materials, omission, and dimensional requirements. The COR shall be notified at least 24 hours in advance of the initial inspection and such inspection shall be made a matter of record in the CQC documentation.

AA1-00150-2P – BLDG. 2022 13

c. Follow-Up. The follow-up phase shall be performed continuously to verify that control procedures are providing an end product which complies with contract requirements.

Adjustments to control procedures may be required based upon the results of this phase.

d. Completion. At the completion of all work or any increment, the CQC representative shall conduct a joint review with the COR. During this review the work shall be examined, quality control shall be examined, and a list shall be developed of work not properly completed or not conforming to plans and specifications. This list shall be included in the quality control documentation with an estimated date for correction of each deficiency.

The Contractor shall make sure that deficiencies be corrected prior to the contract completion date. Payment will be withheld for defective or deficient features until they are satisfactorily corrected except as otherwise provided in the contract.

1b-07 TESTS. The Contractor shall perform tests specified or required to verify that control measures are adequate to provide a product which conforms to contract requirements. The Contractor shall procure the services of an industry recognized testing laboratory or he may establish an approved testing laboratory at the project site. A list of tests which Contractor believes necessary shall be furnished to the COR. The list shall give the test name, specification paragraph containing the test requirements, and the personnel and laboratory responsible for each type of test.

The Contractor shall perform the following activities and provide the following data:

- Verify that the testing procedures comply with contract requirements.

- Verify that facilities and testing equipment are available and comply with testing standards.

- Check test instrument calibration data against certified data.

- Verify that recording forms including all pertaining documentation have been prepared.

The Contracting Officer reserves the right to check laboratory equipment in the proposed laboratory for compliance with the standards set forth in the contract specifications and to check the laboratory technician's testing procedures and techniques.

The Contracting Officer reserves the right to utilize the Contractor's control testing laboratory and equipment to make assurance tests and to check Contractor's testing procedures, techniques, and test results at no additional cost to the Government.

Cost incidental to the transportation of samples or materials will be borne by the Contractor.

1b-08 DEFECTIVE WORK. The Contractor shall not build upon or conceal a defective work.

AA1-00150-2P – BLDG. 2022 14

1b-09 DOCUMENTATION. The Contractor shall maintain current records, on an appropriate form, of quality control operations, activities and tests performed including the work of suppliers and subcontractors. These records shall include factual evidence that the required activities or tests have been performed, including but not limited to the following:

- Type and number of control activities and tests involved.

- Results of control activities or tests.

- Nature of defects, causes for rejection, etc.

- Proposed remedial action.

- Corrective actions taken.

These records shall cover both conforming and defective or deficient features and shall include a statement saying that supplies and materials incorporated in the work comply with the contract. Legible copies of these records shall be furnished to the COR weekly. The records shall cover work performed during the time period for which the records are furnished and shall be verified by persons designated by the Contractor.

AA1-00150-2P – BLDG. 2022 15

SECTION IIa - DESCRIPTION OF WORK

2a-01 STATEMENT OF WORK. Contractor shall furnish all plants, labor, equipment, material and transportation necessary for the accomplishment of the work described in these specifications and shown on drawings, both of which are an integral and binding part of the contract.

2a-02 DESCRIPTION OF THE WORK. The work to be performed in this project AA1- 00150-2P, “Deconstruct and Reconstruct Facility in ASA, Building 2022, Supply and Maintenance Area, Livorno, Italia, consists in the construction of a metal building used as a warehouse for construction timber with a 30-minute fire-resistant steel load-bearing structure, bolted to a reinforced concrete slab thickened around the perimeter for anchoring the plates.

To prevent flooding, the level of the floor will be raised compared to the existing one and the driveway access secured by two ramps. the roof and the walls will be made with insulated metal panels of the same color as the existing ones. To ensure natural ventilation, the two external doors for pedestrian access will be grilled, equipped internally with panic bars and anti-insect nets. Opening from the outside is via handle and key. The two driveways will be protected by steel roller shutters with insulated slats, electrically operated, equipped with accident-prevention protections and equipped with switches which, when opened, will activate the extractors for the expulsion of the exhaust gases. The external works, in addition to the demolition of the existing building, include earthworks for the new foundations and excavations for the construction of the new service lines. To avoid cutting the asphalt, road crossings will be carried out using guided horizontal drilling. New ramps and platforms will be built to facilitate access to the building. The external works will be concluded with the arrangement of the land around the building to drain rainwater and to allow people to leave easily and safely in the event of an escape for safety reasons. The building will be equipped with an exhaust gas extraction system for combustion vehicles operating within the area consisting of two electric extractors positioned on the roof activated by the movement of the shutters. The lighting system will be created by lighting bodies positioned 5.50 from the floor, above the line of the trusses so as to be protected by the buckets of the construction vehicles.

For fire protection, a linear detection system communicating via fiber will be provided. Main work items include but are not limited to the following:

CIVIL WORKS

- Site arrangement;

- Complete demolition of the metal building including the reinforced concrete pavement and foundations;

- Demolition of the exterior platforms in reinforced concrete;

- Cutting existing asphalt and excavation for new ducts;

- Excavations for the construction of new electrical, telecommunication and earth loop cable ducts, including the relative manholes;

- Controlled horizontal drilling for road crossings;

- Slab excavation for new foundations;

- Creation of a foundation with a crawl space;

AA1-00150-2P – BLDG. 2022 16

- Construction of new manholes in reinforced concrete cast on site with covers in ductile iron for electrical and telecommunication cable ducts;

- Laying of new prefabricated concrete wells with nodular cast iron covers for the earthing system;

- Construction of new reinforced concrete ramps for vehicle access to the building;

- Construction of new concrete platforms for pedestrian accesses;

- Laying of new pipes in HDPE 750N dia. 160 for electric cables;

- Laying of new PVC pipes schedule 40 dia. 125 for communication cables;

- Landscaping.

STRUCTURAL WORKS

- Foundation slab with perimeter reinforcement for anchoring the pillar plates;

- Structure in 30' fire resistant steel elements.

ARCHITECTURAL WORKS

- Removal of steel doors and shutters;

- Removal of insulated metal wall and roof panels;

- On-site supply of new insulated steel roofing and wall panels;

- On-site supply of gutters and downspouts in pre-finished galvanized sheet metal;

- Supply of anti-fall safety system on the roof including access ladder in galvanized steel with protective cage;

- On-site supply of new pre-finished galvanized steel grilled doors, equipped with anti-insect screens, panic bar and external handle with key;

- Supply of rolling shutters, in insulated steel, electric movement, equipped with accident prevention safety systems;

- Treatment of the internal concrete floor with hardener and anti-dust;

- Supply of signs with building number;

- Realization of internal horizontal signs.

MECHANICAL WORKS

- Provision of new roof exhaust fans complete with bird screen and safety switch.

ELECTRICAL WORKS

‐ Warehouse will be provided with new Distribution panel serving the electrical systems;

‐ New Distribution panel will be supply from existing main distribution panel siting in the Bldg. 3027 on the Vannini Road;

‐ New electrical line will be installed inside new cable ducts;

‐ New electrical system will be designed as TN-S type with voltage rating

400/230 V, 50 Hz, 3-phase;

AA1-00150-2P – BLDG. 2022 17

‐ Interior power distribution will be in galvanized steel conduits rigid or flexible;

‐ The cables will be installed inside steel conduits. All conductors shall be copper, flexible type;

‐ Lighting system will be equipped with watertight LED lighting fixtures installed in sight. The emergency lighting system will be provided with dedicated LED lighting fixtures;

‐ Power system made up of civil series power receptacles and wall panels with industrial type outlets.

‐ Supply of main ground bus inside the building consisting of a flat perforated copper bar, which will be connected to the new external ground system;

‐ All the metal casings of the equipment will be connected to the main ground;

‐ On site will be providing new fiber cable connecting with Build. 4013;

‐ New fiber line installed partly inside the existing cable ducts along Bassetto

Road and partly inside new cable ducts to connect the existing manholes to warehouse;

‐ Supply of new spare fiber optic cables no. 36;

‐ Supply of a new media converter and all the accessories needed to transmit alarm signals from the warehouse to the Build. 4013;

‐ Supply of a new fire alarm control panel;

‐ Supply of a new telephone dialer;

‐ Supply of the fire alarm system which will be consists of: linear detectors, visual signaling, acoustic signaling, manual station;

‐ Distribution will be rigid pipes of galvanized steel, separated from the power distribution.

2a-03 STRUCTURAL WORKS DIRECTION. The Contractor shall appoint also a professional engineer enrolled in the Order of Professional Engineers section A (5-year degree) in the sector of competence of the work (preferably the designer) that shall assume the role of “structural work director”, as per Law 1086 of 1971, the Nuove Norme Tecniche per le Costruzioni (new technical norms for constructions), DM 14/1/2008 and DM 17/1/2018 and other applicable norms, with limitation to the structural works included in the construction contract. The incumbent shall have the requirements and the competence required by the Italian Law for the performance of the indicated functions. Particularly the requirement of registration to the Engineers Order shall be certified. The tasks of the Direttore dei Lavori (DL) shall consist of the following:

• Vigilance on the work, to be performed during visits in the necessary number, also producing indications through the COR for the implementation of the project work in the several executive phases and verifying for good result;

• Acceptance reports of structural materials;

• Provision through the COR of the necessary indications and orders to the constructing firm to have the work performed in compliance with the structural project and to ensure the good result.

In case the DL estimates a modification to the original project is necessary due to unexpected reasons or to wrong evaluation during the design, he/she shall notify the COR with a technical report, who will forward to the Contracting Officer, to the tester and to the Chief of Engineering Services Branch, containing the necessary technical indications for a correct work performance.

AA1-00150-2P – BLDG. 2022 18

In case a work is performed without the required skill or with materials different from the ones required, the QA (DL) shall inform the COR to immediately request the demolition and the reconstruction of the defective part. At the completion of the structures and within 30 days, the DL shall provide a report in three copies on his/her work accomplishment, containing the following documents:

• Copy of the reports of visits to the work site;

• Copy of reports of structural materials acceptance;

• The certificates of the tests on used materials, provided by authorized official laboratories;

• A report on the result of any load tests, also enclosing the copies of pertaining reports signed for true copy.

Of the two copies of the report after the completion of the structure, one shall be filed in the pertinent office and the other shall be delivered to the Tester with all updated project documents.

2a-04 STRUCTURAL STATIC TESTING. Static testing must be certified according to the Italian code NTC 2018. The static tester will be chosen by the DPW between a trio of professional engineers proposed by the contractor: Contractor will be in charge of the retribution of the aforementioned selected engineer.

2a-05 SAFETY DURING CONSTRUCTION. The project is performed assuming the possible presence of more than one firm, also not at the same time, on the work place, as per paragraphs 3 and 4 of art. 90 of Legislative Decree 81/2008. The “Piano di Sicurezza e Coordinamento” (safety and coordination plan) is included as part of the contract documentation. The Contractor shall provide his/her own “Piano Operativo di Sicurezza” (operational safety plan) and comply with the requirements of the mentioned Law in all applicable parts.

2a-06 EMERGENCY SITUATIONS. Contractor will maintain the following documentation available and usable at the work site, to be provided by the COR:

- A copy of the Camp Darby Emergency Plan, to which contractor will refer in case of the emergency conditions indicated in the plan itself;

- Base Grid Coordinates layout, with the work site highlighted;

- List of emergency telephone numbers.

2a-07 FIRE PREVENTION CONTROL. This project is pertaining to one or more activities that were ascertained to be subject to fire prevention control by the “Vigili del Fuoco” (Italian Fire Department) as set forth by DPR 1 August 2011 n. 151. Whenever applicable (activities under category B or C), during the project design the “Parere di Conformità Antincendio” was obtained and consists of the Fire Prevention Compliance Opinion, released by the Italian Fire Department on the design. The requirement for the preparation of the following documentation necessary to request and obtain the following is included in the scope of the contract:

AA1-00150-2P – BLDG. 2022 19

a. SCIA/CPI. At the completion of the work the contractor shall avail himself/herself of a qualified engineer to collect all the necessary documentation and to prepare the documents required for the submisstion of the SCIA (Segnalazione Certificata di Inizio Attività = certified notification of work start) and/or the request for CPI (Certificato di Prevenzione Incendi = fire prevention certificate) to the Vigili del Fuoco (VVF = Italian fire department). The necessary documentation will have to be prepared in the number of copies as required by the Fire Department + 2 copies to distribute to the different addresses of the requiring activities, in addition to an electronic one, and shall be submitted for the signature of the committing agent (the Installation Commander) through the COR. All expenses for the submittal to the Pisa Fire Department, to include registered stamps and similar charges, will have to be borne by the contractor. The Government will provide a copy of the documentation pertaining to the “Parere di Conformità”. The preparation of all the required forms and the provision of all needed certifications and other documentation will be a Contractor’s responsibility. In case of survey by the VVF, the engineer working for the contractor shall attend.

Note. Any requests of additional works coming from the Pisa Fire Department as a consequence of their reviews and inspections will be submitted to the COR and, if not included in the basic project and causing additional expenses, could constitute basis for contract modification.

2a-08 PROJECT IDENTIFICATION SIGN. The contractor shall supply and install a sign identifying the project. The sign shall be of high-resistant plywood for outdoor installation, white painted. The dimensions shall be 1200x2400x12 mm. The letters of the wording shall be uppercase, black color, 5 cm high, except the letters of the project title which shall be 10

cm. The sign shall be fixed to a structure made of any lasting material in compliance with all safety requirements. The sign shall be well visible, with the lower side at 1.2 m from ground level.

AA1-00150-2P – BLDG. 2022 20

SECTION IIIa - DEMOLITION AND REMOVAL

3a-01 GENERAL. Breakups of predetermined dimensions and partial or total demolition of masonry and concrete surfaces, floor, etc., must be performed in a workmanlike manner, by taking the necessary precautions or by shoring the surfaces in order to avoid damages to the structures to be left in place, accidents, inconveniences or interference. Waste material shall not be thrown down, but rather, it shall be conveyed or guided downward, after wetting it to prevent raising dust. During demolition or removal work, the Contractor shall adopt every measure suitable to avoid deterioration of the items which may be reinstalled, or which, in the opinion of the COR, may be used at a later date. These items shall be cleaned, guarded, hauled and set neatly in the storage areas indicated by the COR. The demolition work shall be limited to the work, or to its parts, and to the dimensions specified. Reconstruction of structures demolished over and above the quantities indicated, as well as rehabilitation of work damaged as a result of lack or omission of precautions or shoring, shall be performed by the Contractor.

All waste material resulting from demolition and removal shall be handled by the contractor in accordance with para. 1a-03 of these specifications.

AA1-00150-2P – BLDG. 2022 21

SECTION IIIb - EXCAVATION AND BACKFILLING

3b-01 EXCAVATION.

a. General. During excavation, material suitable for backfilling shall be piled at a sufficient distance from the banks of the excavation to avoid backslides. All earthy material in excess or unsuitable for backfilling shall be delivered to the location indicated by the COR and within 10 km from work site. This does not apply to debris and rubble of all types, from which excavation material shall be rid of; these shall be disposed of at a dump, as prescribed at paragraph 1a-02. Particular attention is required during the autumn and winter seasons and in case of special storm events when the water is outcropping on the ground and the excavation operations must still take place with appropriate techniques implemented by the Contractor in compliance with the safety regulations and at Contractor’s expense. In case excavation is performed in presence of water and water level is below 20 cm height, the contractor shall remove water at his expense using the means he deems suitable. If water reaches higher levels, removal shall still be at contractor's expense only if the possible presence of groundwater is indicated on the drawings or in these specifications, and only to the extent indicated. In addition, the contractor shall prevent the access of water deriving from outside to the excavation site: in case water accumulates in excavated area, removal will be at contractor's expense. Struts and shoring shall be placed as necessary for the protection of the work and for the safety of personnel.

Adequate precautions shall be taken for the protection of existing underground pipelines or electrical cables. Before any excavation is started, plans showing the approximate location of underground utility lines shall be furnished to the Contractor, upon his request. The area of excavation shall be delimited by trestles, gangplanks, and warning signs visible during night and day, to prevent injuries to persons, as prescribed by the ISPESL standards.

b. Trenches. Trenches shall be of the necessary width for the proper laying of the pipes and electric cables, and the banks shall be as nearly vertical as practicable. The bottom shall be accurately graded so as to provide bearing for the pipe on firm soil. The clear space between the pipe and the trenches wall shall not exceed 8" (20 cm.) on either side of the pipe.

Further excavation will be required for housing and sealing of pipe joints. In proximity of buildings, existing underground utility lines, and wherever specifically requested in other sections of these specifications or on drawing notes, trenches shall be excavated manually.

c. Excavation for Foundation and Appurtenances. Excavation for manholes and similar structures shall be of sufficient dimensions as to leave a 12 inches (30 cm.) free space between their outer surfaces and the embankment or timber which may be used to hold the banks.

3b-02 BACKFILLING. Trenches shall not be backfilled until foundation, pipes or cables have been inspected and approved. Where, in the opinion of the COR, damage is likely to result from withdrawing of shoring, the latter shall be left in place. Trenches shall be backfilled with the excavated materials, if deemed suitable, free from large clods of earth, stones, and roots.

Backfilling material shall be deposited in 15 cm. (6") layers, thoroughly rammed until the trench is completely covered, and watered as necessary. Any material rejected by COR shall be replaced with material acceptable to the COR, coming from borrow pits located outside the US military base.

AA1-00150-2P – BLDG. 2022 22

3b-03 REPAIRS. All crossings of existing paved or asphalt coated surfaces shall be cut neatly vertical and horizontal. At the completion of the work, pavement and sidewalks shall be restored to the original conditions. Damaged lawns shall be sown again and damaged plants shall be replaced with others of the same kinds. Any damage caused during the work progress shall be repaired by and at the expense of the Contractor. The Contractor shall be responsible also for injuries caused to persons as a result of non-compliance with prescribed ISPESL norms.

3b-04 NO-DIG EXCAVATION. Installation of underground piping required to cross the roads shall be realized with no-dig technologies, in particular:

- for the Vannini Road crossing drilling technologies (DDT) shall be used.

a. Description Of Directional Drilling Technology. This drilling technique allows the installation of underground utilities without excavation, with an active trajectory control. The system involves the realization of a pilot hole which will form the seat for the plastic or metal pipe prepared by welding on the surface. The hole in the subsoil is accomplished by the action of a rotating cutter on the end of a tow rod. before starting the excavation, the Contractor must investigate with a metal detector furnished by himself the location of existing underground utility lines, e.g. electrical, communications, water, TV lines, or any other utility which may not be shown on the existing condition drawings, in order to prevent damaging or interrupting any existing utility. Investigation shall be done in the presence of the COR. Trial runs shall be done with the metal detector in the presence of the COR or his representative prior to the investigation.

Investigation shall be done following COR approval of metal detector. The Contractor shall mark-up on a copy of the existing conditions the exact field location of the existing utility lines which are found during excavation. This copy shall then be submitted to the COR. The operative phases for installation of a pipeline using directional drilling are essentially:

(1) Execution Of Pilot Hole. The drilling is done by inserting a series of rods in the soil, the first of which connected to a swivel head which allows it to be guided; the removal of the excess soil is by means of bentonite slurries and various polymers which, passing through the perforation pipe and flowing out of the head, removes the soil making it flow back along the hole up to the starting hole in the form of mud.